The High Court granted an order under Section 160 of the Planning and Development Act 2000 requiring respondents to cease unauthorized development and restore the land. The applicant sought relief for unapproved works on adjacent lands, arguing that the existence of the hotel and commercial motives were irrelevant bars. The court held that prior planning breaches and commercial interests do not disentitle an applicant to relief, though it declined to order removal of existing fence foundations on the respondents' own land.

Legislator headnote

AI generated

s. 160 of the Planning and Development Act 2000; s. 13 of the Planning and Development (Strategy Infrastructure) Act 2006: The fact that an applicant is in breach of a planning obligation or acts for commercial reasons does not, without more, serve to disentitle it to relief under s. 160.

Keywords

AI generated
Section 160 relief unauthorized development planning breach immunity commercial considerations restoration order discretionary relief adjacent lands

Cited Legislation

AI generated
s. 160 of the Planning and Development Act 2000
(1) An order pursuant to s. 160 of the Planning and Development Act 2000 (“the 2000 Act”) requiring the respondents,
s. 13 of the Planning and Development (Strategy Infrastructure) Act 2006
This is the explanations offered at paras. 13 and 17 of Mr.
Schedule 2, Part 1 Class 11 of the 2001 Regulations
Schedule 2, Part 1 Class 11 of the 2001 Regulations (since there is no such wall of fence), I am satisfied that the court should not
Development Act 2000
AND DEVELOPMENT ACT 2000 AS INSERTED BY

Cited Case Law

AI generated

Need to analyze how this precedent applies to your matter?

Cross-reference this judgment against statutes, commentaries, and subsequent citing case law inside Legislator AI.

Open in Legislator →

Full text

[2017] IEHC 381

THE HIGH COURT

[2016 No. 256 MCA]

IN THE MATTER OF SECTION 160 OF THE PLANNING

AND DEVELOPMENT ACT 2000 AS INSERTED BY

SECTION 13 OF THE PLANNING AND DEVELOPMENT

(STRATEGY INFRASTRUCTURE) ACT 2006

BETWEEN

STRATEGIC CAPITAL INVESTMENT FUND PLC

APPLICANT

AND

MICHAEL NAUGHTON, SHANE SCOTT

AND

FARNAN SCOTT

RESPONDENTS

JUDGMENT of Ms. Justice Faherty delivered on the 12th day of May, 2017

1. In the within proceedings, the applicant seeks:

(1) An order pursuant to s. 160 of the Planning and Development Act 2000 (“the 2000 Act”) requiring the respondents,

their servants or agents, or all persons acting in concert with them, to cease all unauthorised development of lands at the

Diamond Coast Hotel, Enniscrone, Co. Sligo; and

(2) An order directing the respondents their servants or agents, or all persons acting in concert to them, to restore the

lands to their condition prior to the commencement of the unauthorised development.

2. The applicant is the owner of the Diamond Coast Hotel (“the hotel”) located in Enniscrone, Co. Sligo. It was previously owned by

Mr. Liam Scott, father of the second and third named respondents herein. The applicant purchased the hotel from David Hughes (“the

Receiver”) who was appointed by virtue of Deeds of Appointment dated 7th January, 2009 and 9th April, 2009, by ACC Loan

Management Limited (formerly ACC Bank Plc) to be a Receiver of all assets referred to and comprised and charged by the

mortgage/charge dated 6th April, 2005, between Liam Scott and the Bank, being the hotel, holidays homes and adjoining lands. The

contract for the sale of the Hotel by the Receiver to the applicant was executed on 23rd December, 2015 and the sale was

completed on or about 16th March, 2016.

3. The hotel is adjacent to lands comprised in folio SL9442 (“the adjacent lands”) which were historically owned by a Mr. James

Cawley. The adjacent lands are now owned by the respondents to these proceedings.

4. It is not in dispute in the present proceedings but that portion of the car park of the hotel is situate on the adjacent lands. It

appears that this was not a matter of any great controversy between 2005 and 2012; the evidence suggesting that Mr. Liam Scott

had entered into an agreement with Mr. James Cawley in 2005 that portion of the car park would be built on the adjacent lands.

However, on 24th January, 2013, solicitors for Mr. Fergal Cawley, son of Mr. James Cawley and the successor in title to the adjacent

lands, wrote to the Receiver to the effect that the hotel’s encroachment on the adjacent lands would have to be resolved and that

“there should be a full and proper consideration paid by the hotel” to Mr. Cawley on foot of a transfer by him of the adjacent lands to

the appropriate entity.

5. Accordingly, upon learning that the car park was partly situate on lands not comprised within the hotel lands, and prior to any sale

of the lands, the Receiver sought to purchase the adjacent lands and apparently reached an informal agreement with Mr. Fergal

Cawley to purchase the adjacent lands for the sum of €50,000. The applicant claims that Mr. Cawley subsequently refused to

complete the transaction and that he sought a sum of €250,000 for the lands, which was not agreed to by the Receiver.

6. According to the replying affidavit sworn on 6th October, 2016, by the first named respondent, Mr. Michael Naughton, the

respondents’ ownership of the adjacent lands came about in the following circumstances: Mr. Naughton, who is the General Manager

of the McGettigan Hotel Group based in Letterkenny, was originally employed by Mr. Liam Scott, the developer of the hotel, when it

was first built in or around the year 2005. On that basis he was familiar with the layout of the hotel, albeit he had no active role in

the hotel since the time of its construction. According to Mr. Naughton, he first became aware that the hotel was being offered for

sale by the Receiver in or about October, 2015. He was interested in acquiring it. He was also aware of the issues surrounding the

title to the hotel grounds, namely that part of the car park was situate on the adjacent lands. Accordingly, he duly approached Mr.

Fergal Cawley to ascertain whether he would be interested in purchasing the hotel jointly with Mr. Naughton, on the basis that Mr.

Cawley’s ownership of the adjacent lands would reduce the price that the Receiver would accept. Mr. Cawley was not interested in

purchasing the hotel. He advised Mr. Naughton of the offer that the Receiver had made to him to purchase the adjacent lands.

Ultimately, Mr. Naughton reached agreement with Mr. Cawley to acquire the adjacent lands for €120,000.

7. It is common case that the adjacent lands were purchased in trust by Mr. Naughton’s then solicitor Mr. Thomas Kelly. The identity

of the beneficial owners of the adjacent lands was not disclosed to the applicant, either for the purpose of the within proceedings (or

indeed earlier injunction proceedings) or otherwise, until in or about October, 2016. I do not believe that anything in particular turns

on this.

8. As deposed to by Mr. Naughton on affidavit, he purchased the adjacent lands as a “strategic move” with the aim of securing the

purchase of the hotel from the Receiver. While Mr. Naughton believed the purchase of the adjacent lands left him in the “driving seat”

as far as the purchase of the hotel was concerned, ultimately his efforts to acquire the hotel from the Receiver were unsuccessful.

9. Mr. Naughton further confirms that he considered the adjacent lands to be a “ransom” insofar as they impacted on approximately

forty six car parking spaces used by the hotel, and Mr. Naughton “did not believe that the hotel could be sold and good title obtained

without” ownership of the adjacent lands vesting in the hotel. Mr. Naughton’s belief in this regard was not borne out, as the sale to

the applicant evidences.

10. The genesis of the present proceedings is set out in the affidavit sworn on 16th July, 2016, by Mr. Brian Pierson, General Manager

of the hotel. He avers that on Wednesday 27th January, 2016, workmen entered the hotel lands, without permission, in order to

commence works on the adjacent lands. It is averred that a JCB digger and a van carrying machinery proceeded to paint a “boundary

line” across the hotel car park and flower beds while another van crossed into the hotel lands with a delivery of wooden frames and

steel fencing. Mr. Pearson avers that the fencing works that were carried out in January – February, 2016 had a significant negative

effect on the business of the hotel. It is his belief that the work which was carried out, on behalf of the respondents, was with a

view to maximising visual damage and interruption to the orderly access and convenience of the hotel. He avers that two types of

fences were erected: the first was a galvanised steel fabrication and the second a timber post structure with timber posts anchored

in concrete. Mr. Pierson avers that the fencing gave the impression that the hotel was closed for business. According to Mr. Pierson,

this led the speculation at the time among customers and staff that the hotel would be closing in the near future.

11. On 28th January, 2016, (prior to the completion of the purchase of the hotel by the applicant), the Receiver instituted

proceedings by way of plenary summons seeking an injunction compelling Mr. Kelly (the then named purchaser of the adjacent lands)

to vacate the hotel lands and to immediately remove the fencing erected on the hotel lands and/or the adjacent lands. In light of the

urgency of the matter and the potential threat posed by the works for the trade of the hotel, the Receiver sought an interlocutory

injunction before Gilligan J. on 19th February, 2016. Following the partial hearing of the interlocutory application in the Receiver’s

proceedings, the proceedings were adjourned with a view to allowing the parties to conclude an arrangement without the necessity

for further steps in the legal proceedings. Mr. Kelly gave certain undertakings to the court that there would be a cessation of

interference with the lands and that the fence would be removed and the harm remedied. Following the purchase of the hotel by the

applicant, the Receiver agreed to have the proceedings struck out with no order on the basis that his interest in the matter had

concluded.

12. In compliance with the undertakings given on behalf of Mr. Kelly to the court, the fence was removed. However, the fence

foundations remain in situ and the remnants of the fence posts protrude above ground level. It is not in dispute but that

approximately forty six car parking spaces and four to six coach parking spaces which had previously being available to the applicant

are unusable as a result of the purchase by the respondents of the adjacent lands.

13. According to Mr. Pierson, subsequent to the aforesaid events, the respondents’ agents constructed an access route between the

hotel and the regional road R297. He also avers that a large area of grassland was covered by hardcore material in order to facilitate

the construction of the vehicular access route and other works carried out on the hotel lands and the adjacent lands. He further

avers that on or around 14th April, 2014, part of articulated lorry, branded with a “Dale Farm” logo was stationed on the adjacent

lands. Mr. Pierson avers that this was facilitated by trespass on the hotel lands. He also avers that the truck was later placed on the

hotel lands.

14. On 16th May, 2016, the applicant’s solicitors wrote to Mr. Kelly advising that the creation of the vehicular access from the

adjacent lands to R297, the placing of hardcore material on a previously grassed area to facilitate such access and other works and

the continuing existence of the foundations of the wooden fencing (which by then had been removed), together with the extant

remnants of the wooden posts, all constituted development for the purpose of the 2000 Act and that same did not constitute

exempted development. Accordingly, the development in question required planning permission which had neither been applied for nor

been granted. In this regard, the applicant had retained Mr. Declan Brassil, Chartered Planning Consultant, whose professional opinion

was that the works undertaken by the respondents constituted development for the purposes of the 2000 Act and which was not

exempted development. In their letter, the applicant’s solicitors sought undertakings from Mr. Kelly that the truck would be forthwith

removed from the hotel lands, that there would be no further acts of trespass and nuisance and that he would cease the disputed

works and confirm that the adjacent lands would be restored to their pre-development condition within four weeks. That undertaking

was not forthcoming, although on or about 22nd to 23rd May, 2016, the truck was removed from the hotel lands. A further letter

issued on 4th July, 2016.

15. The within proceedings were issued on 19th July 2016. The applicant contends that the works undertaken by the respondents on

the adjacent lands constitute development for which no planning permission has been secured and that none of the works is

exempted development for the purpose of the 2000 Act. It is further contended by the applicant that the entire of the development

carried out by the respondents is an orchestrated attempt by them to force the applicant to buy out their interest in the adjacent

lands.

16. In his affidavit sworn 15th July, 2016, Mr. Brassil avers that the works carried out by the respondents do not have the requisite

planning permission or retention permissions. He further avers that the works are not exempted development with the meaning of the

planning legislation.

The relevant statutory provisions

17. Section 3(1) of the 2000 Act provides:

“In this Act, ‘development’ means, except where the context otherwise requires, the carrying out of any works on , in,

or under land or the making of any material change in the use of any structures or other land”

18. Statutory provision is made for exempted development under s. 4 of the 2000 Act and article 6 and Schedule 2 of the Planning

and Development Regulations 2001 (“the 2001 Regulations”).

19. Section 4 (1) (h) of the 2000 Act, the operative section for the purposes of the within proceedings, provides that the following

shall be exempted development:

“development consisting of the carrying out of works for the maintenance, improvement or other alteration of any

structure, being works which affect only the interior of the structure of which do not materially effect the external

appearance of the structure so as to render the appearance in consistent with the character of the structure or of

neighbouring structures”.

20. Article 6(1) of the 2001 Regulations provides:

“Subject to article 9, development of a class specified in column 1 of Part 1 of Schedule 2 shall be exempted

development for the purposes of the Act, provided that such development complies with the conditions and limitations

specified in column 2 of the said Part 1 opposite the mention of that class in the said column 1.”

21. With regard to article 6 exemptions, article 9(1) of 2001 Regulations provides that:

“Development to which article 6 relates shall not be exempted development for the purposes of the Act –

(a) if the carrying out of such development would –

…

(ii) consist of or comprise the formation, laying out or material widening of a means of access to a

public road the surfaced carriage way of which exceeds 4 metres in width.

…”.

22. It is not in contention between the parties that the disputed works constitute development for the purposes of the 2000 Act. The

disputed works will thus be considered by the court for the purpose of establishing whether there is any valid planning permission for

the works or whether they constitute exempted development for the purposes of the 2000 Act or the 2001 Regulations, as contended

for by the respondents.

23. In his replying affidavit, Mr. Naughton addresses the issue of the access road as follows:

“I … say that during my discussions with Mr. Cawley he made a reference to an agreement regarding the construction of a

roadway, this agreement had been reached with Mr. Liam Scott, the previous owner of the hotel. This related to the

construction of a new access road connected with Enniscrone Golf Club

…

Whilst my initial plan was to simply box off [the adjacent lands], I was aware of my obligations which I had reached

agreement with Mr. Cawley to construct a roadway for the Golf Club and this is the development which is averred at para.

25 of the Affidavit of Mr. Pierson. I say I am surprised given his involvement in the hotel since 2009 that Mr. Pierson would

not have been acutely aware of this proposed development. This is especially so in light of its proximity to the hotel and

its boundaries. As my business partner is a builder by trade he agreed to carry out the works and it was agreed that they

would erect a fence clearly separating our lands from those owned by the hotel …

I say that inadvertently my business partner erected a fence which was deemed too high, this was the subject of

litigation and was instantly removed.

…

I say that the Cawley family have always had a right of way and a road access to the R297 and this is what is being

referred to at para. 25 [of Mr. Pierson’s affidavit]. I say that this is purely in keeping with the Planning Permission granted

[in] 2007. I say that any works carried out by us are in keeping with Planning Permission P1700/07.”

24. With regard to Mr. Naughton’s averment that the construction of the roadway was for the purpose of implementing the planning

permission granted for the hotel, it is common case, as averred to in Mr. Brassil’s second affidavit sworn 20th October, 2016, that the

planning permission which had been granted on 31st January, 2008, lapsed on 14th February, 2013. It is also the case that there was

no application made to extend the duration of that permission. Accordingly, I am satisfied that at the time of the carrying out of the

disputed works there was no extant planning permission for any vehicular access to or from R297, albeit that the previous planning

permission allowed for the “construction of a new vehicular entrance and access road onto R297 road and carrying out all associated

site works.”

25. It is also averred by Mr. Brassil that even if the planning permission had not lapsed, the works undertaken by the respondents

were not consistent with the permission which had been granted.

26. As set out in his affidavit, Mr. Naughton’s position with regard to the fence foundation and the hard standing is that such

development is exempted development under s. 4 (1)(h) of the 2000 Act. Alternatively, Mr. Naughton maintains that same is de

minimis or trivial, a position he also adopts with regard to the new access road. He also maintains that works do not constitute an

impediment to the operation of the hotel. He avers that the dispute between the parties is of a commercial nature and that the

applicant is using the planning code to further its commercial interests rather than in the interests of proper planning or sustainable

development. He also avers that Mr. Brassil had inspected the site as far back as 12th May, 2016 and that Sligo County Council, the

Statutory Planning Authority, had closed an Enforcement File (which they had opened) on the matter by 16th June, 2016. Mr.

Naughton thus avers that in light of these circumstances, he is at a loss as to how the applicant alleges that there was any planning

breach, especially since the Enforcement File had been closed.

27. In his second affidavit, Mr. Brassil avers that the Enforcement File only pertained to the fence which had been erected by the

respondents, which was deemed both by Mr. Brassil and Sligo County Council as an unauthorised development. On balance, I accept

this to be the case.

28. Mr. Brassil also restates his view that the entrance to R297 and the associated hard standing constitute an unauthorised

development. He maintains that these works were never the subject of the Enforcement File and that it is incorrect to infer from the

fact that the Enforcement File was closed, that these developments are other than unauthorised. He further avers:

“I do not consider that the provision of foundations and hardstanding can be separated from the development they are

intended to facilitate for the purposes of claiming an exemption. Irrespective of this, I do not consider that the

foundations, hardstanding, fence or entrance, whether considered separately or cumulatively, can be considered to

constitute ‘works for the maintenance, improvement or other alteration of any structure, being works which affect only

the interior of the structure of which do not material effect the external appearance of the structure’.”

29. With specific reference to the access road, Mr. Brassil states:

“The works undertaken include the formation of an access to the R297, a Regional Road significantly in excess of 4 meters

in width. Accordingly, those works cannot avail of any exceptions under article 6 of the 2001 Regulations. In my opinion,

the purpose of the article 9 (a) (ii) provision is to preclude the creation of an access to a road exceeding 4 meters on the

basis that any such entrance would have the significant potential to create a traffic hazard. For this reason, any such

proposed entrance is required to be designed in accordance with national standards and assessed through the planning

application process. Therefore, to suggest it is trivial or de minimis and on that basis does not require permission, is, in

my opinion, incorrect.”

30. In his affidavit sworn 14th November, 2016, Mr. Patrick Gallagher, Consultant Engineer retained by the respondents, avers as

follows:

“I say that I have recently inspected the works and I fully concur with the position as averred to by Mr. Naughton in that

works in question are either exempted and/or in trivial in nature. I further state that even based upon the most cursory

examination of the site and the file plan attaching to it, it is clear that Mr. Naughton has merely carried out works on his

own lands. Whilst I do not believe that Mr. Brassil is trying to suggest that the works had been carried out on the Hotel

lands, for the purposes of certainty I can confirm that they have not and that all works and associated materials are

enclosed entirely within the curtilage of [Mr. Naughton’s] lands only. I further say that it is clear the excavated material

currently contained on the site, is material required to back fill the holes left as a result of the erection of the initial

hoarding and that the exposed foundations are required for the purpose of supporting the new 1.2 m wall that Mr.

Naughton intends to build. I am instructed by Mr. Naughton that he and his advisors have consulted with Sligo County

Council in connection with same and I am instructed that he has also put the Applicant on notice of his intentions to

construct the wall. I would respectively suggest that notwithstanding what has been averred to by Mr. Brassil, the Local

Authority do not consider these works as being an Unauthorised Development and if they did, then surely a further

Enforcement Notice would have issued in relation to these works.”

He goes on to state:

I would also refer to paras. 15 &16 of [Mr. Brassil’s] Second Affidavit where he states the reasons why Mr. Naughton was

not entitled to rely on the exemption status provided to certain works under S. 4 (1) (h) of the 2000 Act. I disagree with

Mr. Brassil’s averments on the basis, that as the owner of the land Mr. Naugthton is perfectly entitled to restore his land

to its original use prior to development which was that of a green area. It should be remembered that the lands are

owned by Mr. Naughton and his predecessors in title and they have never been owned by the Hotel. There can be no

dispute but s. 4 (1) (h) therefore applies in the current case…

…

Notwithstanding to what is averred to by Mr. Brassil at [paras.] 17& 18 of his Second Affidavit, it is clear from an

inspection on the ground that the entrance in question was only a temporary one, which was put in place in order to get

material onto the site. This temporary entrance became necessary whereby the Hotel Management refused access [to]

my clients access to their site via their entrance. As the temporary entrance does not exist at this time, it is absolutely

reasonable to state that the de minimis rule easily covered its existence for the limited period it was required as a

material access route.”

31. Insofar as Mr. Gallagher suggests that the access constructed by the respondents was a temporary entrance, this stands in

contrast to the averment by Mr. Naughton at para. 17 of his first affidavit where he states that “any works carried out by us are in

keeping with Planning Permission P1700/07”. I am satisfied that that averment by Mr. Naughton is intended to convey that the

construction of the access was in pursuance of a planning permission which had been granted by Sligo County Council (albeit that

same had lapsed) and that the access was therefore a permitted development. Accordingly, the explanation put forward by Mr.

Gallagher is not accepted by the court.

32. Furthermore, insofar as there are references in Mr. Gallagher’s affidavit to the respondents being in the process of consulting with

Sligo County Council in relation to the 2007 planning permission, these are vague references and without detail, and put forward on

behalf of the respondents in circumstances where the process of seeking to extend the 2007 planning permission was required to be

engaged on prior to the expiry of that permission. I also agree with the view expressed by Mr. Brassil (as set out in his third affidavit

sworn 9th December, 2016) that Mr. Gallagher’s contention that the works fall within the exemptions contained in the 2001 Planning

Regulations is of such a vague and general nature such as not to be of any great benefit to the court for the purpose of determining

whether the development in question is exempted development or alternatively of such a trivial nature as not to warrant intervention

by the court.

33. From a consideration of the evidence on affidavit, I am satisfied that the primary purpose of the works which were undertaken by

and on behalf of the respondents was for the formation of an access route to the R297, a regional road that is in excess of four

metres in width. In the course of his submissions, counsel for the respondents contended that the opening which was developed by

the respondents opened onto the hard standing and not the public road. Accordingly, it was submitted that it was not caught by the

provisions of article 9 of the 2001 Regulations. However, I am persuaded, on the evidence overall, that Mr. Brassil’s opinion, namely

that the hard standing cannot be separated from the access route, should be preferred by the Court. Prima facie, therefore, the

works carried out in respect of the access route cannot be exempted development pursuant to article 9(a) (ii) of the 2001

Regulations. It cannot be credibly contended by the respondents that the purpose of the works is other than to create an access to

R297. This is the explanations offered at paras. 13 and 17 of Mr. Naughton’s first affidavit, where it is explained that the works are

related to an agreement entered into by him with Mr. Cawley to construct a roadway to access the adjacent Golf Club. At para. 17,

he specifically links the works in question to the issue of a road access to R297 (howsoever the access to the Golf Club was to come

to fruition). This is also consistent with the claim that the works were carried out in keeping with the 2007 planning permission, which

permitted the creation of a new vehicular entrance and access to the R297. Accordingly, I am satisfied that the respondent cannot

rely on article 6 of the 2001 Regulations. I am also satisfied that there is no basis for the respondent’s reliance on s. 4 (1)(h) of the

2000 Act as the basis of an exemption in respect the access works. This section provides for development consisting of the carrying

out of works for the maintenance, improvement or other alteration of any structure. No attempt has been made by the respondents

to explain how the works relating to the fence foundations or the hard standing or the access road constitute works “for the

maintenance, improvement or other alteration of any structure”. Accordingly, there is no evidence to sustain a conclusion that s. 4

(1) (h) of the 2000 Act has any application to the within proceedings. In particular, there is no evidence before the court to identify

the structure which is sought to be maintained, improved or altered or how the fence foundations, hard standing or access road did

actually maintain, improve or alter a particular structure. Furthermore, the claim that the works were carried out for the purpose of

effecting the maintenance, improvement or other alteration to a structure is entirely inconsistent with the admission by Mr. Naughton

that the works were carried out for the purposes of giving effect to an agreement between himself and Mr. Cawley to construct a

roadway for access to the Golf Club.

34. Notwithstanding the foregoing findings, it is nevertheless necessary to consider whether any aspect of the disputed works can be

isolated from the disputed works over all for the purposes of establishing whether any aspect of the works constitute an exempted

development.

35. In his affidavit, Mr. Gallagher avers that the excavated material currently contained on the adjacent lands is for the purpose of

back filling holes that were left as a result of the erection of initial hoarding and that the current exposed foundations are for the

purpose of building a wall and that such a wall is exempted development as provided for in Schedule 2, Part 1 Class 11 of the 2001

Regulations.

36. The applicant contends that the claim of entitlement to rely on the aforesaid exemption was never articulated prior to the

swearing of Mr. Gallagher’s affidavit on 14th November, 2016. It is contended that the respondents are attempting to retrospectively

validate the works in question by reference to exemptions not contemplated by them at the time the works being carried out.

37. Class 11provides an exemption for the following works:

“The construction, erection, lowering, repair or replacement, other than within a bounding the curtilage of a house, of –

(a) any fence (not being a hoarding or sheet metal fence), or

(b) any wall of brick, stone, blocks with decorative finish, other concrete blocks or mass concrete”.

38. This exemption is subject, inter alia, to the limitation that the height of any new structure shall not exceed 1.2 metres or the

height of the structure being replaced, whichever is the greater, and shall in any event not exceed 2 metres. I will return to the issue

of the wall in due course.

39. It is also the applicant’s contention that as the overall works are related to the creation of access to R297, as admitted to by Mr.

Naughton in his affidavit, it would be wholly inappropriate to create an artificial distinction between the creation of the access route

and the construction of the wall so as to enable an exemption to apply to part of the disputed works. The applicant contends that as

all of the works are related to the creation of an access route, article 9 (1) (ii) of the 2001 Regulations is therefore the over arching

statutory provision which precludes the development from being an exempted development.

40. From a consideration of the evidence overall, and by reason of the findings made above, the court is not persuaded by the

respondent’s arguments that the development of the access road or the hard standing is exempted development for the purposes of

the 2000 Act or the 2001 Regulations. Accordingly, the court finds that the respondents have breached the provisions of the 2000

Act. The court rejects Mr. Gallagher’s suggestion that the entrance constructed to R297 was somehow a temporary structure so as

to allow the respondents to construct a fence or wall on the adjacent lands. As already stated, Mr. Naughton’s first affidavit belies

this suggestion. Furthermore, in his second affidavit sworn 21st November, 2016, he does not resile from his previous averment that

he had agreed with Mr. Cawley to construct an access road to the Golf Club. The reality of the situation is that the respondents have

created an access onto a public roadway which is not exempted development.

41. Having found the respondents to be in breach of the 2001 Act as far as the access road and hard standing is concerned, the

question now to be determined is whether the court should exercise its discretion in favour of granting the applicant relief under s.

160 of the 2000 Act.

42. The nature of the discretion vested in the court was described in Morris v. Garvey [1983] I.R. 319 by Henchy J. as follows:

“Section 27, sub-s. 2, is one of the most important and least understood or used provisions of the planning code. The

section expressly recognized for the first time that a member of the public (as well as the planning authority),

regardless of his not satisfying any of the qualifications based on property or propinquity or the like (which are usually

required to justify bringing proceedings), once he discovers that a permitted developer is not complying with, or has not

complied with, the conditions of the relevant development permission, may apply in the High Court for an order

compelling the developer “to do or not to do, or to cease to do, as the case may be, anything which the Court considers

necessary to ensure that the development is carried out in conformity with the permission and specifies in the order.”

The jurisdiction thus vested in the High Court is extremely wide. It recognizes the fact, which has been stressed in other

decisions of this Court, that in all planning matters there are three parties: the developer, the planning authority (or, in

the case of an appeal, the Planning Board) and the members of the public. Compliance with the statutory conditions for

development is expressly recognized in sub-s. 2 of s. 27 to be the legitimate concern of any member of the public. We

are all, as users or enjoyers of the environment in which we live, given a standing to go to court and to seek an order

compelling those who have been given a development permission to carry out the development in accordance with the

terms of that permission. And the High Court is given a discretion sufficiently wide to make whatever order is necessary

to achieve that object.”

43. On the evidence before the court, and particularly in the context of the purpose of the works as set out in Mr. Naughton’s first

affidavit, the court does not find that the unauthorised development is trivial or de minimis in nature. While the court recognises that

there is a jurisdiction to exercise discretion against the grant of injunctive relief where there have been slight or immaterial breaches

of a planning permission, this normally operates in the context of a planning permission which is the process of being implemented.

The jurisprudence does not suggest that such discretion should be exercised in respect of developments for which where there is no

planning permission, at least not in respect of the nature of the access/hard standing works in the present case. In this regard, the

court refers to the decision of Peart J. in Mountbrook Homes Limited v. Oldcourt Development Limited [2005] IEHC 171 and the

decision of Dunne J. in Conroy v. John Craddock Limited & Kildare County Council [2007] IEHC 336. It seems to me that in

circumstances where the works have not being carried out in reliance on the planning permission, the respondents cannot expect the

court to treat them as “trivial” or “de minimis”. In any event, I do not find that the works fall into these categories.

44. I am satisfied to grant relief to the applicant under s. 160. I am satisfied that the present case is not one where the exercise of

the discretion in favour of granting relief would cause significant hardship for the respondents. I also bear in mind that it is “the duty

of the court to uphold the principle of proper planning for developments under clear statutory rules”, as per Charleton J. in Wicklow

County Council v. Forest Fencing [2007] IEHC 242.

45. In the circumstances of this case, I am also satisfied that the fact, as relied on by the respondents, that the hotel itself was not

constructed in compliance with its own planning permission is not a bar to relief. In this regard, I note the dictum of Birmingham J. in

Dublin Airport Authority PLC v. J.D. Motorline Limited [2013] IEHC 510 that “the fact that an applicant is in breach of a planning

obligation does not, without more serve to disentitle it to relief”. Counsel for the applicant submits that since the hotel is now in

existence for in excess of twelve years, any breach on its part is immune from the strictures of the planning legislation.

46. The argument is also made on behalf of the respondents that the applicant’s motive in bringing the within application is entirely to

further their commercial interests in that the applicant is intent on exerting pressure on the respondents to come to an arrangement

whereby the applicant can regularise the car park issue. That may well be the case. However, Dublin Airport Authority PLC v. J.D.

Motorline Limited is also authority for the proposition that commercial considerations on the part of an applicant are not a bar to s.

160 relief. I also note that in this case, as far as the respondents’ are concerned, their actions in acquiring the adjacent lands in the

first place were similarly motivated by commercial considerations, as conceded by Mr. Naughton on affidavit. When it comes to the

question of commercial considerations therefore, neither side should expect this to be the deciding factor. Counsel for the respondent

also relies on the decision of Hedigan J. in Smyth v. Dan Morrissey Limited [2012] IEHC 14 in aid of his submission that the Court

should exercise its discretion and refuse relief to the applicant. However, I am satisfied that as far as that case is concerned, there

were more pressing factors to warrant not granting relief than arise in the present case.

47. I am however in agreement with the argument put forward by the respondents with reference to the fence foundations. While I

refrain from making a finding that any fence or wall which the respondent may build will be exempted development pursuant to

Schedule 2, Part 1 Class 11 of the 2001 Regulations (since there is no such wall of fence), I am satisfied that the court should not

exercise its discretion and require the respondents to remove the erstwhile fence foundations or reinstate the particular portion of the

adjacent lands upon which the fence foundations lie. This is so because no case is made but that the fence foundations are on the

adjacent lands, and in circumstances where the respondents, as the owners of the adjacent lands, are at liberty to construct a fence

or wall on their lands, provided always that same complies with the provisions of the 2000 Act and/or the 2001 Regulations.

48. Accordingly, the order that the court proposes to make is to direct the respondents to cease all works pertaining to the

construction of a vehicular access to R297 and that the respondents restore the hard standing area to its pre-development condition.

I will hear submissions on the exact substance of the orders which the court proposes to make.