High Court dismisses certiorari claim where applicant failed to submit required review application within statutory notice period.

Case Number IEHC 537
Court / Authority
Jurisdiction Ireland (IE)
Decision Date
Outcome Dismissed

Legislator summary

AI generated

The High Court dismissed the applicant's judicial review seeking to quash the County Council's revocation of his waste facility permit. The applicant argued the council's notice was unclear and that he had a legitimate expectation of a review process, but the court found the statutory requirements were explicit. The court determined the applicant failed to submit the mandatory application for review within the specified timeframe, thereby depriving himself of any opportunity for a formal review.

Legislator headnote

AI generated

Article 18(5) of the Waste Management (Facility, Permits and Registration) Regulations 2007; Article 30(3)(d) of the same Regulations: A failure to submit a compulsory application for review within the prescribed period results in the automatic revocation of the permit without the need for further procedural steps.

Keywords

AI generated
judicial review waste facility permit statutory notice period mandatory application automatic revocation legitimate expectation fair procedures

Cited Legislation

AI generated
Article 18(5) of the Waste Management (Facility, Permits and Registration) Regulations 2007
facility permit as contained within a notice issued under Article 18(5) of the Waste Management (Facility, Permits and Registration)
Article 30(3)(d) of the Waste Management (Facility, Permits and Registration) Regulations 2007
persuaded that the absence of any provision in s. 30 of the Act of 1963, as amended, whereby a person might be
Article 16(3) of the Waste Management (Facility, Permits and Registration) Regulations 2007
“a local authority shall, as soon as may be after making a decision under article 16(3) of these Regulations in relation to
Article 29 of the Waste Management (Facility, Permits and Registration) Regulations 2007
Article 29 of the Regulations relates to the surrender of a waste facility permit:-
National Asset Management Agency Act 2009
of the National Asset Management Agency Act 2009 which would have excluded the right to fair procedures in cases where loans
Development Act 2000
enforcement notice served under the Planning and Development Act 2000 –

Cited Case Law

AI generated
AI generated

Need to analyze how this precedent applies to your matter?

Cross-reference this judgment against statutes, commentaries, and subsequent citing case law inside Legislator AI.

Open in Legislator →

Full text

Neutral Citation: [2014] IEHC 537

THE HIGH COURT

JUDICIAL REVIEW

[No. 2014 No. 240JR]

BETWEEN:

STAN O’REILLY

APPLICANT

AND

THE COUNTY COUNCIL OF THE COUNTY OF WICKLOW

RESPONDENT

JUDGMENT of Kearns P. delivered on 14th day of November, 2014

The applicant is the owner and operator of a business known as C&D Recycling which was established in 2004 and which was

operating at Merrymeeting, Rathnew, County Wicklow from May 2006 until the 7th March, 2014. The applicant seeks an order of

certiorari quashing the decision of Wicklow County Council (‘the respondent’) made on the 7th March, 2014 to revoke his waste

facility permit as contained within a notice issued under Article 18(5) of the Waste Management (Facility, Permits and Registration)

Regulations 2007 and the Waste Management (Facility, Permit and Registration) Amendment Regulations 2008 (‘the Regulations’).

THE REGULATIONS

The Regulations are made pursuant to the Waste Management Acts 1996 to 2007. Article 18 of the Regulations relates to the notice

of a decision of grant or refusal in relation to a waste facility permit. Article 18(5) states that:-

“a local authority shall, as soon as may be after making a decision under article 16(3) of these Regulations in relation to

an application, give notice in writing of the decision to the applicant, to any person who made a submission in relation to

the application in accordance with article 15, and to the Agency in accordance with the requirements of article 24(1),

and, where appropriate, to the Minister for Agriculture and Food in accordance with article 24(2).”

Article 29 of the Regulations relates to the surrender of a waste facility permit:-

29. (1) A waste facility permit may, subject to the agreement of the local authority, be surrendered at any time by

notice in writing to the local authority of an application for the surrender for a waste facility permit.

(2) A waste facility permit shall, subject to the agreement of the local authority, be surrendered by notice in writing by

the permit holder to the local authority when the—

(a) waste related activity ceases,

(b) waste facility permit expires,

(c) waste facility permit is reviewed under article 36, or

(d) waste facility permit is refused under articles 18 or 36.

(3) A local authority shall not agree to the surrender of a waste facility permit unless it is satisfied that the condition of

the facility is not causing or likely to cause environmental pollution and may carry out or cause to carry out such

investigations as, are necessary, in the reasonable opinion of the local authority, to verify the condition of the facility.

(4) A local authority may, in agreeing to the surrender of a waste facility permit, attach conditions by way of a notice in

writing to the permit holder, which shall be complied with by the person surrendering the permit.

(5) On surrender of the waste facility permit notwithstanding the provisions of this article, the local authority may

decide that any bond or financial security required under article 19(2)—

(a) shall be maintained in place for such period as the authority may require, or

(b) may be released to the permit holder.

(6) The making of an application for the surrender of a waste facility permit under this article, the revocation of the

waste facility permit or the cessation of the activity to which a waste facility permit relates, shall in no way affect or

diminish such conditions, requirements or obligations applying to or falling on the permit holder as are specified in or

arise under the waste facility permit.

Article 30 of the Regulations is of particular relevance in these proceedings and relates to a notice from the local authority requiring a

review of a waste facility permit:

30. (1) Where–

(a) the local authority has reason to believe that a material change in the nature, focus or extent of the waste-related

activity or in the nature or extent of any emission concerned has taken place to an extent which renders the conditions

attached to the existing waste facility permit inappropriate, or

(b) an amendment to the waste management plan for the region concerned requires a review of the waste facility

permit, the local authority shall initiate a review of a waste facility permit granted by it at any time after the date on

which the said permit was granted.

(2) Where a local authority proposes to review a waste facility permit under sub-article (1), it shall give notice in writing

of such intention to the permit holder and to the Agency and the waste facility permit shall remain in force until such

time as a reviewed waste facility permit is granted or refused pursuant to article 35 or the existing permit is revoked

under article 36.

(3) A notice given under sub-article (2)—

(a) shall inform the permit holder of the intent of the local authority to review the existing waste facility permit,

(b) shall advise the permit holder that the local authority is available for pre-application consultations and that such

course of action is recommended in order to assess the application for the review of a waste facility permit in terms of

the procedures which are likely to apply to the review process under article 32.

(c) shall require the permit holder to make an application to the local authority for a review of the waste facility permit,

(d) may specify such submissions, plans, documents, other information and particulars to be furnished with the

application by the permit holder as the local authority considers necessary for the purposes of the proposed review,

(e) shall require the permit holder to pay the appropriate fee for the review of the waste facility permit in accordance

with the fifth schedule as set out in article 42,

(f) may, in accordance with article 44(2), require the holder of a permit to defray or contribute towards any costs

reasonably incurred by the local authority in respect of the proposed review and such costs shall not exceed the actual

costs incurred,

(g) shall indicate that—

(i) a submission relating to the proposed review, including requirements specified by the local authority under sub-article

3(d), may be made by the waste facility permit holder in writing to the local authority within 25 working days of the

date of the giving of the notice, and that the local authority shall not decide to amend conditions attached to, a waste

facility permit which it has granted, before the expiry of the said period, and

(ii) where the permit holder does not make a submission in accordance with paragraph (i), the local authority shall

revoke the existing waste facility permit it has granted and give notice in writing of the decision with the reasons for the

decision to the waste permit holder and notify the applicant under article 18 of that decision.

(4) Where a waste facility permit has been revoked by a local authority, in accordance with this article, the former

permit holder shall make an application to the local authority for the surrender of the waste facility permit in

accordance with article 29.

(5) The former holder of a waste facility permit which has been revoked may, within a period of 30 working days, appeal

to a court of competent jurisdiction against the revocation of the waste facility permit and, on hearing the appeal, the

court may confirm or annul the revocation.

Article 35 relates to the determination and notice of grant or refusal of a reviewed waste facility permit while Article 36 sets out the

provisions in relation to the revocation of a waste facility permit.

NOTICES ISSUED TO THE APPLICANT

The Article 30 Notice

On the 2nd January, 2014 the applicant received a formal notice pursuant to Article 30 of the Regulations, as outlined above, inviting

him to apply for a review of his waste facility permit. The cover letter accompanying the notice from Mr. Andrew Lawless, Senior

Executive Engineer with the respondent, advised that the notice was issued as “there has been a material change in the nature

focus and extent of the waste-related activities at the Stan O’Reilly T/A C&D Recycling facility at Merrymeeting, Rathnew (facility

permit reference WFP-WW-09-0009-02) to an extent which renders the conditions attached to the existing waste facility permit

inappropriate”. An application form to apply for a review of the permit was attached and Mr. O’Reilly was advised that the respondent

was available to meet to discuss the completion of the form. The cover letter stated “Please do not ignore the attached notice.

Should you fail to follow the procedures laid down in the notice then your waste facility permit WILL be revoked.” [Emphasis in

original] The applicant was also advised that “this letter and attached notice do not constitute definitive legal opinion. The relevant

legislation should be consulted, and in case of doubt, legal opinion should be sought.”

The notice itself reiterated that the respondent had reason to believe there had been “a material change in the nature focus and

extent of the waste-related activity” at the site “to an extent which renders the conditions attached to the existing waste facility

permit” inappropriate. The applicant was advised that his existing permit would remain in force until such a time as a reviewed permit

was granted or refused pursuant to Article 35 of the Regulations or the existing permit was revoked under Article 36. The notice

informed the applicant that he was required to apply for a review of the waste facility permit and, pursuant to Article 30(3)(d) of the

Regulations as set out above, the respondent required the applicant to submit the following information with the application:

• “A completed application form.

• A map at a scale of 1:500 showing the location of all equipment on the site both internally and externally.

• A map at a scale of 1:500 showing the location of all waste streams on the site.

• An independent calculation of the quantity of wastes on site.

• An independent report from a Chartered Fire Officer as to the suitability of measures on site to minimise the risk of a

major fire.

• Waste characterisation studies on all wastes on site for more than 6 months. The methodology shall be as per the

Environmental Protections Agency document “Municipal Waste Characterisation” published in 1996.

• Copy of the current lease between Stan O’Reilly and the Stafford Group.

• Copy of the current public liability insurance showing the extension to the policy to indemnify Wicklow County Council.

• A valid Tax Clearance certificate from the Revenue Commissioners.”

The notice went on to state that under Article 30(3)(g) “(i) a submission relating to the proposed review, including the

requirements specified by the local authority under sub-article 3(d), may be made by the waste facility permit holder in

writing to the local authority within 25 working days of the date of the giving of the notice, and that the local authority

shall not decide to amend conditions attached to, a waste facility permit which it has granted, before the expiry of the

said period”. This 25 day period within which the applicant was required to make a submission would expire on 6th

February 2014. The same section of the notice warned that “(ii) where the permit holder does not make a submission in

accordance with paragraph (i), the local authority shall revoke the existing was facility permit it has granted and give

notice in writing of the decision with the reasons for the decision to the waste permit holder and notify the applicant

under article 18 of that decision.” [Emphasis in original]

THE APPLICANT’S REPLY

By letter dated the 15th January, 2014, within the time required for a submission to be made by the permit holder, the applicant

wrote to Mr. Lawless requesting that he “please advise as to the material change in nature, focus and extent of the was related

activities at the Stan O’Reilly T/A C&D Recycling facility at Merrymeeting, Rathnew to the extent which renders the conditions

attached to the existing waste facility permit as inappropriate.” None of the information required to be submitted as outlined above

was forwarded by the applicant.

Mr. Lawless responded to this brief letter on the 20th January, 2014 and enclosed two drawings, the first of which had accompanied

the applicant’s application for a review of the waste facility permit at the site in 2009. Mr. Lawless stated that “the conditions in the

permit granted would have taken into account the proposed layout of the facility.” The second drawing was a survey of the facility

carried out in November 2013. Mr. Lawless wrote that “It is the view of Wicklow County Council that the current situation on site

when compared to the proposed layout back in 2009 shows that there has been material change in the nature, focus and extent of

waste-related activities at the facility to an extent which renders the conditions attached to the existing waste facility permit

inappropriate.” There was no further correspondence between the applicant and the local authority until the 7th March, 2014.

THE REVOCATION NOTICE

On the 7th March, 2014 a notice pursuant to Article 18(5) of the Regulations was issued to the applicant “revoking waste facility

permit WFP-WW-09-0009-02”. The cover later from Mr. Lawless indicated that the notice was issued as the applicant “failed to make

a submission in relation to the review” of the permit initiated by the notice issued on 2nd January 2014. The applicant was also

notified of his obligation to make an application to the respondent for the surrender of the waste facility permit pursuant to Article 29

of the Regulations as set out above.

APPLICANT’S SUBMISSIONS

Counsel for the applicant contends that Mr. O’Reilly’s letter dated the 15th January, 2014 constitutes a valid submission or

‘engagement’ for the purposes of adequately responding to the initial notice issued by the respondent on the 2nd January, 2014. It is

submitted that this submission, and the query raised therein, was submitted well within time and the respondent was not entitled to

revoke the licence on the 7th March, 2014. The applicant asserts that he was entitled to enquire as to what precisely was meant by

a “material change in the nature focus and extent of the waste-related activity”. It is submitted that the only indication as to what

the respondent meant by this came after the decision to revoke the permit and is now set out in the statement of opposition where it

seems to be suggested that in the respondent’s view the site is being used as a dump. The applicant denies that there has been any

change in his activities or modus operandi on the site and denies that there has been any intensification of those activities. A number

of arguments for the granting of an order of certiorari are advanced on behalf the applicant, which I will now consider in turn.

LEGITIMATE EXPECTATIONS

The notice issued on the 2nd January, 2014 states that pursuant to Article 30(3)(g) –

“(i) a submission relating to the proposed review, including requirements specified by the local authority under sub-article

3(d), may be made by the waste facility permit holder in writing to the local authority within 25 working days of the date

of the giving of the notice, and that the local authority shall not decide to amend the conditions attached to, a waste

facility permit which it has granted, before the expiry of the said period, and

(ii) where the permit holder does not make a submission in accordance with paragraph (i), the local authority shall

revoke the existing waste facility permit it has granted and give notice in writing of the decision…” [emphasis in original]

Counsel for the applicant contends that a submission relating to a “proposed” review at paragraph (i) must be distinguished from the

submission of an actual application for a review and the requirements of Article 30(3)(d), which relates to information which is

required to be submitted alongside the actual application for a review. It is submitted that the use of the words “including” and “may”

in paragraph (ii) above means that it is not a mandatory requirement, as opposed to the compulsory requirement of submitting the

actual review application. Nor must it take any particular form. Counsel contends that the applicant therefore had a legitimate

expectation that the Council would exercise its decision making function in the manner represented to the applicant by the 2nd

January letter and accompanying notice.

Counsel referred the court to the decision of Fennelly J. in Glencar Exploration v. Mayo County Council [2002] 1 I.R. 84 which set out

the matters required to be established in order to succeed in a claim based on a failure of a public authority to respect legitimate

expectations –

“…it seems to me to be necessary to establish three matters. Because of the essentially provisional nature of these

remarks, I would emphasise that these propositions cannot be regarded as definitive. Firstly, the public authority must

have made a statement or adopted a position amounting to a promise or representation, express or implied as to how it

will act in respect of an identifiable area of its activity. I will call this the representation. Secondly, the representation

must be addressed or conveyed either directly or indirectly to an identifiable person or group of persons, affected

actually or potentially, in such a way that it forms part of a transaction definitively entered into or a relationship

between that person or group and the public authority or that the person or group has acted on the faith of the

representation. Thirdly, it must be such as to create an expectation reasonably entertained by the person or group that

the public authority will abide by the representation to the extent that it would be unjust to permit the public authority

to resile from it. Refinements or extensions of these propositions are obviously possible. Equally they are qualified by

considerations of the public interest including the principle that freedom to exercise properly a statutory power is to be

respected. However, the propositions I have endeavoured to formulate seem to me to be preconditions for the right to

invoke the doctrine.”

In Lett & Co. v Wexford Borough [2012] 2 IR 198 the Supreme Court did not demur from the following remarks of Clarke J. in the High

Court in relation to legitimate expectation –

“In the light of those authorities it seems to me that, on the current state of the development of the doctrine of

legitimate expectation, it is reasonable to state that there are both positive and negative factors which must be found

to be present or absent, as the case may be, in order that a party can rely upon the doctrine. The positive elements

are to be found in the three tests set out by Fennelly J. in the passage from Glencar Exploration to which I have

referred. The negative factors are issues which may either prevent those three tests from being met (for example the

fact that, as in Wiley, it may not be legitimate to entertain an expectation that a past error will be continued in the

future) or may exclude the existence of a legitimate expectation by virtue of the need to preserve the entitlement of a

decision maker to exercise a statutory discretion within the parameters provided for in the statute concerned or,

alternatively, may be necessary to enable, as in Hempenstall, legitimate changes in executive policy to take place.”

It is contended on behalf of the applicant that his letter of 15th January, 2014 was submitted in response “by the waste facility

holder in writing to the local authority within 25 working days of the date of the giving of the notice” and that he raised a legitimate

query as part of the process and within time. Furthermore, the respondent’s letter of 20th January did not suggest in any way that

the submission was not in response to and in accordance with the notice of 2nd January. It is submitted that the respondent’s letter

of 20th January failed to elaborate or explain what the issues required to be addressed by the applicant were. The applicant contends

that the respondent local authority failed to comply with its own procedures and that the evidence suggests that they were intent on

closing the applicant’s business down from the outset.

BREACH OF FAIR PROCEDURES

The right to fair procedures was considered by the Supreme Court in The State (Irish Pharmaceutical Union) v. Employment Appeals

Tribunal [1987] I.L.R.M. 36 in the following terms –

“Whether it be identified as a principle of natural justice derived from the common law and known as audi alteram

partem or, preferably, as the right to fair procedures under the Constitution in all judicial or quasi-judicial proceedings, it

is a fundamental requirement of justice that person or property should not be at risk without the party charged being

given an adequate opportunity of meeting the claim, as identified and pursued. If the proceedings derive from statute,

then, in the absence of any set of fixed procedures, the relevant authority must create and carry out the necessary

procedures; if the set or fixed procedure is not comprehensive, the authority must supplement it in such a fashion as to

ensure compliance with constitutional justice…”

Counsel for the applicant submits that in Dellway Investments Ltd. v. National Asset Management Agency [2011] 4 I.R. 1 the

Supreme Court, applying the principles in East Donegal Co-Operative Ltd. v. Attorney General [1970] I.R. 317, rejected a construction

of the National Asset Management Agency Act 2009 which would have excluded the right to fair procedures in cases where loans

were transferred from commercial banks to the agency. Murray C.J. stated at pp.208-209 –

“…Moreover I find it difficult to envisage circumstances where the principles of constitutional justice ensuring that

decisions are fair for the individual could be overridden. To do so would be to abrogate a constitutional protection which

every citizen enjoys when the State decides to exercise a power which encroaches on individual rights.

The State, in exercising its powers through the organs of government designated by the Constitution, has extensive

powers to regulate and limit the exercise of individual rights in the interest of the common good and this may be

relevant where the State is faced with a national crisis, such as one of a fiscal nature. The State has the power to act in

the interests of the common good because the Constitution, in its provisions, expressly envisages that. It also envisages

that in exercising such powers the State must act within the ambit of the Constitution as a whole. In a democratic State

founded on the rule of law there are definite limits to the extent to which the State can interfere with or restrict

constitutional rights or rights vested in or acquired by individuals - freedom of expression, assembly, freedom of religion,

right to education, right to earn a livelihood, property rights (including contractual rights), right to strike - to name but

some, even when it is acting or purporting to act in the interest of the common good in a national crisis. In common

with international instruments, such as Covenants of the United Nations and the European Convention on Human Rights,

the Constitution envisages that rights may be regulated and limited but not to an extent that it is disproportionate or in

a manner which is arbitrary or discriminatory in an invidious sense. In particular, the State cannot act in a manner

which would abrogate a right or deprive it of its very essence.

If the State were to succeed in its argument, namely that the Act prohibits NAMA from giving any consideration to

representations from persons in the position of the applicants, it would be denying the very essence of a right to a

hearing, a concept at the core of the principle of constitutional justice and due process.”

The applicant submits that the absence of fair procedures has invalidated decisions in the context of a refusal to grant planning

permission where the planning authority failed to allow the applicant make a submission on a key point (Frenchchurch Properties Ltd.

v. Wexford County Council [1992] I.R. 268), and the withdrawal of the national television franchise for failing to give clear warning

that the franchise would be withdrawn if information required was not furnished on the promised day (TV3 v. Independent Radio and

Television Commission [1994] 2 I.R. 439. The applicant also refers to Eircell v. Leitrim County Council [2000] 1 I.R. 479, a case

concerning the revocation of planning permission, where, after considering a number of previous decisions, O’Donovan J. held –

“…as I interpret those decisions, it is a fundamental requirement of justice that the applicant should have been given

prior notification of the intention of the elected members of the respondent to consider the revocation of the said grant

of planning permission and should have been afforded the opportunity to make submissions or representations with

regard to the question as to whether or not the said grant of permission should be revoked. Moreover, I am not

persuaded that the absence of any provision in s. 30 of the Act of 1963, as amended, whereby a person might be

affected by a revocation should be notified of the intention of the planning authority to consider making such an order

absolved the respondent from giving such notification to the applicant. In my view, it is clear from the judgment of the

Supreme Court given in The State (Irish Pharmaceutical Union) v. Employment Appeals Tribunal [1987] I.L.R.M. 36, that

where a body is making a decision arising from a statutory power and, when making that decision, that body is obliged

to act judicially, then, in the absence of a procedure laid down by the statute from which the power derives, the body

making that decision must supplement that lacuna in such a fashion as to ensure compliance with constitutional justice.

In this case, I am satisfied that, before deciding whether or not they should revoke the grant of planning permission

aforesaid, the elected members of the respondent, in accordance with principles of constitutional justice and fair

procedures, were obliged to give the applicant prior notification of their intention to consider the revocation of the said

grant of planning permission and to afford the applicant the opportunity to make submissions or representations in that

regard but that they failed to do so and, furthermore, failed to adopt a procedure whereby compliance with

constitutional justice was ensured. Accordingly, I am satisfied that their decision to revoke the said grant of planning

permission was invalid on that account also.”

In the present case, the applicant contends that the respondent failed to notify the applicant that he had not made a submission in

accordance with the notice of 2nd January, failed to notify what it considered was required for a submission to be made in

accordance with the notice, and that if the applicant failed to make such a submission the Council would revoke the applicant’s

permit. The unavoidable consequence of the respondent’s failure to notify the applicant of these matters was that the applicant had

no opportunity to make representations to them. Counsel refers the Court to the decisions in McDonald v. Bord na gCon [1965] IR 217

and State (Crothers) v. Kelly [1978] I.L.R.M in relation to the importance of the principle of audi alteram partem.

UNCLEAR NOTICE

Counsel for the applicant submits that the notice issued on the 2nd January simply repeats statutory provisions in a formulaic manner

without actually explaining how there has been an alleged material change in the nature, focus and extent of the waste-related

activities. In Lawlor v. Dundalk Town Council [2005] IEHC 73 O’Neill J. referred to the need for clarity in the wording of an

enforcement notice served under the Planning and Development Act 2000 –

“It is not sufficient, however, for the purposes of the notice merely to recite the phrases used in subs.(5)(b), such as

demolition or alteration of any structure or as in this case, “return site to its previous condition” where the use of that

kind of phraseology borrowed from the subsection, fails to clearly and precisely indicate to the person served with the

notice what exactly has to be done in order to comply with the notice.”

It is submitted that the consequences of failing to comply with the notice in the present proceedings are very serious and directly

impact on the applicant’s constitutional rights. For that reason, there is an obligation on the local authority to ensure that its notices

are sufficiently clear and where clarification is sought, as in the applicant’s letter of the 15th January, there is a further obligation to

take reasonable steps to provide the clarification sought. In this regard counsel refers to the decision of Quirke J. in Dublin City

Council v. Liffey Beat Ltd. [2005] 1 IR 478 where it was held that there was an onus on planning authorities “to take reasonable steps

to ensure that, insofar as is practicable, the terms of documents granting or refusing planning permission will be comprehensible to

members of the public” and that “where clarification is sought from the planning authority…reasonable steps should be taken by the

planning authority to provide the clarification sought.”

FAILURE TO GIVE ADEQUATE REASONS

It is submitted that the duty to give adequate reasons is particularly significant where the only reason for the respondent’s action

was its allegedly erroneous view that the applicant did not make a submission in response to the 2nd January notice. The applicant

contends that it is clear that such a submission was made. Particular emphasis is placed on the Supreme Court decision in EMI

Records (Ireland) Limited v. Data Protection Commissioner [2013] IESC 34 which considered the duty to give reasons in detail.

ERROR ON THE FACE OF THE RECORD

It is submitted that there is an error of law on the face of the record insofar as the notice recites that the only reason for closing

down the applicant’s business was an alleged failure to make a submission within 25 days when he clearly did make a submission as

required.

RESPONDENT’S SUBMISSIONS

Counsel for the respondent submits that the issue in this case is a very simple one - there is a statutory scheme in place and the

respondent has fully complied with it. Having come to the view that there had been a material change in the “nature, focus and

extent of the waste related activities” at the applicant’s site the respondent was obliged to initiate a review of the waste facility

permit. The applicant was duly advised in accordance with the Regulations as to his obligation to submit an application for a review

along with other specified information. He was also warned of the possibility that his permit would be revoked if he failed to comply

with the notice. Nevertheless, it is submitted that the applicant did not adequately engage in the process and did not submit the

completed application form or any of the other specified information.

According to the statutory scheme, any proposed review of a waste facility permit takes place on the basis of the information

submitted by the applicant and the applicant in this case failed to submit any information and did not comply with the notice of 2nd

January. It is submitted that the notice of the 2nd January is perfectly clear in relation to the applicant’s obligations and that the

letter of the 20th January and two accompanying drawings provides even more information as to what changes the respondent was

referring to. The respondent contends that the two drawings clearly demonstrate the difference between the current operations on

site compared with when the original permit was granted. Furthermore, the applicant did not challenge the respondent in relation to

this letter of the 20th January and simply did nothing within the 25 day period to comply with the 2nd January notice. Consequently,

the permit was revoked in accordance with the Regulations.

According to the replying affidavit of Mr. Andrew Lawless, inspections at the site in 2011, 2012 and 2013 revealed a steady

deterioration of the site whereby mounds of unprocessed waste was being accumulated, much if which was incapable of being

recycled. The statement of opposition states that most of the waste recovery operations at the site ceased in December 2013 and

the only activity on site thereafter was the deposit of approximately 5,000 metric tonnes of construction and demolition waste and

household waste which was not processed. It is submitted that it was clear from the notice that the original proposals for which the

permit had been granted were no longer being complied with. It is further submitted that there is no requirement under the

Regulations to set out the material which the respondent relied on in arriving at its view that there was reason to believe there had

been a change to the applicant’s on site operations. In any event, the respondent contends that even before the notice was issued

the applicant was well aware from a substantial history of interaction in relation to the issue by way of numerous meetings with

officials of the respondent, inspection reports and two previous notices under section 55 of the 1996 Act as to the change in nature,

focus and extent of waste related activity on the site.

The respondent submits that the applicant’s letter dated the 15th January was not a submission within the meaning of Article 30(3)

(g) and that the Regulations make clear that the term “submission” means the submission of an application by a permit holder to

review a waste management permit. In its letter of 2nd January the respondent set out further information which should be submitted

in accordance with Article 30(3)(d) but the applicant failed to comply with his obligation to submit an application for a review within

25 working days. Had such an application for a review been received as required it would have been dealt with in accordance with

Articles 32 and 35.

It is submitted that the statutory scheme has been fully complied with and that notices issued were perfectly clear, that the reasons

for the revocation are clear, and that there is no error on the face of the record.

DISCUSSION

I have carefully considered the notice issued to the applicant on 2nd January and am satisfied that the statutory scheme has been

complied with by the respondent in that it was made clear to the applicant what he was required to do in order to comply with the

notice in order to avoid having his waste facility permit revoked.

Article 30(1) of the Regulations sets out the situations where the respondent authority is obliged to initiate a review of a permit.

Article 30(2) requires the local authority to notify permit holder in writing of its intention to conduct a review and Article 30(3)(a)-(g)

sets out the information which must be included in this notice. It is clear that the covering letter and notice issued to the applicant

on the 2nd January contained all of the requisite information as set out in the Regulations and the applicant was further advised to

consult the Regulations and seek independent legal advice. In my view, it is clear from the notice that the submission of an

application for a review is a mandatory requirement and that additional information as set out in the notice was also required to be

submitted under Article 30(3)(d).

The Court does not accept the applicant’s contention that the submission invited under ‘Article 30(3)(g)’ of the notice in relation to

the proposed review is distinguishable from the actual review application. The relevant section of the notice, namely that section

under the heading ‘Article 30(3)(g)’, refers to the mandatory requirements of sub-article 3(d), which in my view supports the

respondent’s contention that the submission required of the applicant is the compulsory application for a review rather than some

other optional submission. Furthermore, while it is accepted that the word “may” in paragraph (i) would ordinarily suggest that this

section of the notice might refer to some other optional submission, as contended by counsel for the applicant, this must be read in

conjunction with paragraph (ii) of the relevant section which makes it absolutely clear that the notice referred to in paragraph (i) is

mandatory and that a failure to comply within 25 working days will result in the waste facility permit being revoked. Clearly, the

applicant’s letter of the 15th January did not adhere to the requirements of the notice and none of the relevant information was

provided.

I am satisfied that the notice is clear and that the applicant could have been in no doubt as to what the change in activities was

which was causing the respondent concern. The applicant sought greater clarity on the 15th January and the respondent’s reply of

the 20th January provided even greater detail by way of two drawings showing a clear change in the amount of waste on the site.

Five areas where waste has accumulated are identified in the November 2013 drawing and the overall layout of the site is

fundamentally different to that shown in the 2009 drawing. The terminology used by the respondent in these proceedings which the

applicant contends was simply ‘recited’ from the Regulations is not ambiguous and, unlike in Lawlor, can not be said to have left the

applicant in any doubt as to what was required of him in order to comply with the notice. The applicant was given adequate time

within which to make a submission in the same manner required of every waster facility permit holder subject to the Regulations.

However, rather than engaging with the process and submitting the required information as clearly set out in the notice, the applicant

simply allowed the clock to tick until time ran out and his permit was revoked in accordance with the Regulations on the 7th March,

2014. By failing to submit the application and additional information in accordance with the Regulations the applicant effectively

deprived himself of a review which would have been conducted according to the statutory scheme.

The Court therefore does not accept the applicant’s submission that he had a legitimate expectation that the respondent would

perform its functions in the manner contended for. For the reasons outlined above, the Court also rejects the submissions that the

notice issued on the 2nd January was unclear, that there has been a breach of fair procedures or that the respondent has failed to

provide adequate reasons for its decision.

DECISION

In light of the foregoing the applicant’s claim is dismissed.