High Court quashes partial demolition order and remits planning permission for pedestrian route upgrade.
Legislator summary
AI generatedThe High Court partially quashed a planning permission order granting permission to upgrade a pedestrian and cycle route in County Cork. Applicants argued that specific sections of the order required removal to prevent demolition of existing walls and car parks. The court ordered the quashing of demolition between chainage 1610 to 1780 and widening between 1660 to 1740, while remitting the matter for further directions on the remaining scope.
Legislator headnote
AI generatedSections 50, 50A and 50B of the Planning and Development Act 2000; where a planning authority's order grants permission subject to conditions that result in the demolition of existing structures, the court may quash the specific portions causing harm and remit the matter for clarification of the remaining scope.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2026] IEHC 487
THE HIGH COURT
PLANNING & ENVIRONMENT
[H.JR.2025.0001301]
IN THE MATTER OF SECTIONS 50, 50A AND 50B OF THE PLANNING AND DEVELOPMENT
ACT 2000
BETWEEN
MARCIA D’ALTON, MELLA LEONARD AND NORMA LOMBARD
APPLICANTS
AND
AN COIMISIÚN PLEANÁLA
RESPONDENT
AND
CORK COUNTY COUNCIL
NOTICE PARTY
(No. 2)
Date of impugned decision: 7 July 2025
Date proceedings commenced: 29 August 2025
Date of principal judgment: 26 June 2026
Consequential hearing: 6 & 9 July 2026
Date draft judgment circulated: 13 July 2026
JUDGMENT of Humphreys J. delivered on Friday 17 July 2026
1. In D’Alton v. An Coimisiún Pleanála (No. 1) [2026] IEHC 414 (Unreported, High Court, 26
June 2026) I quashed the commission’s order in part. Of the consequential matters that now arise,
the primary issue is remittal.
The order outlined in the principal judgment
2. The substantive part of the order as originally phrased was:
“(i) subject to submissions on the form of the order and to the proposed order under s.
50A(9) of the 2000 Act, there be an order based on relief 1 claimed in the statement of
grounds by way of an order of certiorari removing for the purposes of being quashed the
order of the respondent (ABP-321292-24) made on 7 July 2025 granting permission with
conditions under section 177AE of the Planning and Development Act 2000, as amended, to
the notice party for the upgrading of an existing 2-kilometre-long pedestrian and cycle route
in the townlands of Ardmore and Pembroke, Passage West, Co. Cork, in part only, namely
such part of the order as may be agreed or directed by the court following further
submissions consistent with the judgment;
(ii) subject to submissions on the form of the order, if requested by the council, there
be an order providing for an amendment under s. 50A(9) of the 2000 Act in such terms as
may be agreed or directed by the court following further submissions consistent with the
judgment, noting that the council’s position on remittal is reserved at the present time;”
The consequential issues
3. The consequential issues were:
(i) extent of the partial quashing;
(ii) possible amendment;
(iii) remittal;
(iv) if remittal, to what point; and
(v) the status of the inspector’s report on remittal.
Issue 1 – extent of the partial quashing
4. Following some discussion there was no major objection to partial quashing as follows, which
will preserve both the historic features and also the greenway widening to the maximum extent save
where that interferes with the car park. The reason the car park has to be maintained for now is
that to remove the car park and keep the wall where it is would result in parking space reduction
about which the applicants and council are not agreed, and in relation to which there is no obviously
otherwise acceptable solution. The ultimate order was the one that was therefore reasonably
acceptable to both sides (the commission being fairly neutral on the consequential issues):
(i) to quash the demolition between chainage 1610 to 1780 so the wall and stile in their
entirety remain;
(ii) to quash the widening between chainage 1660 to 1740 so the car park remains; and
(iii) all chainage per drawing GA0011.
5. That order was made on 9 July 2026 without major objection.
Issue 2 – amendment
6. Section 50A(9) of the Planning and Development Act 2000 (the 2000 Act) states:
“(9) If an application is made for judicial review under the Order in respect of part only of a
decision or other act to which section 50(2) applies, the Court may, if it thinks fit, declare
to be invalid or quash the part concerned or any provision thereof without declaring invalid
or quashing the remainder of the decision or other act or part of the decision or other act,
and if the Court does so, it may make any consequential amendments to the remainder of
the decision or other act or the part thereof that it considers appropriate.”
7. As the council’s proposed amendment (which would have eliminated the car park) was not
acceptable to the applicants, they withdrew that proposal. They informed me that they did not need
an amendment to deal with the junction points between the widened and existing greenway. So
amendment does not need to be considered further because it is not sought. In some cases a court
could amend of its own motion, but this is not a case where there is any particular reason to do that.
Issue 3 – whether there should be remittal
8. The applicants’ main point about remittal was that it should not apply to partial quashing.
9. The effect of s. 50A(9A) of the 2000 Act as inserted by the Planning and Development,
Maritime and Valuation (Amendment) Act 2022 (the 2022 Act) is to provide that if a developer
requests remittal, the court shall make such an order unless it would not be lawful to do so:
“(9A) If, on an application for judicial review under the Order, the Court decides to quash a
decision or other act to which section 50(2) applies, made or done on an application for
permission or approval, the Court shall, if requested by the applicant for permission or
approval, remit the matter to the planning authority, the local authority or the Board, as
may be appropriate, for reconsideration, subject to such directions as the Court considers
appropriate, unless the Court considers, having regard to the circumstances of the case,
that it would not be lawful to do so.”
10. That applies to an application under s. 177AE, as here, which comes within s. 50 of the 2000
Act.
11. As pointed out in Quinn v. An Bord Pleanála [2022] IEHC 699 (Unreported, High Court, 16
December 2022), it is a matter of public record that the stated rationale for the amendment was to
address what was alleged to have been judicial reluctance that was said to have manifested itself
recently to remit matters to planning authorities, in that it was erroneously suggested that some
judges refer matters back to the planning authority to make a new decision while other judges are
allegedly reluctant to do so. As outlined in that case (based on a survey of caselaw over the previous
years), the facts do not bear out that purported rationale in any way whatsoever. The pre-2022
caselaw shows a strong tendency to remit if requested, save where to do so would be unlawful,
across a wide range of judges dealing with planning cases before that date. Judicial inconsistency
is just a kind of bedrock cultural cliché that once it takes hold simply cannot be dislodged by
evidence, regardless of how totally unfounded it is. In fact planning jurisprudence is extraordinarily
consistent given the number, nature and complexities of the issues being dealt with. A similar cliché
is the fixed false belief that there is an increasing tendency to quash decisions on technicalities –
there is no such tendency and insofar as there are examples of this they are certainly not increasing
as far as recent jurisprudence is concerned.
12. The applicants perhaps have a point in purely drafting terms in the sense that sub-s. (9)
refers to quashing part only of a decision whereas sub-s. (9A) refers to quashing the decision
simpliciter.
13. However, the text of sub-s. (9A) is capable of being read as covering partial quashing, and
the context and purpose support such an interpretation. If I am wrong about that, the pre-2022
caselaw supports a presumption in favour of remittal which logically applies to partial remittal also.
14. There is no valid rationale to the contrary, which can be demonstrated as follows. The
applicants argue that in effect remittal of a part of a consent would take it “out of context”. But
everything has to be compared not with the rigged comparator of a hypothetical ideal answer
(everything fails when measured against perfection) but against the realistically available
alternative.
15. Here the realistically available alternative is a new planning application covering the quashed
part – which is no more and no less an “out of context” application than remitting the quashed part.
16. So there is no tangible violence being done to environmental objectives or contextual
planning or anything else that would not arise by way of the alternative approach of a new
application.
17. To put it another way, the applicants make the reasonable-sounding point that the matter
needs to be viewed “in the round” – but that ship has sailed. The legislation allows partial quashing
which means that whatever happens thereafter is less than “in the round” in the type of sense meant
by the applicants. As indicated in other caselaw (see e.g. Connolly v. An Coimisiún Pleanála [2026]
IEHC 224 (Unreported, High Court, 17 April 2026) at 70 to 80 and the caselaw cited), a development
can be sought and consented in parts provided that European assessments under the habitats and
environmental impact assessment (EIA) directives cover the full project at each stage, something
the commission will no doubt be conscious of in this case. The Supreme Court has recently upheld
the principle that an overall development can be consented in parts: Concerned Residents of
Treascon and Clondoolusk v. An Bord Pleanála [2024] IESC 28 (Unreported, Supreme Court, Murray
J., 4 July 2024) (O'Donnell C.J., Woulfe, Collins and Donnelly JJ. concurring). So this is settled law.
18. An “in the round” demand sounds as always plausible but there is a big distinction between
an in-the-round decision on all elements, and an in-the-round assessment of all elements at each
stage. A demand for all elements of a consent to be decided together is utterly unworkable,
inappropriate and without legal basis, as explained in Connolly. What can and should be done is
that European assessments take an overall view when considering any individual part of an overall
project, but remittal of a part of the project does not prevent that.
19. Thus I would be minded to remit the matter subject only to clarification of the procedure as
below.
Issue 4 – remittal to what stage
20. As outlined in Quinn, there are numerous judgments specifying the stage to which remittal
should be made.
21. In Crofton Buildings v. An Bord Pleanála [2024] IESC 12 (Unreported, Supreme Court,
Donnelly J., 10 April 2024) (O'Donnell C.J., Charleton, O’Malley and Woulfe JJ. concurring), the
Supreme Court cautioned against unnecessary use of the power to specify a stage to which the
matter is remitted, noting that its strictures against excessive directions regarding the conduct of
remittal were “relevant” (para. 61), and while the matter to be remitted may vary depending on the
procedure adopted, the basic position was that the commission would be presumed to act in
accordance with law and fair procedures.
22. That said, it is not inconsistent with those principles to consider the possibility that where
the parties so agree, or where there is some particular legal feature of the case making it appropriate
notwithstanding lack of complete agreement, there may be cases where it may be appropriate to
consider the stage to which remittal can be made. In that context, subsequent to (and obviously
conscious of) Crofton, O. 103 r. 36(1) RSC was enacted providing as follows:
“Final orders
36. (1) In Planning & Environment proceedings, where the Court makes a final order
remitting a matter to a respondent for reconsideration:
(a) the Court may, having heard the parties, specify the stage of the procedure to which the
matter shall be remitted, with liberty to apply;
(b) in the case of an order remitting a matter for reconsideration under Directive 2003/4/EC,
the Court, having heard the parties, shall issue such directions for the timely, adequate and
effective resolution of the matter as are appropriate in the circumstances, including
directions resolving any legal or procedural questions likely to arise on the remitted
consideration, or a direction that the matter be prioritised on the basis of the original date
of the request for information rather than the date of remittal.”
23. For context, r. 36(1)(b) was introduced to address concerns that had arisen in the Aarhus
Convention Compliance Committee. The new rule is discussed with approval by the committee in
its report of 6 October 2025 (https://unece.org/sites/default/files/2025-
11/ECE.MP_.PP_.2025.55.E.pdf) which was effectively endorsed by the Parties to the Convention
(including the State and the EU) in November 2025: https://unece.org/sites/default/files/2026-
04/Aarhus_MoP8_VIII_8h_Ireland_aec.pdf. While the Aarhus implementation bodies are within the
UN system, the convention itself is part of the EU legal order and views expressed in the UN context
are not without relevance to the meaning of the convention as a matter of European law. People
who dismiss Aarhus as “just” a UN convention are missing that point and perhaps other points. As
put by the CJEU in the judgment of 8 March 2011, Lesoochranárske zoskupenie VLK v Ministerstvo
životného prostredia Slovenskej republiky, C-240/09, ECLI:EU:C:2011:125:
“30 The Aarhus Convention was signed by the Community and subsequently approved by
Decision 2005/370. Therefore, according to settled case-law, the provisions of that
convention now form an integral part of the legal order of the European Union (see, by
analogy, Case C-344/04 IATA and ELFAA [2006] ECR I-403, paragraph 36, and Case C-
459/03 Commission v Ireland [2006] ECR I-4635, paragraph 82). Within the framework of
that legal order the Court therefore has jurisdiction to give preliminary rulings concerning
the interpretation of such an agreement (see, inter alia, Case 181/73 Haegeman [1974] ECR
449, paragraphs 4 to 6, and Case 12/86 Demirel [1987] ECR 3719, paragraph 7).”
24. In the present case there is no particularly pressing reason to specify the stage at which
remittal should take place, subject to the last heading below. The applicants raised the issue of
public participation, but if that is a problem it can be addressed within the remitted process rather
than by way of directions in advance. Thus, consistent with Crofton, I would be inclined not to give
any directions in relation to the stage of (or otherwise in relation to) remittal subject to clarification
of the final point.
Issue 5 – status of the inspector’s report on remittal
25. The final question arising from the applicants’ submissions, but one that affects the
foregoing, is the status of the inspector’s report on remittal. In deference to the Supreme Court in
Crofton, considering that issue here is not just an issue of whether directions could be appropriate
and if so to what effect – it is also and perhaps primarily a question of what relief is appropriate,
i.e., should the inspector’s report be quashed in part depending on whether it will play a continuing
role. The applicants did not seek that relief specifically but the court can grant unpleaded relief
provided that it comes strictly within the pleaded grounds, as held by the Supreme Court in Treascon.
26. The key distinction is between what information should be published and what information
should be considered.
27. As to what information should be published, s. 146 of the 2000 Act provides (emphasis
added):
“Reports and documents of the Board.
146.—(1)
(2)
(3) Where, during the consideration by it of any matter falling to be decided by it in
performance of a function under or transferred by this Act or any other enactment, the Board
either—
(a) is required by or under this Act or that other enactment to supply to any person
documents, maps, particulars or other information in relation to the matter, or
(b) considers it appropriate, in the exercise of its discretion, to supply to any person such
documents, maps, particulars or information (‘relevant material or information’),
subsection (4) applies as regards compliance with that requirement or such supply in the
exercise of that discretion.
(4) It shall be sufficient compliance with the requirement referred to in subsection (3) for
the Board—
(a) where an environmental impact assessment report or a remedial environmental impact
assessment report (as construed in accordance with section 177F), or both such reports, is
or are, as the case may be, submitted with an application or request, or any such report is
received by the Board in the course of considering an application, request or appeal, to place
on its website for inspection and make available for inspection and purchase by members of
the public at the offices of the Board from as soon as may be after receipt of such report—
(i) the application, request or appeal, as the case may be,
(ii) the environmental impact assessment report or remedial environmental impact
assessment report, or both such reports, as the case may be,
(iii) the notice or notices, as the case may be, published in one or more newspapers
circulating in the area in which it is proposed to carry out the development, or in
which the development is located, indicating the nature and location of the proposed
development or development, as the case may be,
(iv) any further information furnished by, or alterations to the terms of the
development made by, or a revised environmental impact assessment report or a
revised remedial environmental impact assessment report (as construed in
accordance with section 177F), or both such reports, as the case may be, furnished
by, the person who is proposing to carry out or who has carried out the development,
as the case may be, and
(v) any other relevant material or information, or
(b) in any other case, to do both of the following (or, as appropriate, the Board, in the
exercise of the discretion referred to in subsection (3), may do both of the following):
(i) make the relevant material or information available for inspection—
(I) at the offices of the Board or any other place, or
(II) by electronic means; and
(ii) notify the person concerned that the relevant material or information is so
available for inspection.
(5) Within 3 days following the making of a decision on any matter falling to be decided by
it in performance of a function under or transferred by this Act or under any other enactment,
the documents relating to the matter—
(a) shall be made available by the Board for inspection at the offices of the Board by
members of the public, and
(b) may be made available by the Board for such inspection—
(i) at any other place, or
(ii) by electronic means,
as the Board considers appropriate.
(6) Copies of the documents referred to in subsection (5) and of extracts from such
documents shall be made available for purchase at the offices of the Board, or such other
places as the Board may determine, for a fee not exceeding the reasonable cost of making
the copy.
(7) The documents referred to in subsection (5) shall—
(a) where an environmental impact assessment was carried out, be made available for
inspection on the Board’s website in perpetuity beginning on the third day following the
making by the Board of the decision on the matter concerned, or
(b) where no environmental impact assessment was carried out, be made available by the
means referred to in subsection (5)(b) for a period of at least 5 years beginning on the third
day following the making by the Board of the decision on the matter concerned.”
28. For context, there is a possible question-mark over the compliance with EU law principles of
legal certainty in relation to the provision that web-publication is only statutorily required in limited
circumstances, which may be considered in C-507/25 Thompson. In fact it is the commission’s
practice generally but the statutory language falls short of that. This aspect seems to be somewhat
rectified by s. 385 of the Planning and Development Act 2024, but as against that the section seems
to radically narrow publication of documents other than decisions and reports. This may raise new
issues that do not arise under the 2000 Act:
“Making available of documents by Commission
385. (1) The Commission shall, within 3 working days of the making of a decision on any
matter falling to be decided by it in the performance of its functions under this Act or any
other enactment, give copies of the documents and information relating to that matter—
(a) where the matter relates primarily to land, to the planning authority in whose functional
area the land is situated, or
(b) where the matter relates primarily to a maritime site, to the Maritime Area Regulatory
Authority.
(2) The Commission shall publish on a website maintained by it or on its behalf copies of—
(a) every decision of the Commission on an appeal, application, referral or request, and
(b) every report of a person assigned under section 376 to make a report in relation to an
appeal, application, referral or request.
(3) The Commission shall retain all documents and information arising from the exercise of
any of its functions for not less than 12 years from the date of the creation or receipt of the
document or information by the Commission.
(4) The Commission shall make the documents and information referred to in subsection
(3), other than such documents as may be prescribed, available for inspection, at the offices
of the Commission during office hours, by—
(a) the owner or occupier of the land or maritime site to which the documents or information
relate, or
(b) a person acting on the authority of such owner or occupier.
(5) Copies of the documents or information made available under subsection (4), and of
extracts from such documents or information, shall be made available for purchase at the
offices of the Commission, or such other place as the Commission may determine, by
persons referred to in that subsection on payment to the Commission of a fee not exceeding
the reasonable cost of making the copy.
(6) Subsection (5) is without prejudice to the Freedom of Information Act 2014, the
European Communities (Access to Information on the Environment) Regulations 2007 to
2014, and the European Communities (Access to Information on the Environment)
(Amendment) Regulations 2018 (S.I. No. 309 of 2018).
(7) In subsection (2) ‘application’ includes a submission of a scheme for approval under
section 49 of the Roads Act 1993, an application for approval under section 51 of the Roads
Act 1993, and an application for a railway order under section 37 of the Transport (Railway
Infrastructure) Act 2001.”
29. The concept of “documents relating to the matter” is broad and covers all formal documents,
including inspectors’ reports. That includes the original version of reports that were later amended,
and includes reports that were withdrawn (e.g., due to irregular use of AI): Environmental Trust
Ireland v. An Coimisiún Pleanála [2026] IEHC 387 (Unreported, High Court, Holland J., 19 June
2026), Carrownagowan Concern Group, Rumberger & Henley v. An Bord Pleanála & Futurenergy
[2024] IEHC 300 (Unreported, High Court, 20 May 2024). In the latter case and in Clonres CLG v.
An Bord Pleanála (No. 2) [2021] IEHC 303, [2021] 5 JIC 0706 (Unreported, High Court, 7 May 2021),
I suggested that quashed decisions and invalid submissions might fall outside the definition but I
have had occasion to revisit that view to some extent in the light of Environmental Trust at 61,
where Holland J. said “I confess that I have difficulty seeing how mere publication of a document
after the final decision has been made can retroactively contaminate the decision-making process”.
I think Holland J.’s comment illustrates the distinction, which my earlier view erroneously failed to
focus on, between publication of material and reliance on the material. That said, my comment
about invalid submissions still holds good. These were never part of the process so do not fall to be
published – they have to be completely disregarded from the outset. But a decision or other
document that was later quashed or an inspector’s report that is later amended or withdrawn was
de facto a part of the process for at least some time, and so is a document relating to the matter. I
agree, on reflection, with Holland J., that the integrity of the procedure can be upheld otherwise
than by non-publication, and we will turn to that in a moment. But that approach does suggest that
even quashed materials should be published – albeit presumably with an annotation recording the
quashing.
30. To conclude this point as a final passing comment on Environmental Trust, there isn’t
anything inherently wrong with using AI in the decision-taking process. The issue is that such use
must be in an institutional context (i.e., the organisation overall should determine whether and how
it is to be used and with what safeguards). With that important qualification, if the simplified binary
choice were to be to commend the trailblazing of the inspector in Environmental Trust or denounce
such a heterodox approach, I would lean towards the former – overreactions quickly become
anachronisms in this kind of rapidly evolving technological space. It certainly hasn’t been shown so
far as I can see that the AI did any particular substantive harm in that case. I do note however that
as of time of drafting the present ruling (16 July 2026) the original inspector’s report has still not
been published on the website page for that case (https://www.pleanala.ie/en-ie/case/318302)
which (to put it neutrally) does not immediately strike one as a particularly enthusiastic embracing
of the finding of Holland J. that the statute was breached by non-publication, a finding with which I
respectfully agree for what it’s worth.
31. Turning then to the second aspect, as I understand matters (and I fall to be corrected by
the commission if this understanding is inadequate), the way the commission draws the distinction
between publication and consideration in the case of remitted matters is that all of the original
papers remain on their website under the page for the original case number, the remitted matter is
given a new case number, and the “file” for the new case excludes papers that are to be disregarded
in the new process.
32. In order therefore to determine whether any particular order or direction is necessary here,
it would be of assistance if the commission would clarify how this would operate in the case of the
partial quashing and remittal here, and in particular, whether the original inspector’s report going to
form part of the file and/or is regard otherwise to be had to it. If so, one might need to consider
thinking in terms of partial quashing of the report or some other form of direction, although in
principle that shouldn’t be necessary. Possibly there are other options not immediately apparent,
or possibly no action is required, but clarification would help.
33. I assume that the judgment(s) of the court in a remitted matter will also be available to the
inspector/commission on the remitted file and that nothing from the court is required to facilitate
that.
34. The agreed directions for further comments were as follows:
Commission to respond in writing by 24 July 2026
Other parties to respond in writing by 31 July 2026
For Mention 21 September 2026
35. Once the commission has clarified matters and the other parties have had the opportunity
to respond the matter can be progressed to a final order.
36. I would like to record my thanks to the applicants and to all of the lawyers involved for their
unfailingly courteous, professional and helpful assistance. As I have previously sought to make
clear, insofar as any points advanced are not being accepted in this or any other given judgment,
that is solely to do with the inherent merits of such points and is no reflection on those making or
instructed to convey such points, a distinction that most certainly should be, and I believe generally
is in fact, self-evident to all concerned.
37. On 13 July 2026, a draft of the present judgment was sent to the parties, pursuant to
paragraphs 15, 195 to 198 and 204 of Practice Direction HC 137 issued by the President of the High
Court, to give an opportunity to address matters such as errors/ambiguities on the basis set out
below.
38. Parties are required to:
(i) Read the draft or have their legal representatives if applicable do so on their behalf.
(ii) Identify any matters falling within the below.
(iii) Positively communicate with the court in writing in response to the draft by the
deadline specified, such responses to be emailed to the court and uploaded to
ShareFile, either stating that they have no comments or setting out the comments.
(iv) Carry out the foregoing without delay – the draft judgment procedure is a concession
which parties can engage with but must do so with immediate dispatch, discipline
and focus – it is not the opening of a new phase of the litigation that gives rise to
“an entitlement to elaborate procedures at every point” (to use a phrase of O’Donnell
C.J. (Dunne, Charleton and Baker JJ. concurring) in O’Sullivan v. Health Service
Executive [2023] IESC 11 (Unreported, Supreme Court, 10 May 2023) at para. 39);
and still less should the procedure invite the perhaps “serious error, to which lawyers
are prone, to approach any such case on the tacit assumption that only procedures
which approximate to a criminal trial are fair, and anything which departs from that
is somehow dubious” (O’Donnell J. (Clarke C.J., McKechnie, MacMenamin, Dunne JJ.
concurring) in O'Sullivan v. Sea Fisheries Protection Authority [2017] IESC 75,
[2017] 3 I.R. 751, [2018] 1 I.L.R.M. 245, 780).
(v) Keep the draft confidential. Draft judgments are not public domain materials and,
while they can be shared between the lawyers concerned and their clients, subject
to the following, it is inappropriate for any person to refer to them for any purpose
other than to assist the court in relation to the finalisation of the formal judgment.
Therefore anyone with information as to the text, content or proposed outcome of
any draft is required not to publish or transmit such information to others save solely
by way of private transmission for the legitimate purposes of assisting in the
finalisation of the judgment and subject to a similar restriction on any recipient.
Trial participants should take reasonable steps to keep drafts confidential. On this
topic, see Attorney General v. Crosland (No. 2) [2021] UKSC 58, [2022] 1 W.L.R.
367, [24/01/2022] T.L.R. 1 (Briggs, Kitchin, Burrows, Rose, Arden SCJJ) which
discusses why restriction on publication of draft judgments is in the interests of the
administration of justice; see also Baigent v. Random House Group Ltd [2006] EWHC
1131 (Ch), [2006] 5 WLUK 45, (2006) 150 S.J.L.B. 603 (Smith J.); R. (Counsel
General for Wales) v. Secretary of State for Business, Energy and Industrial Strategy
[2022] EWCA Civ 181, [2022] 1 W.L.R. 1915, [2022] 4 All E.R. 599 (Sir Geoffrey
Vos MR; Davies and Dingemans LJJ. concurring); Public Institution for Social
Security v. Banque Pictet & Cie SA and others [2022] EWCA Civ 368, [2022] 3 WLUK
291, [2022] B.L.R. 349 (Carr LJ; Jackson and Simler LJJ. concurring); Itkin v. Wood
[2023] JRC 101 (Unreported, Royal Court of Jersey, 22 June 2023).
39. The foregoing constitutes an immediately effective direction of the court to the parties and
anyone having notice of the draft judgment with effect from the date of circulation of the draft.
40. The responses should not be to reargue the substance (submissions to that effect will be
disregarded) but are confined to matters such as:
(i) informing the court as to whether the party prefers an alternative to a formal written
judgment as proposed, and if the party so considers, whether that party considers
that the entire matter or some specified part of it can be disposed of (a) by order
without a reasoned judgment, or (b) by ex tempore reasons without a written
judgment;
(ii) informing the court, assuming that the court proceeds with a formal judgment, as
to whether the party wishes to propose any corrections to the draft such as:
(a) any apparent typographical, factual, legal or other errors in the draft;
(b) any apparent ambiguity or other matter in the draft that could unnecessarily
multiply issues or complicate the further processing of the matter;
(c) any redaction of personal or other information that a party wishes to request;
(d) in the event that the court proposes to refer to any matter (whether factual,
legal (including reference to authorities or other legal material), obiter comment
or otherwise) not referred to at the hearing, any submission as to why such
reference is not relevant or otherwise should not be included or as to why such
matter if included should not lead to the proposed conclusion;
(e) any other matter in the draft judgment that the party considers should be
omitted;
(f) any matter not included in the draft judgment that the party considers should
be added to it (including where the party considers that procedural, factual or
legal points not set out in the judgment should be addressed or where the party
considers that reasons for any aspect of the decision are not set out or where
an overall ground is disposed of but detail of the ground or sub-ground is not
expressly addressed, or where an issue arose the disposition of which would be
obiter but on which the party concerned considers that there would be a benefit
in the court expressing a view); and
(g) any other proposals as to the wording (as opposed to substance) of the decision
if the proposed wording causes any issue for a party for any identified reason;
and
(iii) assisting the court by providing views on such matters if any on which views are
specifically invited in the draft judgment.
41. In particular, parties should draw the court’s attention to any apparent error or ambiguity
whether they have been successful on the point or not.
42. The rules of engagement in such a situation are that the draft is without prejudice to the
right of the court ultimately to issue a judgment in whatever form or with whatever content it
considers appropriate. It is then entirely a matter for the court as to whether to give judgment with
or without amendment including any amendment that appears appropriate to the court whether
arising from submissions or not. Any judgment may be given without further notice following the
expiry of the specified period, whether comments are made or not. That period will not be extended
save in exceptional circumstances.
43. The deadline for such comments from the commission was to be 11:00 on Wednesday 15
July 2026 and from other parties was to be 11:00 on Thursday 16 July 2026.
44. Responses were as follows:
(i) Applicants: The applicants sought confirmation that they could comment on issue 4.
In that regard, as noted above, issue 4 is “subject to” (para. 24) issue 5, i.e., issue
4 is not finalised and depends on submissions by the parties, following initial
clarification by the commission, on foot of issue 5 to the extent that those matters
have implications for issue 4.
(ii) Commission: The commission sought further time to consider the issue identified,
and agreed directions were furnished. I indicated the intention to issue the present
judgment in the meantime. The commission also helpfully pointed out a typo.
(iii) Council: no comments.
Order
45. The order made on 9 July 2026 was:
(i) to quash the demolition between chainage 1610 to 1780 so the wall and stile in their
entirety remain;
(ii) to quash the widening between chainage 1660 to 1740 so the car park remains; and
(iii) all chainage per drawing GA0011
46. For the foregoing reasons, it is now ordered that:
(i) the commission be requested to clarify the issues identified in the judgment subject
to replies by other parties within agreed timelines; and
(ii) the matter be listed at 09:30 on 21 September 2026 for further directions.