Legislator Case Law & Legislation
IEHC 453 ECLI:IE:HC:2026:453 AI generated

High Court dismisses leave to appeal on technical interpretation of non-binding planning guidelines regarding wind turbine separation.

Case Number IEHC 453
Court / Authority
Jurisdiction Ireland (IE)
Decision Date
Outcome Dismissed

Legislator summary

AI generated

The High Court dismissed the applicants' application for leave to appeal a decision on wind turbine planning. The applicants argued that non-binding ministerial guidelines required separation distances even without adjoining wind developments, but the court found this interpretation contrary to the guidelines' non-mandatory language. The judge ruled that advancing such a technical point of law lacks public importance and is not in the public interest given the clear text and lack of practical problems.

Legislator headnote

AI generated

Section 50, 50A and 50B of the Planning and Development Act 2000; Non-binding ministerial guidelines do not create a mandatory requirement for separation distances where the text explicitly states they are general and do not apply to situations lacking adjoining wind developments.

Keywords

AI generated
non-binding guidelines planning separation distances leave to appeal public interest certiorari proceedings wind turbine layout ministerial guidelines

Cited Legislation

AI generated
Section 50 of the Planning and Development Act 2000
IN THE MATTER OF SECTION 50, 50A AND 50B OF THE PLANNING AND
Section 50A of the Planning and Development Act 2000
PLANNING AND DEVELOPMENT ACT, 2000
Section 50B of the Planning and Development Act 2000
PLANNING AND DEVELOPMENT ACT, 2000
Regulation (EU) 2022/2577
the predecessor instrument, Council Regulation (EU) 2022/2577 of 22 December 2022 laying down
Article 191(2) TFEU
emergency, to which a number of key measures are relevant, including the EU Charter, art. 191(2)
Regulation (EU) 2021/1119
TFEU, the polluter pays principle, and the European Climate Law (Regulation (EU) 2021/1119 of the
Development Act, 2000
Section 261A of Planning and Development Act, 2000 Supplementary Guidelines

Cited Case Law

AI generated
AI generated

Need to analyze how this precedent applies to your matter?

Cross-reference this judgment against statutes, commentaries, and subsequent citing case law inside Legislator AI.

Open in Legislator →

Full text

[2026] IEHC 453

THE HIGH COURT

PLANNING & ENVIRONMENT

[H.JR.2026.0000074]

IN THE MATTER OF SECTION 50, 50A AND 50B OF THE PLANNING AND

DEVELOPMENT ACT 2000

BETWEEN

STEPHEN KEOGH, TOM QUIRKE AND RURAL RESIDENTS WIND AWARE AND

ENVIRONMENTAL GROUP

APPLICANTS

AND

AN COIMISIÚN PLEANÁLA

RESPONDENT

AND

EDF RENEWABLES IRELAND LIMITED

NOTICE PARTY

(No. 2)

Date of impugned decision: 27 November 2025

Date proceedings commenced: 20 January 2026

Date of main hearing: 27 April 2026 & 5 May 2026

Date of principal judgment: 29 May 2026

Date of leave to appeal hearing: 6 July 2026

Date draft judgment circulated: 7 July 2026

JUDGMENT of Humphreys J. delivered on Friday 10 July 2026

1. Non-binding ministerial guidelines provide that turbine layout and separation distances

should “ensure that any proposed layout of wind turbines takes into account the development

potential of an adjoining site for a similar development”. The inspector here, correctly, did not view

this clause as relevant where there was no proposed adjoining wind development. The applicants

implausibly attempt to read the guidelines out of context to impose a need for separation distances

even when this is not required to “ensure that any proposed layout of wind turbines takes into

account the development potential of an adjoining site for a similar development”. The question

now is whether a reading that is so completely at variance with the text, in the context of guidelines

that are non-binding to begin with, and that are phrased in non-mandatory language (“in general”),

gives rise to any basis to pursue a failed claim for certiorari further at appellate level.

Judgment history

2. In Keogh v. An Coimisiún Pleanála [2026] IEHC 339 (Unreported, High Court, 29 May 2026),

I upheld the validity of the permission and dismissed the proceedings with no order. The applicants

now seek leave to appeal.

Procedural history

3. Following the substantive judgment, the applicants delivered legal submissions seeking

leave to appeal, dated 17 June 2026. The opposing parties delivered replying submissions and the

matter was heard on 6 July 2026.

4. Judgment was reserved at the end of that hearing. I would like to record my thanks to all

of the lawyers involved for their unfailingly courteous, professional and helpful assistance. As I have

previously sought to make clear, insofar as any points advanced are not being accepted in this or

any other given judgment, that is solely to do with the inherent merits of such points and is no

reflection on those instructed to convey such points, a distinction that most certainly should be, and

I believe generally is in fact, self-evident to all concerned.

5. On 7 July 2026, a draft of the present judgment was sent to the parties, pursuant to

paragraphs 15, 195 to 198 and 204 of Practice Direction HC 137 issued by the President of the High

Court, to give an opportunity to address matters such as errors/ambiguities on the basis set out

below.

6. Parties are required to:

(i) Read the draft or have their legal representatives if applicable do so on their behalf.

(ii) Identify any matters falling within the below.

(iii) Positively communicate with the court in writing in response to the draft by the

deadline specified, such responses to be emailed to the court and uploaded to

ShareFile, either stating that they have no comments or setting out the comments.

(iv) Carry out the foregoing without delay – the draft judgment procedure is a concession

which parties can engage with but must do so with immediate dispatch, discipline

and focus – it is not the opening of a new phase of the litigation that gives rise to

“an entitlement to elaborate procedures at every point” (to use a phrase of O’Donnell

C.J. (Dunne, Charleton and Baker JJ. concurring) in O’Sullivan v. Health Service

Executive [2023] IESC 11 (Unreported, Supreme Court, 10 May 2023) at para. 39);

and still less should the procedure invite the perhaps “serious error, to which lawyers

are prone, to approach any such case on the tacit assumption that only procedures

which approximate to a criminal trial are fair, and anything which departs from that

is somehow dubious” (O’Donnell J. (Clarke C.J., McKechnie, MacMenamin, Dunne JJ.

concurring) in O'Sullivan v. Sea Fisheries Protection Authority [2017] IESC 75,

[2017] 3 I.R. 751, [2018] 1 I.L.R.M. 245, 780).

(v) Keep the draft confidential. Draft judgments are not public domain materials and,

while they can be shared between the lawyers concerned and their clients, subject

to the following, it is inappropriate for any person to refer to them for any purpose

other than to assist the court in relation to the finalisation of the formal judgment.

Therefore anyone with information as to the text, content or proposed outcome of

any draft is required not to publish or transmit such information to others save solely

by way of private transmission for the legitimate purposes of assisting in the

finalisation of the judgment and subject to a similar restriction on any recipient.

Trial participants should take reasonable steps to keep drafts confidential. On this

topic, see Attorney General v. Crosland (No. 2) [2021] UKSC 58, [2022] 1 W.L.R.

367, [24/01/2022] T.L.R. 1 (Briggs, Kitchin, Burrows, Rose, Arden SCJJ) which

discusses why restriction on publication of draft judgments is in the interests of the

administration of justice; see also Baigent v. Random House Group Ltd [2006] EWHC

1131 (Ch), [2006] 5 WLUK 45, (2006) 150 S.J.L.B. 603 (Smith J.); R. (Counsel

General for Wales) v. Secretary of State for Business, Energy and Industrial Strategy

[2022] EWCA Civ 181, [2022] 1 W.L.R. 1915, [2022] 4 All E.R. 599 (Sir Geoffrey

Vos MR; Davies and Dingemans LJJ. concurring); Public Institution for Social

Security v. Banque Pictet & Cie SA and others [2022] EWCA Civ 368, [2022] 3 WLUK

291, [2022] B.L.R. 349 (Carr LJ; Jackson and Simler LJJ. concurring); Itkin v. Wood

[2023] JRC 101 (Unreported, Royal Court of Jersey, 22 June 2023).

7. The foregoing constitutes an immediately effective direction of the court to the parties and

anyone having notice of the draft judgment with effect from the date of circulation of the draft.

8. The responses should not be to reargue the substance (submissions to that effect will be

disregarded) but are confined to matters such as:

(i) informing the court as to whether the party prefers an alternative to a formal written

judgment as proposed, and if the party so considers, whether that party considers

that the entire matter or some specified part of it can be disposed of (a) by order

without a reasoned judgment, or (b) by ex tempore reasons without a written

judgment;

(ii) informing the court, assuming that the court proceeds with a formal judgment, as

to whether the party wishes to propose any corrections to the draft such as:

(a) any apparent typographical, factual, legal or other errors in the draft;

(b) any apparent ambiguity or other matter in the draft that could unnecessarily

multiply issues or complicate the further processing of the matter;

(c) any redaction of personal or other information that a party wishes to request;

(d) in the event that the court proposes to refer to any matter (whether factual,

legal (including reference to authorities or other legal material), obiter comment

or otherwise) not referred to at the hearing, any submission as to why such

reference is not relevant or otherwise should not be included or as to why such

matter if included should not lead to the proposed conclusion;

(e) any other matter in the draft judgment that the party considers should be

omitted;

(f) any matter not included in the draft judgment that the party considers should

be added to it (including where the party considers that procedural, factual or

legal points not set out in the judgment should be addressed or where the party

considers that reasons for any aspect of the decision are not set out or where

an overall ground is disposed of but detail of the ground or sub-ground is not

expressly addressed, or where an issue arose the disposition of which would be

obiter but on which the party concerned considers that there would be a benefit

in the court expressing a view);

(g) any other proposals as to the wording (as opposed to substance) of the decision

if the proposed wording causes any issue for a party for any identified reason;

and

(iii) assisting the court by providing views on such matters if any on which views are

specifically invited in the draft judgment.

9. In particular, parties should draw the court’s attention to any apparent error or ambiguity

whether they have been successful on the point or not.

10. The rules of engagement in such a situation are that the draft is without prejudice to the

right of the court ultimately to issue a judgment in whatever form or with whatever content it

considers appropriate. It is then entirely a matter for the court as to whether to give judgment with

or without amendment including any amendment that appears appropriate to the court whether

arising from submissions or not. Any judgment may be given without further notice following the

expiry of the specified period, whether comments are made or not. That period will not be extended

save in exceptional circumstances.

11. The deadline for such comments from the parties was to be 11:00 on Thursday 9 July 2026.

Responses were as follows:

(i) applicants: no comments;

(ii) commission: helpful pointed out a typo; and

(iii) notice party: helpful pointed out some typos.

Leave to appeal

12. The statutory criteria for leave to appeal are familiar. Some of the major elements required

for the grant of leave to appeal are as follows:

(i) The point must properly arise

(a) The question must fall within the pleadings: Concerned Residents of

Treascon and Clondoolusk v. An Bord Pleanála & Ors. [2024] IESC 28,

[2024] 7 JIC 0402 (Unreported, Supreme Court, 4 July 2024) per Murray

J. at paras. 39 et seq. (O'Donnell C.J., Woulfe, Collins and Donnelly JJ.

concurring). The issue of whether a point falls within the pleadings, as

determined by the trial court, does not normally raise a point of law

suitable for an appeal: see Leech v. An Bord Pleanála [2025] IESCDET 106

(O’Malley, Murray and Donnelly JJ., 30 July 2025) at 30 “The essential

point made by the Applicant is that the trial judge granted relief quashing

the decision of the Board on a basis that was not pleaded, that

misinterpreted the decision of the Board granting the permission in

question, and that failed to properly apply the general presumption that a

decision of an administrative body is lawful. Issues of pleading and of an

alleged misinterpretation of a specific administrative decision will usually

be case specific and will not present issues of law of public importance.

While the presumption of validity attaching to administrative decisions

represents an important legal principle, the fact of that presumption and

its effect are not the subject of any uncertainty and the application of the

presumption to a particular decision will not usually involve an issue of law

of public importance”.

(b) The question must actually arise on the facts and should not be

launched in the abstract: see analogously Minister for Justice and Equality

v. Andrzejczak (No. 2) [2018] IEHC 11, [2018] 1 JIC 1603 (Unreported,

High Court, Donnelly J., 16 January 2018), para. 10.

(c) The question raised must actually have been argued by the would-be

appellant and must not be a new issue formulated for the purposes of an

appeal: GOCE Limited v. An Bord Pleanála [2025] IEHC 43 (Unreported,

High Court, Farrell J., 31 January 2025).

(d) While not an absolute rule, the question should be determinative in some

sense and should make a difference to the outcome – generally it

should not be one which, if answered in a sense favourable to the would-

be appellant, would leave the result unchanged: S.A. v. Minister for Justice

and Equality (No. 2) [2016] IEHC 646, 2016 WJSC-HC 439, [2016] 11 JIC

1404 (Unreported, High Court, 14 November 2016); Morehart v. An Bord

Pleanála [2025] IEHC 701 (Unreported, High Court, Farrell J., 8 December

2025) at 9. This is part of a broader principle that prolonging the process

by recourse to a further instance can’t be based on just identifying some

shiny and interesting point – the whole thing has to be going somewhere.

O’Donnell J. (Clarke and Dunne JJ. concurring) put this vividly in Rooney

v. Minister for Agriculture and Food [2016] IESC 1 (Unreported, Supreme

Court, 28 January 2016) at para. 3: “Some litigants, and not just those

who represent themselves, prefer the comfort of focusing exclusively on

the debatable ruling or judicial comment reinforcing a sense of grievance

rather than recognise the forest of problems in the overall case. The cycle

continues and becomes almost a form of litigious perpetual motion”.

(e) The question must accurately reflect the judgment and must not be

an addition, exaggeration or distortion launched for the purposes of

creating a case for appeal: Monkstown Road Residents Association v. An

Bord Pleanála [2023] IEHC 9, [2023] 1 JIC 1907 (Unreported, High Court,

19 January 2023) per Holland J. at §9(d); Stapleton v. An Bord Pleanála

[2025] IEHC 178 (Unreported, High Court, 1 April 2025) per Holland J. As

put more generally by the Supreme Court in Cooper v. An Bord Pleanála

[2025] IESCDET 96 (O’Malley, Collins and Donnelly JJ., 28 July 2025) at

15, “The applicant’s misunderstanding of the legal situation does not

amount to a matter of general public importance”.

(f) The application for leave to appeal should be made within time,

generally within 28 days from the order to be appealed against: S.A. v.

Minister for Justice and Equality (No. 2) [2016] IEHC 646, 2016 WJSC-HC

439, [2016] 11 JIC 1404 (Unreported, High Court, 14 November 2016).

(g) The question should be specific and should identify something specific that

makes a difference – it should not be an invitation to an appellate

court to write an essay on a particular topic or engage in a discursive,

roving response: S.A. v. Minister for Justice and Equality (No. 2) [2016]

IEHC 646, 2016 WJSC-HC 439, [2016] 11 JIC 1404 (Unreported, High

Court, 14 November 2016); Stapleton v. An Bord Pleanála [2025] IEHC

178 (Unreported, High Court, 1 April 2025) per Holland J.

(ii) The point must be one of law

(a) The point cannot be an essentially factual question such as construing

the import and effect of a particular decision: Leech v. An Bord Pleanála

[2025] IEHC 157 (Unreported, High Court, 24 March 2025) per Farrell J.

(b) Relatedly, the question should not be one of application of law to

particular facts but rather one of the substance, content and

interpretation of law. Questions about the application of established

principles to particular facts are not pure questions of law and are at best

mixed questions of fact and law, and are generally unsuitable for appeal

in such a context: B.S. v. Director of Public Prosecutions [2017] IESCDET

134 (Clarke C.J., O’Donnell, McKechnie, MacMenamin, Dunne, Charleton

and O’Malley JJ., 6 December 2017); per Simons J. in Halpin v. An Bord

Pleanála [2020] IEHC 218, [2020] 5 JIC 1501 (Unreported, High Court, 15

May 2020), para. 60; per Barniville J. in Rushe v. An Bord Pleanála [2020]

IEHC 429, [2020] 8 JIC 3101 (Unreported, High Court, 31 August 2020);

per Phelan J. in Stanley v. An Bord Pleanála [2022] IEHC 671, [2022] 11

JIC 2805 (Unreported, High Court, 28 November 2022); Eco Advocacy CLG

v. An Bord Pleanála, Keegan Land Holdings Limited, An Taisce - The

National Trust for Ireland and Client Earth AISBL [2024] IESCDET 62

(Charleton, Woulfe and Collins JJ., 27 May 2024); per Farrell J. in Leech

v. An Bord Pleanála [2025] IEHC 157 (Unreported, High Court, 24 March

2025).

(iii) The point of law must be of public importance

(a) The question must not be fact-specific arising in the particular context

of a particular case – rather it must transcend the facts in order to create

a point of public importance: see analogously and albeit non-

precedentially, Patrick McCaffrey & Sons Limited v. An Bord Pleanála

[2024] IESCDET 145 (Dunne, Hogan and Collins JJ., 29 November 2024).

See also Leech v. An Bord Pleanála [2025] IESCDET 106 (O’Malley, Murray

and Donnelly JJ., 30 July 2025) at 30: “The essential point made by the

Applicant is that the trial judge granted relief quashing the decision of the

Board on a basis that was not pleaded, that misinterpreted the decision of

the Board granting the permission in question, and that failed to properly

apply the general presumption that a decision of an administrative body is

lawful. Issues of pleading and of an alleged misinterpretation of a specific

administrative decision will usually be case specific and will not present

issues of law of public importance. While the presumption of validity

attaching to administrative decisions represents an important legal

principle, the fact of that presumption and its effect are not the subject of

any uncertainty and the application of the presumption to a particular

decision will not usually involve an issue of law of public importance”.

(b) Advancing the proposed question should resolve doubt rather than

create doubt where none exists – this is consistent with the views of

Baker J. in Ógalas v. An Bord Pleanála [2015] IEHC 205, [2015] 3 JIC

2008 (Unreported, High Court, 20 March 2015) that an appeal may be

necessary in the public interest to resolve doubt. But if no doubt exists,

the function of the appeal mechanism is not to introduce new uncertainty

into the system. Nagle View Turbine Aware Group v. An Bord Pleanála

(No. 2) [2025] IEHC 3 (Unreported, High Court, 10 January 2025)

endorsed a submission that “where the law is not uncertain, the public

interest suggests an appeal is not warranted”.

(c) The application for leave to appeal should engage with the rationale of

the judgment being appealed against and provide a plausible basis

as to why that judgment is wrong to the level that meets the criteria

for an appeal. While a leave to appeal application is in one sense premised

on the view that the decision may be incorrect, that does not relieve a

would-be appellant from actually engaging with the logic and reasoning of

the judgment as opposed to merely repeating his or her position: see

analogously and non-precedentially, Nagle View Turbine Aware v. An Bord

Pleanála [2025] IESCDET 41 (O’Malley, Murray and Donnelly JJ., 10 March

2025).

(d) The fact that an official body is seeking leave to appeal is a relevant factor

(Sherwin v. An Bord Pleanála (No. 2) [2023] IEHC 232, [2023] 5 JIC 0802

(Unreported, High Court, 8 May 2023)) but the mere fact that the

request for leave to appeal is made by an official entity does not

convert a point into one being suitable for appeal if it would not

otherwise be so. As pointed out in Stapleton v. An Bord Pleanála [2025]

IEHC 178 (Unreported, High Court, 1 April 2025) per Holland J., a body

concerned that it is bound by a decided issue is the whole point – the

system is not a one-way ratchet whereby only applicants are bound by

caselaw.

(e) The fact that a point is “novel” is not determinative as to whether a point

is suitable for the granting of a certificate, or to put matters another way,

the mere fact that a point is novel does not render it a suitable

basis for appeal if it would not otherwise be so: Callaghan v. An Bord

Pleanála [2015] IEHC 493, [2015] 7 JIC 2405 (Unreported, High Court,

Costello J., 24 July 2015). And as Hyland J. observed in Maguire T/A Frank

Pratt & Sons (No. 2) [2023] IEHC 209, [2023] 3 JIC 1307 (Unreported,

High Court, 13 March 2023) at §27: “the mere fact that an applicant for

leave disagrees with a conclusion in the judgment cannot be relied upon

to characterise the state of the law as being uncertain”.

(f) The mere inclusion of a request for a reference to the CJEU does

not convert a point into one suitable for appeal if it is otherwise

unsuitable for appeal by reason of being abstract, or not arising having

regard to the findings of fact, or being an issue of application of law rather

than interpretation, or due to lacking sufficient factual foundation or due

to there not being any demonstrable reasonable doubt, for example: see

analogously Carrownagowan Concern Group v. An Bord Pleanála [2025]

IESCDET 8 (Charleton, Collins and Donnelly JJ., 27 January 2025);

Carrownagowan Concern Group v. An Bord Pleanála [2025] IESCDET 9

(Charleton, Collins and Donnelly JJ., 27 January 2025).

(iv) The public importance must be exceptional

If the would-be appellant establishes that there is a point of law of public importance,

it must also be established that the importance is exceptional.

(v) An appeal must be in the public interest

(a) The context is the objective of the Oireachtas in seeking finality, certainty

and expedition in challenges brought by way of judicial review in planning

cases (Cork Harbour Alliance for a Safe Environment v. An Bord Pleanála

[2022] IEHC 231, [2022] 4 JIC 2601 (Unreported, High Court, 26 April

2022) per Barniville J. at para. 32; Freeney v. An Bord Pleanála [2025]

IEHC 36 (Unreported, High Court, 24 January 2025) per Bradley J.). The

nature of the project and the risks of further delay are factors going to the

requirement that an appeal must be in the public interest: see per

McGovern J. in Dunnes Stores v. An Bord Pleanála [2015] IEHC 387,

[2015] 6 JIC 1805 (Unreported, High Court, 18 June 2015) at §15 and

§16. See also analogously and non-precedentially Eco Advocacy CLG v.

An Bord Pleanála, Keegan Land Holdings Limited, An Taisce - The National

Trust for Ireland and Client Earth AISBL [2024] IESCDET 62 (Charleton,

Woulfe and Collins JJ., 27 May 2024) at para. 24: “The Court must have

regard to the potential impact upon the notice party of any further delay

in these proceedings”.

(b) Any assertion of problems in practice caused by a judgment must be

backed up with evidence: see Stapleton v. An Bord Pleanála [2025]

IEHC 178 (Unreported, High Court, 1 April 2025) per Holland J.; Phoenix

Rock Enterprises v. An Bord Pleanála & Ors. [2023] IESCDET 97 (Dunne,

Baker and Donnelly JJ., 20 July 2023) at §22 and §30 which dealt with an

argument that alleged uncertainty in the law was creating alleged

difficulties in practice, but rejected this on the basis that there was “no

evidence before the High Court that the quarry industry was being

seriously affected by the issues in the case”, and that “[t]he decision in

this case was fact-specific to this quarry and it must be recalled that the

role of the Supreme Court on an Article 34 appeal is not to give advisory

opinions but to deal with the controversy at issue between the parties once

the constitutional thresholds have been met”. See also McCaffrey v. An

Bord Pleanála [2024] IEHC 476 (Unreported, High Court, Gearty J., 26 July

2024) at §3.7, leave to appeal refused McCaffrey v. An Bord Pleanála

[2024] IESCDET 145 (Dunne, Hogan and Collins JJ., 29 November 2024).

13. Contextually, perhaps I can point out that if there is a solid case for leave to appeal, it will

presumably be granted – see R.A. v. Refugee Appeals Tribunal [2015] IEHC 830 (Unreported, High

Court, 21 December 2015); B.W. v. Refugee Appeals Tribunal [2015] IEHC 833 (Unreported, High

Court, 21 December 2015); K.R.A. v. Minister for Justice and Equality (No. 2) [2016] IEHC 421

(Unreported, High Court, 24 June 2016); S.T.E. v. Minister for Justice and Equality [2016] IEHC 544

(Unreported, High Court, 14 October 2016); R.A. v. Refugee Appeals Tribunal (No. 3) [2016] IEHC

671 (Unreported, High Court, 21 November 2016); B.S. (India) & Anor. v. Minister for Justice and

Equality & Ors. (No. 3) [2020] IEHC 485, [2020] 10 JIC 1202 (Unreported, High Court, 12 October

2020); Dublin City Council v. An Bord Pleanála (No. 2) [2021] IEHC 34 (Unreported, High Court, 28

January 2021); Waltham Abbey Residents Association v. An Bord Pleanála [2021] IEHC 597, [2021]

10 JIC 0702 (Unreported, High Court, 7 October 2021); Sweetman v. An Bord Pleanála (Sweetman

XVII) (No. 2) [2021] IEHC 662, [2021] 10 JIC 2601 (Unreported, High Court, 26 October 2021);

Save Roscam Peninsula CLG v. An Bord Pleanála (No. 2) [2022] IEHC 328, [2022] 6 JIC 0903

(Unreported, High Court, 9 June 2022); Joyce-Kemper v. An Bord Pleanála (No. 5) [2022] IEHC 349

(Unreported, High Court, 10 June 2022); Kerins v. An Bord Pleanála (No. 5) [2023] IEHC 280

(Unreported, High Court, 25 May 2023); Coolglass Wind Farm Ltd v. An Bord Pleanála [2025] IEHC

1 (Unreported, High Court, 10 January 2025); Heavey v. An Bord Pleanála (No. 2) [2025] IEHC 311

(Unreported, High Court, 30 May 2025). It does not necessarily assist matters to certify superfluous

issues that do not meet the necessary criteria.

The proposed question of alleged exceptional public importance

14. The applicants’ proposed question is as follows:

“Whether the provisions of §.5.13 of the Wind Energy Development Guidelines 2006

(WEDG 2006) provide guidelines for the separation distances as between turbine-to-

turbine on a specific development site.”

The guidelines

15. It will be useful to recall the provisions of the guidelines. The context, as with any planning

instrument, is In re XJS Investments Ltd 1986 WJSC-SC 1935, [1986] I.R. 750, [1987] I.L.R.M. 659,

[1986] 12 JIC 1102 (McCarthy J., nem., diss.), where it was held that “Certain principles may be

stated in respect of the true construction of planning documents ... They are to be construed in their

ordinary meaning as it would be understood by members of the public, without legal training as well

as by developers and their agents, unless such documents, read as a whole, necessarily indicate

some other meaning”.

16. The full text of section 5.13 is (emphasis added):

“5.13 Windtake

The question of windtake should be dealt with at scoping stage and/or during pre-application

discussions, to ensure that any proposed layout of wind turbines takes into account

the development potential of an adjoining site for a similar development.

In general, to ensure optimal performance and to account for turbulence and wake

effects, the minimum distances between wind turbines will generally be three times the

rotor diameter (=3d) in the crosswind direction and seven times the rotor diameter (=7d)

in the prevailing downwind direction. Bearing in mind the requirements for optimal

performance, a distance of not less than two rotor blades from adjoining property boundaries

will generally be acceptable, unless by written agreement of adjoining landowners to

a lesser distance. However, where permission for wind energy development has been

granted on an adjacent site, the principle of the minimum separation distances between

turbines in crosswind and downwind directions indicated above should be respected.”

17. The context of there being an adjoining wind development is alluded to in para. 17.17 which

in turn expressly links back into para. 5.13 (emphasis added):

“Conditions with regard to windtake could be included to ensure that wind turbines are

located in a manner that respects the development potential of the adjoining site for

a similar development. Where such conditions apply they should generally allow a distance

from adjoining site boundaries of not less than two rotor blades having regard to the

wind resource at the site, save with the written agreement of the adjoining

landowner(s). This issue is more appropriately addressed before an application is made

(see paragraph 5.13).”

18. Everything about the text of these provisions screams that they are related to the wind

energy potential of adjoining sites. Literally every sentence contains express language tying the

rationale of the provision to the impact on adjoining lands in the context of the level of kinetic energy

potentially available on such lands in the context of wind energy developments to be located there.

The section of the guidelines is not, on the proper or indeed any reasonable interpretation, a demand

that the specified separation distances in the section must apply whether there are adjoining sites

to be developed for wind energy or not.

19. That is not to say that there may not be an argument for separation distances in general

whether by reference to international practice, or minimisation of noise, as argued by the applicants,

or for some other reasons. But any such arguments arise by way of consideration of submissions

or in the evaluative process, not under section 5.13 of the guidelines as pleaded.

20. The applicants argue that if section 5.13 does not cover separation distances for the sake of

separation distances as opposed to for the sake of other wind farms, then there is no control over

separation distances. That is obviously a misconception. There is nothing stopping the commission

or any other planning decision-taker from considering separation distances as part of its general

function to assess proper planning and sustainable development. But that does not warrant shoe-

horning this question into the quite different language and context of section 5.13 of the guidelines.

21. What is noteworthy about the applicants’ current approach is that having relied

(counterproductively) on section 17.17 at the substantive hearing and again in response to the draft

judgment, they now barely refer to this provision and do not dispute the finding that this relates to

the development potential of adjoining sites. They have in essence painted themselves into a corner

on the interpretation question, and their point can only survive on the basis of taking fragments of

text completely out of context and reading them contrary to their obvious sense. The notice party

points out the difficulty:

“4. During the draft judgment procedure, the Applicants signalled their views in respect

of the Court’s consideration of section 5.13 of the WEDG in the following terms as recorded

at §110 of the Judgment:

‘The Applicants disagree with the Court’s conclusion regarding their contention that the

Inspector and the Commission were in error in their interpretation of the 2006 Wind Energy

Guidelines section 5.13 and paragraph [17.17]. The Applicants have been advised and

believe that section 5.13 and paragraph [17.17] are rooted in engineering and scientific

understanding of the effect of wake in the operation of windfarms where turbines are sighted

at what is considered to be too closely together. The Applicants believe that the Inspector’s

misinterpretation creates a precedent which is contrary to scientific understanding and that

will have consequences which cannot be predicted yet.’

5. It is noteworthy that, on this certificate application, the Applicants have not pursued

any question or issue in respect of section 7.17 of the WEDG, nor is that provision of the

WEDG referred to in the Applicants’ written submissions, notwithstanding that section 7.17

of the WEDG expressly references section 5.13 of the WEDG.

...

17. The Applicant’s submissions at §15 appear to consider the Judgment out of context.

At §108 of its judgment, the High Court considers sections 5.13 and [17.17] of the WEDG –

it is noteworthy that the Applicants do not reference, still less take any issue with, the Court’s

consideration of section [17.17]. However, the Court’s statement at §108 is made in the

context of considering the provisions of section [17.17]. Furthermore, the Court’s comments

at §108 are not inconsistent with section 1.1 of the WEDG. The fact that the Applicants

contend that §5.13 of the WEDG applies internally to one site – does not make it so, or

result in an error on the part of the High Court.”

22. Insofar as the applicants at leave to appeal stage tried to rely on the noise provisions of

section 5.6 of the guidelines this was not a pleaded point and should not properly be considered

further. In any event, a differently worded clause about a different subject doesn’t get the applicants

very far. As the notice party correctly points out:

“16. Furthermore, not only is the belated suggestion that section 5.13 must be read

consistently with section 5.6 not pleaded, moreover, such contention is not supported by an

objective reading of those provisions of the WEDG. As referenced above, section 5.6 of the

WEDG makes no reference to adjacent sites and is focused on noise generated from a turbine

and its impact on noise sensitive properties.”

The judgment under proposed appeal

23. The judgment under proposed appeal upheld the interpretation of the guidelines adopted by

the inspector which was to the effect that the provision of the guidelines did not apply because there

was no proposed wind development of adjoining lands. Implicit in that is the view that a reasonably

intelligent and well informed person without legal expertise would read the guidelines in the way the

inspector did (XJS).

24. In the absence of anything suggesting that there was any similar development consented or

proposed, or even envisaged, for an adjoining site, the inspector was correct in holding that this was

not relevant to this particular project. To put it another way, the issue was academic in the absence

of any other relevant wind energy development that could be affected by this permission.

25. The judgment went on to say that in effect even if the inspector misinterpreted the

guidelines, that and the other pleaded EIA complaints did not give rise to an entitlement to certiorari:

(i) The second paragraph is not mandatory – it begins “In general”.

(ii) It would be inappropriate and counterproductive to use the guidelines, which are a

basis for encouraging more wind developments, as a basis to stymie a consented

development such as this one. It makes no sense to use a provision designed to

encourage maximum wind energy as a justification for an outcome that replaces one

consented wind project with no consented wind projects.

(iii) Insofar as a complaint was made about defects in this regard in the EIAR, that was

largely unpleaded and in any event had not been made out evidentially. The

applicants failed to overcome the onus or proof in that regard.

(iv) The applicants’ complaints about the separation distances were not factually

established. As regards the replying affidavit of Mr Huson, the principal judgment

says that even assuming for the sake of argument that this is admissible (and thus

avoiding the need to formally rest matters on the obvious problems of its original

and non-replying content, its appearance far outside the time allowed in directions,

and the failure to explain why any information was not put forward earlier in the

proceedings), no weight should be attached to it because the decision cannot

generally be condemned by reference to matters not put before the commission,

and insofar as any of the averments are relevant to the scientific robustness of the

commission’s assessments, the court has affidavit evidence supporting the

assessments and so any conflict must be resolved in favour of the opposing parties

in the absence of cross-examination, on the basis of RAS Medical Ltd v. Royal College

of Surgeons in Ireland [2019] IESC 4, [2019] 1 I.R. 63, [2019] 2 I.L.R.M. 273

(Clarke C.J.) (O’Donnell, MacMenamin, Dunne and Finlay Geoghegan JJ. concurring).

The applicants have not engaged with that problem.

(v) Consistent with that, the applicants have failed to engage with the detailed analysis

in the EIA actually carried out and have failed to establish evidentially a route-map

between any alleged defect to a conclusion of illegality or any entitlement to the

relief sought.

(vi) In particular, the noise-related issues of central concern to the applicants are dealt

with in the EIAR at Chapter 12 and related Appendices, which were expressly

considered by the inspector.

(vii) Insofar as reliance is placed on the HSE submission of 14 June 2024, that submission

did not seek refusal of the application. It suggested further assessment and

mitigation. The commission was not obliged to accept that submission but rather to

determine in the light of the material the effects of the project and whether they

were acceptable. That involves a degree of evaluation and judgement and does not

commit the decision-taker to accepting any particular material in favour of other

material. The commission was permitted to prefer the developer’s EIAR and lawfully

did so. The conclusion of lack of significant noise effects is set out at para. 9.13.8.

Furthermore, the commission also had the developer’s first-party appeal report

which addresses the HSE submission at pp. 67-71. Not accepting a submission

cannot be equated with ignoring or reformulating a submission and any assertion to

that effect would be unstateable.

(viii) Merits-based disagreement with an otherwise lawful decision by the commission to

prefer one position to another does not give rise to grounds for certiorari.

(ix) As regards reasons there is no obligation to give reasons for rejecting a legally

incorrect point – a valid decision does not become invalid because an incorrect

submission as to invalidity is not addressed. That would be a boot-strapping

procedure destined to create procedural chaos. In any event it is not up to a process

participant making submissions to determine what are the major issues. This is a

matter for the decision-taker in the first instance subject to certain objective features

of the process such as where institutional actors are being disagreed with and thus

where reasons for that need to be specified. And in any event, there are reasons

for the decision.

Does the point properly arise?

26. The point does arise in the limited sense that I agreed with the commission that it had not

misinterpreted the guidelines. However that doesn’t get the applicants very far given the forest of

other problems with it (as stated above).

27. That said, one overarching difficulty with the point arises from the fact that the entire original

pleaded case of the applicants has now fallen away and we are left with a point introduced by

amendment at the very last minute. As noted at para. 65 of the principal judgment, a pragmatic

solution was devised, which was to allow the amendment on a de bene esse basis. Since the point

failed in any event, it was not necessary to formally determine whether the amendment should

properly be allowed.

28. The alternative to that approach would have been to have a complex argument about

amendment at the last minute which might even have had the potential to derail the existing

arrangements for the hearing. All I need to say right now is that where the whole original case has

fallen away, and the only point left is perching on the highly precarious ledge of a de bene esse

eleventh-hour amendment, it is far from clear that the point properly arises at this stage.

29. Nor is it saying very much to say that there is a question as to the interpretation of the

guidelines. The Department of Housing (https://www.gov.ie/en/department-of-housing-local-

government-and-heritage/collections/planning-guidelinesstandards/) lists 82 national guidelines

currently in operation:

“Planning Guidelines/Standards

From: Department of Housing, Local Government and Heritage

Published on: 23 December 2020

Last updated on: 13 January 2026

1. Section 28 Guidelines - NPF Implementation: Housing Growth Requirements (2025)

2. Design Standards for Apartments, Guidelines for Planning Authorities (2025)

3. Section 28 Ministerial Guidelines - Rezoning Economic Activity (2024)

4. Sustainable Residential Development and Compact Settlements Guidelines for

Planning Authorities (2024)

5. Section 28 Guidelines for Planning Authorities - Regulation of Commercial

Institutional Investment in Housing (July 2023)

6. Sustainable Urban Housing Design Standards for New Apartments Guidelines for

Planning Authorities (2022)

7. Development Plans - Guidelines for Planning Authorities (July 2022)

8. Residential Zoned Land Tax - Guidelines for Planning Authorities (June 2022)

9. Regulation of Commercial Institutional Investment in Housing – Guidelines for

Planning Authorities (May 2021)

10. Ministerial Letter to Local Authorities - Updated Apartment Guidelines to give effect

to restrictions on Co-living Development (Dec 2020)

11. Ministerial Letter to Local Authorities - Structural Housing Demand in Ireland and

Housing Supply Targets (Dec 2020)

12. Section 28 Guidelines for Planning Authorities - Enforcement of certain planning

conditions during the Coronavirus (COVID-19) outbreak

13. Guidance Note for Local Authorities for Regulating Short Term Letting

14. Urban Development and Building Height Guidelines for Planning Authorities

15. Guidelines for Planning Authorities and An Bord Pleanála on carrying out

Environmental Impact Assessment (August 2018)

16. Urban Development and Building Heights – Guidelines for Planning Authorities –

Consultation Draft

17. Design Standards for New Apartments (DSFNA) (2018)

18. Design Standards for New Apartments - Guidelines for Planning Authorities - Draft

Update (Dec. 2017)

19. Design Standards for New Apartments - Guidelines for Planning Authorities (Dec.

2015)

20. Design Standards for New Apartments - Information Note Current

21. Tree Preservation Guidelines

22. Guidance Notes - General

23. Part II - Plans & Guidelines

24. Part V - Housing Supply

25. Part IX - Strategic Development Zones

26. Part XVIII – Miscellaneous

27. Part XIX - Commencement, Repeals and Continuance

28. Framework for Co-operation Spatial Strategies of Northern Ireland and the Republic

of Ireland

29. Local Area Plans - Guidelines for Planning Authorities (June 2013)

30. Local Area Plans Manual (June 2013)

31. Guidelines for Planning Authorities & An Bord Pleanala on carrying out Environmental

Impact Assessments (March 2013)

32. Design Manual for Urban Roads and Streets - 2019 (Low Res)

33. Development Contribution Guidelines - January 2013

34. A Guide to Planning Enforcement in Ireland

35. INSPIRE Protected Sites Pilot Report

36. Draft Environmental Impact Assessment Guidelines (July 2012)

37. Section 261A of Planning and Development Act, 2000 Supplementary Guidelines

(July 2012)

38. Development Contributions - Draft Guidelines for Planning Authorities

39. LAP Draft Guidelines - June 2012

40. LAP Draft Manual - June 2012

41. Retail Planning Guidelines (April 2012)

42. Retail Design Manual April 2012

43. Section 261A of Planning & Development Act 2000 - Guidelines (January 2012)

44. Spatial Planning and National Roads Guidelines (Jan 2012)

45. Guidance for Planning Authorities on Drainage and Reclamation of Wetlands -

consultation draft

46. Implementing INSPIRE Regulations in Public Bodies

47. Collaborative Spatial Framework

48. Implementing Regional Planning Guidelines-Best Practice Guidelines

49. The Planning System and Flood Risk Management - Guidelines for Planning

Authorities - Technical Appendices (Nov 2009)

50. The Planning System and Flood Risk Management - Guidelines for Planning

Authorities (Nov 2009)

51. Sustainable Residential Developments in Urban Areas-Guidelines for Planning

Authorities (May 2009)

52. Best Practice Urban Design Manual (May 2009) Part 2

53. Best Practice Urban Design Manual (May 2009) Part 1

54. The Provision of Schools and the Planning System - Code of Practice for Planning

Authorities

55. Development Management Guidelines

56. Development Plan Guidelines (2007)

57. Extension of Tax Relief Schemes - Certification Guidelines for Local Authorities

58. Redevelopment of Certain Lands in the Dublin area

59. Wind Energy Development Guidelines (2006)

60. Sustainable Rural Housing Development Guidelines

61. Strategic Environmental Assessment (SEA) Guidelines

62. Revised Certification Guidelines

63. Quarries and Ancillary Activities

64. Architectural Heritage Protection Guidelines for Planning Authorities

65. Guidance for Consent Authorities regarding Sub-Threshold Development

66. Further Guidelines on Part V of the Planning and Development Acts 2000 - 2002 -

Circular HMS 9/03

67. Further Guidelines on Part V of the Planning and Development Act 2000-2002 -

Guidelines

68. Further Guidelines Part V of the Planning and Development Acts 2000-2002

69. URS Consolidated Certification Guidelines

70. TRS Monitoring Guidelines

71. LOTS Monitoring Guidelines

72. Implementation Manual Part V of Planning and Development Act 2000

73. Part V of the Planning and Development Act, 2000 - Implementation Issues

74. LOTS Certification Guidelines

75. Certification Guidelines (Commercial Industrial)

76. Childcare Facilities Guidelines

77. Guidelines for Planning Authorities - Part V of the Planning and Development Act,

2000

78. Landscape and Landscape Assessment

79. Town Renewal Scheme guidelines

80. Urban Renewal Scheme 1999 Monitoring Guidelines

81. Telecommunications Antennae and Support Structures 1996

82. Guidelines on Residential Developments in Urban Renewal Designated Tax Incentive

Areas 1995”

30. Those are only the national guidelines – running to thousands of pages. One can add further

tens of thousands of pages of regional and county/city plans. The interpretation of every sentence

of every one of these documents is a matter of law. But the mere fact that a case raises the

interpretation of a couple of sentences in a non-binding policy instrument does not in itself give rise

to a conclusion that appellate procedures need to be invoked.

Is the point one of law?

31. As noted above, the interpretation of planning documents is a matter of law – I will also give

the applicants that much. But that doesn’t get the applicants very far in itself.

Is the point of public importance?

32. The reason this matter is not of public importance is relatively straightforward:

(i) The point fails on the plain meaning of the guidelines as appears from the face of

the text used.

(ii) Nothing in the context or purpose commands a contrary conclusion. The

interpretation of section 5.13 is not in doubt particularly when we place it in context

with section 17.17, a problem the applicants shied away from as noted above.

(iii) No conflict of jurisprudence arises and nor has other legal uncertainty been

demonstrated.

(iv) The guidelines in any event enjoy only a “have regard to” status. The commission

is not required to comply with them.

(v) As noted above, the text of section 5.13 is not highly prescriptive – it refers only to

the position “in general”.

(vi) There is no evidence of a practical problem caused by the interpretation in the

principal judgment. The developer’s evidence is that the separation distances were

determined by industry standard software and the applicants have not discharged

the onus of proof to show any scientific, technical or industry-wide defect with that.

(vii) The applicants’ assertions do not constitute evidence. Nor can their legal

submissions be confused with evidence. Their attempt to impugn the commission’s

approach by way of affidavit failed on established principles of the burden of proof

and lack of cross-examination.

(viii) Despite their obvious lack of standing to do so, they even complain that the

developer will suffer a financial loss/ energy loss due to alleged inadequate spacing

between the turbines, and contend that the permission should be quashed in its

entirety on that basis. This is an obviously implausible posture.

(ix) In any event, as set out above, the point is not in any way determinative of the

outcome. Even if the inspector did in fact misinterpret the guidelines, that should

not lead to certiorari. Most notably, it would be perverse to quash a wind energy

permission on the basis of defective interpretation of a provision designed to

promote wind energy, especially where there are no other adjacent proposals which

would benefit from the hypothetical quashing.

(x) Furthermore the exercise of discretion militates against quashing the permission on

the basis of this complaint. While decided before Pat O’Donnell & Co. v. Dublin City

Council [2026] IESC 36 (Unreported, Supreme Court, 2 July 2026) per Woulfe J.

(O'Donnell C.J., Hogan, Murray and Donnelly JJ. concurring), the principal judgment

is consistent with that. The statutory scheme does not provide (or imply) that failure

to have regard to guidelines as properly interpreted leads automatically to nullity,

and nullification of the decision on such a basis as arises here (assuming

counterfactually that the inspector’s interpretation was erroneous) would be

disproportionate, as understood within existing doctrinal bounds.

33. Ms Costello’s third affidavit for the notice party confirms the lack of adjoining developments

and the fact that windtake was covered in the EIAR:

“6. I confirm for context that, as referenced in the Amended Statement of Opposition,

it is the position of EDF that the pleas at §§E(21)(a) to (g) of the Amended Statement of

Grounds are based on an incorrect premise that the Commission’s Inspector erred in

interpreting the provisions of sections 5.13 and 7.17 of the WEDG 2006.

7. Again, for context, I note the assertion pleaded at §E(21)(a) that, at section 8.5.2

of her report, the Inspector addressed scale and layout, including by reference to Chapters

3 and 4 of the EIAR, and by expressly referring to sections 5.13 and 7.17 of the WEDG 2006

and stating that:

‘…the reference to windtake in Section 5.13 and 7.17 relates to the development potential

of adjoining sites’.

8. As a matter of fact, having conducted planning searches, including searches of

planning application files and records which are publicly available, including on the websites

maintained by Carlow County Council, Kilkenny County Council and An Coimisiún Pleanála,

I confirm that permission for wind energy development has not been granted on an adjacent

site to the site comprising the Seskin wind energy development which forms the subject-

matter of these proceedings.

9. In circumstances where, to the best of my knowledge and belief, the provisions of

sections 5.13 and 7.17 of the WEDG 2006 apply to development potential of adjoining sites

and/or where permission for wind energy development has been granted on any adjacent

sites, there was no requirement for the EIAR submitted with the planning application in

respect of the Proposed Development to have considered the issue of wind-take. However,

for the sake of completeness, I confirm that ‘wind-take’ (or ‘wake effects’) within the

Proposed Development site was referenced in the EIAR, including in sections 3.2.6.2 and

section 4.4.1.1.1.

10. I also note that section 5.13 of the WEDG 2006 does not set out specific separation

distances between turbines within the Proposed Development. Rather, section 5.13 states

that:

‘…where permission for wind energy development has been granted on an adjacent site, the

principle of the minimum separation distances between turbines in crosswind and downwind

directions indicated above should be respected.’

11. As confirmed above, permission for wind energy development has not been granted

on any sites adjacent to the Proposed Development.”

34. Section 3.2.6.2 of the EIAR as referenced above states:

“3.2.6.2 Turbine Layout

The final proposed turbine layout takes account of all site constraints and the distances to

be maintained between turbines and from houses, roads, etc. The layout is based on the

results of all site investigations that have been carried out during the EIAR process. As

information regarding the Proposed Project was compiled and assessed, the proposed layout

has been revised and amended to take account of the physical constraints of the Proposed

Wind Farm and the requirement for buffer zones and other areas in which no turbines could

be located. The selection of turbine number and layout has also had regard to wind-take,

noise and shadow flicker impacts and the separation distance to be maintained between

turbines. The EIAR and Proposed Project design process was an iterative process, where

findings at each stage of the assessment were used to further refine the design, always with

the intention of minimising the potential for environmental impacts.

The development of the final Proposed Wind Farm layout has resulted following feedback

from the various studies and assessments carried out as well as ongoing negotiations and

discussions with landowners and the local community.

There were several reviews of the specific locations of the various turbines during the

optimisation of the Proposed Wind Farm site layout. The initial constraints study identified

a significant viable area within the overall study area of the site. The initial turbine layout

comprised 10 no. turbines within a larger study area. The proposed 7-turbine final layout

has been refined following feedback from the project team, landowners, neighbours and the

need to ensure sufficient separation distances are maintained for on-site constraints. The

Proposed Wind Farm went through 5 separate iterations. All 5 turbine layout iterations have

not been included, but Plate 3-1 to Plate 3-4 below gives an indication of how the design of

the turbine layout evolved during the design process.

...

Iteration No. 1 which is presented in Plate 3-1 is the initial turbine layout which was based

on a preliminary constraint mapping exercise and identification of a viable area for turbine

siting. A larger viable area for a 10-no. turbine layout was identified within the overall study

area during the constraints mapping process. This included for two clusters, a larger 7 no.

turbine array near the Ridge, and a smaller 3 no. turbine array approx. 4.6km to the south

near the Carlow-Kilkenny border. It was determined that it would be more environmental

sensitive and efficient to have a single cluster of turbines at the larger viable area.

...

Iteration No. 2 which is presented in Plate 3-2 comprised of 7 No. turbines, hardstands,

access roads on-site substation and grid connection, met mast, and a temporary

construction compound. The alternative grid connection electrical cabling routes are further

detailed in Section 3.2.8 below.

Layout Iteration No. 2 was presented to the project team for detailed investigations and

assessment. These investigations included habitat mapping, ecological surveying,

hydrological and geotechnical investigations of the Proposed Wind Farm.

...

Iteration No. 3 which is presented in Plate 3-3 comprised of 7 No. turbines, hardstands,

access roads, onsite substation and battery storage, grid connection, met mast, temporary

construction compound, and potential borrow pit locations that underwent site investigative

work. Iteration No. 3 was subject to detailed investigations which led to further refinement

of the layout.

For Iteration No. 3 the following changes were made:

The turbines underwent renumbering.

The met mast was relocated to an adjacent field to accommodate a realignment of Turbine

No. 6 and its associated hardstand, with the temporary construction compound being

realigned accordingly.

The road layout near Turbine No. 1 was realigned to avoid sensitive ecological receptors.

Turbine No. 7 (previously numbered Turbine No. 5) was moved north-east in order to avoid

marsh fritillary supporting habitat.

A battery energy storage compound was included adjacent to the onsite substation. Turbine

delivery site entrance and junction options were also included for consideration by the EIAR

team and subject to site investigations.

...

Iteration No. 4 as presented in Plate 3-4 comprised of 7 No. turbines with a maximum overall

ground-to-blade tip height range of 179.5m – 180m, a rotor diameter range of 149m –

155m, and a hub height range of 102.5m to 105m, one met mast (36.5m), two temporary

construction compounds, one onsite substation and battery storage compound, and one grid

connection underground electrical cabling route which is further detailed in Section 3.2.8.

When considering the site characteristics, including topography, ground conditions,

ecological receptors, sensitive noise receptors and surface features, it was determined not

to develop an onsite borrow pit. For this layout, peat and spoil management areas were

identified throughout the site.

The revisions to the layout were found to have no greater environmental, ecological, and

hydrological effects when compared to the other layout iterations considered (Iteration No.

1 to 3).

The final proposed turbine layout as presented in Plate 3-4 takes account of all site

constraints (e.g., ecology, ornithology, hydrology, etc.) and design constraints (e.g., setback

distances from houses and distances between turbines on-site etc.). The layout also takes

account of the results of all site investigations and baseline assessments that have been

carried out during the EIAR process.

The final chosen turbine layout is considered the optimal layout given it has the least

potential for environmental effects.

A comparison of the potential environmental effects of initial iterations of the turbine layout

as compared against the final turbine layout are presented in Table 3-4 below.”

35. Section 4.4.1.1.1 of the EIAR referred to states as follows (emphasis added):

“4.4.1.1.1 Turbine Locations

The proposed wind turbine layout has been optimised using wind farm design

software (WindPro) to maximise the energy yield from the Proposed Project site,

while maintaining sufficient distances between the proposed turbines so as to

ensure turbulence and wake effects do not compromise turbine performance, and

maintain the minimum setbacks from neighbouring properties set out in the

DoEHLG 2006 Guidelines and Draft 2019 Guidelines. The Grid Reference coordinates

of the proposed turbine locations are listed in Table 4-1 below.

The final Top of Foundation Level of the turbine foundations will be determined by the actual

ground conditions at each proposed turbine location and may differ but not materially from

those levels listed in Table 4-1. Also, in accordance with the ‘Wind Energy Development

Guidelines for Planning Authorities’ (Department of the Environment, Heritage and Local

Government (DOEHLG), 2006) micro-siting of the turbine positions may be required within

the criteria set out in the guidelines.”

36. The above is in effect simply more detail as to why it is fatal for the applicants that they did

not evidentially displace the commission’s acceptance of the developer’s material, inter alia on a

RAS Medical basis. The commission were entitled to accept the proposal regarding turbine layout,

and did so. It was not an unscientific stab in the dark, but a methodical proposal based on

alternatives, reasoning, and industry standard software. To put it another way, the applicants

haven’t shown that it was defective. The applicants’ technical arguments about separation distances

are academic and not of public importance when placed against such a background.

37. Under this heading I would generally endorse the commission’s submission (emphasis

added):

“12. There are number of insuperable problems with this proposed point that make it

inappropriate for certification.

13. First, there is no uncertainty as to what the answer to this question is. It is

‘no’ as the Court has held in the principal judgment (see §105-§112). §5.13 of the WEDG

2006, as the Court found, provides non-binding guidance focused on protecting the

development potential of adjoining lands. There is nothing exceptional or novel about the

Court’s finding in this regard. It is an example of a provision being interpreted on

conventional principles of interpretation, namely: the XJS principles, and read as a whole

and in context and not legalistically parsed and decontextualised in the way the wording of

the proposed point does. The Applicants’ interpretation of §5.13 of the WEDG is

incorrect on a plain reading of that paragraph. That error is compounded when

§5.13 is read together with the plain words of §7.17 of the WEDG 2006 (which

cross refers and links to §5.13 and is notably not referred to the Applicants’

certificate submissions, though relied upon by them in the hearing).

14. In short, the only basis for this question is the Applicants’ already-rejected

misinterpretation of §5.13 of WEDG 2006.

15. At §19(i) and (j) of their written submissions in support of the application for leave

to appeal, the Applicants assert that the law in relation to the proper interpretation of §5.13

is in a state of uncertainty. However, that is mere assertion. In contravention of the

established Glancré principles, the Applicants impute uncertainty in the law where none

exists. No evidence of uncertainty is identified. They do not, for example, point to

conflicting High Court judgments or to divergent planning practice or to conflicting

interpretations adopted by planning authorities or by the Commission or, indeed,

to any evidence of any practical difficulty whatsoever arising in the administration of

the planning system. Nothing is advanced to support the mere assertion or imputation of

uncertainty via legal submission.

...

27. Fourth, any assertion of problems in practice caused by a judgment must be backed

up with evidence: there is no such evidence in this case – which is a further reason as to

why certification is not appropriate (per Massey (No.4) [2025] IEHC 30 at §6(v)(b)). The

Applicants, based only on their already-rejected misinterpretation of §5.13 of WEDG 2006,

repeatedly advance the hyperbolic and speculative assertion that the point affects every

wind farm development in the State (see §19(g), §21, §24 and §28, Applicants’ certificate

submissions). The Applicants’ assertions (see §20, §24, §25, §26, §27, Applicants’

certificate submissions) concerning future consequences for windfarm design are entirely

hypothetical and baseless. There is simply no evidence for anything asserted in this regard.

It also merits recalling that the Applicants’ legal submissions are not evidence

(McGowan [2025] IEHC 405 at §79). There is no basis for the mere assertion (advanced by

the Applicants via legal submission) that the Court’s interpretation of §5.13 of the WEDG

2006 will give rise to any issue or problems in practice. There is no evidence demonstrating

any wind energy industry concern or any planning uncertainty or any regulatory difficulty or

any inconsistency in planning decision-making or any consequences arising from the Court’s

principal judgment. The Applicants rely solely on assertion, which is insufficient.

28. Further, whereas there is no evidential basis for what the Applicants assert via legal

submission in this regard, it is conceptually misconceived to contend that the Court’s

interpretation of §5.13 of the WEDG 2006 (which reflects the literal text, context and

purpose of the paragraph) could give rise to problems in practice. As per Friends of

Killymooney Lough (No.2) [2025] IEHC 576 at §28(iv) ‘The alleged practical

ramifications are typically hypothetical or speculative and/or the proceedings are not

a suitable vehicle to explore them.’ Equally relevant on this point is the observation of

Gearty J. made in a similar context in McCaffrey & Sons [2024] IEHC 476 at §3.7 ‘an

evidence-free submission cannot be a basis for the certification of questions of law to an

appeal court.’

29. Fifth, the proposed point does not accurately reflect the Court’s principal judgment.

It is appropriate in this regard to note that it is a necessary implication of the principle that

‘The point of law must arise out of the decision of the High Court’ that ‘the point of law must

reflect a correct understanding of the decision of the High Court…’ (inter alia: Monkstown

Road Residents Association [2023] IEHC 9 at §9(d)). That is particularly important in this

case in circumstances where the Applicants’ certificate submissions proffer and/or are

premised on mischaracterisation and/or misinterpretation of the Court’s judgment and

without properly engaging in same or the actual basis upon which the Court determined to

refuse relief and, more particularly, the multi-factorial analysis upon which the Applicants’

misinterpretation of the §5.13 of the WEDG 2006 was rejected.

30. More particularly as regards the foregoing, the Applicants effectively mischaracterise

the issue as being solely whether §5.13 of the WEDG 2006 provides guidance on turbine-to-

turbine spacing within a wind farm (see §12-§18, Applicants’ certificate submissions). That

narrow question does not accurately reflect what the Court decided in the principal

judgment. The Court’s conclusions at §105-§111 of the principal judgment were broader,

holding that the Applicants’ interpretation of §5.13 was incorrect (§105-§106), that §5.13

must be read in light of its opening reference to adjoining-site development potential (§105-

§106), that the issue was irrelevant on the facts because no adjoining development existed

or was proposed (§106), that §5.13 was not mandatory in any event (§107), that the

WEDG 2006 are merely ‘have regard to’ guidelines (§111) (meaning that same are not

binding and allow for flexibility and planning judgment and are not strict statutory rules:

Jennings [2023] IEHC 14 at §331), that no evidential challenge to the EIAR had been

established (§109) (relevant in circumstances where chapters 3 and 4 of the EIAR

demonstrate that turbine layout and spacing were carefully modelled and optimised

using industry-standard software, taking into account wind conditions, wake effects,

environmental constraints, and iterative design refinements - this expert analysis was

not challenged by the Applicants), that the Applicants had not displaced the

Commission’s scientific assessment (§111), and that discretionary factors militated

against relief in any event (§111). The proposed point therefore ignores most of the Court’s

relevant findings, isolates only one aspect of its reasoning, and does not accurately reflect

the basis on which the challenge was dismissed. Accordingly, the proposed point fails to

satisfy the requirement identified in Monkstown Road Residents Association [2023] IEHC 9

at §9(d)) that a certified question reflect a correct understanding of the judgment. The

Applicants’ certificate submissions (at e.g. §12-§20) merely repeat the same interpretation

argument expressly rejected by the Court.

31. Sixth, the proposed point of law is not determinative of the proceedings and would

not make a difference to the outcome. The Applicants assert (§19(d), Applicants’ certificate

submissions) that the proposed point is determinative of the proceedings. That is

demonstrably incorrect. Even if the Applicants’ interpretation of §5.13 of WEDG 2006 were

correct, the result of the proceedings would remain unchanged, as the Court identified

multiple reasons in the principal judgment as to why the Applicants’ challenge on this point

failed. In particular: (i) §5.13 of WEDG 2006 is not mandatory (§107); (ii) the WEDG 2006

are not binding (§111); (iii) no defect in the EIAR was established and the complaint about

same was largely unpleaded (§109); (iv) no evidential basis was advanced demonstrating

any deficiency in the EIA carried out by the Commission (§109, §111); (v) the Inspector

expressly considered and addressed the issue (§105-§109); (vi) the Applicants’ complaints

are essentially an (impermissible) merits disagreement (§111); and (vii) in any event,

discretionary considerations arose that militated against relief even if, counterfactually, the

Applicants’ complaint had been made out (which it wasn’t) (§111). The Applicants do not

engage with these alternative and independent bases for the Court’s rejection of the

Applicants’ arguments regarding the proposed point.

32. The Applicants seek certification of a question directed only to the Court's

primary interpretative finding at §105–§106 of the principal judgment, while

leaving entirely unchallenged the multiple alternative holdings at §107–§111

which independently sustain the dismissal of the ground and, therefore, render the

proposed point non-determinative and inappropriate for certification.”

Is the point of exceptional public importance?

38. This does not arise having regard to the foregoing.

Is an appeal in the public interest?

39. An appeal is not in the public interest. I would generally endorse the submissions of the

commission in this respect:

“PUBLIC INTEREST

34. There is no public interest in an appeal on the proposed point. The Applicants have

failed to establish how certification of the point is in the public interest. No actual affirmative

public benefit or public interest has been identified or relied upon by the Applicants in this

regard. In this connection, the Applicants’ submissions consist of reagitating already

rejected arguments, advancing mere assertion as to uncertainty in the law, and failing to

engage meaningfully with relevant findings in the Court’s judgment. Where, as here, the

law that was actually applied by the Court in determining this particular case is not uncertain,

the public interest suggests an appeal is not warranted. No genuine legal uncertainty exists

therefore no appellate clarification is necessary.

35. It is further submitted that in the context of the project at issue here, the public

interest militates against allowing an appeal, for the same reasons as set out in

Carrownagowan (No.3) [2024] IEHC 549 at §83 to §92, and §93(vii). As the Court concluded

in that case at §93(vii) and apposite here:

‘…the public interest militates against allowing further appeal - there is a significant public

interest, now legally enshrined in various ways, in the expeditious determination of the

lawfulness of renewable energy infrastructure, and an enshrined EU law provision affording

a presumed overriding public interest in the provision of such infrastructure in some

circumstances where that conflicts with the habitats directive, and in any event, the facts of

the present case are an extremely poor basis for a proposed appeal, given the lack of

evidence on crucial points.’

36. See also Massey (No.4) [2025] IEHC 309 at §29-§34, Rural Residents (I) (No.3)

[2026] IEHC 300 at §49-§53 and Rural Residents (II) (No.3) [2026] IEHC 301 §34-§37

which are all consistent with the above and supportive of the Commission’s position herein

that an appeal in the present case is not in the public interest. As the Court stated in Rural

Residents (I) (No.3) [2026] IEHC 300 at §51 and applicable here ‘the urgent public interest

in renewable energy infrastructure militates in favour of this matter not going further.’ The

public interest in certainty and the timely delivery of consented renewable energy

infrastructure weighs heavily against certification.

37. It is also not in the public interest to certify the point, noting the point made in Nagle

View (No.2) [2025] IEHC 3 at §9(vii) (‘The nature of the project and the risks of further

delay are factors going to the public interest’). The Applicants' assertion (§23(a),

Applicants’ certificate submissions) that no substantive delay will arise is unsupported by

evidence and is inaccurate on any objective analysis.

38. Further, certain points made by the Court in refusing leave to appeal in Condon

(No.2) [2026] IEHC 136 at §63 apply equally to the present certificate application:

‘63. An appeal that is based on a misunderstanding of the principal judgment in a way that

seems to “spread maximum confusion” (Hellfire Massy Residents Association v. An Bord

Pleanála [2022] IESC 38, [2024] 1 I.R. 386, [2022] 10 JIC 2402 per O’Donnell C.J. at para.

22 (Dunne, Woulfe, Hogan and Murray JJ. concurring)) is not in the public interest.’

39. In addition, per Hoctor (No.2) [2026] IEHC 174 at §§27-30 and directly relevant in

the circumstances of this case:

‘28. An appeal is clearly not in the public interest particularly having regard to the public

interest in infrastructure and renewable energy and to the non-compensatable financial

prejudice to the developer.

29. The project here was found acceptable by the inspector and the commission. The

applicants have also had a full hearing at trial level and in all of the circumstances there is

no public interest in further agitation of the applicants’ complaints given the statutory policy

of finality.

30. As regards the imperative public interest in major infrastructure including particularly

the generation of renewable energy in the context of the climate emergency, I endorse the

submission of the notice party on this issue:

“46. Fourth, there are countervailing public interest considerations at issue. The

development is an onshore wind farm which, upon completion, will provide significant

renewable energy in line with local, regional, national and EU policy. In that connection, it

is directly relevant that EU law has recognised renewable energy projects as being in the

overriding public interest (see, e.g., the discussion in Carrownagowan Concern Group v An

Bord Pleanála [2024] IEHC 549, §86 et seq). […]”’”

40. I also generally endorse the submission of the notice party in this respect:

“(2) Appeal is not in the Public Interest

22. The Applicants characterise the public interest requirement (at §22 to 29 of their

submissions) as being met on the basis of a series of claims which are either unpleaded

and/or unsupported by any evidence before the High Court and/or fall outside of the scope

of the Proposed Question.

23. While the Applicants advance the case that a certificate is in the public interest on

the grounds that ‘there appears a clear legal uncertainty as to the correct applicability of

same’ and ‘that there is a clear public interest in requiring clarity on the applicability of

Section 5.13 WEDG 2006’, for the reasons set out above there is no lack of clarity as to the

meaning of section 5.13 of the WEDG. As such, the Applicants cannot establish that an

appeal would be in the public interest.

24. Furthermore, the Applicants baldly state that an appeal to the Court of Appeal will

cause no substantive delay in the implementation of the EDF Scheme. However, that

contention is incorrect and the Applicants advance no substantiation in that respect. As a

matter of fact, planning permission was granted by the Commission on 27 November 2025.

As such, and notwithstanding the expeditious manner in which the proceedings have been

progressed in the Planning & Environment List, the implementation of the permitted

development has been delayed by seven months, as at the date of filing these submissions.

Further delay in this matter would cause additional significant non-compensable financial

prejudice to EDF. Of particular concern to EDF is securing a connection for the project to

the electricity grid. EDF applied under the ECP-GSS-1 process for a connection in September

2025. In April 2026 the System Operator, ESB Networks, published the list of projects it

intended to process as part of the ECP-GSS-1 process which included a connection for the

permitted development. It is understood that ESB Networks intend to complete the ECP-

GSS-1 process and issue connection offers to qualifying projects between July and

September 2026. EDF anticipates that it will receive a connection offer as part of this

process, at which point EDF will be required to pay a substantial connection offer acceptance

fee. In these circumstances, further delay to the implementation of the permitted

development in the event of an appeal would prejudice EDF in the delivery of this renewable

energy development, including in circumstances where EDF may have to forego the

connection offer, in which case the implementation of the project will set back by a minimum

of 12 months.

25. The High Court in Glancré Teoranta acknowledged that it was the intention of the

legislature that most planning cases will be determined in the High Court and that an appeal

will remain the exception:

‘It is clear that the statutory regime which has been devised by the legislature indicates an

interest to ensure that the planning process is not to be hampered by a completely

unrestricted access to the court which may cause harmful delays. I am satisfied that it is a

restriction to be lifted only in exceptional cases.’

26. As set out by Humphreys J in Massey v An Bord Pleanála (No.4) [2025] IEHC 309 at

§6(v)(a) when considering the principles which apply to the ‘public interest’ criterion and

delay:

‘An appeal must be in the public interest (a) The context is the objective of the Oireachtas

in seeking finality, certainty and expedition in challenges brought by way of judicial review

in planning cases… The nature of the project and the risks of further delay are factors going

to the requirement that an appeal must be in the public interest: see per McGovern J. in

Dunnes Stores v. An Bord Pleanála [2015] IEHC 387, 2015 WJSC-HC 6876, [2015] 6 JIC

1805 (Unreported, High Court, 18th June 2015) at §15 and §16. See also analogously and

non-precedentially Eco Advocacy CLG v. An Bord Pleanála, Keegan Land Holdings Limited,

An Taisce - The National Trust for Ireland and Client Earth AISBL [2024] IESCDET 62

(Charleton, Woulfe and Collins JJ., 27th May 2024) at para. 24: “The Court must have regard

to the potential impact upon the notice party of any further delay in these proceedings”.’

[Emphasis Added]

27. The nature of the project, in this case a renewable wind energy development, and

the risks of further delay are factors going to the public interest, as was considered by the

High Court (Humphreys J.) in an application for a certificate for leave to appeal that arose

in the case of Nagle View Turbine Aware Group No. 2 v An Bord Pleanála [2025] IEHC 3):

‘26. On the contrary, the public interest is strongly the other way. The development will

provide significant renewable energy in line with local, regional, national and EU policy,

backed up by legal instruments referred to in the No. 1 judgment. In the context of the

climate emergency and of the need for energy independence in the light of the Russian

Federation’s full-scale criminal war of aggression against Ukraine, I agree with the notice

party that “it is directly relevant that EU law has recognised renewable energy projects as

being in the overriding public interest” as stated in Directive (EU) 2023/2413 of the European

Parliament and of the Council of 18 October 2023 amending Directive (EU) 2018/2001,

Regulation (EU) 2018/1999 and Directive 98/70/EC as regards the promotion of energy from

renewable sources, and repealing Council Directive (EU) 2015/652. So public interest in

favour of such projects has a legal and not merely a policy basis.

27. These proceedings have delayed the project by almost a full year so far (with further

delay a virtual certainty as a result of the inevitable application for leapfrog leave to appeal,

an application that will take time to determine either way). There is no convincing

counterbalancing reason why an appeal would be in the public interest at all, let alone in

such a way as to outweigh the damage to the public interest of further delay in the matter.’

[Emphasis added]

28. The same consideration applies with equal force to this case, and the application for

a certificate for leave to appeal should be refused on the basis that an appeal is not ‘desirable

in the public interest’.

29. While the Applicants state that there is a greater degree of public interest in ensuring

that the development of wind energy projects is assessed in accordance with correctly

interpreted guidance, that is what happened in this case. In any event, the Applicants have

presented no evidence (nor even argued) that there is a series of cases in which this issue

arises (Stapleton v. An Bord Pleanála [2025] IEHC 178).

30. The Applicants’ submissions at §25 amount to an unpleaded and unargued point

which simply cannot form part of an application for a certificate for leave (GOCE Limited v.

An Bord Pleanála [2025] IEHC 43). The Applicants contend that there was evidence before

the High Court which ‘demonstrated that international engineering best practice adopts

criteria and formulae for the distancing of wind turbines in the same wind farm to ensure

the turbulence created by the operation of wind turbines does not effect and negatively

impact the efficiency of other wind turbines in the same wind farm development. It is in the

national public interest that the laws and regulatory guidance of the state relating to wind

farm development are not to be interpreted as being at odds with best practice.’. It is

noteworthy that this ‘evidence’ is not identified, but moreover, there was no pleaded case

that section 5.13 of the WEDG was required to be interpreted to be consistent with

international best practice.

31. The Applicants fail to point to any evidence before the High Court to support the

proposition that:

‘The interpretation of Section 5.13 WEDG as confirmed by the High Court gives rise to a

situation where Irish national guidance for the design and siting of wind turbines will be

perceived as ignoring the recognised negative consequences of clustering wind turbines too

closely.’

32. Indeed, that point does not even come within the Proposed Question, which is solely

concerned with whether section 5.13 of the WEDG provides guidelines for separation

distances between turbines on a development site. Even if the Applicants are correct and

section 5.13 of the WEDG gives rise to a perception of ‘ignoring the recognised negative

consequences of clustering wind turbines too closely’, the Applicants did not (but could have)

challenged the WEDG in these proceedings, as such that issue will simply not be resolved by

certifying an appeal.

33. EDF does not understand the Applicants’ reference to ‘discretion’ at §29 of their

submissions. The Court’s findings as to discretion at §§123-126 (which the Applicants do

not address) were mere obiter as the Court clearly states that:

‘[i]f counterfactually the applicants had otherwise established an entitlement to relief, I

would have refused such relief as a matter of discretion’

[…]

‘As stated above however the applicants’ points fail on their merits in any event. But in

summary I would exercise discretion, had it been necessary, against such points having

regard to the following which come within the bounds of factors to which regard can be had,

judged against the doctrinal constraints applicable to the court’s discretion and in the light

of the caselaw cited earlier in this judgment…’.

[…]

‘Applying such law to the facts here, even if counterfactually the applicants were otherwise

entitled to relief, such relief should be refused particularly having regard to the applicants’

failure to make many of the points in the administrative process and/or by reference to the

overriding public interest in renewable energy infrastructure as recognised in national and

EU law in order to address the urgent requirements of the climate emergency. In addition

the lack of tangible environmental harm and the absence of any basis to conclude that the

decision would have been different are relevant, especially in a context where the

development plan overall was in fact considered and a conclusion as to the requirements of

proper planning and development was arrived at by the commission.’

34. So, in this case, the Court did not refuse relief on discretionary grounds – rather,

the Court refused relief on the merits of the grounds of challenge.”

41. It would be hard to improve on the above list of reasons why the public interest leans in

favour of not permitting this matter to go further. The appellate architecture for planning law is

designed to facilitate expedition and finality, so that only points of real significance ordinarily proceed

to a further tier of review. There is nothing to show that the inspector’s interpretation of the plan

here is either problematic or contrary to the ministerial intent, or causing difficulties in practice.

42. And in the contrary sense, there is a massive body of national, European and international

law that is predicated on an urgent need for delivery of renewable energy infrastructure at scale.

By way of example one could mention in particular the presumption of “overriding public interest”

under art. 16(f) of Directive (EU) 2023/2413 of the European Parliament and of the Council of 18

October 2023 amending Directive (EU) 2018/2001, Regulation (EU) 2018/1999 and Directive

98/70/EC as regards the promotion of energy from renewable sources, and repealing Council

Directive (EU) 2015/652 (RED III). Case C-325/25, Eneco Wind Belgium is pending regarding

whether this principle goes beyond the context of the directives referenced (that case arose under

the predecessor instrument, Council Regulation (EU) 2022/2577 of 22 December 2022 laying down

a framework to accelerate the deployment of renewable energy. This concept of overriding public

interest in favour of renewable energy plays out against the wider backdrop of the climate

emergency, to which a number of key measures are relevant, including the EU Charter, art. 191(2)

TFEU, the polluter pays principle, and the European Climate Law (Regulation (EU) 2021/1119 of the

European Parliament and of the Council of 30 June 2021 establishing the framework for achieving

climate neutrality and amending Regulations (EC) No 401/2009 and (EU) 2018/1999).

43. None of these matters do much to advance any argument that an appeal on this rather

technical point of interpretation of one fragment of one of a vast number of non-binding guidelines,

which in any event flies in the face of the ordinary meaning of the text concerned, would be in the

public interest.

Summary

44. In outline summary, without taking from the more specific terms of this judgment:

(i) there is no public importance in advancing the question, particularly because:

(a) the answer is not properly in doubt having regard to the express language

of the guidelines;

(b) the guidelines enjoy only a “have regard to” status, and are by their terms

general rather than prescriptive;

(c) there is no actual evidence of a practical problem caused by the

interpretation in the principal judgment; and

(d) in any event, the point is not in any way determinative of the outcome in

this case; and

(ii) there are significant public interest considerations against the matter going further.

Order

45. For the foregoing reasons, it is ordered that:

(i) the application for leave to appeal be dismissed;

(ii) in the event that an application for leapfrog leave to appeal is made and acceded to

by the Supreme Court, the costs of the leave to appeal application be costs in that

appeal;

(iii) otherwise, there be no order as to the costs of the leave to appeal application; and

(iv) the foregoing order and the order already pronounced in the substantive judgment,

i.e., that:

(a) the proceedings be dismissed;

(b) there be a recital to the order confirming that the second named

applicant’s property is not a participating property (including for the

purposes of the exclusion in condition 9(a)) and therefore that the

mitigation measures at conditions 5 and 9 apply to that property; and

(c) there be no order as to costs (including no order as to any reserved or

adjourned costs or costs not otherwise dealt with);

be perfected forthwith with no further listing as the final order of the High Court in

the proceedings.