High Court quashes planning decision for unduly restrictive interpretation of rural enterprise objective.
Legislator summary
AI generatedThe High Court quashed An Coimisiún Pleanála's refusal to permit a pyrotechnics storage facility, ruling the decision-maker failed to correctly interpret the development plan. The applicant argued the site qualified as a 'rural enterprise' dependent on its rural location, while the Commission incorrectly applied a test of necessity. The court held that evaluative judgment is only permissible after the plan is properly interpreted, finding the Commission's approach unduly restrictive.
Legislator headnote
AI generatedSections 50, 50A and 50B of the Planning and Development Act 2000: A planning decision-maker must correctly interpret the development plan before engaging in evaluative judgment; an unduly restrictive interpretation precludes the application of evaluative discretion.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2026] IEHC 408
THE HIGH COURT
PLANNING & ENVIRONMENT
[H.JR.2025.0001387]
IN THE MATTER OF SECTIONS 50, 50A AND 50B OF THE PLANNING AND DEVELOPMENT
ACT 2000, AS AMENDED
BETWEEN
ROCKET PYROTECHNICS (IRELAND) LIMITED
APPLICANT
AND
AN COIMISIÚN PLEANÁLA
RESPONDENT
Date of impugned decision: 24 July 2025
Date proceedings commenced: 17 September 2025
Date of main hearing: 22 June 2026
JUDGMENT of Humphreys J. delivered on Friday 26 June 2026
1. The project in this case was held not to satisfy a development plan objective relating to
“rural enterprises” that are “dependent” on a rural location. The question here is the interpretation
of those concepts in the context of the particular plan concerned.
Geographical context
2. The project (https://www.pleanala.ie/en-ie/case/320786) is installation of a 40-feet metal
shipping container underground with 3.2 m high earth mounding to all sides for the safe and secure
storage of pyrotechnics (Class 1 hazardous goods) along with four square metres timber fence for
packing and unpacking of pyrotechnics, green mesh security fencing, shock-proof fencing to site
perimeter and all associated ancillary site works at Rathoma, Killala, Co. Mayo.
Parties
3. The applicant, Rocket Pyrotechnics (Ireland) Limited, is an Irish company that provides
professional fireworks and special effects services. The respondent is An Coimisiún Pleanála, the
decision-taker.
Facts
4. It may be helpful to begin with the applicant’s contextual submission:
“(B) RELEVANT BACKGROUND
5. The Applicant, Rocket Pyrotechnics (Ireland) Limited, is an indigenous, family-owned
Irish company which has provided professional fireworks and special effects services in
Ireland for over 25 years. The proposed development site is located on the lands of the
historical Breen family home of one of the principals of the business at Rathoma, Killala,
County Mayo. Mr Patrick Gerard (Gary) Breen is a director of the Applicant and Mr John
Breen is its senior pyrotechnician.
6. The Applicant employs 3 full-time staff and 15 freelance, highly trained and
specialised technicians (18 personnel in total). Its team includes creative designers and
display managers who deploy state-of-the-art wireless firing technology and special effects
equipment, choreographing performances synchronised with firings programmable to within
one hundredth of a second. The Applicant provides pyrotechnics for multiple events on a
weekly basis at locations nationwide, including large-scale arts, music and sporting events
(such as the Rose of Tralee, Taylor Swift concerts, Aiken Promotions events and Leinster
Rugby fixtures), corporate events, weddings and displays at historic landmarks, castles,
stately homes and hotels. Past engagements include Riverfest Limerick, Electric Picnic (10th
Anniversary), Spraoi Festival, the Ballina Salmon Festival, Bray Summer Fest, Ardmore
Pattern Festival, St. Patrick’s Festival Dungarvan, Lismore Castle, Tramore Fun Fair,
Ballymun Otherworld Festival, Finglas Halloween Festival, Swords Castle Halloween Festival
and Brian Boru Festival, Puck Fair, Drogheda Christmas Bonanza and Carrick Carnival.
Fireworks displays are a hallmark of major events such as the St. Patrick’s Festival, feature
prominently in promotional materials of Fáilte Ireland, and play a pivotal role in arts festivals,
national sporting events and Ireland’s growing TV and film industries. The Applicant is one
of only two remaining indigenous pyrotechnics companies operating in the State.
7. The withdrawal of the United Kingdom from the European Union (‘Brexit’) has
fundamentally disrupted the supply chain for the Applicant, making it substantially more
difficult to secure combustibles and explosives in a timely manner. Two other indigenous
Irish pyrotechnics companies have closed since Brexit. The Applicant currently has no
storage or sorting facility of its own; each event must be specifically and separately ordered
for collection in person from Northern Ireland. The Applicant is wholly exposed to a volatile
supply chain and bears the economic burden of increased costs, being prevented from bulk
purchasing and storing supplies to achieve economies of scale, reduced transport overheads
and shorter lead-in times for events. The business is, in consequence, under serious threat.
The Applicant has engaged extensively with the Government’s Inspector of Explosives, who
has approved, in principle, five different potential locations for storage. The proposed
volume of storage at the site (subject to licence) is up to 2,000kg of Hazard Type 1
explosives, and the site will be used solely for storage only and not for the manufacture or
sale of supplies; access is anticipated on average four times per week and the development
will not require full-time on-site employees nor generate traffic volumes significant enough
to impact the local road network.
8. The Applicant has previously sought permission for storage facilities at alternative
locations without success. On 22 June 2020, the Applicant applied for permission for a
storage facility in County Wicklow (ref. 20/578); permission was refused on 12 August 2020,
principally on the basis that the development was contrary to an objective to permit
commercial development in rural areas only where there is a proven need to locate therein.
A second application at the same Wicklow location (ref. 21/154) was refused by the planning
authority on 29 July 2021 and on appeal by the Commission on 9 February 2022 (ref. ABP-
311171-21) for the same principal reason. During 2022, the Applicant identified an
industrial-zoned site in County Wexford and again obtained the Government Inspector of
Explosives’ approval in principle, but a section 5 declaration (ref. EXD00983) determined
that the proposed storage facility was not exempted development, and the planning
feedback indicated that an application would be refused. A prior application at the Mayo site
the subject of these proceedings (ref. 23/60447) was refused on 22 March 2024 for the
same principal reason.”
5. On 25 June 2024, Rocket Pyrotechnics (Ireland) Limited applied to Mayo County Council for
permission for a proposed development at Rathoma, Killala, Co. Mayo, comprising the installation of
a shipping container underground for the storage of pyrotechnics and to carry out all associated
ancillary site works.
6. A planning report dated 15 August 2024, signed by an executive planner and a senior
executive planner, recommended the refusal of permission for one reason.
7. On 15 August 2024, the council issued a notification of decision to refuse permission for the
said development for one reason.
8. On 11 September 2024, the applicant appealed to the commission against the council’s
decision. The appeal included a submission entitled “First Party Grounds of Appeal” prepared by
MKO, Planning and Environmental Consultants and included, as appendices, the council’s notification
to refuse permission and a technical letter provided by Ryan and Associates Fire Consultants.
9. The commission received no third party observations on the appeal.
10. In line with its usual practice, the commission appointed an inspector, to prepare a report
and make a recommendation on the appeal. The inspector carried out a site inspection on 20
February 2025, and prepared a report dated 2 July 2025, in which he recommended refusal of
permission.
11. The commission considered the appeal at a meeting held on 22 July 2025. As recorded in
the direction of 22 July 2025, the commission decided to refuse permission generally in accordance
with the inspector’s recommendation, for specified reasons and considerations.
12. A formal order dated 24 July 2025 was then prepared to reflect the direction of 22 July 2025.
The “reasons and considerations” were as follows:
“Having regard to the rural location and the nature of the proposed development, the
Commission was not satisfied that the applicant had demonstrated that the proposed
pyrotechnics storage facility at this location was justified and the proposed development
would be contrary to the objectives of the current County Development Plan, specifically
Objective EDO 54, to facilitate rural enterprises, and resource development that are
dependent on their locality in rural locations. The proposed development would, therefore,
be contrary to the proper planning and sustainable development of the area.”
Procedural history
13. On 17 September 2025, the proceedings were issued.
14. On 29 September 2025, I granted leave (order perfected on 30 September 2025).
15. On 2 October 2025, a notice of motion was filed.
16. On 12 January 2026, a hearing date of 22 June 2026 was fixed.
17. On 13 March 2026, the respondent's opposition papers were filed.
18. On 18 May 2026, the applicant’s legal submissions were filed.
19. On 9 June 2026, the respondent’s legal submissions were filed.
20. I might be allowed to commend both sides for the really excellent written submissions in
this case, and while inevitably there are elements in submissions that are not being upheld, all
submissions were helpful, and their measured and reasonable approach was particularly appreciated.
21. The procedural approach taken in this case was somewhat experimental in the sense that
the parties agreed that innovative options could be taken to cut down on costs. One option which
the court has is under O. 84 r. 22(8) RSC, to dispense with an oral hearing altogether (emphasis
added):
“(8) The Court may on the return date of the notice of motion, or any adjournment thereof,
give directions as to whether it shall require at the hearing of the application for
judicial review oral submissions in respect of any of the written submissions of the
parties on points or issues of law.”
22. I did not go that far. Oral submissions are of course the norm but in this instance the parties
agreed that the initial case would be by written submissions, the court could then prepare a draft
judgment with provisional findings, and the parties could make contrary oral submissions contesting
the merits of any provisional conclusions in a brief hearing of the order of 30-60 minutes. Prior to
the hearing, the parties were sent a draft judgment on 16 June 2026.
23. This is of course unfamiliar but not a completely unprecedented procedure in the common
law world. The Supreme Court of California prepares a document equivalent to a draft judgment
prior to the hearing but does not share it with the parties (Goodwin Liu, “How the California Supreme
Court Actually Works: A Reply to Professor Bussel”, 61 UCLA L. Rev. 1246 (2014)
https://www.law.berkeley.edu/wp-content/uploads/2016/12/Goodwin-Liu-How-the-Supreme-
Court-actually-works-2014.pdf). Compared to that, the procedure the parties agreed to adopt here
was far superior and in some ways the parties were able to obtain somewhat more influence over
the shape of the judgment than a conventional approach where they are just informed of the court’s
views after the chance for persuasion is over. This is not something I would want to impose but if
parties in a given case are prepared to consent to such an approach there is something to be said
for it. Also a certain degree of innovation may be beneficial in a context where judicial resources
are limited given a near-doubling of the planning caseload since existing resources were allocated.
24. As with any draft judgment, parties are required to keep the draft confidential. Draft
judgments are not public domain materials and, while they can be shared between the lawyers
concerned and their clients, subject to the following, it is inappropriate for any person to refer to
them for any purpose other than to assist the court in relation to the finalisation of the formal
judgment. Therefore anyone with information as to the text, content or proposed outcome of any
draft is required not to publish or transmit such information to others save solely by way of private
transmission for the legitimate purposes of assisting in the finalisation of the judgment and subject
to a similar restriction on any recipient. Trial participants should take reasonable steps to keep
drafts confidential. On this topic, see Attorney General v. Crosland (No. 2) [2021] UKSC 58, [2022]
1 W.L.R. 367, [24/01/2022] T.L.R. 1 (Briggs, Kitchin, Burrows, Rose, Arden SCJJ) which discusses
why restriction on publication of draft judgments is in the interests of the administration of justice;
see also Baigent v. Random House Group Ltd [2006] EWHC 1131 (Ch), [2006] 5 WLUK 45, (2006)
150 S.J.L.B. 603 (Smith J.); R. (Counsel General for Wales) v. Secretary of State for Business,
Energy and Industrial Strategy [2022] EWCA Civ 181, [2022] 1 W.L.R. 1915, [2022] 4 All E.R. 599
(Sir Geoffrey Vos MR; Davies and Dingemans LJJ. concurring); Public Institution for Social Security
v. Banque Pictet & Cie SA and others [2022] EWCA Civ 368, [2022] 3 WLUK 291, [2022] B.L.R. 349
(Carr LJ; Jackson and Simler LJJ. concurring); Itkin v. Wood [2023] JRC 101 (Unreported, Royal
Court of Jersey, 22 June 2023).
25. The foregoing constitutes an immediately effective direction of the court to the parties and
anyone having notice of the draft judgment with effect from the date of circulation of the draft.
26. Contrary submissions could be made at the hearing. In particular, parties should draw the
court’s attention to any apparent error or ambiguity whether they have been provisionally successful
on the point or not.
27. The rules of engagement in such a situation are that the draft is without prejudice to the
right of the court ultimately to issue a judgment in whatever form or with whatever content it
considers appropriate. It is then entirely a matter for the court as to whether to give judgment with
or without amendment including any amendment that appears appropriate to the court whether
arising from submissions or not.
28. While the proceedings predate Practice Direction HC 137, para. 58(a) of that practice
direction would require the council to be put on notice. I proposed that the parties might furnish a
copy of the draft judgment to the council forthwith with a view to having any contrary views
communicated to the court before the judgment is finalised.
29. The matter was listed for mention on 17 June 2026. The commission sent a copy of the
draft to the council who replied indicating that they would not be making comments.
30. The matter was to be heard on 22 June 2026, and brief submissions were made on foot of
which the draft was amended.
31. Judgment was reserved at the end of that hearing. I would like to record my thanks to all
of the lawyers involved for their unfailingly courteous, professional and helpful assistance. As I have
previously sought to make clear, insofar as any points advanced are not being accepted in this or
any other given judgment, that is solely to do with the inherent merits of such points and is no
reflection on those instructed to convey such points, a distinction that most certainly should be, and
I believe generally is in fact, self-evident to all concerned. As no submissions were made about the
draft order on costs I am assuming that there was no issue with what was proposed. In that regard
one major advantage of the procedure the parties agreed here was that the costs have been kept
to well below the industry norm in the context of High Court planning litigation.
Relief sought
32. The reliefs sought are as follows:
“1. An Order of Certiorari by way of application for judicial review quashing the decision
of the Respondent, An Coimisiún Pleanála, made on 24 July 2025 (reference no. ABP-
320786-22) to refuse the Applicant’s application for permission to install a shipping container
underground for the storage of pyrotechnics and to carry out all associated ancillary site
works on lands at Rathoma, Killala, County Mayo.
2. An Order remitting the matter to the Respondent to be considered and determined
in accordance with law and in accordance with such directions as this Honourable Court may
deem meet.
3. Such declaration(s) of the legal rights and/or legal position of the Applicant and/or
persons similarly situated and/or of the legal duties of Respondent as the Court considers
appropriate.
4. A declaration that s.50B of the Planning and Development Act 2000, as amended,
(the ‘2000 Act’) and/or that s.3, s.4, and s.7 of the Environmental (Miscellaneous Provisions)
Act 2011 and/or Order 99 of the Rules of the Superior Courts applies in respect of the costs
of this application.
5. Such further or other order as this Honourable Court may deem fit.
6. The costs of these proceedings.”
Grounds of challenge
33. The core grounds of challenge are as follows:
“(1) Domestic Law Grounds
1. The decision of the Respondent, An Coimisiún Pleanála (the ‘Commission’), made on
24 July 2025 (reference no. ABP-320786-24) (the ‘Impugned Decision’) to refuse the
Applicant’s application for permission to install a shipping container underground for the
storage of pyrotechnics and to carry out all associated ancillary site works on lands at
Rathoma, Killala, County Mayo is invalid in that the Commission erred in its interpretation
of the Mayo County Development Plan 2022 to 2028, specifically Objective EDO 54, further
particulars of which are set out in Part 2 below.
2. The Impugned Decision is invalid in that the Commission made a material error of
fact in the characterisation of the proposed development as other than rural enterprise
and/or other than dependent on its locality in a rural location, further particulars of which
are set out in Part 2 below.”
The council’s decision
34. The council refused the application for reasons expressed more widely than being contrary
to EDO 54:
“The Planning Authority issued a Notification of Decision to REFUSE permission on the 15th
of August 2024 for 1 no. reason as follows -
Having regard to the rural location and the nature and scale of the proposed development
and the objectives of the Mayo County Development Plan 2022-2028, in particular Objective
EDO 54 regarding commercial development in a rural area, the lack of sufficient justification
for the provision of a pyrotechnics storage facility at this location, and the surrounding
pattern of development in the area, it is considered that the proposed development would
represent haphazard sporadic development in a rural area, would be contrary to the
objectives of the Mayo County Development Plan 2022-2028 to only permit commercial
development in a rural area where there is a proven need to locate therein and would
seriously injure the amenities, or depreciate the value, of property in the vicinity. The
proposed development therefore would be contrary to the proper planning and sustainable
development of the area.”
35. The council did not, for whatever reason, comment on the appeal.
The inspector’s rationale
36. The inspector reasoned as follows on this issue (emphasis added):
“Principle of Development
6.2.1. The crux of the decision of the Planning Authority, as set out in its single reason
for refusal, is that there is no justification for the proposed development in a rural
location, and that the proposal would be haphazard, injurious to the amenity of the
area and would devalue property in the vicinity.
6.2.2. In response, the appellant contends that the proposed development requires a
rural location in order to achieve separation distances required under regulations
governing the storage of explosives, and cites examples of other types of development
which, whilst not rural in nature, are optimally located in rural locations due to practical
constraints which would arise in urban areas, should they be sited there. The appellant also
states that the proposal would not adversely affect the amenity or value of property given
its location relative to the closest dwelling, and that no adverse impacts on Natura 2000
Sites would arise as a result of the proposed development.
6.2.3. Policy in relation to rural enterprise is set out in Objective EDO54 of the Mayo County
Development Plan 2022 - 2028. Objective EDO54 provides for the facilitation of rural
enterprises and resource development that are dependent on being located in the rural area.
Compliance with Objective EDO54 firstly requires that the development under
consideration is a ‘rural enterprise’ and/or ‘a resource development’, and then
subject to meeting these criteria, requires the proposed development to be
dependent on a rural location.
6.2.4. The basis of the appellant’s case is that a rural location would allow the proposed
development to meet specific regulatory requirements in relation to the storage of
explosives, specifically the achievement of separation distances from houses and roads.
While I acknowledge that the achievement of these separation distances would be
more easily met within a rural area the fact remains that the proposed
development is neither a rural enterprise or a resource development, and therefore
the proposed development does not meet the formative requirement(s) of
Objective EDO54. In my opinion the auxiliary requirement of Objective EDO54,
that being the requirement for the proposed development to be dependent on a
rural location, is moot given that former element(s) have not been met. The
appellant makes reference to examples of uses which it states are not rural in nature but
yet are referred to in Objective EDO54 as being acceptable in rural areas, i.e. extractive
industries, solar and wind developments, due to the fact they benefit from a rural location
and the appellant contends that the proposed development should similarly be considered
on this basis. Aside from the need to be located a specific distance from certain receptors,
the proposed development does not have a need to be located in a rural area, and is not
reliant on any specific rural based resource. In my opinion extractive industries, solar and
wind developments are not comparable with the storage of pyrotechnics. For example,
extractive industries only operate where aggregates arise. Solar developments are
compatible with agricultural practices and allow for grazing beneath arrays. Wind
developments often require upland locations to avail of wind speeds which are more typically
higher in rural upland areas. It is reasonable in my opinion for a development plan objective
to facilitate these uses in a rural area and whilst the appellant does not contest this, to draw
comparisons to a storage facility for pyrotechnics as needing to be located within
a rural area on the basis of meeting licencing requirements cannot be sustained in
my view.
6.2.5. In summation, it has not been demonstrated that the proposed development is a
rural enterprises and/or a resource development, or that it is dependent a rural location.
The proposed development would therefore not accord with the requirements of Objective
EDO 54 of the Mayo County Development Plan 2022 – 2028. I recommend that permission
is refused on this basis.”
The impugned decision
37. The impugned decision provides as follows:
“Decision
REFUSE permission for the above proposed development in accordance with the reasons and
considerations set out below.
Reasons and Considerations
Having regard to the rural location and the nature of the proposed development, the
Commission was not satisfied that the applicant had demonstrated that the proposed
pyrotechnics storage facility at this location was justified and the proposed development
would be contrary to the objectives of the current County Development Plan, specifically
Objective EDO 54, to facilitate rural enterprises, and resource development that are
dependent on their locality in rural locations. The proposed development would, therefore,
be contrary to the proper planning and sustainable development of the area.”
38. This is not hugely explanatory in itself and must be construed as essentially following the
inspector’s logic.
Preliminary issues
39. The parties’ positions on preliminary issues as recorded in the statement of case are
summarised as follows:
“Respondent’s Position
20. The Commission contends (at §4 of its Statement of Opposition and §3 of its
submissions) that the matters raised by the Applicant in these proceedings, in both core
grounds, while pleaded in other terms, involve the Applicant’s disagreement with the
decision by the Commission in concluding that the Proposed Development is not a rural
enterprise and/or is not dependent on being located in a rural area and/or does not come
within Policy EDO 54 of the Mayo County Council Development Plan 2022-28 (‘CDP’). This
is a disagreement on the merits, dressed up in legal language, which is not a basis for relief
in judicial review.
21. The Commission also relies (at §3 of its Statement of Opposition, §3 of its
submissions) on the presumption of validity and contends the Applicant has not discharged
the onus of proof.
Applicant’s Position
22. The Applicant rejects the contention that the matters raised involve no more than
disagreement with the application of the CDP. The Applicant’s case is that the Commission
misinterpreted the CDP, specifically Objective EDO 54, and made material errors of fact.
The interpretation of a development plan is a question of law and is not an exercise of
planning judgement reviewable only on rationality grounds. The presumption of validity
does not insulate the Impugned Decision from scrutiny where it is shown to rest on a
misinterpretation of the CDP and material errors of fact.”
40. As regards the preliminary issues raised, the commission’s attempt to rebuff the challenge
as a merits disagreement is a misunderstanding. The key issue is interpretation of the plan. Given
the proposed order below, the commission can apply the plan as so interpreted to the facts on
remittal.
Domestic law issues
Core ground 1 – misinterpretation of CDP
41. Core ground 1 is:
“1. The decision of the Respondent, An Coimisiún Pleanála (the ‘Commission’), made on
24 July 2025 (reference no. ABP-320786-24) (the ‘Impugned Decision’) to refuse the
Applicant’s application for permission to install a shipping container underground for the
storage of pyrotechnics and to carry out all associated ancillary site works on lands at
Rathoma, Killala, County Mayo is invalid in that the Commission erred in its interpretation
of the Mayo County Development Plan 2022 to 2028, specifically Objective EDO 54, further
particulars of which are set out in Part 2 below.”
42. The parties’ positions as recorded in the statement of case are summarised as follows:
“Core Ground 1
Applicant’s Position
24. The Applicant’s position is that the Impugned Decision is invalid in that the
Commission erred in its interpretation of the CDP, specifically Objective EDO 54. The
Inspector and the Commission parsed Objective EDO 54 to comprise separate conjunctive
requirements: a ‘formative’ or primary requirement that the development constitute ‘rural
enterprise’ or ‘resource development’, and an ‘auxiliary’ or secondary requirement of
dependency on a rural location. The Inspector concluded that the dependency requirement
was ‘moot’ and so was not considered.
25. The Applicant contends that, construed properly, Objective EDO 54 commits to
facilitate enterprise that is dependent on locality in rural locations, of which rural enterprises,
resource development and renewable energy are the principal kinds. The phrase ‘that are
dependent on their locality in rural locations’ is a central element of the Objective and cannot
be treated as secondary or dismissed as ‘moot’.
26. The Applicant further contends that the CDP must be read as a whole, including
paragraph 4.4.8 (which recognises that the rural economy ‘extends beyond’ traditional
sectors to include ‘all aspects of the economy’), Policy EDP 19 (supporting indigenous
industry and business start-ups), and Objectives EDO 55 and EDO 56 (supporting rural
entrepreneurship and micro-businesses). The Applicant also contends that Objective EDO
54 does not contain any prohibition on kinds of development that are not listed, and that
the Inspector and Commission were wrong to conclude that the proposed development
would be contrary to Objective EDO 54, or that it was necessary for the Applicant to justify
the location by reference to rural enterprise or resource development separately from
dependency on rural location.
Respondent’s Position
27. The Commission’s interpretation of Policy EDO 54 – i.e. that it comprises separate
requirements, (a) that the development in question comprises a rural enterprise, resource
development or renewable energy resource and (b) that the development in question is
dependent on its location in a rural area– is correct. The Commission accepts that EDO 54
is not to be interpreted as if it is a provision of statute, and that points (a) and (b) are
related, and that for example, in considering whether a particular development involves a
rural enterprise, it is relevant to consider whether it is dependent on its location in a rural
area. The Inspector’s analysis is consistent with this interpretation and accordingly no error
of interpretation arises.
28. With reference to the Applicant’s claim that ‘construed properly, Objective EDO 54
commits to facilitate enterprise that is dependent on locality in rural locations, of which rural
enterprises, resource development and renewable energy are the principal kinds’, this is an
incorrect interpretation of the Objective. This interpretation flies in the face of the ordinary
meaning of the wording of the objective, which commits to facilitate ‘rural enterprises, and
resource development… and renewable energy resources’ that are dependent on their
locality in rural locations (emphasis added). Further, the underlined use of the word ‘rural’
must be given meaning, and the Applicant’s interpretation would be to empty that word of
meaning. Further, contrary to the Applicant’s claims, a holistic reading of the CDP does not
require the underlined use of the word ‘rural’ to be emptied of meaning; any broadening of
the meaning of the underlined use of ‘rural’ should include e.g. home working, digital hubs
per §4.4.8 of the CDP, but not a pyrotechnics storage facility.
29. Further, the Applicant’s claim that EDO 54 does not contain any prohibition on kinds
of development that are not listed is not consistent with a correct interpretation of this
objective: correctly interpreted, the objective means that only proposed development of
enterprises/resource development/renewable energy resources that come within the types
of developments identified in the Objective will be facilitated.
30. Without prejudice to the foregoing, if the Inspector did err in his interpretation in
the manner alleged by the Applicant (which is denied), this is a harmless error in
circumstances where inter alia the Inspector, as well as considering the question of whether
the Proposed Development was a rural enterprise, also considered the question of whether
it was dependent on its location in a rural area, and concluded that it was not (and the
Applicant has not challenged this conclusion other than by way of the claim of material error
of fact which is without merit on the basis set out below).”
43. Section 4.4.8 of the CDP 2022-2028 (https://www.mayo.ie/getmedia/db6f18d0-73c2-463f-
a6cc-5b1186762a48/Vol-1-Written-Variation-No-1.pdf) is as follows (emphasis added):
“4.4.8 Rural Economy
Mayo is a rural county, with much of its population rural-based and the majority of the land
in the county is in agricultural / forestry use. Construction, engineering, manufacturing,
quarrying, tourism related services, transport, energy production, forestry, agriculture, food,
education, waste disposal and health are all significant areas of employment in the rural
areas of County Mayo. The Council recognises, however, that rural-based employment
extends beyond these traditional rural sectors to include all aspects of the
economy. A national strategic outcome of the NPF is ‘Strengthened Rural Economies and
Communities’. Rural areas play a key role in defining our identity, in driving our economy
and our high quality environment and are part of the county’s strategic development during
the plan period.
In addition to the natural resources and food sector as traditional pillars of the rural
economy, improved connectivity facilitating home working and digital hubs, broadband and
rural economic development opportunities offer the potential to ensure our rural area
remains and strengthens as a living and working community. Local Development Companies
are important collaborators with Mayo County Council on rural economic development
through their work with the LEADER Rural Development Programme and other rural based
programmes.
Rural Economy Policies
EDP 19 To support, in conjunction with Mayo LEO and other agencies, the development of
indigenous industry and business start-ups in rural employment centres (villages and
settlements) in the county, subject to compliance with siting, design and environmental
considerations.
EDP 20 To support the implementation of the new LEADER Rural Development Programme
2014-2020, and any subsequent amended/updated programme for the county.
Rural Economy Policies [this appears to be a misprint for objectives]
EDO 54 To facilitate rural enterprises, and resource development (such as agriculture,
agrifood sector, agri-tourism, commercial fishing, aquaculture, rural tourism, forestry, bio-
energy, the extractive industry, recreation, cultural heritage, marine enterprise sector,
research and analysis) and renewable energy resources (such as wind/solar/ocean energy)
that are dependent on their locality in rural locations, where it can be demonstrated
that the development will not have significant adverse effects on the environment,
including the integrity of the Natura 2000 network, residential amenity or visual amenity.
Where proposals demonstrate measures to promote environmental enhancement through
improved ecological connectivity, such as measures in the Pollinator Plan, additional native
species planting or blue and green infrastructure measures, these will be favourably
considered.
EDO 55 To support rural entrepreneurship and the development of micro businesses
(generally less than 10 no. employees) in rural areas, where environmental and landscape
impact is minimal and such developments do not generate significant or undue traffic. This
objective shall not apply to sites accessed from the National Road Network.
EDO 56 To support remote working in the rural area, at an appropriate scale, for
enterprise/businesses that do not require visiting members of the public, subject
to normal planning considerations.”
44. Sometimes people quibble that public bodies have no function in statutory interpretation but
that is misconceived and unworkable. All public law entities of necessity must interpret the
legislation they are required to apply, and make any legal or factual findings required to carry out
their functions.
45. Insofar as Browne says at 12-883 of Simons on Planning Law that “An Bord Pleanála does
not have jurisdiction to decide other than simple questions of law”, I am afraid that I can’t agree.
There is no logical or legal basis for that. Any decision-taker has to decide any questions of fact or
law necessary for their decision subject only to procedural exclusivity (for example, the commission
doesn’t have jurisdiction to declare government policy documents or legislation invalid although if
rigorous criteria are met they may need to disapply such matters in favour of EU law).
46. Furthermore, the suggestion in Simons is unfortunately not workable anyway because there
is no special bespoke theory of law for the commission alone – a version of the restricted railroad
ticket good for this journey only. The “simple points only” theory would have to apply throughout
the public sector. Decision-making would quickly grind to a halt on that basis.
47. Even more fundamentally, the notion of what is a “simple question of law” is hopelessly
subjective. Lawyers (I include judges) are conditioned to regard the questions of law they deal with
as highly complex. You don’t need to be Sigmund Freud to appreciate some of the reasons for that.
In the case of practitioners, the incentive to characterise questions as complex also has an economic
overlay – something that has now been institutionalised in the Planning and Development (Costs of
Part 9 Judicial Review Proceedings) Regulations 2026 (S.I. No. 200 of 2026) – no doubt a topic for
interesting debates to come. And yet very few cases are that complex in the end – most boil down
to the application to particular facts of well-established legal principles. Innovative theories are
normally stillborn but every once in a while the law does develop in some tangible way. However
let’s not fool ourselves – this is not the norm.
48. The fact that the commission has power to refer questions to the High Court does not mean
that it is obliged to do so or even that it is a good idea to do so. My own view for what it is worth is
that generally that procedure is highly inefficient. A far preferable approach is what is apparently
referred to in military terms as “completed staff work” – namely that in any hierarchical system,
when one tier is presenting something for potential review by the next tier, it should be a complete
piece of work. Edwin C. Bliss describes it thus in his classic work on time management, Getting
Things Done (Revised ed., London, Warner Books, 1991), p. 110:
“It is believed that the idea originated with Napoleon, and it is a standard operating
procedure in just about every modern army, navy, and air force in the world.
In a military context, the idea is that under no circumstances does the chief of staff go into
the commanding general and say ‘General, here is the problem we face. What would you
like us to do about it?’”
49. The commission are familiar with the principle because that’s what they get from the
inspectorate – a complete draft decision including proposed conditions – but the notion applies to
trial courts just as much to administrative bodies. So the most helpful thing the commission or any
administrative body can do is to address all issues that are necessary for the decision and come up
with a completed piece of work. Stopping half way to ask questions just unleashes another lengthy
process (for good measure, one not subject to any procedural streamlining such as applies to
planning decisions under s. 50) which, at its conclusion, leaves the original process incomplete and
needing to be picked up again from a standing start. The fundamental point for present purposes
is the existence of this procedure does not mean that the administrative body cannot decide complex
questions of fact or law. The exception is where asking the question will have the effect of speeding
matters up. This arises in particular with a reference to the CJEU. If that is likely at some point, it
is often quicker to do it straight away rather than force everybody through two or three tiers of the
domestic legal system first.
50. While acknowledging that planning decision-takers can and must decide questions of law,
including complex ones, the interpretation of the plan – like any legal point – is ultimately a matter
for the court, and such decisions by public bodies are in a sense working interpretations rather than
settled answers, until the courts are called upon to get involved.
51. We can now turn to the commission’s reasons for rejection:
(i) “Having regard to the rural location and the nature of the proposed development” –
that does not tell us very much about the reason for refusal in this particular context
– the rural location was the reason proposed by the applicant why permission should
be granted, and presumably the location and nature of the development are relevant
in every case.
(ii) “the Commission was not satisfied that the applicant had demonstrated that the
proposed pyrotechnics storage facility at this location was justified”. Any proposal
could be rejected on the basis that the applicant for permission has not
demonstrated that the application was justified.
(iii) “and the proposed development would be contrary to the objectives of the current
County Development Plan, specifically Objective EDO 54, to facilitate rural
enterprises, and resource development that are dependent on their locality in rural
locations” – this is where the problem of interpretation erupts.
(iv) “The proposed development would, therefore, be contrary to the proper planning
and sustainable development of the area.” – if words mean anything this is not a
further reason, it is a consequence of the foregoing.
52. In Sherwin v. An Bord Pleanála [2024] IESC 13 (Unreported, Supreme Court, Woulfe J., 11
April 2024) (Charleton, O’Malley, Baker and Murray JJ. concurring), the Supreme Court decided that
a planning decision-taker is required, where it relevantly arises, to address the text of development
plans and interpret them where required, and enjoys a zone of evaluative judgement in relation to
development plan provisions that involve flexibility. Here we don’t get beyond the first step because
the commission’s interpretation was incorrect. Any valid evaluation can only arise on a correct
interpretation, so if and insofar as the correct application of the plan involves some (not excessively
wide) margin of evaluation, that can be addressed by the commission on remittal.
53. The core problem is the conceptualisation of the application as contrary to objective EDO
54. This unfortunately is a complete misinterpretation of the plan – albeit one shared by all of the
statutory actors here.
54. The simple reason this is fundamentally flawed is that EDO 54 does not prohibit anything.
It simply gives policy support to a particular type of development. Other types of development are
given policy support by other plan objectives. If a development falls outside EDO 54 all that means
is that it does not get support from that particular objective, but it may do so from other plan
provisions. The whole notion of being “contrary to” EDO 54 is fundamentally misconceived.
55. For example, objectives EDO 1 to 28 support economic development in the county generally:
“EDO 1 To facilitate and support the continued growth of the economy in the county in a
sustainable manner and in accordance with the National Planning Framework (NPF) and the
Regional Spatial and Economic Strategy.
EDO 2 To support and facilitate the economic development of the county in a manner which
is consistent with the economic pillars identified in the Enterprise and Investment Units
Economic Strategy.
EDO 3 To continue to promote the county to attract enterprise and investment into Mayo
through the Enterprise & Investment Unit and/or Local Enterprise Office, with a focus on a
number of established and emerging sectors including tourism, manufacturing, marine,
renewable energy, ICT, food and agri-food.
EDO 4 To continue to support new and existing enterprises in the county through the
provision of training, mentoring, financial supports, advice and networking events.
EDO 5 To encourage enterprise and employment development to locate in brownfield sites
or unoccupied buildings in town centres or where appropriate in existing industrial/retail
parks or other brownfield industrial sites in preference to undeveloped zoned or unzoned
lands.
EDO 6 To facilitate the economic development of Mayo to create a viable and favourable
economic environment for business and enterprise, whilst delivering sustainable jobs,
employment opportunities and an enriched standard of living for all.
EDO 7 To identify and promote a range of locations within the County for different types of
enterprise activity including international business and technology parks, small and medium
enterprises (SME) and micro enterprise centre.
EDO 8 To co-operate with local and national development agencies and engage with existing
and future employers in order to maximise job opportunities in the County.
EDO 9 To encourage and facilitate home-based start up enterprises of appropriate type,
size and scale, subject to compliance with the criteria outlined in 5.10 of Volume 2
(Development Management Standards) of the Plan, and where it can be demonstrated that
the development will not have significant adverse effects on the environment, including the
integrity of the Natura 2000 network, residential amenity or visual amenity.
EDO 10 To work in partnership with relevant stakeholders, to ensure that a sustainable
approach is taken to enterprise development and employment creation across all sectors of
the Mayo economy, in accordance with the Green Economy national frameworks relevant to
each sector.
EDO 11 To engage with all relevant government stakeholders, enterprise agencies and
sectoral representatives in pursuing ‘green’ approaches to economic development and
actively collaborate with key industry and educational bodies to promote Mayo based
initiatives across the economic sectors.
EDO 12 To promote quality employment and residential developments in proximity to each
other in order to reduce the need to travel.
EDO 13 To encourage the provision of ‘live work’ communities, in which employment,
residency and sustainable transport facilities are located in close proximity to each other, to
reduce long distance commuter trends and congestion, as well as reducing outward
migration from the county.
EDO 14 To ensure that people intensive developments are located close to the strategic
public transport network.
EDO 15 To address the rate of out bound commuting, with the provision of ‘live work’
communities in strategic settlements served by sustainable transport, thereby improving
quality of life, encouraging volunteerism and community engagement.
EDO 16 To encourage mixed use settlement forms and sustainable centres, in which
employment, residency, education and local services / amenities are located in close
proximity to each other.
EDO 17 To work with Irish Water and other infrastructure providers, to support the provision
of services and facilities to accommodate the future economic growth of the County and to
seek to reserve infrastructure capacity for employment generating uses.
EDO 18 To ensure that there is sufficient quantum of zoned lands to facilitate a range of
enterprise across the county in line with the settlement hierarchy.
EDO 19 To support start-up businesses and small-scale industrial enterprise at appropriate
locations throughout the County, subject to the principles of proper planning and sustainable
development.
EDO 20 To further linkages and partnerships with GMIT including the branding of the area
as a centre of excellence in the knowledge-based economy.
EDO 21 To encourage and facilitate indigenous industries, at appropriate locations with good
communication infrastructure, in recognition of their increasing importance in providing local
employment and helping to stimulate economic activity within small communities.
EDO 22 To support the use of town centre and other suitable locations for new service
focused enterprises.
EDO 23 To support the continued development of Galway Mayo Institute of Technology
(GMIT), Castlebar Campus including the development of a shared approach to enterprise
development with the Local Enterprise Office.
EDO 24 To acquire suitable land (subject to the availability of funding), including, where
appropriate, disused sites in State ownership, for creative and innovative entrepreneurial
initiatives and the provision of clustered incubator units.
EDO 25 To promote the development of the key strategic employment sites identified in the
Economic Development Strategy for County Mayo.
EDO 26 To support and promote the equine industry in the County as an economic and
employment provider.
EDO 27 To work with Eirgrid, as far as practicable, to ensure power infrastructure is available
for the development of zoned employment lands within the N5 corridor.
EDO 28 To review the Development Contribution Scheme.”
56. The commission is correct (submissions para. 30) that EDO 54 does not operate “to facilitate
the types of development identified within the Objective, but also to facilitate any other type of
development, as long as this does not prevent or prejudice the Council from facilitating rural
enterprise”. It is not EDO 54 that facilitates other development but other objectives, plan text, and
national and regional policy. EDO 54 applies to what it applies to, but it does not exhaust the
economic policies of County Mayo. That does not “empty the Objective of all meaning and render it
futile” as submitted, any more than would arise in any other policy area where there are multiple
instruments, none of which are totally exhaustive.
57. In fairness to the commission and the inspector, this confusion originated with the council’s
wording. The council came up with the following:
“it is considered that the proposed development ... would be contrary to the objectives of
the Mayo County Development Plan 2022-2028 to only permit commercial development in
a rural area where there is a proven need to locate therein ...”
58. This is a textual hallucination. The plan does not “only permit commercial development in
a rural area where there is a proven need to locate therein”. No clause of the plan is quoted because
none exists.
59. If the commission’s use of “in particular” were to be suggested as covering the plan overall,
that would be an untenable interpretation given that EDO 54 is the only text engaged with, and its
language is used by both the inspector and the commission in this context.
60. With the background of that fundamental confusion in mind, we can now turn to why the
commission’s engagement with that particular objective was flawed, although not entirely so
because the inspector’s basic interpretation is quite correct. Contrary to the applicant’s submission,
objective EDO 54 does involve a cumulative test:
(i) the objective applies to projects that are either (a) rural enterprises or (b) resource
development or (c) renewable energy resource;
(ii) projects must be dependent on their locality in rural locations; and
(iii) in addition it should be demonstrated that the development will not have significant
adverse effects on the environment.
61. The inspector’s application of this test was:
(i) this is not a rural enterprise; and
(ii) locality-dependency was “moot” but the inference is that it did not appear to be
satisfied.
62. Opposing parties tend to see everything as evaluation, but evaluation presupposes a correct
interpretation. The analysis here is not the application of a correct test to particular facts because
it involves further more detailed questions of interpretation. Those are in essence:
(i) does the concept of “rural enterprise” mean (a) enterprises that serve the rural
community or are suitable for a rural location or (b) enterprises that in effect “have
a need to be located in a rural area, [or are] reliant on any specific rural based
resource”; and
(ii) does the concept of “dependent” on locality in rural locations include (a) cases where
the conditions for the development are more easily met in rural locations as opposed
to (b) only cases where they “have a need to be located in a rural area, [or are]
reliant on any specific rural based resource”?
63. In broad terms:
(i) as to (i) the inspector did not define “rural enterprise” but seemed to conflate the
test with the concept of dependency on being located in a rural area (option (b));
and
(ii) as to (ii) the inspector goes for interpretation (b).
64. Contrary to Sherwin, the inspector and commission did not actually interpret the plan
provision. One can infer from the discussion what interpretation they appear to have taken but it is
certainly not clearly articulated. The commission’s submissions here obliquely acknowledge the lack
of an actual interpretation (emphasis added):
“11. The Commission accepts that this Development Plan provision is not to be
interpreted as if it is a provision of statute, and that points (a) and (b) (described in the sub-
heading above paragraph 6, above) are related, and that for example, in considering
whether a particular development involves a rural enterprise, it is relevant to consider
whether it is dependent on its location in a rural area, i.e. that this is a factor (but not the
only factor) that is relevant in considering whether a particular enterprise constitutes a
‘rural enterprise’. The Inspector’s analysis is consistent with this.”
65. “Consistent with this” seems to mean that the commission have thought about it after the
event and come up with a wording into which the decision can be fitted. “Not the only factor” also
seems to mean that they have re-interpreted the decision, but without specifying what the other
factors are.
66. Unfortunately, applying the test in Re XJS Investments Ltd. 1986 WJSC-SC 1935, [1986]
I.R. 750, [1987] I.L.R.M. 659 (McCarthy J., nem. diss.)), I consider that interpretation (a) is the
appropriate one in both cases for the following reasons.
67. On the first question, the development plan itself does not define rural enterprises but states
that “The Council recognises, however, that rural-based employment extends beyond these
traditional rural sectors to include all aspects of the economy.” With such a statement immediately
preceding the policies and objectives at issue, the only reasonable interpretation of “rural enterprise”
has to be reasonably consistent with this (“all aspects of the economy”). To interpret “rural
enterprises” as requiring necessarily inherent rurality renders the qualification about locality-
dependency otiose and duplicative.
68. Rural enterprise can’t mean owned by rural dwellers, as that contradicts the objective nature
of planning law (for example, such a firm could be sold immediately following the grant of
permission).
69. It clearly does include enterprises that serve the needs of the rural community, but the
overall text of the plan has the implication that it is not limited to that.
70. The numerous references in the plan to home working for example must constitute rural
enterprise if the plan is to be read as a coherent whole.
71. So the best interpretation is that rural enterprise is enterprise serving a rural area or
otherwise appropriate for such an area. That does involve a degree of evaluative judgment.
72. As the applicant points out, EDO 54 should be viewed as part of a coherent whole with EDO
55 and EDO 56 which situate the concept of rural entrepreneurship in the overall economy (micro-
businesses, remote working, etc.) rather than being completely conditioned by rurality. Likewise
EDP 19 is relevant insofar as it refers to supporting indigenous industry and business start-ups.
73. Development plans are not statutes, and this is a particularly loosely drafted provision. Any
interpretation of such a clause runs the risk of creating some duplication. But the meaning that best
accords with the text, context and purpose is to give “rural enterprise” and “dependent” different
meanings – the former relating to contribution to the rural economy in some way. We will turn to
the latter shortly.
74. If rural enterprise means (as the inspector in effect held) enterprise that needs to be located
in a rural area, that renders the second limb of the test totally duplicative and otiose. A broad
reading of “rural enterprise” keeps the duplication to the minimum and also accords better with the
context and purpose of the objective.
75. The commission’s reading would also exclude many rural economic activities that have plan
support from EDO 54 and from the notion of rural enterprise generally.
76. The fact that EDO 54 gives examples does not have the implication that other matters are
not included. The wide variety and mix of the examples precludes any rigid interpretation based on
noscitur a sociis.
77. Insofar as the commission submits that “only proposed development of enterprises/resource
development/renewable energy resources that come within the types of developments identified in
the Objective will be facilitated”, this is ambiguous. If it means that only enterprises meeting the
cumulative criteria above are covered by the objective, then that is correct. If it means that only
enterprises coming within the named examples are covered, then that is incorrect. That reading
would contradict the term “such as” which is used twice in the objective.
78. As a final footnote on this topic, the Irish statute book does not furnish much material in
terms of a definition of rural enterprise, but my thinking on this issue was assisted by a look at
international material, particularly one New South Wales instrument, the Bellingen Local
Environmental Plan 1990 (https://legislation.nsw.gov.au/view/whole/html/1999-12-24/epi-1990-
0080) that includes the following definition:
“rural enterprise means an industry or other business which, by virtue of its nature, the
service provided or the products produced, distributed or sold, is in the opinion of the council
appropriately located in a rural zone.”
79. This is helpful by analogy, taking it for what it is (to state the obvious).
80. So we can now turn to the issue of dependency which the inspector held meant that the
enterprise needs to be located in a rural area.
81. Nietzsche proposed that „Alles ist Nothwendigkeit“/ “everything is necessity” (Menschliches,
Allzumenschliches/ Human, All Too Human (Chemnitz, Ernst Schmeitzner, 1878), §107), but literal
readings are at one’s own risk at the best of times, and are supremely perilous in his case. I interpret
his statement as meaning that things are more necessary than we like to admit – which is in this
context a reasonable riposte to the inspector’s comments.
82. The most striking thing about the inspector’s notion is that the concept of “need to be located
in a rural area” makes the test for the application of the objective extremely restrictive – far more
so than anything arising from the wording, context or purpose. Very little can be said to need to be
located in a rural area. Taking some examples:
(i) there can be agriculture in the city – e.g. market gardening, or city farms;
(ii) there can be wind turbines in urban or industrial areas, e.g. there are many on the
Thames east of London (anecdotally and for transparency, in my own encounters
with them they seemed to make no discernible noise at all above the ambient urban
baseline); and
(iii) there can be solar farms in cities on rooftops or otherwise – Spain’s largest urban
solar farm is across a group of cemeteries
(https://environment.ec.europa.eu/news/requiem-power-project-valencia-2024-
2024-08-26_en).
83. Forestry and outdoor rural recreation maybe meets the “need to be located in a rural area”
test but such a test would render EDO 54 very vestigial in its application. This would also contradict
the wide introductory context about all aspects of the economy.
84. In that context and bearing in mind that the purpose of the provision would be rendered
largely nugatory by a “need” test, the term “dependent” should be read in a sense of drawing support
from or being facilitated by a rural location as opposed to some form of sine qua non.
85. This is the vernacular use of the term “dependent”, which does not normally connote an
absolute need but some relationship whereby that which is depended on assists and facilitates that
on which it is dependent. An employer might depend on a particular worker but that doesn’t imply
absolute necessity – she can make do without the worker if that arises.
86. Having regard to the foregoing, a project that is significantly more suited to a rural as
opposed to an urban area is capable of being regarded as dependent on a rural location even if that
falls short of some absolute need. Such a project is also capable of meeting the test for being a
rural enterprise by virtue of being an enterprise suitable for a rural area.
87. Contrary to the respondent’s submission, the core of the challenge is not merits-based, it is
plainly one of legal interpretation of the plan. That interpretation does leave some room for
evaluation but not unlimited room.
88. Insofar as the commission say any error of interpretation is harmless because the locality-
dependency issue is not challenged, that reads the challenge too narrowly. It is acceptably clear
that the finding on this issue is challenged, albeit perhaps largely phrased as an error of fact. I
would accept that there is an error but would characterise it as one of interpretation. Relief should
not be refused on the basis of such a somewhat debateable characterisation on the pleadings if the
point is acceptably clear, as it is here.
89. The application of the plan, correctly interpreted, to the facts, will be a matter for remittal.
That said, I am far from clear as to what the planning objection to this proposal is other than what
the council said was “haphazard” development – which presumably implies it should be somewhere
else. But where? I appreciate the commission may say that’s not their problem. But the planning
policy point remains that if this site is deemed unsuitable, it must be on the basis of a theory that
involves either a conclusion that this is not a suitable development full stop for some as yet
unidentified reason, or that it could be suitable in some other type of location on a logic that is also
unidentified. In a more normal case one might suggest engagement with the council’s planning
department, but it is not clear that this would achieve anything given the kitchen-sink nature of their
rejection, including the dreaded spectre of property price depreciation, happily not something that
spooked the commission on appeal. No doubt the commission can address all matters that require
to be addressed on remittal. The problem with the property-price argument is that it compares the
particular project not with the practical alternative but with some fictional perfect solution which
doesn’t exist. Assuming for the sake of argument that this project will depress property prices on
adjacent lands (which is denied), the alternative to storing fireworks here is storing them somewhere
else which will presumably depress property prices there instead. All that is significant is the
marginal increase in adverse effect of choosing this location – but in fact a rural location is much
more likely to reduce any such effects than increase them, which is presumably why the commission
were not having any of that particular argument.
90. Ultimately the problem is that if our society wants fireworks, they have to be stored
somewhere. In general, the best place to keep dangerous materials is the middle of nowhere – that
applies to anthrax on Gruinard Island in Scotland, underground nuclear storage (something we may
need to get used to eventually if the underlying problem of runaway demand for energy cannot be
curbed), or infectious disease specimens – as in the underground lab in Michael Crichton’s The
Andromeda Strain (New York, Knopf, 1969). The council classified this development as “commercial”
with the implied suggestion that it could be in an industrial estate or the like. That unfortunately
misses the point that storage of dangerous matter is not just any old commercial development. If
this was in an industrial estate, and an explosion occurred, other structures could be damaged
causing severe economic loss not to speak of personal injury. If it was in an isolated area that would
be much less likely to be the case. One doesn’t need to be Michael Crichton to conceive a planning
and development-themed science fiction plot whereby, say, an infectious disease lab was refused
permission for location in a rural area due to not being a rural enterprise, and relocated to an
urbanised area near a wet market. The real inflection point of such a genre of Planning Noir will
arise if a project involving storage of dangerous materials relocates to a more urbanised area, and
if there is an accident causing collateral damage, at which stage we will find out if planning decision-
takers come forward to take ownership. The rejection of this application by the council on grounds
of being “commercial” could give rise to the potential for anxiety that the real problem with the
proposal is its unfamiliarity, rather than anything that arises from deeper engagement with the
particular trade-offs arising in this type of context.
Core ground 2 – alleged error of fact
91. Core ground 2 is:
“2. The Impugned Decision is invalid in that the Commission made a material error of
fact in the characterisation of the proposed development as other than rural enterprise
and/or other than dependent on its locality in a rural location, further particulars of which
are set out in Part 2 below.”
92. The parties’ positions as recorded in the statement of case are summarised as follows:
“Core Ground 2
Applicant’s Position
31. The Applicant’s position is that the Impugned Decision is invalid in that the
Commission made a material error of fact in the characterisation of the proposed
development as other than rural enterprise and/or as other than dependent on its locality in
a rural location. The Inspector concluded the proposed development was not rural enterprise
and that dependency was ‘moot’; the Commission does not demur from those conclusions.
32. These are material errors of fact: the Applicant is a mobile pyrotechnics business
providing specialised services for multiple weekly events nationwide, including large-scale
arts, music, sporting and corporate events, and its business supports rural tourism,
recreation and cultural heritage. The proposed storage facility is necessary for the long-
term sustainability of the business. The business supports rural tourism, recreation and
cultural heritage, all matters listed within Objective EDO 54 among the examples of rural
enterprise the CDP commits to facilitate.
33. Further, the supplies required for the business are Hazard Type 1 explosives which
must be licensed for storage under Section 7 of S.I. No. 804 ‘Stores for Explosives Order
2007’. Table 3 of Schedule 4 requires a separation distance of 229 metres to the nearest
road or other building. These regulatory constraints mean that the proposed development
could not meet licensing requirements in an urban location and, as a practical matter, must
be located in a rural area. The Inspector and Commission were wrong to conclude that the
proposed development is not dependent on its locality in a rural location.
Respondent’s Position
34. The Applicant’s claims that the Commission’s findings that (a) the Proposed
Development is not a rural enterprise and (b) the Proposed Development is not dependent
on being located in a rural area constitute material errors of fact are without merit:
35. Firstly, these alleged facts are not questions of fact but questions of evaluative
judgement and therefore not amenable to a finding of material error of fact.
36. Secondly, these alleged facts are not objectively verifiable. There is no method of
objectively or definitively determining whether the Proposed Development (a) is a rural
enterprise, or (b) is dependent on being located in a rural area.
37. Thirdly, these alleged facts are not uncontentious. aRegarding [sic] the question of
whether the Proposed Development is a rural enterprise, the Applicant and the Commission
disagree on this point and therefore it is contentious. In the case of the question of whether
the Proposed Development is dependent on being located in a rural location, the Applicant
(on the one hand) and the Commission and the Council (on the other hand) disagree on this
point, and therefore it is contentious.
38. Fourthly, there is no mistake by the Commission on either of these points, and the
Commission relies in this regard on §6.2.4 of the Inspector’s Report. Further, with specific
reference to the claim that the Commission materially erred in fact by finding that the
Proposed Development is not dependent on being located in a rural area, the Commission
notes that the planning authority concluded, in the Planning Report, that ‘[t]here is
insufficient justification for the proposed development to be at this rural location’. Further,
it is not even clear that the Applicant is now definitively stating that the Proposed
Development is definitively dependent on location in a rural area: ‘[t]he prospect of
acceptance in a residential or industrial area must be low’ (§30 of Applicant’s submissions).
Further, with reference to the matters set out at §34 above, these are classic arguments
against the merits of the Inspector’s findings on the issue of dependency on rural location,
which cannot give rise to relief.”
93. This does not add a whole lot to the previous point and does not call for further discussion,
other than to emphasise that contrary to what the commission might be taken to be suggesting, not
everything can be collapsed into evaluation. There has to be a correct interpretation of the plan
first, and evaluation only gets going within whatever scope is afforded by that correct interpretation.
We don’t get to that point in this case. The real issue is not error of fact but unduly restrictive
interpretation of the plan.
Summary
94. For the avoidance of doubt, preambular matters prior to the first heading of this judgment,
and the following summary, do not take from the operative parts of the judgment and must be read
in a sense consistent with those. In outline summary, therefore:
(i) it is settled law that planning decision-takers should engage with the plan and
correctly interpret it;
(ii) applying such law to the facts here, the commission did not in fact clearly interpret
the plan, but insofar as its decision involved interpretation, it incorrectly viewed EDO
54 as precluding developments not within its terms and/or it incorrectly adopted a
test of necessity for both limbs of the objective (“rural enterprise” and dependency
on a rural location);
(iii) it is settled law that evaluative judgement in the application of an instrument only
arises on the basis of the relevant instrument as properly interpreted; and
(iv) applying such law to the facts here, we do not get to the point of evaluative
judgement due to the unduly restrictive approach taken to the interpretation of the
plan.
Order
95. For the foregoing reasons, it is ordered that:
(i) there be an order based on relief 1 claimed in the statement of grounds by way of
an order of certiorari by way of application for judicial review quashing the decision
of the respondent, An Coimisiún Pleanála, made on 24 July 2025 (reference no. ABP-
320786-22) to refuse the applicant’s application for permission to install a shipping
container underground for the storage of pyrotechnics and to carry out all associated
ancillary site works on lands at Rathoma, Killala, County Mayo;
(ii) in accordance with O. 103 r. 36(1)(a) RSC, the matter be remitted to the commission
at a point prior to the inspector’s report to reconsider the appeal in accordance with
this judgment;
(iii) there be an order for costs (including reserved costs and the costs of written
submissions) to the applicant against the respondent;
(iv) any issue as to the extent of such costs be determined, in default of agreement, by
way of legal costs adjudication; and
(v) for the avoidance of doubt, the order for costs shall include an order for the costs of
legal costs adjudication.