VSL sklep I Cp 280/98 ECLI:SI:VSLJ:1998:I.CP.280.98 AI generated

Appeal allowed: Pre-contractual agreement does not exclude agreement on contractual penalty for breach.

Case Number VSL sklep I Cp 280/98
Court / Authority
Jurisdiction Slovenia (SI)
Decision Date
Outcome Partially Allowed

Legislator summary

AI generated

The first-instance court dismissed the plaintiff's claim for a contractual penalty based on a pre-contractual agreement, ruling only for specific procedural costs. The plaintiff argued that a pre-contractual agreement can include penalties for failing to conclude the main contract, while the defendants claimed they were misled about the property's condition and rightfully withdrew. The appellate court held that a pre-contractual agreement does not preclude an agreement on a penalty, but since the defendants' withdrawal was due to the plaintiff's alleged misrepresentation, the case was remitted for a new trial to determine if the withdrawal was justified.

Legislator headnote

AI generated

1. odst. 45. čl. ZOR; 1. odst. 270. čl. ZOR; 1. odst. 273. čl. ZOR; 2. odst. 370. čl. ZPP: A pre-contractual agreement does not exclude an agreement on a contractual penalty for the failure to conclude the main contract; however, if the failure to conclude is justified by the other party's breach or misrepresentation, the penalty claim must be reassessed in a new trial.

Keywords

AI generated
pre-contractual agreement contractual penalty failure to conclude misrepresentation remittal for new trial ZOR provisions ZPP provisions

Cited Legislation

AI generated
AI generated

Need to analyze how this precedent applies to your matter?

Cross-reference this judgment against statutes, commentaries, and subsequent citing case law inside Legislator AI.

Open in Legislator →

Full text

Pritožbi se ugodi, izpodbijana sodba se razveljavi in zadeva vrne sodišču prve stopnje v novo sojenje.

Odločitev o stroških pritožbenega postopka se pridrži za končno odločbo.

[JEDRO]

Predpogodba ne izključuje dogovora o pogodbeni kazni.

[OBRAZLOŽITEV]

Z izpodbijano sodbo je sodišče prve stopnje zavrnilo zahtevek, da morata toženca tožniku solidarno plačati 1.002.210,00 SIT z zakonitimi zamudnimi obrestmi od 20.2.1997 dalje. Tožnika je zavezalo, da mora tožencema povrniti 74.650,00 SIT stroškov postopka.

Zoper to sodbo se zaradi zmotne uporabe materialnega prava pritožuje tožnik in predlaga spremembo, podrejeno pa razveljavitev. Navaja, da ima tudi predpogodba pravne učinke, ter da je mogoče obveznost, ki izhaja iz predpogodbe, tudi iztožiti. V predpogodbi se zato lahko določijo tudi sankcije, če druga stranka ne izpolni svoje obveznosti, t.j., če odstopi od sklenitve glavne pogodbe. Zato je zmotno naziranje prvostopnega sodišča, da bi moral tožnik tožiti toženca na sklenitev glavne pogodbe. Če bi tožnik to storil, potem sploh ne bi zahteval plačila pogodbene kazni. Ker sta toženca v dopisu z dne 18.11.1996 nedvomno izrazila stališče, da glavne pogodbe ne bosta sklenila, ima tožnik pravico bodisi zahtevati izpolnitev obveznosti iz predpogodbe, bodisi plačilo pogodbene kazni.

Toženca v odgovoru na pritožbo navajata, da sta bila ob podpisu predpogodbe v zmoti ter da ju je v zmoto spravil tožnik. Sporno predpogodbo sta podpisala takoj potem, ko sta si hišo na hitro ogledala. Nista vedela, pa tudi tožnik ju na to ni opozoril, da gre za spomeniško zaščiteno hišo. Šele kasneje sta ugotovila, da je tožnik hišo adaptiral in to brez kakršnihkoli dovoljenj. Očitno je šlo le za navidezno adaptacijo, da bi prodajalec dosegel čim večji dobiček. Kasneje je bilo tudi ugotovljeno, da hiša nima vodovodnega priključka ter da sosed ne dovoli prekopati svojega zemljišča. Tožnik končno tudi ni uredil okolice hiše, kar ga zavezuje 4. čl.

predpogodbe. Zaradi vsega tega sta toženca upravičeno odstopila od predpogodbe. Krivda za to je v celoti na tožnikovi strani. Zato predlagata, da pritožbeno sodišče zavrne pritožbo kot neutemeljeno in potrdi sodbo prve stopnje.

Pritožba je utemeljena.

S predpogodbo se prevzame obveznost skleniti glavno pogodbo (1. odst.

45. čl. Zakona o obligacijskih razmerjih - v nadaljevanju ZOR).

Predmet obveznosti iz predpogodbe je torej sklenitev glavne pogodbe.

To pa pomeni, da s predpogodbo ni nezdružljiv dogovor o pogodbeni kazni. S takim dogovorom se namreč stranki dogovorita, da bo tista, ki ne bo izpolnila svoje obveznosti (ki bo torej odrekla sklenitev glavne pogodbe) drugi (predpogodbi zvesti stranki) plačala določen denarni znesek, ali ji preskrbela kakšno drugo gmotno korist (1. odst. 270. čl. ZOR). Zato pritožba utemeljeno opozarja na zmotnost pravnega stališča prvostopnega sodišča, da je edini pravni učinek predpogodbe, da lahko ena ali druga stranka zahteva od nasprotne stranke sklenitev glavne pogodbe, ter da zato, ker nobena od strank ni zahtevala sklenitve glavne pogodbe, tožnik tudi ne more zahtevati plačila pogodbene kazni (za neizpolnitev glavne pogodbe, ki je stranki sploh še nista sklenili). Če je kazen dogovorjena za primer neizpolnitve obveznosti, lahko namreč upnik zahteva bodisi izpolnitev obveznosti (v primeru predpogodbe je to sklenitev glavne pogodbe) bodisi pogodbeno kazen (1. odst. 273. čl. ZOR).

Kljub temu pa pritožbeno sodišče izpodbijane sodbe ni moglo spremeniti. Kajti toženca ugovarjata, da sta upravičeno odrekla sklenitev glavne pogodbe (ker, da naj bi ju tožnik spravil v zmoto o bistvenih lastnostih hiše). Ker pa tega sodišče prve stopnje ni ugotavljalo, je dejansko stanje nepopolno ugotovljeno. Zato je pritožbeno sodišče pritožbi ugodilo, izpodbijano sodbo razveljavilo in zadevo vrnilo sodišču prve stopnje v novo sojenje (2. odst. 370. čl. Zakona o pravdnem postopku - v nadaljevanju ZPP).

V dopolnjenem postopku bo moralo sodišče prve stopnje obravnavati ugovore tožencev ter ugotoviti, ali sta upravičeno odrekla sklenitev glavne pogodbe.

Izrek o stroških pritožbenega postopka temelji na 3. odst. 166. čl.

ZPP.