High Court dismisses appeal on unauthorized development where new house is distinct from previous mobile homes.
Legislator summary
AI generatedThe High Court dismissed the appellants' appeal regarding unauthorized development, affirming the Circuit Court's finding that a new dwelling house is distinct from the previous mobile homes. The appellants argued the new structure was merely an improvement of the old one, but the court rejected this based on objective photographic evidence showing a completely different structure. Consequently, the mandatory order requiring surrender of vacant possession for remediation was upheld as the new development did not constitute maintenance of the original unauthorized structure.
Legislator headnote
AI generatedPlanning and Development Act 2000, s. 160; s. 154: The court must determine if a new structure constitutes unauthorized development distinct from a previous one; a completely different dwelling house replacing mobile homes is not merely an improvement or maintenance of the original unauthorized structure.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2026] IEHC 342
THE HIGH COURT
PLANNING & ENVIRONMENT
CIRCUIT APPEAL
DUBLIN CIRCUIT COUNTY OF THE CITY OF DUBLIN
[High Court Record No.: H.CA.2025.0000329]
[Circuit Court Record No.: 2025 5748 Co. Dublin]
IN THE MATTER OF THE PLANNING AND DEVELOPMENT ACT 2000
NOTICE OF MOTION FOR RELIEF UNDER SECTION 160 OF THE PLANNING AND
DEVELOPMENT ACT 2000
BETWEEN
SOUTH DUBLIN COUNTY COUNCIL
RESPONDENT/PLAINTIFF
AND
THRESHFORD LIMITED, MULLNASSA LIMITED AND BRANACH DEVELOPMENTS LIMITED
APPELLANTS/DEFENDANTS
AND
THE HIGH COURT
PLANNING & ENVIRONMENT
CIRCUIT APPEAL
DUBLIN CIRCUIT COUNTY OF THE CITY OF DUBLIN
[High Court Record No.: H.CA.2025.0000330]
[Circuit Court Record No.: 2025 5894 Co. Dublin]
IN THE MATTER OF THE PLANNING AND DEVELOPMENT ACT 2000
NOTICE OF MOTION FOR RELIEF UNDER SECTION 160 OF THE PLANNING AND
DEVELOPMENT ACT 2000
BETWEEN
JOHN O’NEILL
APPLICANT/RESPONDENT
AND
BRANACH DEVELOPMENTS LIMITED AND MULLNASSA LIMITED
RESPONDENTS/APPELLANTS
Commencement of works: mid-August 2025
Date of Circuit Court order: 19 December 2025
Date of main hearing: 13 May 2026
Date draft judgment circulated: 22 May 2026
JUDGMENT of Humphreys J. delivered on Wednesday 3 June 2026
“Two photographs probably best encapsulate what this case is about.
Firstly, the below photograph shows the type of structure that was previously located on the
lands – mobile homes (there is no dispute about this).
Secondly, the below photograph shows what is now on the lands – a completely different
structure, a dwelling house. Nothing remains of the earlier structure.
Based on any objective and rational consideration of these images, any reasonable person would
plainly see that they are different structures. Despite this, the Appellants adopt a different and,
with respect, nonsensical approach in saying that they are, in essence, the same structure (the
second being represented by the Appellants as maintenance/improvement/alteration of the
first). This is not even so much as an application of the Ship of Theseus paradox, but more
gaslighting on a monumental scale.” (SDCC submissions paras. 4 to 6).
1. This is a particularly egregious case of disregard of planning law. It is not made any better
by the non-reality-based sworn evidence on behalf of the respondents that, like the Party’s final and
most essential command in Orwell’s Nineteen Eighty-four (London, Secker & Warburg, 1949), pt. 1
§7, “told you to reject the evidence of your eyes ...”. Nor are matters improved by the fact that
the unauthorised works have occurred in a highly sensitive setting – zoned “High Amenity – Dublin
Mountains” in the South Dublin County Development Plan 2022-2028, with the objective to “protect
and enhance the outstanding natural character of the Dublin Mountains Area”. Nor is the situation
made better by the almost unbelievable chutzpah of the developers who even now claim “innocent
mistake”, even though they ignored or deflected warning letters and intensified construction of the
unauthorised development in the teeth of interventions from the council and residents and during
the course of proceedings before the Circuit Court. This is as far from innocence as you can get –
this was an attempt to create a fait accompli with a view to turning around and defiantly asking the
system, in effect, “what are you going to do about it?”. I suppose like many other people who defy
planning law, the respondents are now going to find out.
2. The old adage is that when the facts are against you, hammer the law – and nobody could
take from the vigour of the hammering resorted to by the respondents in that regard. While a
superhuman jurisprudential effort has been made on behalf of the respondents to advance any
conceivable reason as to why the facts should not lead to an adverse order, that exercise, while at
one level enormously impressive, is, unpersuasive. As the council submitted, “this isn’t a marginal
case”. The ultimate reason for that is that while ornate scholarly infrastructure was totteringly
erected by the respondents in a majestic doctrinal exercise by way of defence, none of this arises
on the facts and therefore none of this makes any difference to anything. What defeats the
respondents is not some abstruse point of law that cries out for clarification, but the egregious nature
of their own conduct and the inevitably adverse factual findings that flow from that.
Judgment history
3. A 1972 permission required the removal of caravans within one year, but this was not
complied with. It also prohibited additional caravans. When the council sought to enforce this
against the previous owner Mr Hill, they were unsuccessful: Dublin County Council v. Hill [1994] 1
I.R. 86, [1992] I.L.R.M. 397 per McCarthy J. (ex tempore, O’Flaherty and Egan JJ. concurring).
4. During the Circuit Court proceedings, the appellants issued judicial review proceedings
seeking to restrain s. 160 proceedings but apparently without disclosing the existing s. 160
proceedings on the papers (Threshford Limited and Mullnassa Limited v South Dublin County Council
[Record No. 2025 1624 JR]). The appellants, the first time the matter was before the court, applied
to withdraw those proceedings. Notwithstanding the application to withdraw the said proceedings
the council sought to address the High Court (Holland J.), and I deal with this further below.
Ultimately the judicial review application was struck out.
5. Section 160 injunctions were granted by HH Judge O’Connor on 19 December 2025, and the
respondents appeal from those orders.
Geographical context
6. The proceedings comprise an appeal by the first and second named appellants against a s.
160 order made by Dublin Circuit Court on 19 December 2025 and perfected on 22 December 2025
in relation to lands located at Chianti Park, Mount Seskin Road, Raheen, Brittas, Co Dublin, at:
https://maps.app.goo.gl/5TAAWEjDT1VqLmDMA. The lands are zoned “High Amenity- Dublin
Mountains (HA-DM)” in the South Dublin County Development Plan 2022-2028.
7. The property the subject of these proceedings can be viewed on Google Street View using
https://maps.app.goo.gl/pnLXdfk8VTya5ALaA. An aerial photo of the property from Google Maps
can be accessed at https://maps.app.goo.gl/2S42xG7Vq8QWkVq36 .
8. Next door to Chianti Park is a development called Hillbrook Lawns which is a similar caravan/
mobile home park since 1968. The respondents say that the next door park demonstrates that the
modular dwellings may be of a superior type of structure to caravans/ mobile homes for the purposes
of living conditions.
Parties
9. The plaintiff/respondent, South Dublin County Council, is the relevant planning authority.
10. John O’Neill is the applicant/plaintiff in these proceedings. He lives c. 200 m from the
property the subject of these proceedings.
11. As to the respondents, Threshford Limited, of College House, 71/73 Rock Road, Black Rock,
Co. Dublin (A94 FPXP), is the owner and/or occupier of the lands and/or is the entity responsible for
carrying out the development the subject of proceedings pursuant to s. 160 of the Planning and
Development Act 2000 (the 2000 Act).
12. Mullnassa Limited, of College House, 71/73 Rock Road, Black Rock, Co. Dublin (A94 FPXP),
is the owner and/or occupier of the lands and/or is the entity responsible for carrying out the
development the subject of proceedings pursuant to s. 160 of the 2000 Act.
13. Branach Developments Limited, of Thomastown, Caragh, Kildare, Ireland, is the entity
carrying out the development on the lands on behalf of the first and second named appellants.
Facts – SDCC case
14. The alleged unauthorised development, the subject matter of these proceedings, gave rise
to a series of complaints from mid-August 2025 to mid-September 2025.
15. On 18 August 2025, pursuant to s. 152 of the 2000 Act, the council issued warning letters
to Mr Hill (the previous owner of the lands) and the third named appellant.
16. The previous owner responded to the said warning letter, indicating he was no longer the
owner of the lands.
17. The third named appellant responded to the council by letter dated 12 September 2025,
indicating that whilst they were carrying out the works on the lands, it was at the request/instruction
of the owner.
18. The council subsequently issued a letter to various parties, including the appellants herein,
prior to proceedings. Dated 30 September 2025, same sought for the unauthorised development to
cease immediately, as well as other specific undertakings.
19. The third named appellant replied to the said letter, by way of correspondence dated 1
October 2025, and again disputed any responsibility for the unauthorised development.
20. In response to this correspondence, the council wrote to the third named appellant on 1
October 2025, asking it to clarify who the owner of the lands was or who it was working for. By way
of further letter, dated 1 October 2025, the third named appellant failed and/or refused to provide
this information.
21. On 2 October 2025, the council received correspondence from solicitors acting for the first and
second named appellants. This correspondence indicated that they were seeking time to take
instructions.
22. The council responded to the said correspondence by email dated 3 October 2025, indicating
that it would extend time for any undertakings to 6 October 2025 at 2 pm.
23. On 7 October 2025, the solicitor for the first and second named appellants responded to the
council’s correspondence and indicated, for reasons set out, that the appellants’ position was that
the allegation of unauthorised development was “misconceived” and the development was exempt
pursuant to s. 4(1)(h) of the 2000 Act.
Facts – O’Neill case
24. The lands the subject of these proceedings are known as Chianti Park, Mount Seskin, Brittas,
County Dublin, also referred to as Hillsbrook Lawn, and are situated within the administrative area
of South Dublin County Council. The property comprises a former caravan, mobile home and chalet
site and is owned by the respondents.
25. The applicant resides in close proximity to the property and has done so for a number of
years. The applicant’s dwelling is located approximately 200 m from the property.
26. The property was originally in agricultural use. From 1968, allegedly, the property was used
for mobile homes and chalets. Planning permission was granted in or about 1972 for the retention
of a limited number of mobile homes, subject to conditions including a requirement that the
structures be removed within one year and that no further such structures be erected.
27. Over time, the number of structures on the property increased beyond what was originally
permitted, and there has been a history of unauthorised development on the property.
28. On or about 11 August 2025, works commenced on the property which are the subject of
these proceedings.
29. The works the subject matter of these proceedings are works for the maintenance,
improvement or other alteration of existing structures.
30. On or about 18 August 2025, the council issued a warning letter in respect of the said works.
31. On 19 September 2025, the applicant made a complaint to the council in relation to the
works being carried out on the property and was informed of the warning letter issued on 18 August
2025.
32. By correspondence dated 23 September 2025, the applicant’s solicitors wrote to the council
seeking information as to what further steps, if any, had been taken by the council in respect of the
said works. No reply was received.
33. By letter dated 2 October 2025, the applicant’s solicitors wrote to the respondents noting
that no planning permission had been granted for the development and calling upon the respondents
to cease all works on the property. The respondents were requested to confirm the basis upon which
the development was said to be authorised and were put on notice that injunctive relief would be
sought in the absence of an undertaking to cease works. No reply was received.
34. By further correspondence dated 21 October 2025, the applicant’s solicitors wrote to the
second named respondent in similar terms. No reply was received.
35. Notwithstanding the absence of any planning permission and the said correspondence, the
works on the property continued. The works carried out include the demolition of existing caravan/
mobile home/ chalet-type structures, the clearance of significant areas of the site, and the
construction of new modular dwellings, including on previously undeveloped areas of the property.
36. The works have also resulted in impacts on adjoining lands, including runoff from the
property which has affected drainage at the applicant’s dwelling.
37. On 3 November 2025, the applicant instituted proceedings pursuant to s. 160 of the 2000
Act seeking to restrain the said unauthorised development and to restore the property to its prior
condition.
38. On or about the same time, without notice to the applicant, the council instituted separate
proceedings pursuant to s. 160 of the 2000 Act in respect of the same property.
39. The applicant’s position is that the development is unauthorised development and is not
exempted development.
40. The respondent/defendants position is that development is exempted development pursuant
to s. 4(1)(h) of the 2000 Act.
41. Both sets of s. 160 proceedings were heard together on 4 and 9 December 2025.
42. On 19 December 2025, the Circuit Court delivered judgment and made orders restraining
the unauthorised development and directing relief pursuant to s. 160.
43. The respondents appealed the said orders to the High Court on 19 December 2025, and
sought an interim stay. A limited stay was granted by Ms Justice Farrell on 19 December 2025,
permitting certain specified weatherproofing works to be undertaken and directing that photographic
evidence of such works be furnished.
Procedural history – SDCC case
44. The proceedings were issued in Dublin Circuit Court on 24 October 2025.
45. The council, by way of ex parte application on 30 October 2025 – which the appellants
appeared at and addressed the court on – sought interim relief and/or short service for an application
for interlocutory relief to be heard at the earliest possible date.
46. The Circuit Court (HH Judge O’Connor) made the interlocutory application returnable for the
following week – 6 November 2025.
47. On 5 November 2025, the appellants issued a notice of motion to transfer the proceedings
to the High Court on the basis that it was contended that the market value of the lands exceeded
the Circuit Court’s jurisdiction.
48. Due to time constraints, the Circuit Court was unable to hear the interlocutory application
on 6 November 2025, and the matter was adjourned to the following week to fix an early hearing
date for the substantive case.
49. On 7 November 2025, the council, without prejudice to its position that the market value of
the Lands was within the jurisdiction of the Circuit Court, indicated to the appellants that it would
consent to the proceedings being transferred to the High Court (with a view to having same
determined as expeditiously as possible in the Planning and Environment List). The council appeared
before the Circuit Court to seek an order to this effect on 7 November 2025, however the appellants
informed the court, that they were withdrawing their motion (costs were awarded against them for
same) in circumstances where the Circuit Court had listed the matter to fix an early hearing date.
50. Following the close of pleadings (exchange of affidavits) and following the substantive
hearing of the matter on 4 December 2025 (2 hours) and 9 December 2025 (2 hours), on 19
December 2025, the Circuit Court made an order granting a planning injunction in the terms outlined
in the order under appeal.
51. On 19 December 2025, the appellants lodged the within appeal on the same day and sought
a stay on the Circuit Court order from the High Court (Farrell J.). The appellants were granted a
very limited stay which allowed them to carry out some minor weather-proofing to two structures
on the lands.
52. For the purposes of their appeal, the appellants have filed two additional affidavits, the
second affidavit of Keith McDermott and the affidavit of Ann Mulcrone. This was on a de bene esse
basis and the council maintained an objection to that.
53. Without prejudice to the council’s objections to the admissibility of same, the council filed a
replying affidavit from Cian Harte on 15 April 2026.
54. The council served its legal submissions, input into this statement of case and input index
of authorities on the appellants on 28 April 2026.
55. The appellants served their legal submissions, input into this statement of case and input
index of authorities on the council on 8 May 2026.
56. The appeal was heard on 13 May 2026 together with the related case 2025 5894 CA (the
O’Neill proceedings).
Procedural history – O’Neill case
57. The applicant instituted proceedings seeking an interim injunction before the Circuit Court
on 3 November 2025. Interim relief was refused, and the matter was listed for the hearing of an
application for interlocutory relief on 6 November 2025.
58. On or about the same time, South Dublin County Council instituted separate proceedings
pursuant to s. 160 in respect of the same property. The applicant had been unaware of such
proceedings.
59. On 5 November 2025, the respondents issued a motion seeking to transfer the proceedings
to the High Court on the basis, inter alia, of the alleged value of the property.
60. On the return date of 6 November 2025, issue was raised by the respondent as to the
jurisdiction of the Circuit Court to deal with both sets of proceedings by reference to the alleged
value of the property. The court rose to enable South Dublin County Council and the respondents
to consider matters. The application for an interlocutory injunction was not heard and no
undertaking was made by the respondents not to undertake further works.
61. On 7 November 2025, the applicant indicated to the Circuit Court his consent to the transfer
of the proceedings to the High Court. The respondents however subsequently withdrew the motion
to transfer and agreed that the proceedings would continue in the Circuit Court.
62. On 11 November 2025, the costs of the respondents’ motion to transfer the proceedings to
the High Court were awarded to the applicant with no stay.
63. On 13 November 2025, directions were given for the full hearing of the proceedings,
including directions as to the exchange of affidavits, the matter being fixed for hearing on 4
December 2025 and 9 December 2025. The respondents did not comply with the directions for filing
an affidavit.
64. The proceedings were called on for hearing on 1 December 2025 in the Circuit Court.
65. The respondent furnished unsworn replying affidavits to the applicant on 4 December 2025.
The applicant objected to the introduction of those affidavits in breach of the court’s directions.
They were admitted by the court on 4 December 2025.
66. The hearing continued, and concluded on 9 December 2025 with the court reserving
judgment and requesting that the respondents respect the court’s wish that no further work be
carried out pending delivery of judgment.
67. On 15 December 2025, the applicant informed the court that, inter alia, deliveries of sand
had been made to the property subsequent to 9 December 2025. The court indicated that judgment
would be brought forward to be delivered on 19 December 2025.
68. On 19 December 2025, the Circuit Court delivered judgment and made orders restraining
the unauthorised development and directing relief pursuant to s. 160 of the 2000 Act.
69. The respondents appealed the said orders on 19 December 2025, and sought an interim
stay from Ms Justice Farrell. Ms Justice Farrell granted a limited stay permitting certain specified
weatherproofing works only and directing that photographic evidence of such works be furnished.
The matter was listed for mention from time to time thereafter.
70. The matter was listed for hearing together with the related case 2025 0329 CA on 13 May
2026.
Post-hearing procedural history
71. Judgment was reserved at the end of that hearing. I would like to record my thanks to all
of the lawyers involved for their unfailingly courteous, professional and helpful assistance. As I have
previously sought to make clear, insofar as any points advanced are not being accepted in this or
any other given judgment, that is solely to do with the inherent merits of such points and is no
reflection on those instructed to convey such points, a distinction that most certainly should be, and
I believe generally is in fact, self-evident to all concerned.
72. On 22 May 2026, a draft of the present judgment was sent to the parties, pursuant to paras.
15, 195 to 198 and 204 of Practice Direction HC 137, to give an opportunity to address matters such
as errors/ ambiguities on the basis set out below.
73. Parties are required to:
(i) Read the draft or have their legal representatives if applicable do so on their behalf.
(ii) Identify any matters falling within the below.
(iii) Positively communicate with the court in writing in response to the draft by the
deadline specified, such responses to be emailed to the court and uploaded to
ShareFile, either stating that they have no comments or setting out the comments.
(iv) Carry out the foregoing without delay - the draft judgment procedure is a concession
which parties can engage with but must do so with immediate dispatch, discipline
and focus – it is not the opening of a new phase of the litigation that gives rise to
“an entitlement to elaborate procedures at every point” (to use a phrase of O’Donnell
C.J. (Dunne, Charleton and Baker JJ. concurring) in O’Sullivan v. Health Service
Executive [2023] IESC 11 (Unreported, Supreme Court, 10 May 2023) at para. 39);
and still less should the procedure invite the perhaps “serious error, to which lawyers
are prone, to approach any such case on the tacit assumption that only procedures
which approximate to a criminal trial are fair, and anything which departs from that
is somehow dubious” (O’Donnell J. (Clarke C.J., McKechnie, MacMenamin, Dunne JJ.
concurring) in O’Sullivan v. Sea Fisheries Protection Authority [2017] IESC 75,
[2017] 3 I.R. 751, [2018] 1 I.L.R.M. 245, 780).
(v) Keep the draft confidential. Draft judgments are not public domain materials and,
while they can be shared between the lawyers concerned and their clients, subject
to the following, it is inappropriate for any person to refer to them for any purpose
other than to assist the court in relation to the finalisation of the formal judgment.
Therefore anyone with information as to the text, content or proposed outcome of
any draft is required not to publish or transmit such information to others save solely
by way of private transmission for the legitimate purposes of assisting in the
finalisation of the judgment and subject to a similar restriction on any recipient.
Trial participants should take reasonable steps to keep drafts confidential. On this
topic, see Attorney General v. Crosland (No. 2) [2021] UKSC 58, [2022] 1 W.L.R.
367, [24/01/2022] T.L.R. 1 (Briggs, Kitchin, Burrows, Rose, Arden SCJJ) which
discusses why restriction on publication of draft judgments is in the interests of the
administration of justice; see also Baigent v. Random House Group Ltd [2006] EWHC
1131 (Ch), [2006] 5 WLUK 45, (2006) 150 S.J.L.B. 603 (Smith J.); R. (Counsel
General for Wales) v. Secretary of State for Business, Energy and Industrial Strategy
[2022] EWCA Civ 181, [2022] 1 W.L.R. 1915, [2022] 4 All E.R. 599 (Sir Geoffrey
Vos MR; Davies and Dingemans LJJ. concurring); Public Institution for Social
Security v. Banque Pictet & Cie SA and others [2022] EWCA Civ 368, [2022] 3 WLUK
291, [2022] B.L.R. 349 (Carr LJ; Jackson and Simler LJJ. concurring); Itkin v. Wood
[2023] JRC 101 (Unreported, Royal Court of Jersey, 22 June 2023).
74. The foregoing constitutes an immediately effective direction of the court to the parties and
anyone having notice of the draft judgment with effect from the date of circulation of the draft.
75. The responses should not be to reargue the substance (submissions to that effect will be
disregarded) but are confined to matters such as:
(i) informing the court as to whether the party prefers an alternative to a formal written
judgment as proposed, and if the party so considers, whether that party considers
that the entire matter or some specified part of it can be disposed of (a) by order
without a reasoned judgment, or (b) by ex tempore reasons without a written
judgment;
(ii) informing the court, assuming that the court proceeds with a formal judgment, as
to whether the party wishes to propose any corrections to the draft such as:
(a) any apparent typographical, factual, legal or other errors in the draft;
(b) any apparent ambiguity or other matter in the draft that could unnecessarily
multiply issues or complicate the further processing of the matter;
(c) any redaction of personal or other information that a party wishes to request;
(d) in the event that the court proposes to refer to any matter (whether factual,
legal (including reference to authorities or other legal material), obiter comment
or otherwise) not referred to at the hearing, any submission as to why such
reference is not relevant or otherwise should not be included or as to why such
matter if included should not lead to the proposed conclusion;
(e) any other matter in the draft judgment that the party considers should be
omitted;
(f) any matter not included in the draft judgment that the party considers should
be added to it (including where the party considers that procedural, factual or
legal points not set out in the judgment should be addressed or where the party
considers that reasons for any aspect of the decision are not set out or where
an overall ground is disposed of but detail of the ground or sub-ground is not
expressly addressed, or where an issue arose the disposition of which would be
obiter but on which the party concerned considers that there would be a benefit
in the court expressing a view); and
(g) any other proposals as to the wording (as opposed to substance) of the decision
if the proposed wording causes any issue for a party for any identified reason;
and
(iii) assisting the court by providing views on such matters if any on which views are
specifically invited in the draft judgment.
76. In particular, parties should draw the court’s attention to any apparent error or ambiguity
whether they have been successful on the point or not.
77. The rules of engagement in such a situation are that the draft is without prejudice to the
right of the court ultimately to issue a judgment in whatever form or with whatever content it
considers appropriate. It is then entirely a matter for the court as to whether to give judgment with
or without amendment including any amendment that appears appropriate to the court whether
arising from submissions or not. Any judgment may be given without further notice following the
expiry of the specified period, whether comments are made or not. That period will not be extended
save in exceptional circumstances.
78. The deadline for such comments from the parties was to be 16:00 on Wednesday 27 May
2026. Comments were as follows:
(i) SDCC – no changes proposed.
(ii) Applicant in O’Neill – some corrections/ updating of information.
(iii) Respondents – sought more time to respond due to Senior Counsel unavailability
during vacation. Unfortunately that is not generally a basis for additional time
because accepting that rationale would prevent the court from issuing judgments
during the vacation, which is an essential safety valve to avoid unsustainable build-
up of backlogs. Parties in cases heard near the end of any given term need to have
a contingency plan for the totally foreseeable possibility of a draft being issued
shortly thereafter. When this application was rejected the respondents then
delivered a "notice of appeal” type response.
79. This was, of course, a complete misunderstanding of the procedure, and, I’m afraid, not
uncharacteristic of the scattergun approach on behalf of the respondents here. For the record, their
response was:
“Further thereto, the Appellants would like to address the Court on the following matters
prior to the Court finalising its draft judgment.
It is respectfully submitted as follows:
1. The Court has failed to have appropriate regard to the nature of the structure which was
the subject matter of the works for alteration and improvement
2. The Court has failed to have appropriate regard to the fact that the footprint of the
structure has not been increased, nor the dimensions altered beyond what existed on the
site which evidence was not contradicted. That evidence was that the foundations of the
structure have been retained. That evidence was not cross examined and where there was
no contradictory evidence to undermine what was set out in that Affidavit
3. The evidence from the Architect showing the before and after demonstrates that the
extent of the alterations as was shown and was not a significant given the surveys carried
out by the Architect both before and after.
4. The Court has failed to have appropriate regard to the application of the principle
governing Section 4(1)(h) and in particular the Judgement of Ryan J (as he was then) in
Micheal Cronin (ReadyMix) Limited and the subsequent Judgment of the Supreme Court in
Cairnduff v O’Connell which gives the effect that there is a greater margin of appreciation
shown in a set of works which are exempted development as prescribed under that section
and is not confined to insignificant works.
5. The Court errored [sic] in its interpretation of the Defences available under Section
4(1)(h) as set out in Morris v Garvey the application of which defences apply to the facts of
this case where it was a genuine belief based on a statutory exemption which related to no
alteration of the character of the structure that would render the development inconsistent
with the previous development or adjoining structures.
6. It is also submitted that the Court errored [sic] in its interpretation of the defence of
disproportionate hardship in terms of how it has been applied to the facts of this case.
7. Whether the finding of the court that this development commenced subsequent to the
1st October 1964 is consistent with the purpose of the Section 160(6) (7 year rule) of the
Planning & Development Act 2000, as amended.
8. Having regard to the defences raised, whether it is appropriate to make the cost orders
contemplated in the draft judgment and in particular to the cost orders contemplated in the
O9’Neill [sic] proceedings in circumstances where those proceedings were commenced after
the first return date of the SDCC proceedings.
9. It is submitted that the Court errored [sic] in its interpretation of the reliefs sought by
the Applicants and in particular those reliefs relating to the restoration of the lands to their
condition immediately prior to the commenced of the development in August 2025.
10. The Court appears to make a finding that the original development consisted of mobile
homes only. If that is indeed the finding of the Court, it is disputed by the Appellants.
11. The Court errored [sic] in its finding that both Affidavits of Ann Mulcrone were
inadmissible on the basis that they should have been before the Court of first instance. The
Appellants were given liberty to file an Affidavit in the Appeal. The Appellants submit that
both affidavits should be admissible in the circumstances and on the basis of their relevance
and at the very least should be heard in the question of inadmissibility.
The Appellants have had a preliminary preview of the comments to the Court in the O’Neill
proceedings in the last few minutes and reserve its position in respect of those comments.
The Appellants also confirms that the photographs that were directed to be sent to the parties
by Ms Justice Farrell were in fact sent to the parties.”
80. In fairness to the parties I did extend the period for responses to a full seven days up to
17:00 on Friday 29 May 2026 (the period for corrections started on Friday 22 May 2026) and invited
any further responses from the applicants to the foregoing.
81. The council then responded in the following terms which I generally endorse:
“Date: 29th May 2026
Re:
SOUTH DUBLIN COUNTY COUNCIL Plaintiff /Respondent
-and-
THRESHFORD LIMITED, MULLNASSA LIMITED AND BRANACH DEVELOPMENTS LIMITED
Defendants/ Appellants
Dear Registrar,
Re: South Dublin County Council’s Response to the Appellants’ comments on Draft Judgment
As to the Appellants’ comments on the Draft Judgment, the Council respond as follows.
The Appellants appear to misunderstand the nature and purpose of the Draft Judgment
process - this is so notwithstanding the fact that same is clearly set out in the Draft Judgment
(§72 et seq). In this regard, the Appellants fail to note that the purpose of the Draft
Judgment procedure is not to reargue the substance of the case (Draft Judgment, §76). The
Appellants’ ‘points’ on the Draft Judgment ignore this very plain stated purpose and are
therefore regrettably a disrespectful attempt to re-argue the case and are entirely
inappropriate. The so called ‘points’ are framed in the language of a notice/grounds of
appeal to the same Court of judgment. In substance, the Appellants are inappropriately
purporting to treat the Draft Judgment as an opportunity for another appeal (having already
appealed from the Circuit Court).
A number of general observations can be made in response to the Appellants’ ‘points’ on the
Draft Judgment: they are advanced without actually engaging with the Draft Judgment -
noting that not one point is referrable to any particular paragraph of the Draft Judgment;
they are framed, in substance, as (albeit not in any sense compelling or weighty) grounds
of appeal; they appear to reflect an unwillingness on the part of the Appellant to accept that
on the application of existing case law to the facts of their case, their attempt to argue that
the works were exempted development was completely unsustainable; and they are
baseless when one considers the actual terms of the Draft Judgment.
The Council also has a broader concern, stemming from the nature of the Appellants’ ‘points’
on the Draft Judgment and the related request to address the Court on same, that the
approach being adopted by the Appellants is a rather blatant/obvious attempt to seek to
delay the finalisation of the Orders proposed.
Appellants’ Point 1: ‘The Court has failed to have appropriate regard to the nature of the
structure which was the subject matter of the works for alteration and improvement.’
Council’s Response: It is not clear what the Appellants point here is by reference to the
purpose of the Draft Judgment procedure. In any event, there is no substance to this
complaint and same appears to have been made without actually reading the Draft Judgment
or, alternatively, in wilful ignorance of same. In this respect, the Council would note:
The assertion that the Court failed to have ‘appropriate regard’ to the nature of the structures
which was altered or improved, is un-stateable. The Court was clearly aware of the existing
structures and new structures on the lands having had all of the relevant exhibits opened to
it, including photographs of the existing structures and the new structures, which the
Appellants did not dispute or address.
This complaint appears to repeat the similar approach adopted by the Appellant in opposing
the proceedings - which was one of ignoring the actual evidence and electing to make high
level abstract arguments divorced from the facts of the case.
The contention is also premised on the Appellants legally misconceived argument, which the
Court correctly rejected (inter alia, §130), that the same structure remained on the lands.
As the Draft Judgment notes, by reference to a range of cases which the Appellants did not
engage with in any meaningful way (either at trial or now in making these misconceived
complaints) the ‘total or near-total replacement of a structure is not maintenance,
improvement or alteration of the structure’.
The Draft Judgment deals with this issue at §128 et seq- where it expressly refers to the
photographic evidence adduced from the Council (§130, §133, and §135) - this included
images of what were there previously and what is now there.
Appellants’ Point 2: ‘The Court has failed to have appropriate regard to the fact that the
footprint of the structure has not been increased, nor the dimensions altered beyond what
existed on the site which evidence was not contradicted. That evidence was that the
foundations of the structure have been retained. That evidence was not cross examined and
where there was no contradictory evidence to undermine what was set out in that Affidavit.’
Council’s Response: Again it is unclear what the Appellants point here is by reference to the
purpose of the Draft Judgment procedure. There is no substance to this complaint - which
is again unhelpfully advanced without actually referring to or engaging with the content of
the Draft Judgment or the evidence before the Court. The points made in response to Point
1 also apply here. In addition, this point appears to repeat the error which informed the
Appellants approach in the case - continuously asserting that their evidence was not
contradicted - it was expressly contradicted by the Council, the Appellants just elected not
to engage with same. This is relevant to the Court’s findings that the Appellants have failed
to discharge the burden of proof which rests on them to established exempted development.
Relevantly, the Draft Judgment addresses these points:
At §96 et seq- the Court expressly noted that averments made by Mr Donoghue fly in the
face of reality and highlighted the lack of weight that could be attached to his evidence (a
point which the Appellants don’t dispute - illustrating the misplaced nature of the points they
now seek to make on the Draft Judgment).
At §133 et seq- there was no failure to have appropriate regard to anything.
Further, the point has to be considered in light of the findings made about Mr Donoghue’s
Affidavit - which the Appellants notably fail to address in their comments on the Draft
Judgment.
Appellants’ Point 3: ‘The evidence from the Architect showing the before and after
demonstrates that the extent of the alterations as was shown and was not a significant given
the surveys carried out by the Architect both before and after’.
Council’s Response: It is not clear what the Appellants point here is by reference to the
purpose of the Draft Judgment procedure. To compound matters, this ‘point’ invokes Mr
Donoghue’s misplaced invocation of the ‘Architect’ title, an issued addressed in the Draft
Judgment ( §95 et seq). This is worrying in circumstances where the Appellants appeared
to accept during the course of the hearing that this was incorrect and offered to file a
correcting affidavit (which they did not do). As outlined above, by reference to the Draft
Judgment, the Appellants do not actually say what the point here is - noting that Mr
Donoghue’s evidence was contradicted by the Council and rejected by the Court. Simply
stating that Mr Donoghue gave certain evidence (which is all this point does), which the
Court was aware of and which the Court addressed, does not enlighten anyone as to what
the issue is with the Draft Judgment (and there is no issue).
Appellants’ Point 4: ‘The Court has failed to have appropriate regard to the application of
the principle governing Section 4(1)(h) and in particular the Judgement of Ryan J (as he was
then) in Micheal Cronin (ReadyMix) Limited and the subsequent Judgment of the Supreme
Court in Cairnduff v O’Connell which gives the effect that there is a greater margin of
appreciation shown in a set of works which are exempted development as prescribed under
that section and is not confined to insignificant works.’
Council’s Response: It is not clear what the Appellants point here is by reference to the
purpose of the Draft Judgment procedure. Certainly the procedure is not one that permits
an unsuccessful party to ignore the actual text of the Draft Judgment and complain that
cases were not considered when they clearly and expressly where. This point is just wrong
- the Court did have regard to these authorities and other relevant authorities ( which the
Appellants conveniently ignore). Same were cited in submissions, same were opened in oral
argument and same are expressly cited in the Draft Judgment (§92, §130(i) and (ii)). The
reality for the Appellants (albeit one which they seem unwilling to accept - reflective of the
unreality based nature of the evidence they sought to tender to the Court - a point which is
also not addressed in their series of points raised in respect of the Draft Judgment), is that
neither of the cases support their erroneous argument that the exempted development
provisions under s.4(1)(h) of the PDA apply.
Appellants’ Point 5: ‘The Court errored [sic] in its interpretation of the Defences available
under Section 4(1)(h) as set out in Morris v Garvey the application of which defences apply
to the facts of this case where it was a genuine belief based on a statutory exemption which
related to no alteration of the character of the structure that would render the development
inconsistent with the previous development or adjoining structures’.
Council’s Response: It is not clear what the Appellants point here is by reference to the
purpose of the Draft Judgment procedure. In any event the point, insofar as it refers to
‘defences’, is misconceived. Moreover, the Draft Judgment records that the Court considered
Morris v Garvey [1983] IR 310 (§151 and §15B(xii)). The fact that the Applicants’ unreal
contention that this unauthorised development occurred because of a ‘genuine mistake’ was
correctly rejected does not disclose any issue with the Draft Judgment. The Court is not
obliged to accept such misconceived contentions and the rejection of same is not a basis for
seeking to revisit a Draft Judgment.
Appellants’ Point 6: ‘It is also submitted that the Court errored [sic] in its interpretation of
the defence of disproportionate hardship in terms of how it has been applied to the facts of
this case’.
Council’s Response: It is not clear what the Appellants point here is by reference to the
purpose of the Draft Judgment procedure. This abstract complaint (not tethered to any
specific part of the Draft Judgment) is baseless. The Court addressed the Appellants
arguments advanced in respect of the discretionary nature of the relief sought - the fact that
same weren’t convincing is not a reason to revisit the Draft Judgment.
Appellants’ Point 7: ‘Whether the finding of the court that this development commenced
subsequent to the 1st October 1964 is consistent with the purpose of the Section 160(6) (7
year rule) of the Planning & Development Act 2000, as amended’.
Council’s Response: Again, it is not clear what the Appellants point here is by reference to
the purpose of the Draft Judgment procedure. This abstract complaint is without merit and
difficult to follow. In this regard, the development, works, commenced in August 2025 as
the Draft Judgment records ( §113-§115). It is not suggested that this is incorrect - in fact,
the agreed Statement of Case records the Appellants accepted this to be the case.
Appellants’ Point 8: ‘Having regard to the defences raised, whether it is appropriate to make
the cost orders contemplated in the draft judgment and in particular to the cost orders
contemplated in the O’Neill proceedings in circumstances where those proceedings were
commenced after the first return date of the SDCC proceedings’.
Council’s Response: This is not a matter for the Council as it appears to be directed to the
O’Neill proceedings. In any event, as to the Council’s case, the proposed costs orders are
entirely appropriate.
Appellants’ Point 9: ‘It is submitted that the Court errored [sic] in its interpretation of the
reliefs sought by the Applicants and in particular those reliefs relating to the restoration of
the lands to their condition immediately prior to the commenced of the development in
August 2028’.
Council’s Response: There was no error in the Draft Judgment in this respect ( §163 et seq),
which notes the wide discretion available to the Court to make whatever order it deems
appropriate - a position accepted by the Appellants (§165).
Appellants’ Point 10: ‘The Court appears to make a finding that the original development
consisted of mobile homes only. If that is indeed the finding of the Court, it is disputed by
the Appellants’.
Council’s Response: As outlined in the Council’s response to Point 1 above, the Court
correctly understood the nature of the previous structures on the lands - as was evident
from the exhibits opened to the Court (see, for example, Fifth Affidavit of Paul Byrne, SDCC,
dated 251209) and, for example, by the recitation of the parties position as set out in the
Statement of Case (mostly mobile homes). The Council’s exhibits set out the nature of the
structures located on the lands previously - the Respondent did not establish in evidence of
anything to the contrary, rather, it accepted the position but tried to argue the demolition
and removal of same was exempted development. The Applicants’ Written Submissions
accept that the previous structures on the lands comprise mobile-home type structures
(§55):
‘ ...the character that has been replicated in terms of the appearance of the buildings with
the height, the type of roof, the type of window detail, the type of materials used to be
consistent with that of a mobile home type chalet...’
The Court was fully aware of the nature of the structures previously located on the lands -
with the central point being that once demolished and removed, they could not be the same
structures (a point which the Appellants seem unwilling to accept). Indeed, this is expressly
reflected in the proposed Order at §175(iii), wherein the Court restrains the Appellants from
‘re-erecting caravans, mobile homes or other structures that have been removed ..’.
Appellants’ Point 11: ‘The Court errored [sic] in its finding that both Affidavits of Ann
Mulcrone were inadmissible on the basis that they should have been before the Court of first
instance. The Appellants were given liberty to file an Affidavit in the Appeal. The Appellants
submit that both affidavits should be admissible in the circumstances and on the basis of
their relevance and at the very least should be heard in the question of inadmissibility’.
Council’s Response: This really is not an appropriate point to raise in the Draft Judgment
procedure. It is an entirely belated and inappropriate attempt to address matters which the
Appellants, for reasons only known to themselves, didn’t address at trial. The Council
objected to the admissibility of these Affidavits in its Written Submissions and Statement of
Case. The Appellants did not address this objection in any meaningful way - despite the
opportunity to do so in Written Submissions, Statement of Case and oral submissions. It
can’t seek to do so now that the case has concluded. Significantly, the point also doesn’t
engage with the Draft Judgment and the reasons therein for determining the Affidavits to be
inadmissible ( §107-§108).
The Council do not consider that any of the points raised by the Appellants warrant further
consideration by the Court and are wholly inappropriate in circumstances where the
Appellants are or should be aware be aware that the Draft Judgment process is not for the
purposes of re-arguing the matter which has already been heard.”
82. The applicant in O’Neill replied as follows:
“Thank you for the opportunity to reply to the respondent’s comments.
We like to highlight some points relevant to item 8. in the recent reply from the respondents
wherein it is stated that:
‘Having regard to the defences raised, whether it is appropriate to make the cost orders
contemplated in the draft judgment and in particular to the cost orders contemplated in the
O’Neill proceedings in circumstances where those proceedings were commenced after the
first return date of the SDCC proceedings.’
The Applicant’s position is as follows:
- We wrote to the respondents with pre-litigation letters on the following dates 3rd October
2025, 7th October 2025. 10th October 2025, 21st October 2025 and the 23rd October 2025
and received no response despite threating to bring injunctive proceedings in the event of
no reply.
- We also wrote to SDCC before our client issued their proceedings seeking details of
enforcement action and we did not receive a substantive reply to our queries.
- It was in these circumstances our client felt compelled to bring proceedings because he
was directly affected by the development and lived right beside it and where the
development was progressing apace without the benefit of any planning permission.
- When the applicant applied for interim relief to the Circuit Court, the Court refused interim
relief and made our application for interlocutory relief returnable for the same date as SDCC’s
case and the proceedings then travelled together.
- Judge O’ Connor in delivering judgment on 19th December expressly thanked the local
residents for their assistance.”
83. Any apparent clarity as to the joinder of issue was then fractured by the arrival at 13.14 on
31 May 2026, the Sunday of a bank holiday weekend in the Whit vacation, of notifications of upload
to ShareFile of the following two files:
“260529 Appellants further response to draft judgment.msg
Size 77.50 KB
Date 05/31/2026 8:13:58 am
User ...
260529 Appellants further response to draft judgment.msg
Size 77.50 KB
Date 05/31/2026 8:14:25 am
User ...
84. The time of 8:13 am is predictably inaccurate, the emails by way of ShareFile notification
arriving at 13:14. The file name suggests that the responses were dated Friday 29 May 2026 – but
were not uploaded on that date. The files arrived, needless to say, in a non-standard .msg format
which I could not open (despite trying multiple apps for the purpose). All I could read was the
header of one of them which purported to be an email dated 29 May 2026 at 17:00.39 – even then
outside the time allowed albeit only just – almost as if one was making a point. The content was
not readable.
85. For future reference it would be appreciated if parties could:
(i) comply with timelines for submissions/ observations;
(ii) upload documents as they are issued;
(iii) limit themselves to readily accessible formats like .docx and .pdf – preferably .docx;
and
(iv) ensure their own internal systems are not set to generate inaccurate information
such as regarding time/date.
86. The suspense was broken on Tuesday 2 June 2026, when I eventually received the content
of the message. The content was:
“Dear Registrar,
We refer to the above matter and to the further request by the Court for further comments
on the draft judgment until 5pm today.
The following comments are additional to the comments submitted by the Appellants by
email of 4pm on 27 May 2026 and should be read in conjunction with those comments.
Please note that the comments are submitted in accordance with the requirements of HC137
in relation to draft judgments.
The Appellants note that SDCC made no comments on the draft Judgment within the time
prescribed for in the original timeline.
The Appellants note that Mr O’Neill did make a comment in relation to the form of the order.
In addition to the comment of the Appellants at bullet point 8 of their original commentary
the Appellants do not accept that Mr O’Neill is entitled to seek to vary the terms and wording
of the reliefs sought in his notice of motion. The O’Neill proceedings were brought at a point
after which the South Dublin County Council proceedings were before the Court and are in
essence no more than a duplication of the SDCC proceedings. The O’Neill reliefs are
encompassed in the SDCC proceedings, and it is respectfully submitted that there is no basis
or jurisdiction to amend the reliefs now being sought. In addition, no application of that
nature was made during the course of the hearing, and the Appellants would certainly need
to be heard by Court if that application as to be considered or acceded to by the Court.
Without prejudice to the forgoing the Appellants make the following additional comments
arising from the judgment.
1. The Appellants assert that the Court errored [sic] in its interpretation of the established
use of the development site at para 115 of the judgment.
2. The Appellants submit that the order at para 175(x)(a) are unworkable arbitrary and
unfair having regard to the requirements of the Planning and Development Act 2000 as
amended and the provisions of Section 4(1)(h).
3. The Appellants submit that the order at para 175(x)(b) is in error and does not take
account of the reliefs sought by both Respondents.
4. The Appellants submit that it should and would have the opportunity to address the Court
on any and all of the issues arising from the within comments and the original comments of
Wednesday 27 May.”
87. The statement that “Please note that the comments are submitted in accordance with the
requirements of HC137 in relation to draft judgments” is unfortunately a complete misunderstanding
and a non-reality-based statement from the respondents. The comments overall largely constitute
an impermissible attempt to reargue the substance, contrary to PD HC 137 and to any ordered and
rational procedure.
88. The statement that “The Appellants note that SDCC made no comments on the draft
Judgment within the time prescribed for in the original timeline” could give the unintendedly
inaccurate impression that the council did not reply in time. The original letter stated “The deadline
for comments is 16:00 on Wednesday 27 May 2026, and parties are required to positively respond
one way or another by the deadline either with comments or confirmation that there are no
comments.” The council’s email expressing no changes is timed at “Sent: 27 May 2026 10:07”.
89. Insofar as the letter from the respondents requested to “address the court ... prior to the
Court finalising its draft judgment”, the form of response envisaged by the draft judgment procedure
is in writing and to a tight timetable, consistent with Practice Direction HC 137. The concession of
written corrections was made clear in the draft judgment when issued. Any jurisdiction, such as
England & Wales, that envisages draft judgments operates on the basis of written comment, because
it is obviously totally unworkable to have further oral hearings to reargue the substance of the case.
90. That said, I have no particular objection to the respondents making submissions on the form
of the order. But we need to be clear that such submissions will be within the contours of the
judgment and not by way of rearguing the case, which would be totally improper and inappropriate.
91. For the tiny minority interested in the mechanics of judgment production, maybe I can be
forgiven for mentioning that an excessive and inappropriate attempt to reargue the case on the
basis of a draft judgment imposes considerable production pressures on the court. The present
judgment involved a local record of 20 further internal drafts subsequent to the circulated draft in
order to cope with the ebb and flow of that attempt here (see previous relevant judgments for how
numbers are calculated). This case is not a how-to guide for parties addressing draft judgments.
Relief sought
92. The reliefs sought by the council in the notice of motion before the Circuit Court are as
follows:
“1. An Order, pursuant to Section 160(1)(a) of the Planning and Development Act 2000
(as amended), requiring the Defendants, their respective servants, agents, licensees or any
persons acting in connection with them or on their instruction, to cease and/or refrain from
carrying out unauthorised development (as more particularly described in the Affidavit of
Paul Byrne), at the lands located Chianti Park, Mount Seskin Road, Raheen, Brittas, Co Dublin
(‘the Lands’) (as more particularly described in the Affidavit of Paul Byrne), comprising the
following:
(i) Site clearance works and the demolition and removal of multiple chalets and mobile-
home structures from the Lands.
(ii) The laying of serviced concrete platforms/foundations – and all works associated
with servicing same, including installation of electrical cabling and waste/water pipework.
(iii) The development of multiple new accommodation/chalet structures on the Lands.
2. An Order, pursuant to Section 160(1)(b) of the Planning and Development Act 2000
(as amended), requiring the Defendants, their respective servants, agents, licensees or any
persons acting in connection with them or on their instruction, to remove the unauthorised
development referred to at paragraph 1 above and to restore the Lands to the condition that
such lands were in prior to the commencement of the unauthorised development referred to
at paragraph 1 above.
3. Interim and/or interlocutory relief, pursuant to Section 160(3)(a) of the Planning
and Development Act 2000 (as amended), as may be necessary.
4. Such further or other order as this Honourable Court shall deem fit.
5. The costs of these proceedings.”
93. In the O’Neill case the reliefs were as follows (relief 3 having been amended by consent in
the Circuit Court prior to the hearing per underlined wording):
“1. An Order pursuant to section 160(1)(a) of the Planning and Development Act 2000
(as amended), restraining the Respondent, its servants, agents, or licensees, or any person
acting in concert with them and any person having knowledge of such Order, from carrying
out or continuing to carry out unauthorised development and/or unauthorised use at the
property (the ‘Property’) known as Chianti Park, Mount Seskin, Brittas, County Dublin and
identified in the Schedule to the Notice of Motion;
2. An Order pursuant to section 160(1)(a) of the Planning and Development Act 2000
(as amended), enjoining the Respondent, its servants, agents, or licensees, or any person
acting in concert with them and any person having knowledge of such Order, to cease and
desist from carrying out any unauthorised development on and/or unauthorised use of the
Property;
3. An Order pursuant to section 160(1)(b) of the Planning and Development Act 2000
(as amended), directing the Respondent, its servants, agents, or licensees, or any person
acting in concert with them and any person having knowledge of such Order, to restore the
Property to its condition before its/the unauthorised development;
4. Interlocutory Orders in terms of the above paragraphs, or such Orders as this
Honourable Court shall deem appropriate pending the hearing of the within application;
5. An Order granting the Applicant and its experts permission to enter onto the Property
and inspect, survey, observe, photograph, and investigate the same, prior to the
determination of these proceedings;
6. A determination pursuant to section 7 of the Environment (Miscellaneous Provisions)
Act 2011 that section 3 of the said Act applies to these proceedings;
7. Such further or other Order, including declaratory relief, as this Honourable Court
shall deem appropriate;
8. An Order providing for the costs of this application;
9. Liberty to file further affidavits,
10. Such further or other Order as this Honourable Court deems fit.”
Order of the Circuit Court
94. While ideally in a circuit appeal, the High Court would not be told of the order, that wasn’t
an option here not least because of the extensive publicity given to the matter. The orders were
identical apart from the title and apart from the fact that the SDCC order covered two counsel. The
O’Neill order provides as follows:
“DUBLIN CIRCUIT
COUNTY OF THE CITY OF DUBLIN
BEFORE JUDGE O’CONNOR
THE 19th DAY OF December 2025
IN THE MATTER OF THE PLANNING AND DEVELOPMENT ACT 2000 (AS AMENDED) NOTICE
OF MOTION FOR RELIEF UNDER SECTION 160 OF THE PLANNING AND DEVELOPMENT ACT
2000 (AS AMENDED)
BETWEEN
John O’Neill
PLAINTIFF
AND
Branach Development Limited and Mullnassa Limited
DEFENDANTS
The application coming before the Court this day on Motion on behalf of the Plaintiffs for
reliefs pursuant to Section 160(l)(a) and (b) of the Planning and Development Act 2000 (as
amended). WHEREUPON and on hearing Counsel for the Plaintiffs and Counsel for the
Defendants.
AND THE COURT having adjourned the matter for Judgement to this day
THE COURT DOTH ORDER
1. An Order, pursuant to Section 160(l)(a) of the Planning and Development Act 2000 (as
amended), requiring the Defendants, their respective servants, agents, licensees or any
persons acting in connection with them or on their instruction, to cease and/or refrain from
carrying out unauthorised development (as more particularly described in the Affidavit of
Paul Byrne), at the lands located at Chianti Park, Mount Seskin Road, Raheen; Brittas, Co.
Dublin (‘the Lands’) (as more particularly described in the Affidavit of Paul Byrne),
comprising the following :
(i) Site clearance works and the demolition and removal of multiple chalets and mobile-
home structures from the Lands;
(ii) The laying of serviced concrete platforms/foundations - and all works associated with
servicing same, including installation of electrical cabling and waste/water pipework;
(iii) The development of multiple new accommodation/chalet structures on the Lands.
2. An Order, pursuant to Section 160(1)(b) of the Planning and Development Act 2000 (as
amended), requiring the Defendants, their respective servants, agents, licensees or any
persons acting in connection with them or on their instruction, to remove the unauthorised
development referred to at paragraph 1 above within 4 months and to restore the Lands to
the condition that such lands were in prior to the commencement of the unauthorised
development referred to at paragraph 1 above within 8 months.
THE COURT DOTH ORDER that the Plaintiff do recover from the Defendants costs of the
proceedings, to include a Certificate for Junior Counsel, such costs to be taxed in default of
agreement.
THE COURT DOTH MAKE AN ORDER granting liberty to the Defendants to take up the DAR
transcript of today’s Judgement, on the undertaking that they pay for the transcript and
furnish a copy of the transcript to the Plaintiff’s Solicitor.
BY THE COURT
… (SEAL)
NOMINATED SIGNATORY BY THE COMBINED OFFICE MANAGER
Order settled by …
Draft Order settled on 22/12/2025”
95. The reference to taxation of costs is the procedure in the Circuit Court. Adjudication applies
to the High Court and upwards.
Section 160
96. Section 160 of the 2000 Act provides (emphasis added):
“160.—(1) Where an unauthorised development has been, is being or is likely to be
carried out or continued, the High Court or the Circuit Court may, on the application of a
planning authority or any other person, whether or not the person has an interest in the
land, by order require any person to do or not to do, or to cease to do, as the case
may be, anything that the Court considers necessary and specifies in the order to
ensure, as appropriate, the following:
(a) that the unauthorised development is not carried out or continued;
(b) in so far as is practicable, that any land is restored to its condition prior to the
commencement of any unauthorised development;
(c) that any development is carried out in conformity with—
(i) in the case of a permission granted under this Act, the permission pertaining to
that development or any condition to which the permission is subject, or
(ii) in the case of a certificate issued by the Dublin Docklands Development Authority
under section 25(7)(a)(ii) of the Dublin Docklands Development Authority Act 1997
or by the Custom House Docks Development Authority under section 12(6)(b) of the
Urban Renewal Act 1986, the planning scheme made under those Acts to which the
certificate relates and any conditions to which the certificate is subject.
(2) In making an order under subsection (1), where appropriate, the Court may
order the carrying out of any works, including the restoration, reconstruction,
removal, demolition or alteration of any structure or other feature.
(3) (a) An application to the High Court or the Circuit Court for an order under this section
shall be by motion and the Court when considering the matter may make such interim or
interlocutory order (if any) as it considers appropriate.
(b) Subject to section 161, the order by which an application under this section is determined
may contain such terms and conditions (if any) as to the payment of costs as the
Court considers appropriate.
(4) (a) Rules of court may provide for an order under this section to be made against a
person whose identity is unknown.
(b) Any relevant rules of Court made in respect of section 27 (inserted by section 19 of the
Act of 1992) of the Act of 1976 shall apply to this section and shall be construed to that
effect.
(5) (a) An application under this section to the Circuit Court shall be made to the judge of
the Circuit Court for the circuit in which the land which is the subject of the application is
situated.
(b) The Circuit Court shall have jurisdiction to hear and determine an application under this
section where the market value of the land which is the subject of the application does not
exceed €3,000,000.
(c) The Circuit Court may, for the purposes of paragraph (b), in relation to land that has not
been given a market value or is the subject with other land of a market value, determine
that its market value would exceed, or would not exceed, €3,000,000.
(d) Where the market value of any land which is the subject of an application under this
section exceeds €3,000,000, the Circuit Court shall, if an application is made to it in that
behalf by any person having an interest in the proceedings, transfer the proceedings to the
High Court, but any order made or act done in the course of such proceedings before the
transfer shall be valid unless discharged or varied by the High Court by order.
(e) In this subsection ‘market value’ means, in relation to land, the price that would have
been obtained in respect of the unencumbranced fee simple were the land to have been sold
on the open market, in the year immediately preceding the bringing of the proceedings
concerned, in such manner and subject to such conditions as might reasonably be calculated
to have resulted in the vendor obtaining the best price for the land.
(5A) (a) An application under this section to the Circuit Court shall, in respect of development
situated wholly or partly in the nearshore area of a coastal planning authority, be made to
the judge of the Circuit Court for the circuit in which the functional area (other than the
nearshore area) of that coastal planning authority is situated.
(b) The Circuit Court shall have jurisdiction to hear and determine an application under this
section in relation to a development referred to in paragraph (a) where the aggregate
amount of the levy or levies payable under Chapter 7 of Part 4 of the Maritime Area Planning
Act 2021 in respect of the maritime area consent granted to the person who carried out the
development does not exceed €500,000.
(5B) (a) An application under this section, in respect of development situated wholly or partly
in the nearshore area of a coastal planning authority, shall be made to the High Court if that
development was carried out by or on behalf of a person who at the time of the carrying out
of the development was not the holder of a maritime area consent granted for the occupation
of a maritime site for the purposes of the proposed development.
(b) An application under this section, in respect of development situated wholly in the outer
maritime area, shall be made to the High Court.
(6) (a) An application to the High Court or Circuit Court for an order under this section shall
not be made—
(i) in respect of a development where no permission has been granted, after the
expiration of a period of 7 years from the date of the commencement of the
development,
(ii) in respect of a development for which permission has been granted under Part
III or section 293, after the expiration of a period of 7 years beginning on the
expiration, as respects the permission authorising the development, of the
appropriate period (within the meaning of section 40) or, as the case may be, of the
appropriate period as extended under section 42, or
(iii) in respect of a development in respect of which a certificate has been issued by
the Dublin Docklands Development Authority under section 25(7)(a)(ii) of the Dublin
Docklands Development Authority Act 1997 or by the Custom House Docks
Development Authority under section 12(6)(b) of the Urban Renewal Act 1986, after
the expiration of a period of 7 years beginning on the date the certificate ceases to
have effect in accordance with Part 4 of the Dublin Docklands Development Authority
(Dissolution) Act 2015.
(aa) Notwithstanding paragraph (a) an application to the High Court or Circuit Court for an
order under this section may be made at any time in respect of unauthorised quarry
development or unauthorised peat extraction development in the following circumstances:
(i) where no permission for the development has been granted under Part III and
the development commenced not more than 7 years prior to the date on which this
paragraph comes into operation;
(ii) where permission for the development has been granted under Part III and, as
respects the permission—
(I) the appropriate period (within the meaning of section 40), or
(II) the appropriate period as extended under section 42 or 42A,
expired not more than 7 years prior to the date on which this paragraph comes into
operation.
(ab) Notwithstanding paragraph (a) or (aa), an application to the High Court or Circuit Court
may be made at any time for an order under this section to cease unauthorised quarry
development or unauthorised peat extraction development.
(b) Notwithstanding paragraph (a), an application for an order under this section may be
made at any time in respect of any condition to which the development is subject concerning
the ongoing use of the land.
(7) Where an order has been sought under this section, any other enforcement action under
this Part may be commenced or continued.”
Procedure on circuit appeals
97. An appeal from the Circuit Court to the High Court is by way of rehearing. Thus even if it is
the respondent is appealing, the applicant goes first. That is an instance of the general principle
that the party bearing the onus of proof goes first (which is why, for example, the respondent in an
Article 40.4 application goes first – the order is determined by the burden of proof and not by the
title “applicant”). Thus in a circuit appeal, the concept of the applicant going first would not apply if
the only issue was one on which the respondent carried such a burden. The respondents carried the
burden to show this was exempted development, which was the main issue, but in fact the
respondents didn’t avail of any rights to open the appeal that arose from that but (rightly or wrongly)
asked for the applicants to go first, a request which I humoured in the circumstances.
98. The procedure for an appeal depends on whether oral evidence was heard and also on what
circuit the matter originated in. Case heard on oral evidence from provincial circuits are heard by
the High Court on Circuit. Cases originating in Dublin or heard without oral evidence elsewhere
generally go to the Non-Jury List, except insofar as they relate to planning and environment matters
which go to the Planning & Environment Court (see PD HC 137).
99. In terms of evidence in such a rehearing, s. 37 of the Courts of Justice Act 1936, as amended,
provides:
“(1) An appeal shall lie to the High Court sitting in Dublin from every judgment given or
order made (other than judgments and orders in respect of which it is declared by this Part
of this Act that no appeal shall lie therefrom) by the Circuit Court in any civil action or matter
at the hearing or for the determination of which no oral evidence was given.
(1A) Notwithstanding subsection (1), an appeal shall lie to the High Court sitting in Dublin
from every judgment given or order or decision made (other than a decision to which section
169 (4) of the Personal Insolvency Act 2012 applies) by the Circuit Court in the performance
of any function or exercise of any power or jurisdiction conferred on that court by that Act,
whether or not oral evidence was given at the hearing or for the determination of the
proceedings or matter concerned.
(2) Every appeal under this section to the High Court shall be heard and determined by one
judge of the High Court sitting in Dublin and shall be so heard by way of rehearing of the
action or matter in which the judgment or order the subject of such appeal was given or
made, but no evidence which was not given and received in the Circuit Court shall be given
or received on the hearing of such appeal without the special leave of the judge hearing such
appeal.”
100. Order 61 RSC includes inter alia the following (emphasis added):
“6. An appeal shall not operate as a stay of proceedings upon the judgment or Order
appealed from unless the Circuit Judge, or, upon appeal, the High Court sitting in Dublin
shall so order and then only upon such terms (if any) as the Circuit Judge or the High Court
sitting in Dublin (as the case may be) may fix. Such appeal shall be by notice of motion
served on all parties affected by the application and lodged in the Central Office within four
days of the application to the Circuit Judge.
…
8. Where any party desires to submit fresh evidence upon the hearing of an appeal in any
action or matter at the hearing or for the determination of which no oral evidence was given,
he shall serve and lodge an affidavit setting out the nature of the evidence and the
reasons why it was not submitted to the Circuit Court. Any party on whom such
affidavit has been served shall be entitled to serve and lodge an answering affidavit or to
apply to the Court on the hearing of the appeal for leave to submit such evidence, oral or
otherwise, as may be necessary for the purpose of answering such fresh evidence, provided,
however, that the Court may at any time admit fresh evidence, oral or otherwise on such
terms as the Court shall think fit, and may order the attendance for cross-examination of
the deponent in any affidavit used in the Circuit Court or the High Court.
…
11(1) Every judgement or order of the High Court on Circuit shall be drawn up and signed
by the County Registrar, and every judgement or order of the High Court sitting in Dublin
shall be drawn up and signed by the Registrar of such Court, who shall transmit a copy
thereof to the County Registrar of the appropriate county. Every judgement or order of the
Court shall state whether it is made with or without costs and the sum (if any) payable for
costs, including witnesses’ expenses, shall be inserted therein, except in such cases as the
Court may refer such costs and expenses for taxation.
(2) A copy of every judgement or order of the High Court on Circuit in a Circuit appeal from
or against the making of an order transferring any civil action to the Court from the Circuit
Court or an order sending forward any civil action or appeal to the Court from the Circuit
Court shall be remitted to the proper officer of the Central Office forthwith on its being
signed.
12. The costs of appeals, when referred for taxation, shall be taxed by the appropriate
County Registrar (who shall for this purpose have all the powers of a Legal Costs
Adjudicator). Such costs shall, subject to any special direction by the Court, be taxed on
the scale applicable to an action or matter commenced or heard in the Circuit Court, with
the addition of necessary outlay and the items set out in Part III of the scales of costs in
Appendix W. Any application for the review of a taxation effected under this rule shall be
by notice of motion to the High Court sitting in Dublin served on all parties affected by the
application and lodged in the Central Office within ten days from the date of the certificate
of taxation. The notice of motion shall specify the matters or items or parts thereof objected
to and the grounds and reasons for such objection. A copy of the notice of motion shall be
transmitted forthwith from the Central Office to the County Registrar for his report or
observation thereon. In the taxation of costs under this rule, the County Registrar shall, in
addition to the principles specified in Schedule 1 to the Legal Services Regulation Act 2015,
have regard to the costs allowed or allowable in respect of the hearing of the case in the
Circuit Court.
…
20. Every judgment or order of the High Court on Circuit and of the High Court sitting in
Dublin may (unless the Court shall otherwise direct) be enforced by execution order issued
by the Circuit Court in accordance with the Rules of the Circuit Court for the time being in
force as if it were a judgment or order of the Circuit Court.”
Onus of proof
101. The onus is on a defendant to establish that development is exempted development: South
Dublin County Council v. Fallowvale Limited [2005] IEHC 408 (Unreported, High Court, McKechnie
J., 28 April 2005); Doorly v. Corrigan [2022] IECA 6 (Unreported, Court of Appeal, 21 January
2022) (Ní Raifeartaigh and Pilkington JJ. concurring) at §121.
102. Any such defence must be capable of being distilled from the affidavit evidence before the
court: Diamrem Ltd. v. Cliffs of Moher Centre Ltd [2018] IEHC 654 (Unreported, High Court, Faherty
J., 20 November 2018) (§157-§160), a decision upheld by the Court of Appeal in Diamrem Ltd. v.
Cliffs of Moher Centre Ltd [2021] IECA 291 (Unreported, Court of Appeal, Woulfe J., 5 November
2021).
103. In that regard, the court is not obliged to accept vague and unsubstantiated averments:
Tesco Ireland Limited v. Stateline Transport Limited [2024] IECA 46 (Unreported, Court of Appeal,
Butler J., 23 February 2024) (Costello and Noonan JJ. concurring) (§63).
104. While the appellants relied on Michael Cronin (Readymix) v. An Bord Pleanála [2017] IESC
36, [2017] 2 I.R. 658 (O’Malley J.; MacMenamin and Laffoy JJ. concurring) at 39, referring to the
fact that a defendant only needs to raise a reasonable doubt, that is self-evidently a statement in
the criminal context. It has no relevance to civil enforcement.
105. Given the onus of proof, the lack of cross examination is fatal to the respondents. Where
there is a conflict of admissible evidence, in the absence of cross-examination such a conflict must
generally be resolved against the party carrying the onus of proof: RAS Medical Ltd v. Royal
College of Surgeons in Ireland [2019] IESC 4, [2019] 1 I.R. 63, [2019] 2 I.L.R.M. 273 (Clarke C.J.)
(O’Donnell, MacMenamin, Dunne and Finlay Geoghegan JJ. concurring).
106. Two further matters regarding the affidavit evidence for the respondents unfortunately
occasion some concerns.
107. The more specific one is the misplaced use on affidavit of the title “Architect” by Mr Adrian
Donoghue who is not a registered architect. He is an “architectural graduate”, and my understanding
of the practical effect of s. 18 of the Building Control Act 2007 which criminalises the use of the term
“architect” by a non-registered person in specified circumstances.
108. His latest affidavit begins:
“1. I say that I am an qualified architect having graduated in 2005 from Edinburgh
University with a BA Architecture. I say that I have been practicing in Ireland as an Architect
and I am the principal of Adrain [sic] Donoghue Design Studio. I say that Adrian Donoghue
Design Studio have been retained as a consulting architect by the First and Second Named
Defendants in respect of the development known as Chianti Park and Hillbrook Lawns located
at located at Raheen, Brittas, Co. Dublin and in that regard and I am duly authorised to
make this affidavit for and on behalf of the First and Second Named Defendants from facts
within my own knowledge, save where otherwise appears whereso appearing I believe same
to be true.”
109. He is referred to as an “Architect” throughout the respondents’ legal submissions.
110. In this affidavit he purports to give a “professional opinion”, e.g. para. 16.
111. Counsel’s response was that the word “architect” was used in the sense of graduate. That
concept in other contexts can be non-problematic, for example someone with a degree in law could,
depending on the context, call themselves a lawyer even if not practising or qualified to practice.
But the whole point of a protected title is that once protected, people are not entitled to use that
title in their own sense. The protection requires people to use the term only in the sense defined
by law. That’s the point that the respondents are missing.
112. The dismissive response to this perfectly legitimate concern was unfortunately misplaced. I
did give an opportunity for a further affidavit on this issue but have not been notified of that having
been taken up. On the contrary the respondents doubled down on their position in their further
correspondence to the court so I will be open to any proposals from the applicants as to how best
to address this problem.
113. The more general point is that certain of the matters sworn to on behalf of the respondent
include averments that fly in the face of reality and that no reasonable person could have sworn to.
A prime example is para. 13 of Mr Donoghue’s second affidavit (emphasis added):
“13. I say that I was careful in advising on the design to ensure that the said design
was such as to create no material change in the appearance. I say that I have
prepared a series of drawings showing the appearance of residential units as they were
before works were carried out and the design as they appear when they are complete and I
beg to refer to a copy of said drawings located at TAB 4 of the Booklet of Exhibits.”
114. As outlined above, this is a non-reality-based averment. The necessary implication that the
new design did not in fact involve a material change to the appearance of the structures is manifestly
false and untenable and lacks any stateable basis whatsoever.
115. The council put Mr Donoghue fully on notice of the complete unreality of this via their
affidavits – any reply was little more than a repetition and certainly not an answer. I am not offering
a view on deliberateness or culpability, merely on the total objective unreasonableness of such an
averment which does nothing for the weight to be attached to his evidence generally, even assuming
that it otherwise warranted weight given that the burden to show exempted development lies on the
developers and must be resolved against them in the absence of cross-examination.
116. The legal context is that while conflict between equally inherently credible averments, with
no cross-examination, is generally resolved against the party carrying the onus of proof, a court is
not always obliged to regard all averments as being equally credible, or to disregard
internal or evident problems with them (see by analogy the manner in which the Supreme Court
considered it was entitled to prefer an affidavit over even oral evidence in Koulibaly v. Minister for
Justice, Equality and Law Reform [2004] IESC 50, [2004] 7 JIC 2906 (Unreported, Supreme Court,
Denham J. (Geoghegan and McCracken JJ. concurring), 29 July 2004)). Among the matters to which
regard might be had would be included the failure to explain patently relevant questions that are
clearly within that party’s responsibility (Doorly v. Corrigan [2022] IECA 6 (Unreported, Court of
Appeal, 21 January 2022) at para. 137). This specific and common sense power of the court to
evaluate inherent defects in evidence remains notwithstanding caselaw on cross-examination such
as RAS Medical Ltd v. Royal College of Surgeons in Ireland [2019] IESC 4, [2019] 1 I.R. 63, [2019]
2 I.L.R.M. 273 (Clarke C.J.) (O’Donnell, MacMenamin, Dunne and Finlay Geoghegan JJ. concurring)
or Re Bayview Hotel (Waterville) Limited [2022] IEHC 516 (Unreported, High Court, Butler J., 8
September 2022). This is consistent by analogy with the judgment of Hardiman J. (Hanna and
Feeney JJ. concurring) in DPP v. Barnes [2006] IECCA 165, [2007] 3 I.R. 130, [2007] 1 I.L.R.M. 350
at para. 95 – the court as finder of fact is “not ... constrained” to accept “the only account available”
even if that account is provided by oral evidence.
The issues here
117. As to the necessary proofs there is no issue about the following:
(i) there was development (not an issue save in relation to tree cutting);
(ii) there is no planning permission; and
(iii) the jurisdiction of the Circuit Court by reference to rateable valuation – this had been
a concern at an earlier stage but the respondents confirmed they are not making an
issue of it now.
118. Thus the issues are the following:
(i) an issue about admissibility of affidavits;
(ii) whether this was pre-1964 development;
(iii) the seven-year rule;
(iv) whether tree cutting was development;
(v) whether this is exempted development;
(vi) in the event of breach, the question of discretion; and
(vii) in the event of an order, the form of such order.
Issue 1 – admissibility of affidavits
119. The appellants have sought to introduce new evidence for the purpose of this appeal,
including from a planner, Ms Mulcrone. This is not admissible because such evidence was not
adduced before the Circuit Court (when it could have been) and no explanation has been provided
for the failure to do so, and no special leave was sought from or granted by the High Court. Thus
the affidavit is out by reason of a failure to engage with O. 61 r. 8 RSC and s. 37 of the Courts of
Justice Act 1936 (see e.g.: Murphy v. Minister for Defence 1991 WJSC-SC 981, [1991] 2 I.R. 161;
Emerald Meats v. Minister for Agriculture [2012] IESC 48 (Unreported, Supreme Court, 30 July 2012)
per O’Donnell J. (Hardiman and McKechnie JJ. concurring) at §36; Student Transport Scheme Limited
v. Minister for Education and Skills [2015] IECA 303 (Unreported, Court of Appeal, Hogan J., 18
December 2015) (Ryan P. and Peart J. concurring) (§10); Wicklow County Council v. Beattie [2018]
IEHC 282 (Unreported, High Court, Barrett J., 17 May 2018); Kerry County Council v. McElligott
[2021] IEHC 542 (Unreported, High Court, Hyland J., 30 July 2021) (§33); Lyons v. McDonagh
[2024] IEHC 471 (Unreported, High Court, Simons J., 31 July 2024) (§14), wherein the court noted
that “the respondents should have applied to the judge for special leave to file an affidavit…required
under [s. 37]…and Order 61…”).
120. The respondents seem to be labouring under the misunderstanding that obtaining de bene
esse liberty to file an affidavit constitutes the sort of special leave envisaged by s. 37 and O. 61
RSC. That is not the case. A de bene esse permission is subject to objection – and there was an
objection. That should have triggered the formal application for special leave. No such application
was made.
121. Even if I am wrong about the foregoing, no weight should be attached to the new evidence
as in the absence of cross-examination the respondents have not discharged the onus of proof on
the issue of exempted development. Furthermore Ms Mulcrone’s affidavit contradicts other affidavits
of the respondents regarding the date of commencement of the caravan/ mobile home park.
122. The respondents also misleadingly attempted to cry foul in the draft judgment process by
demanding a “right to be heard” on the admissibility of the affidavits. But where have they been all
this time? The council maintained the objection from the outset of such affidavits, and put it in lights
in submissions. The respondents could have said anything they wanted at the hearing. The
respondents now turn around and claim to be victims denied a right to be heard - but they were
heard. A right to a hearing does not involve a right to be spoon-fed: Y.Y. v. Minister for Justice and
Equality (No. 1) [2017] IEHC 176 (Unreported, High Court, 13 March 2017), para. 95 (this point
wasn’t affected by the judgment in Y.Y. v. Minister for Justice and Equality [2017] IESC 61, [2018]
1 I.L.R.M. 109 (O’Donnell J.)); Friends of Killymooney Lough v. An Coimisiún Pleanála [2025] IEHC
407 (Unreported, High Court, 16 July 2025).
123. The council’s written legal submissions contain the following:
“45. Noting that the burden is on the Appellants to establish that the said works comprise
exempted development, and whilst it is submitted that the evidence of the Council (including
photographs) clearly demonstrates that the Appellants’ position is untenable, the following
comments can be made about the evidence adduced:
- The Appellants have sought to introduce new evidence for the purpose of this appeal,
including from a planner – Ms Mulcrone. The Council objects to the admissibility of this
Affidavit (and indeed the further Affidavit from Mr McDermott) in circumstances where such
evidence was not adduced before the Circuit Court (when it could have been) and no
explanation has been provided for the failure to adduce same. In this regard, Order 61 Rule
8 of the Rules of the Superior Courts provides:
‘Where any party desires to submit fresh evidence upon the hearing of an appeal in any
action or matter at the hearing or for the determination of which no oral evidence was given,
he shall serve and lodge an affidavit setting out the nature of the evidence and the reasons
why it was not submitted to the Circuit Court. Any party on whom such affidavit has been
served shall be entitled to serve and lodge an answering affidavit or to apply to the Court
on the hearing of the appeal for leave to submit such evidence, oral or otherwise, as may
be necessary for the purpose of answering such fresh evidence, provided, however, that the
Court may at any time admit fresh evidence, oral or otherwise on such terms as the Court
shall think fit, and may order the attendance for cross-examination of the deponent in any
affidavit used in the Circuit Court or the High Court.’
- Moreover, the Appellants have not complied with s.37 of the Courts of Justice Act
1936, as amended, insofar as special leave was not sought from this Honourable Court.
Section 37 provides:
‘(1) An appeal shall lie to the High Court sitting in Dublin from every judgment given or order
made (other than judgments and orders in respect of which it is declared by this Part of this
Act that no appeal shall lie therefrom) by the Circuit Court in any civil action or matter at
the hearing or for the determination of which no oral evidence was given.
(1A) Notwithstanding subsection (1), an appeal shall lie to the High Court sitting in Dublin
from every judgment given or order or decision made (other than a decision to which section
169 (4) of the Personal Insolvency Act 2012 applies) by the Circuit Court in the performance
of any function or exercise of any power or jurisdiction conferred on that court by that Act,
whether or not oral evidence was given at the hearing or for the determination of the
proceedings or matter concerned.
(2) Every appeal under this section to the High Court shall be heard and determined by one
judge of the High Court sitting in Dublin and shall be so heard by way of rehearing of the
action or matter in which the judgment or order the subject of such appeal was given or
made, but no evidence which was not given and received in the Circuit Court shall be given
or received on the hearing of such appeal without the special leave of the judge hearing such
appeal.
…’
Order 61 Rule 8 of the RSC and s.37 have been addressed in a number of s.160 appeals –
including Kerry County Council v McElligott [2021] IEHC 542 (§33); Lyons v McDonagh
[2024] IEHC 471 (§14), wherein the Court noted that ‘the respondents should have applied
to the judge for special leave to file an affidavit…required under [s.37]…and Order 61…’; and
Wicklow County Council v Beattie [2018] IEHC 282.
- No explanation has been provided by the Appellants for the failure to adduce this
evidence before the Circuit Court – which could have been so adduced with reasonable
diligence. Same should not be admitted. See also Murphy v Minister for Defence [1991] 2
I.R. 161; Student Transport Scheme Limited v. Minister for Education and Skills [2015] IECA
303 (§10); and Emerald Meats v Minister for Agriculture [2012] IESC 48, wherein O’Donnell
J observed (§36):
‘The rules on the admission of fresh evidence on an appeal are quite strict. This is as it
should be. There are very few cases in which the losing side does not regret that different
witnesses were called, evidence given or points made either in cross-examination or in
submission. But a trial is not a laboratory experiment where one element can be substituted
and all other elements maintained and a different outcome obtained. It is important that
parties are aware of the finality of litigation, and bring forward their best case for
adjudication’.
- Without prejudice to the foregoing, the substance of the Affidavit from Ms Mulcrone
does not add anything to the case. It comprises a reiteration of the Appellants’ flawed
submissions which were advanced before the Circuit Court relating to s.4(1)(h) of the PDA
and makes a number of unsubstantiated averments which are in fact inconsistent with the
Appellants’ other Affidavits – including in respect of pre-1964 use (the Appellants’ evidence
before the Circuit Court was that the use of the Lands for residential purposes has occurred
‘since approximately 1968…’).
- Mr Donoghue purports to be an architect, but does not appear to be and does not
aver that he is registered with the RIAI. Section 18 of the Building Control Act 2007, as
amended, contains a prohibition against using the title/term architect unless registered.
- The Appellants have not adduced any evidence and do not address their claim of
exempted development by reference to the actual structures previously located on the Lands
(an approach repeated by Ms Mulcrone). Rather, they vaguely refer to ‘residential dwellings’
being located on the Lands, but at no point do they actually acknowledge that the previous
structures mostly comprised mobile homes (although, it appears that Ms Mulcrone accepts
that this was the case insofar as she refers to previous/historic enforcement action). Noting
that the burden of proving the exemption rests on them, the failure of the Appellants to
engage in this basic exercise is fatal to their misconceived attempt to rely on same. For
example, at no point do the Appellants acknowledge the previous mobile home structures
located on the Lands and then attempt to explain how the new structures comprise
improvements/repair to same. The reason for this failure is obvious – they simply cannot
make such a claim as the new structures are manifestly not mobile homes, but rather are
completely different, new larger structures.
- The Appellants have adduced no evidence to establish existing foundations on the
Lands – noting that the photographs depict mobile homes on blocks. Moreover, even if
foundations did previously exist on the Lands, the Council’s photographs depict the
development of new larger and materially different foundations with new services to same.
Again, none of the Appellants’ deponents attempt to engage with this evidence. Noting the
restrictive interpretation to s.4(1)(h) of the PDA, it is simply not credible to argue, as the
Appellants enthusiastically attempt to, that these comprise repairs to the alleged existing
foundations. The evidence demonstrates that the new structures are considerably larger
and different from those previously located on the Lands – which is consistent with the need
for new larger foundations.
- The Appellants do not address the fact that there were clearly parts of the site where
no structures were located at the time they commenced the unauthorised development – it
is thus simply not possible to suggest that the unauthorised works comprise improvement
works to a non-existent structure.
- The Appellants have not adduced any evidence from anyone who actually carried
out the unauthorised works – this includes the Third Named Appellant. The contentions
regarding what was on the Lands before the works started and what is now there are lacking
any evidential substance. Many of the averments made as to the condition of the Lands and
the structures thereon before the commencement of the unauthorised development ignore
the evidence adduced by the Council of the nature of the previous structures on the Lands
– for example, the Appellants completely ignore (and do not dispute) the evidence of mobile
homes being previously located on the Lands.
46. The Appellants have not remotely discharged the onus of proof which they bear that
the unauthorised works are repair works to existing structures for the purposes of s.4(1)(h)
of the PDA – which they clearly are not.”
124. It was up to the respondents to reply to that at the hearing if they wanted to – they did not
rebut that in any meaningful way. The claim of a “right to be heard” is in essence a claim to a “right
to reargue the case having lost”. No rational, self-respecting, serious, developed legal system could
operate on that basis. The council’s reply, which I endorse, is pretty devastating:
“It is an entirely belated and inappropriate attempt to address matters which the Appellants,
for reasons only known to themselves, didn’t address at trial. The Council objected to the
admissibility of these Affidavits in its Written Submissions and Statement of Case. The
Appellants did not address this objection in any meaningful way - despite the opportunity to
do so in Written Submissions, Statement of Case and oral submissions. It can’t seek to do
so now that the case has concluded. Significantly, the point also doesn’t engage with the
Draft Judgment and the reasons therein for determining the Affidavits to be inadmissible
(§107-§108).”
Issue 2 – whether this was pre-1964 development
125. The respondents accept that their averments (Mr McDermott first affidavit para. 6, Mr
Donoghue at para. 6) that a development had taken place “since approximately 1968” is mere
assertion, and they also accept that they have no actual evidence that there was a development of
any relevant kind in place here pre-1964.
126. So it is not at all clear to me why they made this even formally an issue in the case. Doing
so is, unfortunately, wholly without merit and bound to fail. This is a frivolous point, to use a
somewhat superseded but unfortunately appropriate term.
127. Even if counterfactually there had been a development pre-1964, the various changes and
intensifications since then and in particular the completely new works since August 2025 mean that
we are dealing now with a new development which cannot avail of the pre-1964 defence.
Issue 3 – the seven-year rule
128. As noted in Rutledge v. Fingal County Council [2026] IEHC 223 (Unreported, High Court, 17
April 2026) at 97 in relation to uses, but analogous principles are relevant to works:
(i) “abandonment and resumption can defeat any seven year defence: see e.g. South
Dublin County Council v. Balfe (Unreported, High Court, Costello P., 3 November
1995); Kildare County Council v. Goode & Ors. (Unreported, High Court, Morris J.,
13 June 1997); Sligo County Council v. Martin [2007] IEHC 178 (Unreported, High
Court, O’Neill J., 24 May 2007); Pierson v. Keegan Quarries Ltd [2010] IEHC 404
(Unreported, High Court, Irvine J., 7 October 2010); Wicklow County Council v. Lee
[2019] IEHC 19 (Unreported, High Court, Noonan J., 15 January 2019);
(ii) permission for an inconsistent use can be evidence of abandonment thus
necessitating permission for a resumption of the previous use: Clonres v. An Bord
Pleanála [2021] IEHC 303 (Unreported, High Court, 7 May 2021), §37; Leitrim
County Council v. Dromaprop Ltd [2024] IEHC 233 (Unreported, High Court, 29 April
2024), §33-35; Murphy v. An Bord Pleanála [2024] IEHC 186 (Unreported, High
Court, Farrell J., 30 August 2024), §42; Ó Murthuile v. An Bord Pleanála [2026] IEHC
36 (Unreported, High Court, Farrell J., 3 February 2026) at §32; and
(iii) intensification can require permission and thus defeat any seven year defence:
Patterson v. Murphy [1978] I.L.R.M. 85 (Costello J.); Butler v. Dublin Corporation
[1999] IESC 19, [1999] 1 I.R. 565, [1999] 1 I.L.R.M. 481; Kildare County Council
v. Goode [1999] IESC 43, [1999] 2 I.R. 495, [2000] 1 I.L.R.M. 346; In Lanigan and
Benghazi Ltd t/a Tullamaine Castle Stud v. Barry and Motor Speedway Ltd t/a
Tipperary Raceway [2008] IEHC 29 (Unreported, High Court, Charleton J., 15
February 2008); Cork County Council & Ors v. Slattery Pre Cast Concrete Ltd & Ors
[2008] IEHC 291 (Unreported, High Court, Clarke J., 19 September 2008); Lanigan
v. Barry [2016] IESC 46, [2016] 1 I.R. 656 (at §5.5 per Clarke J.; Denham C.J. and
Dunne J. concurring).”
129. It is clearly established that significant works commenced in mid-August 2025. These works
resulted in significant new development, site clearance, excavation, tree felling, hard standing and
the replacement of mobile home-type structures with block built modular homes. On any reality-
based analysis, this is a new development. Hence even on the basis that there was a previous
caravan/ mobile home park-type development for more than seven years, the various changes and
intensifications since then mean that we are dealing now with a new development which cannot avail
of the seven-year defence.
130. More specifically, the removal of an unauthorised structure that would have benefitted from
a defence does not give rise to an entitlement to reinstate such a structure without permission,
because that would in itself be a new development.
131. There was an ancillary, unstateable, argument by the respondents that there was an
established “use” as a caravan/ mobile home park which precluded enforcement. The reason that
is unstateable is twofold. Firstly it gets the respondents nowhere in terms of the legality of works.
Secondly, even assuming in their favour that there was such an established use while the caravans/
mobile homes were in place, the lawful exercise of that use requires structures. The respondents
themselves have in substance removed all of the previous structures (I deal below with the last-
ditch defence that there were fragments of foundations underneath new concrete), so there are no
structures there by reference to which any such use could be carried out. Hence the removal of the
last caravan/ mobile home with a view to being replaced by the present house-type structures
terminated the lawful established use by caravans/ mobile homes. Any resumed use in the latter
regard would be a new development. Estoppel and so on simply doesn’t arise once the use ceases.
Issue 4 – whether tree-cutting is development
132. Section 3 of the 2000 Act defines development:
“Development.
3.—(1) In this Act, except where the context otherwise requires, ‘development’ means—
(a) the carrying out of any works in, on, over or under land, or the making of any material
change in the use of any land or structures situated on land, or
(b) development within the meaning of Part XXI (inserted by section 171 of the Maritime
Area Planning Act 2021).
(2) For the purposes of subsection (1) and without prejudice to the generality of that
subsection—
(a) where any structure or other land or any tree or other object on land becomes used for
the exhibition of advertisements, or
(b) where land becomes used for any of the following purposes—
(i) the placing or keeping of any vans, tents or other objects, whether or not
moveable and whether or not collapsible, for the purpose of caravanning or camping
or habitation or the sale of goods,
(ii) the storage of caravans or tents, or
(iii) the deposit of vehicles whether or not usable for the purpose for which they
were constructed or last used, old metal, mining or industrial waste, builders’ waste,
rubbish or debris,
the use of the land shall be taken as having materially changed.
(3) For the avoidance of doubt, it is hereby declared that, for the purposes of this section,
the use as two or more dwellings of any house previously used as a single dwelling involves
a material change in the use of the structure and of each part thereof which is so used.”
133. Section 3(2)(a) draws an implicit distinction between a “structure” and a “tree or other
object”. This is not an unquestionably natural distinction because the normal meaning of “object”
does not suggest immoveable living natural beings.
134. Section 2 defines “structure”:
“‘structure’ means any building, structure, excavation, or other thing constructed or made
on, in or under any land, or any part of a structure so defined, and—
(a) where the context so admits, includes the land on, in or under which the structure is
situate, and
(b) in relation to a protected structure or proposed protected structure, includes—
(i) the interior of the structure,
(ii) the land lying within the curtilage of the structure,
(iii) any other structures lying within that curtilage and their interiors, and
(iv) all fixtures and features which form part of the interior or exterior of any
structure or structures referred to in subparagraph (i) or (iii);”
135. Thus structures are either human made constructions or the land in, on or under which they
are made. Given that “structure” includes the land on which it is situated, we will not be surprised
at the somewhat circular definition of “land”:
“‘land’ includes any structure and any land covered with water (whether inland or coastal);”
136. The key point is that “land” includes the natural environment even though “structure” is
directed to the built environment.
137. Thus cutting a tree or a hedge is the carrying out of “works” on “land” and thus is
“development”.
138. Such a reading leads to a coherent interpretation of the 2000 Act. It therefore makes sense
that the definition of “exempted development” in s. 4(1) includes the following (which would not be
necessary if works on trees were not development):
“(i) development consisting of the thinning, felling or replanting of trees, forests or
woodlands or works ancillary to that development, but not including the replacement of
broadleaf high forest by conifer species;”
139. Section 34(4)(e) allows tree planting to be conditioned by the imposition of:
“(e) conditions for requiring the planting, maintenance and replacement of trees, shrubs or
other plants or the landscaping of structures or other land;”
140. The fifth schedule includes this as a non-compensatable condition and extends it to flowers:
“20. Any condition relating to the preservation and protection of trees, shrubs, plants and
flowers.”
141. In summary therefore, tree felling/ thinning (or cutting of hedges, shrubs, flowers or other
plants) is indeed development, subject to consideration of exemptions. For good measure this is
consistent with Doorly v. Corrigan [2022] IECA 6 (Unreported, Court of Appeal, 21 January 2022).
Issue 5 – whether the development is exempted development under s. 4(1)(h) of the
2000 Act
142. The parties’ positions in the SDCC case as recorded in the statement of case are summarised
as follows:
“Main Issue
Is the development exempted development under s.4(1)(h) of the PDA?
Respondent’s Position:
1. As appears from their Affidavit evidence before the Circuit Court, the only basis upon
which the Appellants opposed the Council’s application for injunctive relief under s.160 of
the PDA was on the basis that same comprised exempted development for the purposes of
s.4(1)(h) of the PDA. This position is [maintained] on appeal (as appears from the further
Affidavits filed before the High Court – which, as outlined in Written Submissions, the Council
is objecting to).
2. The Appellants’ arguments in this regard are entirely misconceived. The following
points can be noted:
- This case concerns significant unauthorised development of multiple dwelling-type
structures and extensive unauthorised site development works by the Appellants on lands
located at Chianti Park, Mount Seskin Road, Raheen, Brittas, Co Dublin.
- As is clear from the Council’s photograph exhibits, the structures previously located
on the lands comprised mobile homes (this is not disputed) while the structures now on the
lands are dwelling houses. The exhibits illustrate the full extent of the unauthorised site
clearance works and the construction, from the ground up, of these new dwelling structures.
- Section 4(1)(h) is concerned with works which make insignificant differences
(improvements/maintenance/alterations) to existing structures. It does not apply to works
which comprise the total or substantial replacement of the original structure. It does not
apply to development which involves the demolition of one structure and the construction of
an entirely new structure. It does not apply to site clearance works.
- It is completely unsustainable to suggest, as the Appellants do, that these new
unauthorised structures comprise the maintenance and improvement of the previous
structures (mostly mobile homes) located on the Lands. The Appellants’ position is utterly
un-stateable. The structures now on the Lands are completely different to the [structures]
previously located on same. There is no pre-existing structure which is subject to some
form of maintenance or improvement works (per s.4(1)(h)), so that the same structure
remains but has been improved or repaired for maintenance. The structures are not even
similar – the previous structures comprise mostly mobile homes, while what has now been
constructed on the Lands are new permanent dwellings. They are different in size, shape,
design, materials, etc. The Appellants’ reliance on s.4(1)(h) of the PDA is entirely without
substance.
- The onus of proof is on the Appellants to demonstrate that they fall within the
exemption - which they have failed to discharge.
- In terms of discretion (noting that the Appellants did not address this in the Circuit
Court), as detailed in the Council’s submissions, all of the relevant factors which the Court
can consider (per Meath County Council v Murray [2018] 1 IR 189) weigh in favour of
affirming the Circuit Court Order.
Appellants’ Posiiton [sic]:
1. The site is long established as a residential use and development. The documents
on file state this use has been established pre October 1964. The SDCC Development Plan
2022-2028 land use Zoning Map shows the subject development as an existing established
development within the context of the land use and heritage and other conservation
objectives. The planning unit of the overall site of Hillsbrook Lawns and Chianti Park are
included on the development plan zoning map and it is implicit that this forms the relevant
planning unit.
2. The works on site can be described in broad terms as;
• the existing residential units were in poor condition and required improvement
• that the works were limited to and incorporated the existing foundations to the
existing structures which were generally retained,
• the existing footprint of the structures and site layout was retained, and
• and road and access and entrance arrangements were retained.
• Existing site infrastructure and services were retained.
• That the works were confined to the footprint of the existing structure and land
under the structure.
3. The works, subject matter of the complaint, are an exempted development because
they fall within statutory exemption contained within Section 4(1)(h) of the Planning and
Development Act 2000, as amended.
4. The exemption clearly provides therefore that if a person is carrying out works, that
is any construction, demolition, excavation, alteration, improvement, repair or renewal of
anything or part of a thing made or constructed on land then this falls with a category of the
exemption) specifically that category of exemption provided under Section 4(1)(h) of the
Planning and Development Act 2000, as amended.
5. There is no doubt that these works complained of fall into at least three categories
of activity provided for in Section 4(1)(h) namely works for the ‘maintenance’ and/or
‘improvement’ and/or ‘alteration’ of a structure.
6. These structures were the subject matter of a survey conducted by the Respondents
architect (who’s [sic] qualifications and expertise are not disputed) and who confirms that
the foundations of these structures were retained and improved and that the
alteration/improvement works are carried out on or within the footprint of those foundations.
This is the only evidence of actual survey which is averred to at paragraph 7 of the affidavit
of Adrian Donoghue and therefore as a matter of evidence has not been put in dispute and
must be accepted.
7. These works prima facie exempted development so long as they comply with the
second element of the exemption contained in Section 4(1)(h) of the Planning and
Development Act 2000, as amended.
8. The only limitation provided for in this statutory exemption is that where the works
materially affect the external appearance of the structure they are exempted development
so long as they do not render the appearance of that structure inconsistent with its own
character or the character of neighbouring structures.
9. The appearance of the said structures are consistent with the character of the
original structures being of the same size height, and design constructed as it has been on
the original footprint of the existing structure. It has similar lightweight materials,
fenestration, design and has exhibited a drawing of the design of the original structure and
a drawing of the design of the new structure to demonstrate the non-material nature of the
alteration.
10. The Appellant/Respondents submit that exempted development is specifically
excluded from the definition of unauthorised development/ unauthorised works that the
works being carried out by the Respondent constitute exempted development and
accordingly they cannot amount to an unauthorised development for the purposes of Section
2 of the Planning and Development Act 2000, as amended.”
143. In the O’Neill case the statement of case records as follows:
“Applicants’ Position
42. The Applicant’s position is that the Respondents have carried out, and continue to
carry out, a substantial and ongoing programme of unauthorised development at Chianti
Park, Mount Seskin, consisting of site clearance, demolition of existing structures,
construction of new modular homes, and the laying of new foundations. The Applicant
submits that there is no planning permission for these works, no valid basis for exempted
development under the Planning and Development Act 2000, and that the works go well
beyond maintenance or alteration of existing structures. The Applicant relies on extensive
affidavit and photographic evidence showing continued development, including on land
where there were no structures prior to the commencement of the unauthorised
development.
43. The Applicant further contends that the Respondents’ attempt to rely on exemptions
under section 4(1)(h) of the Act is legally and factually unsustainable. It is argued that the
exemption only applies to works affecting existing structures and cannot cover demolition
and complete replacement of structures, nor the construction of entirely new dwellings. The
Applicant relies on established case law, including authorities confirming that exemptions
must be strictly construed and do not extend to substantial rebuilding or replacement. On
that basis, the Applicant submits that the Respondents’ activities constitute ‘unauthorised
development’ within the meaning of the Act and cannot be retrospectively justified.
44. Finally, the Applicant argues that the Court should exercise its discretion under
section 160 in favour of granting relief because there is a clear and continuing breach of the
planning code, with works proceeding despite complaints, engagement with the planning
authority, and the commencement of proceedings. The Applicant emphasises that the
development has significant planning and environmental impacts, including drainage issues
affecting nearby residents, and that allowing it to continue would undermine the integrity of
the planning system. Accordingly, the Applicant seeks orders restraining further works and
requiring restoration of the land to its prior condition, with no stay on any such orders.
The Respondent’s Position
45. The site is long established as a residential use and development. The documents
on file state this use has been established pre October 1964. The SDCC Development Plan
2022-2028 land use Zoning Map shows the subject development as an existing established
development within the context of the land use and heritage and other conservation
objectives. The planning unit of the overall site of Hillsbrook Lawns and Chianti Park are
included on the development plan zoning map and it is implicit that this forms the relevant
planning unit.
46. The works on site can be described in broad terms as;
• the existing residential units were in poor condition and required improvement
• that the works were limited to and incorporated the existing foundations to the
existing structures which were generally retained,
• the existing footprint of the structures and site layout was retained, and
• and road and access and entrance arrangements were retained.
• Existing site infrastructure and services were retained.
• That the works were confined to the footprint of the existing structure and land
under the structure.
47. The works, subject matter of the complaint, are an exempted development because
they fall within statutory exemption contained within Section 4(1)(h) of the Planning and
Development Act 2000, as amended.
48. The exemption clearly provides therefore that if a person is carrying out works, that
is any construction, demolition, excavation, alteration, improvement, repair or renewal of
anything or part of a thing made or constructed on land then this falls with a category of the
exemption) specifically that category of exemption provided under Section 4(1)(h) of the
Planning and Development Act 2000, as amended.
49. There is no doubt that these works complained of fall into at least three categories
of activity provided for in Section 4(1)(h) namely works for the ‘maintenance’ and/or
‘improvement’ and/or ‘alteration’ of a structure.
50. These structures were the subject matter of a survey conducted by the Respondents
architect (who’s qualifications and expertise are not disputed) and who confirms that the
foundations of these structures were retained and improved and that the
alteration/improvement works are carried out on or within the footprint of those foundations.
This is the only evidence of actual survey which is averred to at paragraph 7 of the affidavit
of Adrian Donoghue and therefore as a matter of evidence has not been put in dispute and
must be accepted.
51. These works prima facie exempted development so long as they comply with the
second element of the exemption contained in Section 4(1)(h) of the Planning and
Development Act 2000, as amended.
52. The only limitation provided for in this statutory exemption is that where the works
materially affect the external appearance of the structure they are exempted development
so long as they do not render the appearance of that structure inconsistent with its own
character or the character of neighbouring structures.
53. The appearance of the said structures are consistent with the character of the
original structures being of the same size height, and design constructed as it has been on
the original footprint of the existing structure. It has similar lightweight materials,
fenestration, design and has exhibited a drawing of the design of the original structure and
a drawing of the design of the new structure to demonstrate the non-material nature of the
alteration.
54. The Appellant/Respondents submit that exempted development is specifically
excluded from the definition of unauthorised development/ unauthorised works that the
works being carried out by the Respondent constitute exempted development and
accordingly they cannot amount to an unauthorised development for the purposes of Section
2 of the Planning and Development Act 2000, as amended.”
Analysis of exempted development defence
144. Section 4(1)(h) provides that the following is exempted development:
“development consisting of the carrying out of works for the maintenance, improvement or
other alteration of any structure, being works which affect only the interior of the structure
or which do not materially affect the external appearance of the structure so as to render
the appearance inconsistent with the character of the structure or of neighbouring
structures;”
145. The exempted development categories are to be construed strictly: Dillon v. Irish Cement
Limited 2004 WJSC-SC 2866, [1986] 11 JIC 2602 (Unreported, Supreme Court, Finlay C.J., 26
November 1986); Corajio Unlimited v. An Bord Pleanála [2023] IEHC 373 (Unreported, High Court,
Phelan J., 29 June 2023) (§70); Leitrim County Council v. Dromaprop Ltd [2024] IEHC 233
(Unreported, High Court, 29 April 2024) (§44).
146. The respondents bear the onus to show that the exemption applies, an onus they have not
only not discharged but which they never had any hope of discharging. There are two independent
but mutually reinforcing and insuperable problems:
(i) Total or near-total replacement of a structure is not maintenance,
improvement or alteration of the structure: this is clear from an overview of the
consistent caselaw touching on this, including Cairnduff v. O’Connell 1986 WJSC-SC
209, [1986] I.R. 73, [1986] I.L.R.M. 465; Dublin Corporation v. Arnold Lowe and
Signway Holdings Limited [2000] IEHC 161 (Unreported, High Court, Morris J., 4
February 2000) at p. 9; Fingal County Council v. Crean [2001] IEHC 148
(Unreported, High Court, Ó Caoimh J., 19 October 2001); Dublin City Council v.
Lowe [2004] IESC 106, [2004] 4 I.R. 259 (McCracken J.; Murray C.J. and Kearns J.
concurring); McCabe v. Coras Iompair Éireann and Iarnród Éireann [2006] IEHC
356, [2007] 2 IR 392 (Herbert J.) (§28); Sligo County Council v. Martin [2007] IEHC
178 (Unreported, High Court, O’Neill J., 24 May 2007) (§21 et seq.); Cronin
(Readymix) Ltd v. An Bord Pleanála [2017] IESC 36, [2017] 2 I.R. 658 (O’Malley J.;
MacMenamin and Laffoy JJ. concurring); Morgan v. Slaneygio Limited [2017] IEHC
284 (Unreported, High Court, Baker J., 4 May 2017), at 39-41.
(ii) Furthermore, the works did materially affect the external appearance of each
structure (see photographs illustrated above) so as to render it inconsistent with
the character of the structure. The works here go so far beyond anything accepted
in Cairnduff v. O’Connell 1986 WJSC-SC 209, [1986] I.R. 73, [1986] I.L.R.M. 465 or
any other case as to make reliance on s. 4(1)(h) simply unstateable and irrelevant.
The averment to the contrary by Mr Donoghue is not reality-based as set out above.
147. So the elaborate legal arguments based on s. 4(1)(h) just don’t get off the ground on these
facts.
148. It doesn’t help that there are clearly areas of the site which had no pre-existing structures,
so there was nothing to improve in any event. This illustrates I suppose that it is possible for an
argument to be totally without merit for more than one reason.
149. As regards the argument that the foundations are improvements to the pre-existing
foundations, I endorse the council’s reply bearing in mind the onus of proof:
“The Appellants have adduced no evidence to establish existing foundations on the Lands –
noting that the photographs depict mobile homes on blocks. Moreover, even if foundations
did previously exist on the Lands, the Council’s photographs depict the development of new
larger and materially different foundations with new services to same. Again, none of the
Appellants’ deponents attempt to engage with this evidence. Noting the restrictive
interpretation to s.4(1)(h) of the PDA, it is simply not credible to argue, as the Appellants
enthusiastically attempt to, that these comprise repairs to the alleged existing foundations.
The evidence demonstrates that the new structures are considerably larger and different
from those previously located on the Lands – which is consistent with the need for new larger
foundations.”
150. The respondents implausibly claim that they have discharged the onus via Mr Donoghue:
“These structures were the subject matter of a survey conducted by the Respondents [sic]
architect [sic] (who’s [sic] qualifications and expertise are not disputed) and who confirms
that the foundations of these structures were retained and improved and that the
alteration/improvement works are carried out on or within the footprint of those foundations.
This is the only evidence of actual survey which is averred to at paragraph 7 of the affidavit
of Adrian Donoghue and therefore as a matter of evidence has not been put in dispute and
must be accepted.”
151. As noted above Mr Donoghue is not an architect. The assertion that the lack of foundations
is not in dispute is incorrect given the photographic evidence put forward by the council. The
respondents’ failure to invoke cross-examination means this issue must be decided against the party
carrying the onus of proof – in relation to an exemption that is the respondents.
152. Furthermore Mr Donoghue’s affidavit generally is manifestly not reality-based, to a very
concerning degree. Little or no weight should be attached to his averments in any event, even if
the council bore the onus of proof. There is no explanation of how pouring new foundations on top
of 50-year-old foundations could ever have worked, even if counterfactually all of the previous
homes had foundations.
153. Even if rudimentary fragments of old foundations survive, they have been subsumed into
the new unauthorised development and thus fall to be removed in their entirety.
154. As regard what the respondents clearly think is a winning point that they have kept the same
footprint and dimensions, that is not a winning point. The 2000 Act does not create a defence that
you can have a new development as long as you keep the old footprint and dimensions. This is a
new and different development, irrespective of those matters.
155. As regards the ancillary matters – the extensive site clearance works, the development of
new roads within the lands, the installation of new services such as pipes – the defence is that these
are ancillary to exempted development and are thus themselves exempted in consequence (relying
on Rehabilitation Institute v. Dublin Corporation 1988 WJSC-HC 626, [1988] 1 JIC 1401 (Unreported,
High Court, Barron J., 14 January 1988)). Unfortunately, the notion of acceptable ancillary
development does not arise when the substantive development is not exempted. So this argument
never gets out of the traps.
156. The immense ingenuity deployed on behalf of the respondents knew few bounds (and in
case I had overlooked any of the numerous elaborate fall-back arguments, I invited the respondents
to let me know during the draft judgment process, but no such notification was received), in that a
further argument was made that the road works were covered by para. (h) as improvements to the
existing roads. Again however the respondents have not discharged the onus of proof on this
including by way of showing that the original roads were authorised or exempt in the first place. If
the original roads were unauthorised structures (and the respondents have not proved the contrary),
it would be contrary to public policy to interpret s. 4 as having the effect that improvements to such
roads, even if proved, could also be exempt.
Tree-cutting issue as alleged exempted development
157. In fairness to the respondents I have considered s. 4(1)(i) even though it didn’t particularly
feature in their submissions.
158. First of all that doesn’t cover any damage to hedges and the like, only to trees.
159. Secondly and more generally, the tree-cutting was in the service of an unauthorised
development. That which might otherwise be non-exempted may be permissible if it is ancillary to
exempted development: by analogy with Rehabilitation Institute v. Dublin Corporation (Unreported,
High Court, Barron J., 14 January 1988) whereby a use ancillary to the main use was deemed not
to be a different use. But this cuts both ways – by necessary logical reciprocation and as a matter
of legal policy, that which might otherwise be exempted ceases to be so if it is for the purposes of
an unauthorised development.
160. In any event, s. 4 goes on to provide:
“(1B) Development referred to in paragraph (a), (d), (e) or (g) of subsection (1A) shall not
be exempted development if an environmental impact assessment of the development is
required.
(1C) Development referred to in paragraph (a), (d), (e) or (g) of subsection (1A) shall not
be exempted development if an appropriate assessment of the development is required.”
161. The respondents here, who carry the onus of proof to demonstrate that an exemption
applies, have not shown that no environmental impact assessment (EIA) or appropriate assessment
(AA) would have been required. So the defence is not made out in any event.
Issue 6 – discretion
162. The council submitted, with all due respect, that “you can hardly come across a less
deserving case of discretion”. Unfortunately that is fair comment.
163. Discretion has two dimensions, an objective element (regarding planning considerations
independently of the particular occupier/developer etc.) and a subjective element. Of these, the
objective element is notably more compelling.
164. There are multiple reasons why that should be so. The primary context is separation of
powers – it is for statutory decision-takers to decide whether to allow any development. If a court
refuses to require remediation of an unauthorised development, it in effect grants a form of retention
permission contrary to the statute and contrary to the separation of powers.
165. Secondly, it is central in planning law that development is objective, and that taking into
account in a material way the identity or personal characteristics or conduct of the owner or occupier
renders a decision unlawful – see Killegland Estates Ltd v. Meath County Council [2023] IESC 39,
[2023] 12 JIC 2109 (Unreported, Supreme Court, Hogan J., 21 December 2023) at 83-85, applied
in daa v. Fingal County Council [2024] IEHC 589 (Unreported, High Court, 17 October 2024). So it
would be illogical and unprincipled to quash planning decisions if regard was had to particular
occupiers or developers, and yet grant a de facto retention permission by reference to those very
types of subjective considerations.
166. The third and most poignant reason why objective factors are notably more weighty is that
development by a particular person is a transitory thing. Yes, a court might be understandably
tempted to hold off on enforcement against a sympathetic respondent, perhaps an aged and infirm
individual and so on, but once that particular respondent goes the way of all flesh, we are left in
perpetuity with a blot on the landscape and violence having been done objectively to the
environment and the separation of powers, to the detriment of the public interest for as long as the
development lasts, perhaps indefinitely, and to the detriment in particular a whole cohort of present
and future people who must suffer the illegality and who are rendered invisible in a subjective
analysis that renders the wrongdoer’s ill-gotten interests as somehow weighty or decisive.
167. For this reason, the fact that a property is used as a dwelling does not give rise to an
exemption from planning law, any more than the existence of housing shortages renders the law
unenforceable against dwellings constructed without permission. To put it another way, rights are
not boot-strapping – you can’t confer on yourself a right to live in structure X merely by erecting the
structure, if you do not otherwise enjoy such a right, any more than you can confer on yourself a
right to live in a particular State by entering it, or a right to private property in something just by
taking possession of it that you are not otherwise entitled to. To go down that road does a severe
injury to the objective nature of planning law and renders the law overall incoherent and in significant
part unenforceable. And when the sympathetic resident waving their copy of the Constitution has
disappeared over the horizon, the structure remains potentially for all time. Such an argument
inflates a distortedly individualised notion of constitutional rights to eclipse the rights and interests
of others and society generally, as well as the bedrock notion of the rule of law and the separation
of powers. What Hogan J. said for a unanimous seven-judge Supreme Court in Killegland at 84,
“[p]lanning and zoning decisions should, generally speaking, at least, be blind as to issues of
ownership”, is doubly true of discretion in planning enforcement, because a court has no legitimacy
to impose its own subjective planning outcomes by refraining from applying the law based on some
kind of romanticised sympathetic consideration of the individual owner/occupier at a given time.
This misconception of self-starting “rights” takes an even more extreme form when we are dealing
with people who simply walk onto land and set up residence. To block enforcement of planning law
based on the “rights” of people, however otherwise unfortunate, who trespass onto lands is to
incentivise trespass and to undermine equality before the law. To reward wrongdoers with court-
imposed rights in such situations is to in effect exempt trespassers, or even worse particular judicially
favoured categories of trespassers, from laws that apply to other citizens. This is, I emphasise,
simply comment for completeness. And also for completeness we must acknowledge the growing
relevance of EU law in the planning area – failure by the courts to uphold the integrity of the planning
system and provide an effective remedy for unauthorised developments would in many cases
constitute a breach of European law, including as to assessments and public participation.
Objective factors
168. The primary objective factor is the integrity of the planning system (Morris v. Garvey 1982
WJSC-SC 1253, [1983] I.R. 319, [1982] I.L.R.M. 177 (Henchy J.; Griffin and Hederman JJ.
concurring); Meath County Council v. Murray [2017] IESC 25, [2018] 1 I.R. 189 (McKechnie J.;
Denham C.J, O’Donnell, Laffoy and Dunne JJ. concurring) at 221-225). That militates in favour of
full remediation.
169. Relief will only be refused in exceptional circumstances. As put in Krikke v. Barranafaddock
Sustainability Electricity [2020] IESC 42 (Unreported, Supreme Court, 17 July 2020) by O’Malley J.
(Clarke C.J., Charleton and Baker JJ. concurring) at §110:
“The orderly operation of the planning code is, in my view of high public importance. As
McKechnie J. emphasised in Murray, the starting point is that, subject to certain exemptions,
no development can lawfully be commenced without planning permission. As well as
rendering the developer liable to very far-reaching orders under s. 160, unauthorised
development is a serious breach of the criminal law. The penalties are, McKechnie J. stated,
‘a significant expression of the high level of public concern there is in regulating orderly and
sustainable development’.”
170. That primary consideration of the integrity of the system, the principle of legality, the need
for equal justice and the rule of law, militating in favour of an order being made, is reinforced here
by:
(i) the high amenity zoning;
(ii) the related protection objective;
(iii) the traffic hazard, as explained by John Joe Hegarty, senior engineer, traffic and
transportation division – noting the unsuitable nature of the roads serving the area
around the lands;
(iv) the water and wastewater arrangements and impacts on local water courses, as per
the affidavit of Lorcan Brennan, senior engineer with the council; and
(v) the impacts on the local heritage and sensitive environment – as per the affidavit of
Rosaleen Dwyer, heritage officer with the council and the affidavit of Laurence
Colleran, senior executive parks superintendent.
171. It is also reinforced by the impact on local residents. Mr O’Neill lives 200m from the
unauthorised development – to translate that into terms some readers may relate to, it is the
distance as the crow flies from Chancery Place to the Bar’s Church Street building. The need to
consider residents illustrates the general problem with subjective approaches that render innocent
parties legally invisible – wrongdoers are not the only people whose interests or rights need to be
considered.
172. Finally, this is not a technical breach or one that can be readily remedied.
173. The objective factors overwhelmingly favour full remediation.
Subjective factors
174. Subjective factors, even if established to be in any way favourable (which they are not in
this case), are generally of limited weight when placed against objective factors, particularly the
need to enforce planning law.
175. The claim for the exercise of discretion is unsustainable having regard to the following:
(i) Some of the development – particularly in the area with no previous structures – is
not covered by any claimed exemption, however threadbare (unless passing
reference to a septic tank on the virgin field is a claim that the building of houses is
“improvement” of that, although I didn’t understand that to be the argument).
(ii) The response to pre-litigation letters was either lacking (in Mr O’Neill’s case) or
wholly unsustainable (in the council’s case – e.g., raising a frivolous and evidence-
free pre-1964 point that was never substantiated).
(iii) Works continued and accelerated despite the council’s intervention and while the
matter was before the court. As the council submits, the appellants ignored the
warning letters and correspondence from the council seeking an undertaking to
cease the works and continued to proceed with the completion of the work. If the
appellants had stopped when the council requested, they would not be facing the
extent of removal required – they are therefore entirely the authors of their own
misfortune. As the council submits, “any consequences, including financial
consequences, for the Appellants are entirely of their own making and were entirely
foreseeable. The Appellants’ action of proceeding with the unauthorised
development, driven by their own commercial motivations (noting the averments
indicating an intention to rent out the unauthorised structures), does not provide
any basis for withholding the relief and would in fact set an extremely dangerous
precedent by rewarding the Appellants for continuous unauthorised development (a
criminal offence under s. 151 of the PDA). Nobody made the Appellants proceed
with the unauthorised development. Nobody stopped the Appellants applying for
planning permission before commencing the unauthorised development. Nobody
stopped the Appellants applying for a s. 5 Declaration before commencing the works.
Nobody made them expedite the unauthorised development whilst the s. 160
proceedings were before the Circuit Court. The financial consequences of an Order
on the Appellants provides no basis for withholding relief”.
(iv) There was removal of significant mature trees without a felling licence.
(v) This was likely to have been during prohibited season contrary to the Wildlife Act
1976.
(vi) The respondents’ litigation conduct does not improve their position. There was an
unexplained failure to comply with the Circuit Court’s directions as to the exchange
of affidavits.
(vii) There was also the issuing and then withdrawing (without any explanation ever
having been provided on affidavit) of a motion to transfer the case to the High Court
on the basis that the Circuit Court lacked jurisdiction (for which costs were ordered
against them).
(viii) There was also the issuing and withdrawing judicial review proceedings (High Court
Record No. 2025 1024 JR)which sought to stay these proceedings. These judicial
review proceedings sought, inter alia, a stay on any enforcement steps being taken,
including the issuing of s. 160 proceedings (§D6, statement of grounds), but did not
refer to the fact that, as of 10 November 2025 (the first listing date before the High
Court), s. 160 proceedings had already issued in the Circuit Court and directions had
been fixed for the hearing of an urgent interlocutory application (with the case
having been listed before the Circuit Court on 30 October 2025 and 6 November
2025 in this regard).
(ix) While this isn’t of course criticism, it is nonetheless a fact that this is a commercial
exercise by the respondents who clearly seek to make a gain from the unauthorised
structures by renting same out.
(x) There has been no delay in the council acting to address the unauthorised
development, not that delay within the quasi-limitation period is particularly weighty
or even relevant in any event (there is developed EU law on that subject).
(xi) Housing shortages are not a weighty consideration. The fact that the structures
would be used as dwellings is not a weighty consideration. The respondents don’t
in any event have standing to assert dwelling-based interests in that regard. There
is no such argument anyway because these houses are not occupied. The former
occupants are not parties and there is no evidence that they have any rights of
reoccupation. Even if there was occupation of unauthorised structures,
constitutional rights don’t provide protection against demolition of such structures
save in the most exceptional circumstances that are hard to envisage. Even in such
circumstances, a stay or adjournment would be more proportional than objectively
despoiling the environment in perpetuity by refusing relief without any policy
mandate to do so and on the insubstantial basis of the transitory fact of occupation
by a particular person.
(xii) Characterising what happened here as “genuine mistake” (Morris v. Garvey 1982
WJSC-SC 1253, [1983] I.R. 319, [1982] I.L.R.M. 177 per Henchy J. (Griffin J. and
Hederman JJ. concurring)) is a ludicrous defence to offer when works pressed ahead
and intensified after enforcement letter, an enforcement order and proceedings. To
do that isn’t engaging in a genuine mistake – it is defiance and a voluntary
assumption of risk.
(xiii) There is no acquiescence over a long period as referred to by Henchy J. We are not
talking about the old caravan/ mobile home park anymore. We are talking about
the new works since August 2025. The triviality or the mere technicality of an
infraction could be relevant in a given case (which is an objective factor as noted
above) but this is not a trivial or technical infraction. Gross or disproportionate
hardship or such like extenuating or excusing factors are subjective but the hardship
here is not disproportionate. It cannot be the law that some illegal developments
are too big to remediate. A developer cannot create a defence of gross or
disproportionate hardship merely by engaging in gross or disproportionate illegality.
To put it another way, full remediation is not disproportionate merely because it is
full, or merely because the illegality is large and therefore the full remediation is
going to be expensive. Even if legally recognised gross hardship did arise, the
objective factors are still of compelling weight.
176. Insofar as any of the factors are contested, the respondents bear the onus to establish facts
necessary to show that discretion should be exercised in their favour, which they have not
discharged.
177. Overall, even if counterfactually, there were subjective reasons against immediate
enforcement, it would normally be disproportionate to refuse relief altogether and certainly would
be here. Relief with a stay or an adjournment pending some engagement with the planning system
would be far more proportionate in one of the exceptionally rare situations where the subjective
elements were of such immense moment as to outweigh the separation of powers and the integrity
of the planning system.
178. Ultimately the core reasons why objective factors are compelling were identified in Sligo
County Council v. Martin [2007] IEHC 178 (Unreported, High Court, O’Neill J., 24 May 2007) (§28-
29):
“If the court were to not grant relief that would have the effect of granting planning
permission for this structure in circumstances where the various procedures set out in the
Act of 2000 for the purposes of protecting the public in regard to development would be
ignored with the inevitable defeat of a variety of public interests. Firstly there is the interest
of the public in general to participate in the planning process by making objection or
observation in relation to any particular proposed development. Secondly the expert
supervisory role of the local authority as planning authority would be set at nought as it
would be entirely excluded.
It was at all times open to the respondent prior to taking the precipitous action of replacing
this mobile home in August of 2005 to seek, in the ordinary way, planning permission for
this development. He choose not to do so and in my view he cannot now call in aid the
discretion of this court, when it is clear that what he has done is a breach of the statutory
obligation to obtain planning permission prior to the carrying out of a development ...”
Issue 7 – form of the order
179. There are three basic questions about the form of the order:
(i) what should happen;
(ii) who should do it; and
(iii) when should it happen.
Sub-issue I – what should happen
180. The logic of the position successfully put forward by the applicants is that the removal of the
original caravans/ mobile homes terminated any defences that would have applied to those
structures. The modular homes are a new development which is unauthorised. Remediation of the
unauthorised development therefore involves removing the new structures including new
foundations without re-erecting the old ones which would be unauthorised development.
181. The respondents made extensive submissions on the shortcomings of the reliefs as originally
drafted by the applicants in the notices of motion before the Circuit Court. That’s all as may be, but
the court has to be able to grant the appropriate relief under s. 160. Since the respondents also
made much of the right to have ancillary matters included in the substantive matter, the appropriate
order under s. 160 is going to involve some ancillary matters to make it effective.
182. In any event, in fairness to the applicants, the claim for further and other relief has to be
wide enough to allow the court to make the order under the section they invoke that most
appropriately gives effect to the findings of the court. Indeed the respondents submitted that the
court “can make any order that the court considers appropriate”, and while that was a concept they
invoked in favour of allowing them to continue to have unauthorised structures, it applies equally to
an order requiring removal and remediation.
183. Relying on Lawlor v. Dundalk Town Council [2005] IEHC 73, [2005] 2 I.L.R.M. 106 (O’Neill
J.), the respondents claim lack of clarity as to what is demanded. But there is no analogy between
a self-executing enforcement notice, at issue in that case, and a motion invoking an equitable
jurisdiction of the court. It is the order, and not the motion, that provides the necessary clarity. If
the respondents think there is any lack of clarity in the order I invited them to raise their issues in
the draft judgment process (which they did not do) or to invoke the liberty to apply post-perfection.
184. Overall, the respondents gave the impression of having the belief that they had a winning
“gotcha” point that the exact reliefs in the notices of motion were insufficiently wide and/or that the
applicants needed to be pinned down rigidly to the original wording. Unfortunately it is my painful
rôle to explain that that is not a winning point.
185. Especially in the quasi-equitable context of a statutory injunction, the court needs to be able
to fashion the relief that arises most appropriately from the evidence as the issues are shaped by
the particular submissions made.
186. By way of summary, the court is not shackled to the exact wording of the specific reliefs
sought in the original notices of motion in the Circuit Court for any one or more of the following
independent reasons and a fortiori for these reasons taken cumulatively:
(i) the respondents submitted that the court “can make any order that the court
considers appropriate”, and so it is improper to now make the opposite submission
having lost;
(ii) the precise order made has to take into account the evidence and the run of the
case in terms of what issues were raised by way of defence and what issues were
determined, something that cannot conceivably be anticipated on day one;
(iii) the applicants in any event expressly sought further and other relief;
(iv) this is in any event a quasi-equitable context;
(v) the order provisionally proposed remains squarely within the context of s. 160 of the
2000 Act;
(vi) subsection (1) of s. 160 provides inter alia that the court can “by order require any
person to do or not to do, or to cease to do, as the case may be, anything that the
Court considers necessary and specifies in the order to ensure, as appropriate,
the following: (a) that the unauthorised development is not carried out or continued;
(b) in so far as is practicable, that any land is restored to its condition prior to the
commencement of any unauthorised development; ...”
(vii) subsection (3)(b) of s. 160 provides inter alia that the order “may contain such terms
and conditions (if any) as to the payment of costs as the Court considers
appropriate”;
(viii) there will be an opportunity to make a submission on the form of the order; and/or
(ix) there are in any event significant objective interests involved in terms of the integrity
of planning law and EU law.
187. As specified above, the exact form of the order will be open for submissions but not in a way
that revisits the judgment.
188. With a view to assisting the respondents, I can clarify that it would be improper to attempt
to avail of the liberty to make submissions on the form of the order in a manner that impermissibly
re-argues the case, including by reference to any of the following:
(i) that the court has failed to have appropriate regard to the nature of the structure
which was the subject matter of the works for alteration and improvement;
(ii) that the Court has failed to have appropriate regard to the fact that the footprint of
the structure has not been increased, nor the dimensions altered beyond what
existed on the site which evidence was not contradicted;
(iii) that the evidence from the unregistered person showing the before and after
demonstrates that the extent of the alterations as was shown and was not a
significant given the surveys carried out by him both before and after;
(iv) that the court has failed to have appropriate regard to the application of the principle
governing s. 4(1)(h) and in particular the judgement of Ryan J. in Micheal Cronin
(ReadyMix) Limited v. An Bord Pleanála [2009] IEHC 553, [2009] 4 I.R. 736, and
the subsequent judgment of the Supreme Court in Cairnduff v. O’Connell 1986
WJSC-SC 209, [1986] I.R. 73, [1986] I.L.R.M. 465 which gives the effect that there
is a greater margin of appreciation shown in a set of works which are exempted
development as prescribed under that section and is not confined to insignificant
works;
(v) that the court erred in its interpretation of the defences available under s. 4(1)(h)
as set out in Morris v. Garvey 1982 WJSC-SC 1253, [1983] I.R. 319, [1982] I.L.R.M.
177 (Henchy J.; Griffin and Hederman JJ. concurring) the application of which
defences apply to the facts of this case where it was a genuine belief based on a
statutory exemption which related to no alteration of the character of the structure
that would render the development inconsistent with the previous development or
adjoining structures;
(vi) that the court erred in its interpretation of the defence of disproportionate hardship
in terms of how it has been applied to the facts of this case;
(vii) that the finding of the court that this development commenced subsequent to the 1
October 1964 is not consistent with the purpose of the s. 160(6) (seven-year rule)
of the 2000 Act;
(viii) that the court erred in its interpretation of the reliefs sought by the applicants and
in particular those reliefs relating to the restoration of the lands to their condition
immediately prior to the commenced of the development in August 2025;
(ix) that the court erred in its finding that both affidavits of Ann Mulcrone were
inadmissible on the basis that they should have been before the court of first
instance;
(x) that the respondents should be (re-)heard in the question of inadmissibility of
affidavits;
(xi) that the court erred in its interpretation of the established use of the development
site;
(xii) that the proposed mandatory order is arbitrary and unfair having regard to the
requirements of the 2000 Act and the provisions of s. 4(1)(h); and/or
(xiii) that the proposed mandatory order is in error and does not take account of the
reliefs sought by both respondents (or the applicants for that matter).
189. In short, to pay homage to Oscar Wilde, inappropriately trying to re-litigate the case once is
unfortunate but twice would be careless – presumably that won’t arise. Liberty to make submissions
on the form of the order is fine as long as we are clear it is within the tramlines of the judgment and
not a procedure to reargue a case having lost it.
Sub-issue II – who should do it
190. While in theory a s. 160 order should require the respondent to carry out works themselves,
the council seemed to appreciate that in practice this often doesn’t work and failure to comply with
legal responsibilities tends to continue. The only practical method of upholding the integrity of the
planning system is in some cases for the relevant council to carry out thew works itself and reclaim
the cost via the obligations stemming from the enforcement notice, or on a quantum meruit basis,
or by way of terms of an order of the court.
191. The respondents’ preference was to do any remediation themselves in the first instance. I
am not inherently opposed to that, but it needs to be understood that this would be on a strict
timetable and on strict conditions to ensure compliance, breach of which would mean that the council
would be required to take exclusive possession for the purposes of enforcement of the order. The
respondents would need to demonstrate a reality to compliance. On reflection I am not going to be
absolutely prescriptive about what that would involve at this stage other than that there will
inherently need to be a timetable and a plan to remediate the site, to be agreed or directed. There
would be something to be said for nominating individual directors to take responsibility for receiving
personal service of the order marked with the penal endorsement and/or for payment on account,
but on reflection if the order is very prescriptive it could get in the way of a practical solution.
192. If the respondents comply with the reasonable and modest conditions of the order, then
they can be allowed to take the remediation in hand. If they do not then non-compliance with
anything would mean that the council could either take the lead in carrying out the works, without
prejudice to any legal consequences for the respondents in terms of recovering the costs of non-
compliance (preferable, I would have thought), or else proceed exclusively by contempt (resource-
heavy as far as the court is concerned so probably my second preference, if my views are of interest).
193. I am providing for submissions on the form of the order but strictly within the contours of
the judgment.
Sub-issue III – when should it happen
194. There is no obvious reason at the moment why the situation should not be rectified forthwith,
so I have included a timeline in the proposed order below subject to submissions on the form of the
order.
Costs
195. Section 161 of the 2000 Act provides (emphasis added):
“Costs of prosecutions and applications for injunctions.
161.—(1) The court shall, unless it is satisfied that there are special and substantial reasons
for not so doing, order the person to pay—
(a) where a person is convicted of an offence under this Part, to the planning authority, or
(b) where the person is the subject of an order under section 160, to the planning
authority or to any other person as appropriate,
the costs and expenses of the action, measured by the court.
(2) Where costs or expenses are to be paid to the authority, they shall include any such
costs or expenses reasonably incurred by the authority in relation to the investigation,
detection and prosecution of the offence or order, as appropriate, including costs incurred in
respect of the remuneration and other expenses of employees, consultants and advisers.”
196. Presumptively therefore costs will follow the event.
197. I am open to measuring the costs as specified in s. 161(1) but it may just be easier to allow
for adjudication. If the parties wanted measuring I invited them to raise that in the draft judgment
process but nobody did.
198. The order will provisionally include the specific provision in sub-s. (2) insofar as relevant.
Summary
199. In outline summary, without taking from the more specific terms of this judgment:
(i) it is settled law that the onus of proof to show that development is exempted lies on
the respondent;
(ii) applying such law to the facts here, the respondents have failed to discharge that
onus;
(iii) it is settled law that exemptions should be construed narrowly and that an exemption
for alteration does not include total removal and replacement;
(iv) applying such law to the facts here, this is not exempted development;
(v) it is settled law that removal of structures or a definite cessation of use means that
any pre-1964 or seven-year rule defence ends and that new structures or a re-
established use requires permission unless exempted;
(vi) applying such law to the facts here, this is new and unauthorised development;
(vii) it is settled law that the integrity of the planning system is a significant factor in the
court’s discretion; and
(viii) applying such law to the facts here, discretion weighs in favour of making an order.
Order
200. For the foregoing reasons, it is ordered that:
by way of order to be perfected forthwith on the delivery of this judgment:
(i) in each case, the appeals be dismissed;
(ii) in each case, the orders of the Circuit Court be affirmed, on the basis of being
varied by way of prohibitory order as set out below and on the basis of being varied
by way of mandatory and further order(s) in a manner to be determined by order(s)
of the court following submissions on the form of the provisional orders;
(iii) in each case, there be a prohibitory order under s. 160 of the 2000 Act, such
order to be effective immediately, restraining the respondents, their directors or
officers or any person having notice of the order from at any time:
(a) carrying out any works on any of the lands on which the unauthorised
development took place, save in accordance with an order of the court;
(b) permitting any use of any of such lands (including occupation of any
structures) save in accordance with an order of the court; and
(c) re-erecting on such lands any of the caravans, mobile homes or other
structures that have been removed save in accordance with an order of
the court;
(iv) in each case, that the respondents have liberty to make written legal submissions
(without attempting revisit any findings in the judgment) on the form of the
provisional further orders and as to on costs, by 09:30 on Wednesday 10 June
2026, with the applicants to reply by 09:30 on Wednesday 17 June 2026;
(v) in each case, that the respondents be required to submit a detailed draft
remediation and landscaping plan by 09:30 on Wednesday 10 June 2026,
specifying both (a) the steps the respondents intend to take to comply with the order
if the provisional order is made as drafted and (b) any proposed variations within
the scope of the judgment, specifying specific timelines in respect of all steps, with
the applicants to reply by 09:30 on Wednesday 17 June 2026, specifying the extent
to which (if at all) the proposals in the draft remediation and landscaping plan are
agreed;
(vi) in each case, it be directed that any unsuccessful application to vary the provisional
order set out in the judgment may be the subject of an adverse costs order, inter
alia pursuant to O. 103 r. 40(4) RSC, and that any improper attempt to revisit the
findings of the judgment in the context of submissions on the form of the order or
costs may be the subject of an adverse costs order;
(vii) in each case, there be liberty to apply including in the event of non-compliance
with any order of the court;
(viii) in each case, the matter be listed at 14:00 on Wednesday 3 June 2026;
by way of order to be perfected 7 days following the judgment in the event of failure
by the respondents to make contrary submissions by the specified time or failure by
the respondents to prepare a draft remediation and landscaping plan within that
time, or otherwise to comply with the order, or in the event of such submissions and
compliance, 14 days following this judgment or at such other time as may be
specified subject to contrary submissions within the scope of the judgment as set
out above, provisionally as follows:
(ix) in each case, there be a mandatory order under s. 160 of the 2000 Act requiring
the respondents to take the following steps (such order to cease to have effect
(without prejudice to the consequences of any breach that has already occurred) if
vacant possession of the entire lands on which the unauthorised development
occurred is surrendered to the council with the consent of the council in accordance
with the order), namely within 6 weeks from the date on which the remediation and
landscaping plan is agreed by the parties or directed by the court, to remove all
structures erected since August 2025 including remnants of previous structures
incorporated in the new structures, which includes removal of all foundations, and
to restore the lands, in a manner to be agreed with the applicants or directed by the
court in default of agreement, and in accordance with a remediation and landscaping
plan to be so agreed or so directed by the court in default of agreement, to a
condition representing a landscaped finish to the status quo on each part of the lands
as it stood:
(a) in the case of trees, hedges or other vegetation, immediately prior to their
removal (i.e., by replanting trees, hedges and vegetation as appropriate);
(b) in the case of dwellings, following the removal of all caravans and mobile
homes (or other dwellings however described) and prior to the erection of
modular houses and foundations; and
(c) in the case of other works, immediately prior to such works;
and subject in each case to such consequential and ancillary landscaping as may be
required by the remediation and landscaping plan;
(x) in each case, there be a mandatory order under s. 160 of the 2000 Act requiring
the respondents to surrender to the council vacant possession of the entire lands
within their possession or ownership within which the unauthorised development
occurred for the purposes of remediation by the council, either in the event that the
respondents and the council agree such surrender or in the event that the
respondents breach any provision of this order and the council thereafter requests
such surrender, and that in the event of any dispute as to the extent of the lands
required to be surrendered to the council, the matter be determined by the court,
and that in the event of the council taking exclusive possession of the lands pursuant
to this order, the council be required to carry out all necessary demolition and
restoration works as set out above in this order, subject to any further directions of
the court, within 6 weeks from taking such possession or such further period as may
be allowed by the court, and that in that eventuality, the return of possession of the
lands to the respondents will be determined by further order of the court subject to
completion of remediation and landscaping and to s. 154(6) and (7) of the 2000 Act;
(xi) in the O’Neill case, the order of the Circuit Court as to costs be affirmed on the basis
that there be an order for costs in the Circuit Court (including reserved costs and
the costs of written submissions and including a certificate for junior counsel as
granted by that court) being awarded to the applicant against the respondents jointly
and severally to be taxed in default of agreement;
(xii) in the SDCC case, the order of the Circuit Court as to costs be affirmed on the basis
that there be an order for costs in the Circuit Court (including reserved costs and
the costs of written submissions and including a certificate for junior counsel and
senior counsel as granted by that court) being awarded to the applicant against the
respondents jointly and severally to be taxed in default of agreement;
(xiii) in each case, there be an order for costs in the High Court (including reserved costs
and the costs of written submissions) being awarded to the applicants against the
respondents jointly and severally and any issue as to the extent of such costs be
determined, in default of agreement, by way of legal costs adjudication;
(xiv) in each case, the order for costs in the High Court shall include an order for the costs
of legal costs adjudication; and
(xv) in the SDCC case, pursuant to s. 161(2) of the 2000 Act, the order for costs in the
High Court shall include all costs or expenses reasonably incurred by the applicant
in relation to the investigation and detection of the unauthorised development as
well as in the proceedings, including costs incurred in respect of the remuneration
and other expenses of employees, consultants and advisers in respect of those
matters.