Administrative court allows suspension of demolition order due to irreparable business loss and essential legal requirements met.

Case Number 030447
Court / Authority
Jurisdiction Portugal (PT)
Decision Date
Outcome Allowed / Granted

Legislator summary

AI generated

The Supreme Administrative Court granted the request for suspension of the demolition order issued against a textile company. The court found that the demolition would cause irreparable damage to the company's client base, violating the requirement for difficult-to-repair prejudice. Consequently, the court ruled that all cumulative statutory conditions for suspending the administrative act were satisfied.

Legislator headnote

Official

SUSPENSÃO DE EFICÁCIA ELEMENTOS ESSENCIAIS DEMOLIÇÃO PREJUÍZO DE DIFÍCIL REPARAÇÃO

Keywords

AI generated
suspension of administrative act irreparable prejudice demolition order business loss LPTA 85 article 76

Cited Legislation

AI generated
LPTA 85 Art. 76 n. 1 al. a), b), c)

Cited Case Law

AI generated
AC STA 1989/03/09 IN AD N338

Need to analyze how this precedent applies to your matter?

Cross-reference this judgment against statutes, commentaries, and subsequent citing case law inside Legislator AI.

Open in Legislator →

Full text

[AREA TEMATICA 1] DIR ADM CONT - MEIO PROC ACESSÓRIO SUSPEFIC.

[LEGISLACAO NACIONAL] LPTA85 ART76 N1 A B C.

[JURISPRUDENCIA NACIONAL] AC STA DE 1989/03/09 IN AD N338 PAG191.

[ANO DA PUBLICACAO] 92

[DATA DE ENTRADA] 02/20/1992

[Nº CONVENCIONAL] JSTA00034271

[Nº DO DOCUMENTO] SA119920319030447

[OBJECTO] SENT TAC COIMBRA.

[PRIVACIDADE] 01

[RECORRENTE] REDIMALHAS-EMP TEXTIL LDA

[RECORRIDO 1] VEREADOR DE OBRAS DA CM DE COIMBRA

[URL] https://www.dgsi.pt/jsta.nsf/35fbbbf22e1bb1e680256f8e003ea931/62ABB9DAF1367A5E802568FC0038D365?OpenDocument

SUMÁRIO

I - A suspensão de eficácia do acto recorrido depende da verificação cumulativa dos requisitos das alíneas a), b) e c) do n. 1 do artigo 76 da LPTA.

II - A execução de acto que ordena a demolição de um armazém complementar de complexo fabril, determinando o não cumprimento de compromissos assumidos pela respectiva empresa, com a consequente perda de clientela, é susceptível de causar danos de difícil reparação, pelo que se justifica a suspensão de eficácia desse acto, desde que, além do requisito da alínea a), ocorram, também, os requisitos referidos nas alíneas b) e c), acima citados.