1 L'Office de l'environnement dresse et tient à jour l'inventaire des prélèvements d'eau existants et établit le rapport sur les assainissements conformément à la législation fédérale.
Décisions judiciaires appliquant cette disposition (12)
B.2012.108 · sg (Art. 44 GSchG)
Gravel Extraction Prohibition in Water Protection Zone Upheld
This provision, concerning the prohibition of gravel extraction below the groundwater level if the water body is suitable for water abstraction, is the direct legal basis for denying the gravel extraction plan.
B.2012.108 · sg (Art. 44 GSchG)
Gravel Extraction Rejection Upheld in Water Protection Zone
This article concerns the prohibition of gravel extraction below the groundwater level, which justifies the rejection of the extraction plan.
AC.2009.0098 · vd (Art. 44 LEaux)
Municipality v. Gravel Extraction Approval on Incomplete Hydrogeological Study
The annulment of the decision was based on the finding that the requirements of this article, concerning water protection, were not sufficiently established in the contested decision.
AC.2009.0138 · vd (art. 44 LEaux)
Gravel Pit Permit Appeal with Operational Restrictions
The court partially admitted the appeals to reform the challenged decision by adding specific conditions related to water protection, referencing the law on water protection.
AC.2009.0138 · vd (art. 44 al. 1 LEaux)
Gravel Pit Permit Appeal with Operational Restrictions
The court referenced this article when establishing the requirement for an authorization for gravel exploitation.
AC.2009.0138 · vd (art. 44 al. 2 let. a et b LEaux)
Gravel Pit Permit Appeal with Operational Restrictions
The court referenced this article regarding the prohibition of exploitation in groundwater protection zones or below exploited groundwater levels.
AC.2009.0138 · vd (art. 44 al. 3 LEaux)
Gravel Pit Permit Appeal with Operational Restrictions
The court decision relies on this article when discussing the requirement to maintain a protective layer above the maximum groundwater level, which is part of the reformed conditions.
AC.2006.0131 · vd (art. 44 LEaux)
Appeal Concerning Gravel Pit Extraction Plan Insufficient Hydrogeological Investigation Annulment in Part
This article, concerning gravel exploitation and the maintenance of a protective layer above groundwater, was the core legal issue leading to the annulment regarding Area A.
AC.2004.0256 · vd (art. 44 al. 3 LEaux)
Appeal Against Gravel Pit Extraction Approval Due to Flawed Hydrogeological Study and Contravention of Classification Decree
Cited extensively in the reasoning (point 7.a, 7.b, 7.c) as the federal law provision establishing the requirement for a protective layer above the highest groundwater level, violation of which justified the annulment.
AC.2004.0258 · vd (art. 44 LEaux)
Gravel Pit Extraction Plan and Deforestation Authorization Annulled Due to Insufficient Hydrological Studies
Cited in the reasoning as the federal law governing quarry operations and water protection requirements, central to the decision to annul the main decision (Order III).
AC.2001.0135 · vd (art. 44 LEaux)
Gravel Pit Extension Over Groundwater Protection and Noise Concerns
The extraction levels were deemed non-compliant with this article regarding the maintenance of a protective layer above the highest groundwater level.
AC.2000.0215 · vd (art. 44 LEaux)
Gravel Pit Extraction Plan Annulment Upheld Due to Insufficient Groundwater Protection Layer.