High Court discharges attachment order against respondents who provide undertakings to cooperate with demolition.
Legislator summary
AI generatedThe High Court discharged an order of attachment against the respondents on the condition they comply with specific undertakings regarding the demolition of an unauthorized structure. The respondents had previously failed in multiple appeals, including before the Supreme Court and the European Court of Human Rights, regarding the Council's injunction to demolish the dwelling. The court ruled that providing these undertakings to cooperate with demolition works and assist An Garda Siochana satisfied the requirements to lift the attachment.
Legislator headnote
AI generateds. 160 of the Planning & Development Act 2000; Order 44 rule 4 of the Rules of the Superior Courts: An order of attachment may be discharged if the respondents provide undertakings to cooperate with the execution of demolition works and assist law enforcement.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2026] IEHC 302
THE HIGH COURT
PLANNING & ENVIRONMENT
[H.MCA.2007.0000076]
IN THE MATTER OF SECTION 160 OF THE PLANNING & DEVELOPMENT ACT 2000
AND IN THE MATTER OF AN APPLICATION BY
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
AND
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
(No. 2)
Date of decision refusing permission: 29 June 2006
Date proceedings commenced: 25 June 2007
Date of s. 160 order: 27 July 2010
Date appeal dismissed: 25 May 2017
Date of undertakings: 24 September 2020
First listed in Planning & Environment Court: 13 February 2026
Date of main hearing on contempt: 23 March 2026
Date draft judgment circulated: 11 May 2026
JUDGMENT of Humphreys J. delivered on Friday 15 May 2026
1. In Πρὸς γραμματικούς/ Adversus Grammaticos (mid-to-late 2nd century CE), the Skeptic
Hellenistic philosopher Σέξτος Ἐμπειρικός/ Sextus Empiricus cited a saying of an unknown 1st
century CE poet: Ὀψὲ θεῶν ἀλέουσι μύλοι, ἀλέουσι δὲ λεπτά/ “Slowly grinds the mill of the gods but
it grinds fine”. The gods and the legal system have that much in common, so inevitably the same
point has been made more recently about the wheels of justice (although the definitive source of
that adaptation is elusive). While there can be no argument about the fact that 20 years to
remediate an unauthorised structure constitutes slow grinding by any standards, and without taking
from the fact that the outcome is uncomfortable for the respondents or wishing to add unnecessarily
to that discomfiture, it is ultimately a vindication of the rule of law, the principle of equal justice and
the integrity of the planning system that the law got there in the end.
Judgment history
2. This is the tenth written decision in this matter. The respondents have been unsuccessful
in all decisions, achieving that home run before the High Court, Court of Appeal, Supreme Court and
the European Court of Human Rights. The earlier decisions were as follows.
(i) In Meath County Council v. Murray (No. 1) [2010] IEHC 254 (Unreported, High
Court, 29 June 2010), Edwards J. granted a s. 160 injunction in the present
proceedings requiring demolition of the unauthorised structure, with a stay of 24
months.
(ii) In Meath County Council v. Murray [2017] IESC 25, [2018] 1 I.R. 189, [2017] 2
I.L.R.M. 297 (McKechnie J.; Denham C.J., O'Donnell, Laffoy and Dunne JJ.
concurring), this was affirmed on appeal with a stay of a further year.
(iii) In Murray v. Meath County Council [2024] IEHC 658 (Unreported, High Court, 20
November 2024), Dignam J. dismissed as “frivolous and vexatious and an abuse of
process” separate proceedings (“the 2022 proceedings”) brought by the respondents
to set aside the s. 160 orders and refused interlocutory relief.
(iv) In Murray v. Meath County Council [2025] IESCDET 39 (10 March 2025, O’Malley,
Murray and Donnelly JJ.), the Supreme Court refused leave to appeal a procedural
ruling of Costello P. on the appeal from that order.
(v) In Murray v. Meath County Council [2025] IECA 164 (Unreported, Court of Appeal,
Allen J.; Butler and O’Moore JJ. concurring, 5 August 2025), the order of Dignam J.
was affirmed.
(vi) In Murray v. Meath County Council [2025] IESCDET 143 (10 November 2025,
O’Malley, Hogan and Donnelly JJ.), leave to appeal was refused in relation to issues
regarding the refusal of interlocutory relief.
(vii) In Murray v. Meath County Council [2025] IESCDET 144 (10 November 2025,
O’Malley, Hogan and Donnelly JJ.), leave to appeal was refused in relation to issues
regarding the dismissal of the 2022 proceedings.
(viii) In an unpublished decision letter in Murray v. Ireland (Application no. 9012/26, Rule
39 Site #8847, ECtHR, 20 March 2026), the European Court of Human Rights
(EctHR) rejected the respondents’ application for interim measures under rule 39 of
the Rules of Court of the European Court of Human Rights that the demolition of the
unauthorised structure not be carried out.
(ix) In a further unpublished decision letter in Murray v. Ireland (Application no.
9012/26, Rule 39 Site #8847, ECtHR, 23 March 2026), the ECtHR rejected
correspondence making continued request for rule 39 relief, having regard to the
decision letter of 20 March 2026.
3. The purpose of the present judgment is to outline for the record the background to the order
ultimately made regarding contempt in relation to the respondents’ failure to comply with their
undertakings regarding the unauthorised structure. It outlines the position as it appeared to the
court based on the material submitted up to 23 March 2026, and without predetermining the
respondents’ motion seeking to vacate and revisit prior orders and decisions to be heard in due
course. Of course the issue of a motion to effectively vacate an order does not retrospectively nullify
a court’s reasoning for having made such an order or inhibit the court from setting out that
reasoning. That doesn’t mean that the motion will not be objectively examined on its merits in due
course subject to the preliminary objections. Everything in this judgment needs to be read in that
sense – i.e., it is essentially a statement for the record of how matters appeared to me as of the
relevant dates but without prejudging the respondents’ motion to revisit matters in due course. The
respondents didn’t need to propose that I specifically caveat the (no doubt extensive) matters in
this judgment that they disagree with – the foregoing general caveat will apply to everything to the
extent that if they succeed in their motion, anything to the contrary in this judgment will not preclude
any order that would otherwise follow.
4. As the respondents have been keen to dispel any doubt, perhaps in that vein I should also
repeat that succeeding in their motion involves, per the order discharging the respondents from
attachment, also overcoming the preliminary objections from the council that they are not entitled
to pursue the motion. The agreed order records both positions:
“And the Court noting the position of the Respondents that they propose pursuant to the
said Notice of Motion to revisit the issue of contempt
And the Court noting the position of the Applicant that the Respondents are not entitled to
apply for the relief sought in the said Notice of Motion and that if which is denied the
Respondents are entitled to apply for the said relief the Respondents are not entitled to be
granted the said relief”
5. In a further spirit of avoiding doubt, while the present judgment records matters as I saw
them at the time, that doesn’t imply that I see matters differently now. Whether anything should
be seen differently at this point will depend potentially on submissions made on the respondents’
motion, so phrases such as “at the time” don’t involve prejudgment of the motion by indirect
implication.
6. In the draft judgment process the respondents asked for the following change:
“Paras to note suggested amendments:
2. (viii) the words indication to restrain the demolition... should be replaced by the words
an order for interim measures to be made ...etc..”
7. I think this is just a semantic point but for the avoidance of doubt, a rule 39 indication is not
an “order” in the sense familiar in domestic law. However hopefully the rewording above will meet
the concerns of the respondents, if I have understood them correctly.
8. As regards para. 3, the respondents commented as follows in the draft judgment process:
“In response to your email of 26th April attaching the Draft Judgment of the Court, we are
instructed to state as follows:= [sic]
Whilst it is noted that the email states :-
‘the draft judgment will include a clause that nothing in the judgment will preclude any relief
under the motion that the Court would otherwise be minded to grant. It will not be necessary
or appropriate for the respondents to object to any and every part of the judgment with
which they disagree at their position overall will be acknowledged in line with the order’
The draft judgment itself in extract states:-
Para 3.
The purpose of the present Judgment is to outline for the record the background to the order
-ultimately made regarding contempt in relation to the respondents’ failure to comply with
their undertaking regarding contempt in relation to the respondents’ failure to comply with
their undertakings in relation to the unauthorised structure. It outlines the position as it
appeared to the court based on the material submitted up to the 23rd March 2026, and,
without predetermining the respondents’ motion seeking to vacate and revisit prior orders
and decisions to be heard in due course.....
Everything in this judgment needs to be read in that sense - i.e. , it is essentially a statement
for the record of how matters appeared to me as of relevant dates, but without prejudicing
the specific caveat (the no doubt extensive) matters in this judgment that they disagree
with - the foregoing general caveat will apply to everything to the extent that if they succeed
in their motion, anything to the contrary in this judgment will not preclude any order that
would otherwise follow.
With the utmost respect to the Court, and in full appreciation of the acknowledgments that
have by caveat, been made. The respondents are obliged for the record, to make certain
observations and express some concerns before dealing with the proposed factual
corrections and clarifications in the paragraphs as numbered which are suggested to the
Court in its draft judgment.
This response is neither exclusionary nor exhaustive but is prepared with limited time to
deal with the matters which arise in the draft judgment. Insofar as there is omission or
failure to comment on any particular issue, such is not tantamount to an admission or
concession in relation thereto. The respondents are at all times conscious and respectful of
the Courts inherent jurisdiction generally and specifically in relation to contempt proceedings
to determine its own procedures.”
9. It is not totally clear whether the foregoing is suggestive of a change to the draft judgment,
but if it is to be construed as suggesting any ambiguity in the draft, the statement in the covering
letter and the statement in the judgment are not meant to be contradictory. Attempting to
paraphrase that point in a third way might only create further confusion so it is best to leave it at
that.
10. Insofar as the foregoing is a statement that the respondents want additional more specific
caveats, notwithstanding that I don’t think that is necessary, I am happy to record their caveats
albeit that these are repetitive of the general saver for their motion.
Steps in the procedure for coercive civil contempt
11. The sequence of steps required in relation to coercive civil contempt can be broadly
summarised as follows:
(i) The court makes an order, or receives an undertaking, that is either prohibitory or
mandatory, which may be made against persons unknown.
(ii) The order is served on the persons concerned, although service of an order does not
appear to be necessary in the case of an undertaking to the court made personally
by the alleged contemnor. Such service, where required, should be personal, subject
to the possibility of an order for substituted service or an order deeming service
good in the event that personal service is not possible or is being evaded. Such an
order should be marked with the penal endorsement. It should, ideally, be served
as so endorsed prior to the expiry of the time-limit for any mandatory steps,
although this is not an absolute rule.
(iii) In the event of non-compliance, the moving party either seeks leave ex parte to
issue a motion for attachment, and if permission is granted, issues the motion (which
would be appropriate at least in highly case-managed litigation as in the Planning &
Environment Court), or simply issues a motion for attachment if procedures in the
relevant List so allow – apparently there is a diversity of approaches on this in
practice.
(iv) On the return date, subject to the court being satisfied as to the contempt following
any submissions or evidence from the parties, the court can order the attachment
of the contemnor, if not present, or can order the committal of the contemnor, if
present. The court can also make a declaration of contempt as well as or instead of
attachment, or can impose financial penalties such as a fine or sequestration if
appropriate.
(v) In the case of attachment, the moving party then obtains an order for attachment
from the Central Office on foot of the order of the court, which is in the nature of a
warrant addressed to the Garda Commissioner and members. Normally this is
issued from the Central Office by way of execution of the court’s order but in principle
it may be issued directly by the court if for example the Central Office is closed. The
moving party then serves the order of attachment on the Gardaí for enforcement.
(vi) The order is executed by the Gardaí, the contemnor is arrested and brought before
the court.
(vii) The court will again satisfy itself as to whether contempt has been committed. If so
satisfied, the court has enforcement options having considered what is appropriate
in the circumstances.
(viii) Enforcement option 1 is to receive all appropriate undertakings, information and/or
cooperation from the contemnor, and if satisfied, the court can release the
contemnor either absolutely or on conditions.
(ix) Enforcement option 2 is that if the court is not satisfied with the
undertakings/information/co-operation, the contemnor can be committed to prison
until the contempt is purged.
(x) In the event of committal, an order of the court will be perfected in the ordinary
way.
(xi) Subject to the Central Office being open, the moving party will then obtain an order
of committal from that office by way of execution of the order of the court. Otherwise
the order of the court will suffice.
(xii) This order is then transmitted by the moving party to the Gardaí.
(xiii) The Gardaí then execute the order of committal by lodging the contemnor in prison.
(xiv) The court, in making the order of committal, will fix a date to review the detention.
(xv) If the contemnor wishes to purge his or her contempt prior to the review date this
should be facilitated where practicable.
(xvi) If the contempt is not purged, a new review date should be fixed and so on.
12. It will assist in understanding the background to this matter if we follow the foregoing steps
insofar as they played out in this case.
Step 1 – the undertakings
13. The applicants were refused permission for a dwelling at the site almost 20 years ago on 29
June 2006. They then proceeded, without permission, to construct an unauthorised structure about
twice the size of the one refused. As put by Allen J. at 154 in Murray v. Meath County Council [2025]
IECA 164 (Unreported, Court of Appeal, 5 August 2025):
“In 2006 the Murrays built a 6,220 ft2 house at Faughan Hill, Kells, County Meath. They did
so without planning permission. They well knew that they needed planning permission but
hoped that they would get away with it. It was an aggravating factor that the Murrays had
very shortly previously been refused permission for a much smaller house.”
14. These proceedings were instituted on 25 June 2007.
15. On 29 June 2010, Edwards J. granted the s. 160 injunction with a stay of two years.
16. For some reason not altogether clear this was not perfected until 3 March 2011. The notice
of appeal is dated 24 March 2011. For reasons also not totally clear from the papers it then took a
further six years for the matter to proceed through the appellate process. The council commented
as follows in response to the foregoing in the draft judgment:
“Meath County Council has no comments to make as regards the Judgement save to highlight
that the six years that it took for the matter to proceed through the Appeals process, that
this occurred at a time before the establishment of the Court of Appeal when there were
very significant backlog of cases before the Supreme Court and despite numerous requests
by Meath County Council to the Supreme Court to list the matter for hearing.”
17. On 17 October 2016, the Supreme Court heard the appeal.
18. On 19 May 2017, the appeal to the Supreme Court was dismissed by McKechnie J. (Denham
C.J., O’Donnell, Laffoy and Dunne JJ. concurring) with a one year stay. The order is dated 25 May
2017, perfected 30 May 2017.
19. One year on, 25 May 2018, was the date for compliance. But instead of compliance there
was simple defiance of the order.
20. On 4 March 2019, the council issued a first motion for attachment and committal due to
non-compliance.
21. On 24 September 2020, Meenan J. received an undertaking from Mr and Ms Murray “to
vacate the property on or before the 24th September 2022 and to facilitate the demolition of the
premises by the County Council or its agents” and on that basis made an order granting Meath
County Council possession of the unauthorised structure for the purpose of carrying out demolition
works and extended the stay granted by Edwards J. in 2010 for a further two years (i.e. from 24
September 2020). The order provided that “in the event of the undertakings provided by the
Respondents not being complied with, such Order to take effect on the 25th September 2022 and
such demolition works to be completed as expeditiously as the circumstances allow”.
22. He also made an order for Meath County Council’s costs with a permanent stay on that order
in the event of the undertakings by the Murrays being complied with.
23. The order was not perfected until 3 December 2020.
24. Three days before the expiry of the period of the undertaking and the stay granted by
Meenan J., the respondents issued the 2022 proceedings 2022 4576 P (later struck out as frivolous
and vexatious and an abuse of process).
25. On Friday 23 September 2022, the respondents applied for and obtained ex parte in the
2022 proceedings an order from Heslin J. that “that the Defendant the County Council of the County
of Meath be restrained until the 7th Day of November 2022 from taking any further action in the
proceedings entitled the County Council of the County of Meath and Michael Murray and Rose Murray
2007/MCA 76 and Appeal 127/2011”. On its face this purports to prevent the council from taking
steps not just in High Court proceedings but in a Supreme Court appeal, albeit one that had
ostensibly concluded in 2017.
26. The deadline of 24 September 2022 came and went without compliance. The respondents
have been in breach of their undertaking since then – about three and a half years. They state that
the order of Heslin J. (given ex parte for a two-week period) had the effect of supplanting their
undertakings to the court (given on oath in an inter partes contempt application). For the purposes
of the orders discussed in this judgment I did not see any basis at the time to conclude that such an
argument prevented a finding of contempt, but I appreciate that the respondents propose to argue
this matter further in the proposed notice of motion.
27. The respondents commented as follows on the draft judgment:
“Parsa [sic] 18 19, the submission that the respondents following the Order of Heslin J. have
been in breach of their undertaking since then - three and a half years. This is a matter to
be determined by the 23rd March motion pending and yet to be heard.”
28. I don’t think this point amounts to a disagreement. The proper legal effect of the order of
Heslin J. is an issue the respondents want to agitate on their motion and that can be addressed in
due course. All I am saying here is that at the relevant time I did not see the order of Heslin J. as
affecting anything I was dealing with. That is a historical statement. The general saver for the
respondents’ motion applies.
29. On 20 November 2024, Dignam J. dismissed the 2022 proceedings.
30. The respondents appealed to the Court of Appeal.
31. On 14 February 2025, Costello P. declined to allow an amendment, a stay, or the addition
of the Attorney General. The Supreme Court declined to grant leave to appeal as noted above.
32. On 5 August 2025, Allen J. dismissed the appeal from Dignam J. Costs were proposed to
follow the event.
33. On 10 November 2025, the Supreme Court refused leave to appeal therefrom.
Step 2 – service
34. As we are dealing with undertakings given personally by the respondents on oath rather
than imposed by order, I did not consider that service of the order recording the undertakings was
in fact required. But if I was wrong about that I did in any event satisfy myself as to service.
35. The second named respondent was served with copies of the orders made in the within
proceedings, with the penal endorsement attached thereon, on 22 November 2012 and 9 June 2025
respectively (see affidavits of Martin Barrins, sworn on 27 November 2012, affidavit of David
McGlynn sworn on 27 June 2017 and affidavit of Patrick Tully sworn on 4 September 2025 and
supplemental affidavit of Patrick Tully sworn on 5 February 2026).
36. The applicant was unable to achieve personal service on the first named respondent of any
of the orders made in the within proceedings (see affidavits of Mr Barrins, Mr McGlynn and the
affidavits of Patrick Tully sworn on 4 September 2025 and sworn on 5 February 2026).
37. This necessitated an application for substituted service.
38. The council’s ex parte docket dated 9 February 2026 sought the following relief:
“1. An Order pursuant to Order 10 Rule 1 of the Superior Court Rules, as amended
(RSC) and/or Order 103 Rule 18 of the RSC for an Order of substituted service, granting
the Applicant liberty to serve the first named Respondent, Michael Murray (otherwise known
as Christopher /Chris Murray ), with the Orders made in the within proceedings, namely the
Order made by Mr Justice Edwards on the 27th July, 2010, the Order made by Mr Justice
McKechnie 25th May 2017 and the Order made by Mr Justice Meenan Order dated 24th
September, 2020 respectively (‘the Orders’), with the penal endorsement attached thereon,
by the following means, namely;
i) The affixing of the Orders, with the penal endorsement attached thereon, to the
entrance gates of lands, situate at Faughan Hill, Bohermeen, Navan, County Meath, being
part of the lands previously comprised in Folio No 14049 of the register of Freeholders for
the County of Meath and which lands are now registered in Folio 59360F of the Register of
Freeholders, County Meath and which lands relate to the Orders made in the within
proceedings (‘the lands’).
ii) Service of the Orders, on the first named Respondent, by means of ordinary pre-
paid post addressed to him at Faughan Hill, Bohermeen, Navan, County Meath.
iii) The service of the Orders on the Respondents solicitors, Messrs McNelis & Company
Solicitors, The Square, Milltown Malbay County Clare, A95 K259, Email: … by email and
ordinary pre-paid post
2. An Order permitting service of any further applications brought by the Applicants
against both Respondents in the within proceedings, seeking enforcement of any or all of
the Orders made herein in the manner provided for at paragraphs 1(i), 1(ii) and 1(iii)
herein
3. Such further or other Orders as to this Honourable Court seem meet and just.
4. Order for costs.”
39. On 13 February 2026, the matter was first mentioned in the Planning & Environment Court.
I admitted the case to the list and granted an ex parte application for substituted service on the first
named respondent.
40. The affidavit of John Sweeney of 2 March 2026 sets out the service effected on foot of the
order:
“11. I say that in accordance with the Substituted service Order, this your deponent
attended the premises on the 19th February, 2026, at approximately 10.15am. On that
occasion, I confirmed that the unauthorised residential dwelling remained on the premises
and the entrance gates were closed and secured by a chain. On that date, I fixed the
following ‘Court Orders’ to the gate, namely:
(a) Order of Mr. Justice Edwards dated 27th July 2010 with penal endorsement thereon.,
(b) Order of Supreme Court, dated 25th of May 2017 with penal endorsement thereon,
(c) Order of Mr. Justice Meenan dated 24th of September 2020 with penal endorsement
thereon.
I also confirm that I served a copy of the Substituted consent order, dated 13th February
2026, by affixing same on the closed entrance gates situate on the lands.
In that regard I beg to refer to copies of the aforementioned ‘Court Orders’, with the penal
endorsement thereon and ‘Substituted consent Order’ that I served by affixing on the
entrance gates to the premises on the 19th February, 2026 which appear at TAB 8 in the
booklet of exhibits herein. I also beg to refer to photographs taken by this your deponent
on the 19th February, 2026 of the ‘Court Orders’ and ‘Substituted consent Order’ affixed to
the entrance gates of the premises which appear at TAB 9 in the booklet of exhibits herein.
As can be seen from the penal endorsement attached to the ‘Court Orders’, the penal
endorsement thereon stated as follows-
‘If you the within named Michael (otherwise Christopher) Murray and Rose Murray neglect
to obey this Judgment or Order by the time therein limited, you will be liable to process of
execution including imprisonment for the purpose of complying you to obey the same
judgment or Order’
I say there was a typographical error in that the word ‘complying’ should have read
‘compelling’, for which I apologise.
12. I say that while at the entrance gates to the premises on the 19th February, 2026,
I also Pressed the intercom at the entrance and identified myself as being from Meath County
Council and advised that I was there to request vacant possession of the premises. I did
not receive a response from the intercom. I then proceeded to post a letter, dated 19th
February, 2026 addressed to Rose Murray and Chris Murray with a copy of the Court Orders
and a copy of the Substituted service Order into the letter box attached to the wing walls of
the entrance gate. I beg to refer to a copy of this letter and a photograph of this your
deponent inserting it into the letterbox which appears at TAB10 in the booklet of exhibits
herein.
13. I say and I am advised that the Council’s solicitors, Messrs Regan McEntee & Partners
Solicitors, High Street, Trim, County Meath, had previously posted to the First named
Respondent by ordinary pre-paid post a letter dated 18th February, 2026 with copies of the
Court Orders, with the penal endorsement thereon and Substituted service order and I beg
to refer to the affidavit of David McEntee Solicitor, sworn on the 2nd day of March 2026 in
that regard when produced.
14. I say that this was the third time this your deponent had attended at the premises
in recent years to seek possession of the premises to facilitate [its] demolition, the two prior
occasions to my attendance on the 19th February 2026 being as follows, namely-
i) On the 4/4/2025 at 10.40am I attended the premises.
On arrival I approached the gated entrance and identified two intercoms on the gate pier
and a letter box on the entrance wing wall. I pressed both intercom buttons and identified
myself as John Sweeney from Meath County Council planning enforcement section and
stated I was there requesting possession of the property, asked for a response. After a few
minutes, again I pressed the intercoms, repeated who I was, again received no response.
While waiting at the gates for a response I observed that the gates had a motorised opening
mechanism, but this had been disconnected and that there was a metal chain securing the
gate closed. On closer inspection I noted that the chain was looped around the gates on the
inside and there was a pad lock placed on the kerb to the driveway on the inside of the
gates.
I pressed intercom one more time when there was no response I then placed a letter into
the letter box and left the premises.
ii) On the 5/9/2025 at 9.45 am I attended the premises.
I approached the two intercoms on the gate pier which are positioned below a security
camera and pressed both buttons identified myself as John Sweeney from Meath County
Council. After a few minutes again I pressed the intercoms, repeated who I was, again
received no response.
I did observe that there was a robot lawn mower cutting the grass and that there were two
padlocks [one] with key still inserted on top of the gate pier. I took photos and left the
premises.
15. I further say and I am advised that the Council and the Council’s solicitors also made
numerous written requests to the Respondents and to the Respondent’s Solicitor, Messrs
McNelis & Company Solicitors, The Square, Milltown Malbay, County Clare A95K259 to
furnish possession of the premises to the Council in compliance with the undertaking given
to the Court by the Respondents on 24th September 2020 and to enable the Council to take
possession of the premises to carry out demolition works in accordance with the Order of Mr
Justice Meenan dated 24th September 2020, such requests have not been acceded to. To
date the Respondents, in breach of their undertaking given to the Court on the 24th
September, 2020, remain in possession of the said premises and have not vacated the
premises and have not facilitated the demolition of the premises by the Council or its agents.
In that regard I beg to refer to correspondence which has ... been issued by the Council
requesting that the Respondents furnish vacant possession of the property which appears at
TAB11 in the Booklet of exhibits herein and to the affidavit of David McEntee, Solicitor sworn
on the 2nd of March 2026 when produced which details and exhibits further correspondence
which was sent to the Respondents by the Council’s solicitors requesting the Respondents
to offer vacant possession of the premises to the Council of which there has been no reply,
save for without prejudice correspondence received from the Respondents solicitors.
16. I say that despite the Respondents undertaking, given by both the First and Second
named Respondents individually under oath to Mr Justice Meenan on the 24th September,
2020, on their own behalf and on behalf of any persons occupying the premises with their
permission, to vacate the premises on or before the 24th September 2022 and to facilitate
the demolition of the premises by the Council or its agents, the Respondents have failed and
or refused to vacate the premises and have failed and/or refused to facilitate the demolition
of the premises by the Council, thereby preventing the Council from obtaining vacant
possession of the premises for the purpose of carrying out demolition works at the premises,
as ordered by Mr Justice Meenen by Order dated 24th September 2020 and despite further
service of the Order of Mr Justice Meenan, with the penal endorsement thereon on the
Respondents, which recited the Respondents sworn undertaking given to the Court on the
24th September, 2020.
17. I further say that despite the Order of Mr Justice Edwards requiring the Respondents
to remove the unauthorised residential dwelling from the premises and to restore the
premises to a condition suitable for agricultural use, and the expiry of the stay placed by Mr
Justice Edwards on his Order of two years, which order was affirmed and the stay extended
for a further year by Order of the Supreme Court dated 25th May 2017 and a further
extension of the stay of the Order of Mr Justice Edwards by the Order of Mr Justice Meenan
to the 24th September 2022 the Respondents have failed and/or refused to remove the
unauthorised residential dwelling from the premises and restore the premises to a condition
suitable for agricultural use and as of the date of my attendance at the premises on the 19th
February, 2026, the unauthorised residential dwelling remains at the premises, in breach of
the Court Orders made and duly served on the Respondents.”
41. The affidavit of David McEntee of 2 March 2026 avers:
“3. I beg to refer to the Order of Mr. Justice Humphreys on the 13th of February 2026,
when produced (‘Substituted Service Order’), providing for [Substituted] service of
documents on the First Named Respondent and in particular to paragraph 1(ii) thereof which
provided for service by ordinary prepaid post addressed to the first named Respondent at
Faughan Hill, Bohermeen, Navan, Co. Meath (‘the lands’). I say and I believe that
consequent upon the Substituted Service Order, on the 18th day of February 2026 Regan
McEntee & Partners Solicitors for the Applicants herein served the First named Respondent
by prepaid ordinary post a letter enclosing copies of the following Orders made in these
Proceedings, with the penal endorsement attached thereon (‘ the Orders’ ), namely:-
1. High Court Order of Mr. Justice Richard Humphreys dated the 13th of February 2026.
(‘Substituted Service Order’)
2. Order of Mr. Justice Edwards dated 27th of July 2010, with penal endorsement
thereon. (‘Order of Mr Justice Edwards’)
3. Order of Mr. Justice McKechnie of the 25th of May 2017 with penal endorsement
thereon.
4. Order of Mr. Justice Meenan dated the 24th of September 2020 with penal
endorsement thereon. (‘Order of Mr. Justice Meenan’)
And I beg to refer to a copy of the letter dated 18th February, 2026 with the Orders enclosed
which appear at Tab 1 in the Book of Exhibits.
4. I say that the said Substituted Service Order also authorised service on the first
name Respondent by service on the first named Respondent’s Solicitors namely Messrs.
McNelis & Co., Solicitors of The Square, Miltown Malbay, Co. Clare A95K259 by email to …
and by ordinary pre-paid post. I say that Regan McEntee & Partners as Solicitors for the
Applicant wrote to the Respondents Solicitors McNelis & Co., on the 17th of February 2026
enclosing the Orders. I say that the said letter was sent by email and ordinary pre-paid post
to the said Solicitors and was followed by an email of the 18th of February 2026 furnishing
a copy of the attested Substituted Service Order and a copy of Regan McEntee’s letter to the
first named Respondent dated the 18th of February 2026. I beg to refer to copies of the
letter of the 17th of February 2026, with the Orders enclosed and the email of the 18th of
February 2026, with a copy of the Substituted service Order, appearing at TAB 2 in the Book
of Exhibits.
5 I say that following the Respondents sworn Undertaking of the 24th of September
2020 to this Honorable Court, Regan McEntee & Partners in correspondence dated the 15th
of October 2021 sent a copy of the Order of Mr. Justice Meenan dated 24th September,
2020, with a Penal Endorsement thereon, which duly recited the sworn undertaking given
by the Respondents to the Court, to the Applicant’s Solicitors, Messrs. McNelis & Co and I
beg to refer to a copy of the said letter appearing at TAB 3 in the Book of Exhibits. I further
say that prior to the date for compliance by the Respondents with the said Undertaking,
namely the 24th of September 2022, Regan McEntee & Partners again wrote in
correspondence dated the 28th of February 2022, 12th of May 2022, 13th of July 2022, 25th
of August 2022 and 22nd of September 2022 respectively to the Respondents Solicitors,
Messrs. McNelis & Co, seeking to put in place arrangements for the delivery of possession of
the premises to the Applicant. I beg to refer to copies of the said letters which appear at
TAB 4 in the Book of Exhibits. I confirm that there was no response to the aforementioned
correspondence.
6 I say that on the 14th of February 2025 the Court of Appeal in proceedings entitled’
The High Court, Record No 2022/4876, Between Chris Murray and Rose Murray, Plaintiffs v
Meath County Council, Defendant’ the Court vacated a previous stay on the operation of the
Order of Mr. Justice Dignam on the 12th day of December 2024 and following which Regan
McEntee & Partners as Solicitors for the County Council wrote on the 20th day of February
2025 to the Respondents Solicitors, Messrs. McNelis & Co seeking possession of the property
on foot of the Respondents undertaking to the Court on the 24th of September 2020.
Thereafter, there followed an exchange of correspondence between the respective Solicitors
for the parties wherein the Respondents sought a deferral of any enforcement action on the
part of the Applicants pending, inter alia, the determination of their Appeal and their parallel
Application to the Supreme Court for reinstatement of the Stay on the Order of Mr. Justice
Dignam I beg to refer to copies of the said correspondence appearing at TAB 5 in the Book
of Exhibits.”
Step 3 – liberty to issue motion for attachment and committal
42. On 23 February 2026, I gave liberty to issue a motion for attachment and committal (the
second such motion – the first one having been noted above).
43. The motion was dated 2 March 2026, and seeks the following relief:
“1. A Declaration, that the First and Second named Respondents are in Contempt of
Court, having failed and/or refused to comply with the undertaking given under Oath, to Mr.
Justice Meenan on the 24th September 2020, by the said first and second named
Respondents on their own behalf and on behalf of any persons occupying the premises with
their permission, being the premises situate at Faughan Hill, Bohermeen, Navan, County
Meath, comprised in Folio No.14049 of the Register of Freeholders for the County of Meath
and which lands are now registered in Folio 59360F of the Register of Freeholder, County
Meath (‘the premises’), that the first and second named Respondent vacate the premises on
or before the 24th September 2022 and [facilitate] the demolition of the premises by the
County Council or [its] agents, in circumstances where the first and second named
Respondent have failed and/or refused to vacate the premises and have failed and/or refused
to facilitate the demolition of the premises by the Council, preventing the Council from
obtaining vacant possession of the premises for the purpose of carrying out demolition works
at the premises, as Ordered by Mr Justice Meenan by Order dated 24th September 2020
(‘the Order of Mr. Justice Meenan’) and despite further service of the Order of Mr Justice
Meenan, with the penal endorsement thereon, on the Respondents.
2. An Order pursuant to Order 44, Rule 1, 2 and 3 of the Rules of the Superior Courts
1986, as amended, (‘RSC’) and/or pursuant to the inherent Jurisdiction of this Honourable
Court, giving liberty to the Council to issue an Order for Attachment and/or Committal to
prison of the first and Second named Respondents for failing and/or refusing to comply with
the undertaking given under Oath to this Honourable Court on 24th September, 2020, and
recited in the Order of Mr Justice Meenan therein, whereby the first and second named
Respondent undertook to vacate the premises on or before the 24th September 2022 and
to facilitate the demolition of the premises by the Council, in circumstances where the first
and second named Respondent have failed and/or refused to vacate the premises and have
failed and/or refused to facilitate the demolition of the premises by the Council, in breach of
their undertaking to the Court dated 24th September, 2020 and recited in the Order of Mr
Justice Meenan and despite personal service of the Order of Mr Justice Meenan on the second
named Respondent, with the penal endorsement thereon, on the 9th June, 2025 and service
of the Order of Mr Justice Meenan, with the penal [endorsement] thereon, on the first named
Respondent on the 19th February, 2026, pursuant to the Order of Substituted service made
by Mr Justice Humphrey dated 13th February, 2026 (‘Substituted service Order’), together
with service of the Substituted service Order on the first named Respondent .
3. Further or in the [alternative], a Declaration that the first and second named
Respondents are in Contempt of Court, having failed and/or refused to comply with the Order
of Mr Justice Edwards, made on the 27th July, 2010 (‘Order of Mr Justice Edwards’) by the
time provided by the Order of Mr Justice Edwards, which Order was affirmed and extended
by the Order of the Supreme Court, dated 25th May, 2017 and further extended by the
Order of Mr Justice Meenan dated 24th September, 2020, in that the first and second named
Respondents were Ordered to remove the unauthorised residential building constructed by
the Respondents at the premises and to restore the premises to a condition suitable for
agricultural use, by the 24th September 2022 and in circumstances where that time frame
has now expired and despite [its] expiry, the Respondents have failed and/or refused to
remove the unauthorised residential building constructed at the premises and have failed
and/or refused to restore the premises to a condition suitable for agricultural use, in breach
of the Order of Mr Justice Edwards, as affirmed and extended by Order of the Supreme Court
dated 25th May 2017 and further extended by the Order of Mr Justice Meenan, despite due
service of the Order of Mr Justice Edwards, the Order of the Supreme Court, dated 25th May,
2017 and the Order of Mr Justice Meenan, with the penal endorsements thereon, on the
Respondents.
4. Further or in the [alternative], an Order pursuant to Order 44, Rule, 1, 2 and 3 of
the RSC and/or pursuant to the inherent jurisdiction of this Honourable Court, giving liberty
to the Council to issue an Order for the Attachment and/or the Committal to prison of the
first and second named Respondents for failing and/or refusing to comply with the Order of
Mr Justice Edwards, within the time frame therein provided, the Order of Mr Justice Edwards
being [affirmed] and extended by the Order of the Supreme Court, dated 25th May 2017
and further extended by the Order of Mr Justice Meenan, in that the Respondents were
ordered to remove the unauthorised residential building constructed on the premises and to
restore the premises to a condition suitable for agricultural use on or before 24th September
2022 and the Respondents have failed and/or refused to remove the unauthorised residential
building from the premises and have failed and/or refused to restore the premises to a
condition suitable for agricultural use, in breach of the Order of Mr Justice Edwards, within
the time frame provided, as affirmed and extended by Order of the Supreme Court, dated
25th May, 2017 and further extended by the Order of Mr Justice Meenan, and despite
personal service of the Order of Mr Justice Meenan with the penal [endorsement] thereon,
personal service of the Order of the Supreme Court dated 25th May 2017 with the penal
[endorsement] thereon and personal service of the Order of Mr Justice Edwards, with the
penal endorsement thereon, on the second named Defendant on the 9th June 2025 and
service of the Order of Mr Justice Meenan with the penal [endorsement] thereon, service of
the Order of the Supreme Court dated 25th May, 2017 with the penal [endorsement] thereon
and service of the Order of Mr Justice Edwards, with the penal endorsement thereon, on the
first named Respondent, pursuant to the Substituted service Order, together with service of
the said Substituted service Order on the first named Respondent.
5. If necessary an Order directed to the Commissioner of An Garda Siochana to attach
the first and second named Respondent and to bring the first and second named Respondent
to this Honourable Court on such date as to this Honourable Court appears just.
6. An Order committing the first and second named Respondent to Prison for such
period as to be determined by this Honourable Court for failure to comply with the
undertaking given to this Honourable Court dated 24th September, 2020 under oath by the
Respondents and recited in the Order of Mr Justice Meenan, which said Order was personally
served on the second named Respondent with the penal endorsement thereon on the 9th
June 2025 and which said Order, with the penal [endorsement] thereon was served on the
First named Respondent, in accordance with the Substituted service Order on the 19th
February, 2026, and which undertaking was for the Respondents to vacate the premises on
or before the 24th September 2022 and to [facilitate] the demolition of the premises by the
Council or its agents and which undertaking the Respondents have failed and refused to
comply with in that the Respondents have failed and /or refused to vacate the premises and
have failed and/or refused to [facilitate] the demolition of the premises by the Council or its
agents, in breach of the undertaking given to the Court on the 24th September 2020 and
recited in the Order of Mr Justice Meenan duly served on the Respondents.
7. Further or in the alternative, an Order, pursuant to Order 44 Rule 4 and/or the
inherent jurisdiction of this Honourable Court, directing the first and second named
Respondents to remove their personal belongings from the premises and to provide vacate
possession of the premises to the Council by delivering to the Council’s Solicitors office,
situate at Messrs Regan McEntee & Partners, Solicitors, High Street, Trim, County Meath,
within a period of 48 hours of the Order being served on the [Respondent], all keys to the
premises, to include the entrance gates, so as to enable the Council carry out demolition
works at the premises, in lieu of imprisonment for failure to comply with the Undertaking
given to this Honourable Court dated 24th September, 2020 and/or for failure to comply
with the Order of Mr Justice Edwards, dated 27th July 2010, which order was affirmed and
stayed by Order of the Supreme Court dated 25th May, 2017 and which stay was further
extended by the Order of Mr Justice Meenan, dated 24th September, 2020, to 24th
September 2022.
8. Further or in the alternative, an Order, if necessary, pursuant to Order 42 Rule 24
giving the Council leave to issue the within proceedings seeking an Order for Attachment
and Committal of the first and second named Respondents for failure to comply with the
Order of Mr Justice Edwards dated 27th July, 2010, such Order having been affirmed and a
further stay granted by Order of the Supreme Court dated 25th May, 2017 to 30th May 2018
and thereafter stayed by further Order of Mr Justice Meenan, dated 24th September, 2020,
to the 24th September, 2022, whereby the first and second named Respondents were
ordered to remove the unauthorised residential building constructed on the premises and to
restore the premises to a condition suitable for [agricultural] use, in circumstances where
the first and second named Respondents have failed and /or refused to remove the
unauthorised residential building on the premises and to restore the premises to a condition
suitable for agricultural use in breach of the Order of Mr Justice Edwards, as affirmed by
Supreme Court Order dated 25th May, 2017 and extended by the Order of Mr Justice Meenan
dated 24th September 2020, despite service of the aforementioned Court Orders on the first
and second named Respondent.
9. Further or in the alternative, an Order extending the time for the first and second
named respondents to comply with the undertaking given to the Court on the 24th
September 2020 by the first and second named Respondent, to vacate the premises, so as
to enable the Respondents to vacate the premises on or before the 16th March, 2026 and
to [facilitate] the demolition of the premises by the Council or its agents.
10. Further or in the alternative, an Order that the stay on the Order of Mr Justice
Edwards made on the 27th July 2010 be extended until the 16th May, 2026 and that service
of any Order so extending the stay, together with service of the Order of Mr Justice Edwards
and the Supreme Court Order, dated 25th May, 2017, is permitted by means of the said
orders being affixed to the gates of the premises.
11. Further or in the alternative, an Order that the Respondents deliver up possession
of the Premises within 48 hours of the service of such an Order on the Respondents and with
service of said Order to be effected by means of affixing a copy of said Order to the entrance
gates of the premises.
12. An Order declaring service of the within application/proceedings on the first and/or
second named Respondent good and sufficient, having regard to the evidence of attempted
personal service of the within [proceedings] on the Respondents and the evidence of
alternative methods of service effected by the Council, its servants or agents, on the
Respondents.
13. Such further or other Orders as to this Honourable Court seem just and meet.
14. Costs.”
44. On 7 March 2026, the respondents’ solicitor stated that applications had been lodged with
the ECtHR, described inaccurately as appeals (emphasis added):
“We are instructed to advise that Chris Murray and Rose Murray have lodged their Appeals
in time, to the European Court of Human Rights, in Strasbourg, in respect of, breaches of
their rights under Articles of the convention. The Council is therefore requested to adhere
to due process and to respect the fact that, there are now two live Appeals lawfully filed and
pending before that Court. The response from the European Court of Human Rights is
awaited.
The Murray’s have been forced to Appeal to the European Court of Human Rights where, the
Council opposed their appeals in relation to violations of articles of the convention, being
admitted by leave to appeal, to the Supreme Court, and to the denial by determinations of
that Court to their efforts at domestic level, to have their complaints of breaches of their
fundamental rights under the Convention assessed and heard.
The Murray’s are exercising, in the only way they can, their rights to seek redress for
several violations of the said fundamental rights under several Articles of the convention and
are doing so in the only way which is left open to them, to seek redress, having
exhausted all domestic legal remedies, to which they have been denied.
The Murrays reserve their rights to be allowed pursue their Appeals without in the interim
being prevented from doing so, or enduring harm, loss or irreparable damages pending the
determination of the said Appeals process.”
45. My view of this letter at the time was that the most immediately striking thing about it was
the implicit acceptance (presumably in the light of the 2022 proceedings having been dismissed as
an abuse of process) that the “only way” the applicants could seek to vindicate their rights was in
Strasbourg. That noted, there appeared to me to have been a number of immediate problems with
the ECHR-based submission. Section I (arts. 1 to 18) of the ECHR is headed “Rights and Freedoms”
and sets out the most well-known rights in that instrument. Section II (arts. 19 to 51) is headed
“European Court of Human Rights” and sets out institutional and procedural provisions, one of which
is Article 34 which allows “individual applications”. Section III (arts. 52 to 59) relates to
“Miscellaneous Provisions”. The European Convention on Human Rights Act 2003 in s. 1(1) defines
“Convention provisions” as only referring to “Articles 2 to 14 of the Convention” and certain
protocols, all subject to reservations. The Act does not give effect to the ECHR as a whole, only to
the “Convention provision” as so defined. Thus the fact that someone has availed of art. 34 to make
an application (not an appeal as phrased by the respondents) does not in itself create domestic legal
effects. Even if it did, they would not be such as to constitute a stay on an order. Notwithstanding
the foregoing, if the ECtHR did in a given case issue an interim measure under rule 39 of the Rules
of Court, a domestic court should sit up and take notice of that as a relevant factual development
within the scope of such discretion as it might have under domestic law to hold fire on a given
matter. Discretion should ideally not be exercised in a way that puts the State in breach of
international law, even if that law is not directly enforceable. Should that happen in relation to the
respondents’ application to Strasbourg, I would of course give it immediate and serious
consideration. But no such interim measure was brought to my attention here. In any event should
the respondents win their application in Strasbourg, their losses are not wholly “irreparable” as
alleged because the ECtHR has jurisdiction to grant just satisfaction. Finally, the overall problem is
that since the 2022 proceedings were an abuse of process and thus not a legal basis to revisit the
s. 160 order, the correct time to apply to Strasbourg would appear to have been six months from
the Supreme Court decision in 2017, not in 2026 after the respondents incorrectly sought to
reagitate matters. My view at the time of having my attention drawn to this letter was that an
application to Strasbourg from a final order in the 2022 proceedings doesn’t restart the clock to
challenge a final order made at an earlier date. So my view was that the ECHR application was not
a reason to hold fire on enforcement of the orders and undertakings.
46. On the issue of nomenclature, the respondents commented as follows in the draft judgment
process:
“The following clarifications and suggested corrections are made.
Generally, the Applicants, Meath County Council, were referred to as ‘the Applicants’ as they
appear as such parties in the 2007 MCE 76 proceedings. The respondents Chris and Rose
Murray are referred to as such in those proceedings. Because the reference to Applicants in
different contexts could arise, in drafting the email of the 7th March 2026, to avoid confusion
by reference to ‘the Applicants’ who are Meath County Council, and where they are also
‘Applicants’ in the Contempt proceedings, and where the Murrays (were referred to as ‘the
Applicants’ in respect of the ECHR application. As stated to avoid confusion, the Murrays as
the Applicants to ECHR were referred to as the Appellants in respect of their Appeals (such
were referred to by not using the word ‘applications’ so as not to confuse) and so as to
distinguish them from references to the Council otherwise as ‘the Applicants’. For that
reason in the email of the 7th March, the words Applicants was replaced by the word
‘Appellants’ and the word Application(s) was replaced by the word Appeals.
This is the explanation for the wording in the email of the 7th March.”
47. I don’t mean to unduly parse the respondents’ correspondence and I appreciate the potential
confusion that can arise with overlapping terminologies and capacities as pointed out by them. I
am simply pointing out that an application to Strasbourg is not in fact an appeal from the domestic
courts, albeit that it is frequently referred to as such, including by lawyers speaking informally.
48. On the issue of substance the respondents comment as follows:
“Para 36 ....Thus the fact that someone has availed of art 34 does not in itself create
domestic effects. It is submitted that this is matter to be determined on the 23rd March
motion in terms of the effect of an action taken in violation of Art 34 arising.
The correct time to apply to Strasbourg would appear to have been six months from the
Supreme Court decision in 2017. This is a matter to be determined by legal submissions on
the 23rd March motion pending.”
49. Again the general saver applies above – nothing in the judgment should preclude any relief
the court would otherwise be minded to grant on the motion. As I say above, the foregoing was
just how the respondents’ position appeared to me “at the time”.
Step 4 – order of the court for attachment
50. On 9 March 2026, the council’s second motion for attachment and committal came before
the court. It would appear that one or both of the respondents and their solicitor on record were
listening in online but did not make themselves known to the court. I don’t need to get into the
rights and wrongs of that for present purposes but all that needs to be said is that if an on-notice
application is made without the thus-notified parties choosing to attend and to make themselves
known to the court, such a situation has a significant effect on the approach of the court towards
the application because the court can take it that it is unopposed. That situation applies here up to
the point when the respondents did appear. Had they wanted their views taken account of earlier
that would have been no problem but it would have required the minimal step of making their online
or counterfactual physical presence known to the court.
51. I deemed the application duly served and there was no appearance from the respondents.
I made a declaration as to contempt and ordered the attachment of the respondents, the matter
being returnable to 16 March 2026.
Step 5 – order of attachment from Central Office
52. The formal order of attachment was issued out of the Central Office on 11 March 2026. The
applicant then served this on the Gardaí for enforcement.
53. On 16 March 2026, the council appeared on the return date. The registrar then asked
whether there was an attendance from Michael Murray or Rose Murray. There was no such
attendance.
54. Again, a general point needs to be made about all that follows from that. The respondents
knew about the hearing of 16 March 2026 but chose not to attend – one or both of them and their
solicitor on record tried to log into the muted non-participating observation channel, but for some
technical reason that did not work. Had there been any attendance in court, matters would have
proceeded in a completely different manner. But in the absence of any objection I had to engage
with the council on the basis that no counter-arguments were being put up against immediate
enforcement. Had the respondents attended and made such arguments, they would have been
given attention – not having done so meant that I had to simply get on with enforcing the Supreme
Court order and consequent undertakings as rapidly as possible. I did of course remain conscious
of the respondents’ rights, for example by not ordering any costs against them in their absence, but
such rights do not include a right not to have an unauthorised structure demolished as soon as
possible, doubly so if they don’t show up to make any arguments. What followed needs to be seen
as having been entirely conditioned by that context.
55. Even apart from the imperative for a trial court to enforce orders of the Supreme Court, the
foregoing was also influenced in my mind by the correspondence from the respondents’ solicitor that
the “only” lawful avenue open to them was Strasbourg. That restrained position was to be
abandoned at a later stage when the motion was issued without leave, but at the time (i.e., on 16
and 18 March 2026 in particular) the articulated stance of the respondents that there was no
domestic legal answer to the council’s position. As I read it at the time, that logically implied that if
there was any resistance to the council from that point onwards, it would not have a domestically
lawful basis, which strongly reinforced the imperative, as I saw matters, to render the unauthorised
structure uninhabitable immediately, such as by knocking its roof, and to complete the demolition
as soon as possible.
56. Any concerns I had in that regard about the extra-legal obstructions that would be
incentivised by delay were massively amplified by the evidence of serious criminality that was to
emerge.
57. Thus, to anticipate somewhat the subsequent listings, and as I indicated to the respondents
when they did eventually appear at a later stage, I was of the view that the quicker the council
implemented the orders and undertakings the better. My encouragement to do so immediately and
decisively even if things had to be tidied up later was based on a number of factors, of which the
following would be the main points:
(i) As the remediation had been upheld by the Supreme Court it was the role of a trial
court to implement that without delay.
(ii) The initial correspondence from the respondents seemed to acknowledge that they
had no remaining domestic legal answer to the council.
(iii) The respondents’ failure to appear also meant that there was no contrary argument
to be considered against immediate demolition.
(iv) In the light of previous obstruction (claims of being in London that were contradicted
by the evidence, letters being implausibly sent back, trucks being parked, dogs being
unleashed outside the unauthorised structure), failure to immediately demolish the
unauthorised structure or at least render it uninhabitable say by removing the roof
in whole or in part would only act as an incitement and provocation for further
obstruction, or to put it another way, leaving the unauthorised structure intact while
heart was being given to criminal actions by its continued existence would be a form
of fiddling while Rome burned.
(v) There would also be the risk of re-occupation if the unauthorised structure was not
rendered uninhabitable as has happened in many repossession cases.
(vi) This could also lead to escalation of the obstruction – which it did in terms of criminal
behaviour although I am not attributing responsibility for that. Ultimately I was
concerned that having heard evidence of a van being burned out, a contractor’s
home being visited threateningly, and other threats being made by phone, the next
step one could anticipate was somebody being injured, so urgent action to demolish
the unauthorised structure was preferable to taking any risk of letting that happen.
Again I am not finding that the respondents are answerable for the process of
escalation.
(vii) From an efficiency point of view, leaving the unauthorised structure in place for any
period could lead to a proliferation of further unnecessary and potentially pointless
applications to the court.
58. With that context firmly in mind we can turn to the events following the order of attachment.
59. In relation to the above, the respondents commented on the draft judgment:
“Para 44. ‘...claims of being in London that were contradicted by the evidence ...’ such
contradictions in the evidence are and were the subject of the 23rd March motion and as
such a matter for evidence and legal submissions.”
60. Again the general saver applies. This is a historical statement of how I viewed the matter
at the time. Nothing in this judgment should stand in the way of relief if the court on hearing the
motion would be minded to grant such relief, but for the judgment.
61. Counsel for the applicant said that Sergeant Bowens from Kells Garda Station was present
and she proposed to call him so that he could update the court on the situation.
62. Counsel for the applicant said that the court would see that there were two affidavits
uploaded on ShareFile on Friday, one from John Sweeney on behalf of the council as regards service,
and one from David McEntee for the applicant, both relating to the service of the orders of this court
by affixing and by various other means of service.
63. Counsel for the applicant said that, notably, when Mr Sweeney attended the unauthorised
structure on Friday he found that three articulated trucks had been placed at the entrance to the
unauthorised structure together with an additional steel lock placed on the front gate. She said that
the Sergeant would update the court on what was found that morning in relation to the matter,
namely that the lock and the three articulated vehicles were still blocking the entrance to the
unauthorised structure.
64. She said that the court would also note from David McEntee’s affidavit that there had been
a further return of documentation, namely the notice of motion and grounding affidavit in respect of
the attachment proceedings, which had again been returned with a note on the envelope stating
“not at this address”, and that there appeared to be a repeat performance, as the court may have
seen previously, of the returning of documentation.
65. Counsel for the applicant said that she could inform the court that the council had engaged
the services of agents who were in position that morning to remove the three articulated trucks at
the unauthorised structure.
66. Counsel for the applicant said that, together with a locksmith who was in a position to
remove the bolted lock currently on the gate, the council’s agents were also in a position to attend
the front door, having securely managed to get through the entrance gate, and to break the lock on
the front door with a view to changing the lock, entering the unauthorised structure, seeing if the
unauthorised structure could be secured by way of boarding windows and similar measures, and
also to be in a position to identify with the Gardaí whether or not anyone was currently occupying
the unauthorised structure.
67. Counsel for the applicant then called Sergeant Bowens, who was sworn. Counsel for the
applicant asked the Sergeant to confirm whether he was in receipt of an order of attachment from
this court directing that he attend at the premises the subject matter of the order for the purpose
of bringing Rose Murray and Michael Murray before the court that morning.
68. Sergeant Bowens confirmed that that was correct.
69. Counsel for the applicant asked the Sergeant to tell the court what efforts he had made for
the purposes of fulfilling that attachment order.
70. Sergeant Bowens said that the previous morning at 9:30 am he and a colleague, Sergeant
Dennis O’Brien, attended at the Murray premises at Faughan Hill, Bohermeen, and observed that
there were three 40-foot articulated lorry containers outside the main gate, which was secured with
two padlocks. He said that there had been a prior report from another colleague that there were
two Dobermann dogs within the curtilage of the premises, that the premises were very well secured,
and that unless one physically hopped the wall into the garden there was no way of getting access.
71. He said that he rang the intercom system, observed another camera system at the gate,
and that there was no answer whatsoever. He said that at 16:30 the previous afternoon he had
obtained two phone numbers for Michael Murray and Rose Murray and rang both numbers with a
view to speaking to them, but there was no answer and the phones simply rang out. He said that
that morning he and another colleague, Garda David O’Callaghan, attended at the premises again.
I asked him what time that was. Sergeant Bowens said that it was at 07:25 that morning and that
there was no answer whatsoever from the residence, that if anyone was present there was no sign
of life whatsoever, and that they rang the intercom and called out but nobody made themselves
known to them.
72. Counsel for the applicant asked whether, in those circumstances, they were not in a position
to attend at the front door of the property.
73. Sergeant Bowens said that they did not enter the curtilage of the building that morning, nor
on the previous morning.
74. Counsel for the applicant said that the council had engaged a locksmith together with agents
who were in a position to remove the articulated containers blocking the entrance and the padlocks,
and asked whether that would assist the Sergeant’s efforts.
75. Sergeant Bowens said that it would assist in gaining entry and also referred to the mention
of a dog warden.
76. Counsel for the applicant confirmed that a dog warden would be in attendance for the
purposes of the animals currently on the grounds.
77. Sergeant Bowens said that that would assist with their mission.
78. Counsel for the applicant further said that the council would be in a position to remove the
lock at the front door in order to gain entry and asked whether that would assist.
79. Sergeant Bowens confirmed that it would definitely assist.
80. There was then some further discussion during which I said that counsel could take it that I
had no interest in punitive orders.
81. Counsel for the applicant said that that was made very clear and that the council did not
have an interest in punitive orders either, they simply wanted the orders complied with.
82. The order was then along the following lines:
(i) without prejudice to the existing powers of the applicant whether under the orders
of the court or otherwise to authorise the applicant to remove and detain any and
all vehicles, animals and/or movable property at the premises or obstructing access
thereto and retain them pending further orders of the court and authorise the
applicant to change any locks or close or alter any openings;
(ii) requiring the An Garda Síochána to attend with the council at any attendance by the
council at the property, by the council and/or any servants or agents at the property
and prevent the obstruction of the orders of the court and endeavour to execute the
order for attachment and otherwise assist within the scope of their functions;
(iii) permitting the An Garda Síochána to use such reasonable force as they consider
appropriate to comply with the orders of the court and to attach the respondents;
(iv) adjourn the matter to 1300 today or such later time as convenient to the court;
(v) for the avoidance of doubt, the existing order for substituted service will apply to
service of this order; and
(vi) costs reserved.
83. The matter returned before me at 14:00 on the same day.
84. I directed that the respondents be called again. The registrar called Michael Murray and
Rose Murray, and there was no appearance for either respondent.
85. Counsel for the applicant informed the court that the respondents had still not been located
for the purposes of effecting the order for attachment, but the council had secured the property, and
in that regard they had removed the trailers, removed the bolt that was on the gate, replaced the
council’s lock at the front gate, and also changed the lock on the front door and the back door of the
unauthorised structure and gained access to the unauthorised structure. When they were doing
that, Tadgh Murray, the youngest son of the respondents was in the unauthorised structure, and he
has voluntarily left the property, taken the two dogs that were on the property with him, and he was
facilitated by the council and the Gardaí to take some of his personal belongings with him. He had
also advised that his sister, Shauna Murray, was at work and that she would also potentially need
to come back to the property. Shauna Murray then also made contact with the council and was
facilitated to enter the unauthorised structure for the purposes of removing some of her personal
belongings from the unauthorised structure. The council now had security at the front door, back
door and at the gate, and security was there for the purposes of 24 hours/ 7 days a week until the
demolition of the unauthorised structure commenced.
86. Counsel for the applicant then asked that Sergeant Bowens be called again to confirm what
had occurred and said next steps could be discussed after that. Sergeant Bowens returned to the
witness box. Counsel for the applicant asked the Sergeant to outline what he saw when he attended
the property that morning.
87. Sergeant Bowens said that he attended the premises personally at 12:05 pm and spoke to
his colleagues who had gone straight to the premises with Meath County Council employees as soon
as they got the court order. The only occupant of the house when they arrived was the son, Tadhg
Murray, and he voluntarily left the house upon the arrival of the Gardaí. While Sergeant Bowens
was there, Tadhg Murray’s sister arrived and picked him up. The house was fully furnished, the
locks were being changed as he arrived, and the security personnel were on site and the premises
were pretty much secured by Meath County Council and Sergeant Bowens instructed the Gardaí to
stay there until the council were free to leave and hand it over in its entirety to the security team.
88. Sergeant Bowens said that Rose and Christopher, who also goes by the name of Michael
Murray, were not present and he believed from speaking with the council that Rose Murray had been
seen last Thursday. The son had said they were out of the country, but Sergeant Bowens did not
believe that to be the case personally.
89. I said that the Gardaí did not need to be very vigorous regarding enforcement of the
attachment order, but that my inclination would be not to discharge it as that would be premature.
Counsel for the applicant said that it certainly would not be her application to discharge it simpliciter.
90. The order was then along the following lines:
(i) direct An Garda Síochána to furnish the respondents’ phone numbers for the purpose
of notification of orders and applications;
(ii) adjourn generally with liberty to apply with 24 hours’ notice in accordance with the
order for substituted service and via the phone numbers as so furnished or ex parte
in the case of urgency; and
(iii) reserve costs.
91. Counsel for the applicant said that that was it.
92. Matters then moved into a phase of significant criminality, although I need to make clear
that not least because the evidence for this was in an interlocutory context I am not placing personal
responsibility on the respondents.
93. On 18 March 2026, the matter came before the court on an ex parte application by the
applicant.
94. The registrar asked whether there was an appearance for Rose Murray or Michael Murray.
There was none.
95. The respondents’ commented on the draft judgment:
“Para 78 Whilst it was initially claimed that the Respondents and their legal representative
did not appear in Court for the ex parte hearing on the 18th March, they were not notified
of this hearing at all, but only of the order that was made thereafter. This is a matter for
evidence.”
96. I was approaching matters on the basis that this was an ex parte application, but if this is
an issue on the hearing of the respondents’ motion then so be it and the court will presumably deal
with that as it thinks appropriate.
97. Counsel for the applicant said that, firstly, she wished to thank the court for facilitating the
application that day and said that she had been required to make the application ex parte in
circumstances where the council had been advised that there had been further acts of contempt by
the respondents in relation to the court and the council’s enforcement of the orders. She said that
she again had Sergeant Bowens present, but that she wished to outline by way of background what
had occurred since the court made its order on the previous Monday.
98. Counsel for the applicant said that, as she had advised previously, the council had secured
security personnel to attend at the unauthorised structure for the purpose of ensuring the council
retained possession. She said that the locks had been changed and that the security company were
present securing the unauthorised structure so that no one would enter.
99. She said that at 20:40 the previous night, one of the security vehicles had been burned out.
100. She said that thereafter the owner of the security company retained by the council had been
contacted, as she understood it, by Michael Murray asking him to leave the unauthorised structure
and the premises. She said that when that did not occur, the owner was advised that someone else
would be attending, and that the owner of the security company had persons unknown attend at his
home and make threats which he took very seriously.
101. She said that, as of 10:00 that morning, all security staff had left the property and that, as
she understood it, a member of An Garda Síochána was currently present at the site. She said that
she had also been advised that as of that morning there were a number of protesters, approximately
six, who appeared to be neighbours who had attended at the property. She said that, as she
understood from Sergeant Bowens, they were not causing difficulty to Gardaí entering or exiting the
property but that they were present nonetheless. She said that she proposed to call Sergeant
Bowens to formally give evidence as to what was unfolding on the lands and said that she also had
a representative from the council present, who could be called if necessary, acknowledging that
some of the information was hearsay. I said that it was hearsay but that the matter was interlocutory
and that this was not a major problem.
102. Counsel for the applicant then asked Sergeant Bowens to outline his understanding of what
had unfolded on the lands since Monday.
103. Sergeant Bowens said that at approximately 20:40 the previous evening Gardaí in Kells had
received a call about a vehicle on fire outside the house at Faughan Hill, Bohermeen. He said that
from investigations it was determined that the vehicle, a transit van used by security personnel, had
been deliberately set alight, and that examination by a scene of crime investigator indicated that
the fire began in the passenger seat, ruling out a battery fire. He said that the van had broken down
the previous day and could not be moved.
104. He said that local neighbours were protesting in a peaceable manner but that their presence
caused concern for the security personnel, who had contacted Gardaí three times in the previous 24
hours requesting Garda presence when coming and going from the site.
105. He said that the security personnel had since withdrawn following alleged threats received
by the owner of the company. He said that the detective sergeant based in Navan had spoken with
the owner who declined to make a statement or complaint to Gardaí in relation to the threats. He
said that the owner had withdrawn his staff and that two Garda members were currently positioned
outside the premises while awaiting further instructions.
106. Counsel for the applicant said that it would certainly assist the council if the Gardaí were
present while councils’ servants or agents were moving or relocating movable property from the
unauthorised structure, and asked whether the Gardaí would have any difficulty with that.
107. Sergeant Bowens said that this would be a good course of action, noting that the protesters
were amicable toward Gardaí.
108. Counsel for the applicant asked whether the Gardaí would have any difficulty with being
present during the demolition works.
109. Sergeant Bowens asked about the anticipated timeframe.
110. Counsel for the applicant said that initial instructions were that the removal of property
would commence the following day and that demolition was hoped to occur within a number of
weeks, subject to the circumstances and the need to inform contractors of the threats that had
occurred. She said that it was important that Gardaí be present whenever demolition occurred.
111. Sergeant Bowens said that he would be very favourable to that approach but that advance
notice would be required to arrange Garda resources.
112. Counsel for the applicant said that there would be no difficulty with that.
113. Counsel for the applicant then asked whether Sergeant Bowens would see a difficulty if
protesters were directed to remain approximately 500 metres from the property.
114. Sergeant Bowens said that many of the protesters were neighbours living within a few
hundred metres but that a restriction of 500 metres from the entrance would facilitate access by
security or council staff without interference.
115. Counsel for the applicant said that she had no further questions. I asked about the location
of the burned out vehicle. Sergeant Bowens said that it was parked on the public road just outside
the wall of the property, approximately 10 to 20 metres from the house.
116. Counsel for the applicant called Mr Brian Murphy, who was sworn. Counsel for the applicant
asked Mr Murphy to outline his position within the council. Mr Murphy said that he was Senior
Executive Officer in the Planning Department and Acting Director of Services.
117. Counsel for the applicant asked him what contact, if any, he had received in relation to the
property in the previous 24 hours.
118. Mr Murphy said that the owner of the security company had contacted him that morning to
say that he had received a number of threats the previous afternoon and into the evening in relation
to his operations on behalf of the council securing the property. He felt the second threat in particular
was serious enough to effect his livelihood and the future operations of the business that he felt
necessity to pull his services out. He had negotiated until 10:00 that morning to remain in situ until
he had made relevant contact with Mr Murphy and other officials in the council so Mr Murphy had
spoken to the owner twice that morning between 08:00 and 09:00.
119. Counsel for the applicant asked Mr Murphy if he was aware whether the owner had made a
complaint to the Gardaí at that stage.
120. Mr Murphy said that at that stage he wasn’t, but subsequently the owner had informed him
that he wouldn’t be making a formal complaint because he felt to do so and to name those who had
contacted him may escalate the threat that was made to him initially.
121. Counsel for the applicant asked Mr Murphy to confirm whether security staff had left the
premises.
122. Mr Murphy said that the owner had contacted him just after 10:00 to say that he had
removed all personnel from the property and was standing down. Mr Murphy said that normally the
owner is reputable and able to secure sites but unfortunately in this instance he was unable to
remain in situ.
123. Counsel for the applicant asked whether Garda presence would be of assistance to any future
security, removal of furniture, or demolition operations by the council’s servants or agents.
124. Mr Murphy said that Garda presence would be of great assistance given the fire and the
physical threats.
125. Counsel for the applicant asked whether the two threats mentioned came from two different
people.
126. Mr Murphy said that the first threat was a phone call purporting to be Michael Murray and
the second involved persons attending at the security company owner’s home.
127. In the draft judgment process, the respondents stated:
“Para 109 the allegation made against Mr Murray, is a matter for evidence on the 23rd March
Motion.”
128. Again the general saver applies, the foregoing is just recording what happened in the witness
box, and the court will presumably deal with this as it thinks fit at the appropriate time.
129. Counsel for the applicant then said that the council and undoubtedly the court take very
seriously what has occurred over the last 24 hours on the lands, and in particular the council was
very concerned that without direction from the court requesting in the first instance the Gardaí to
be at attendance at the property when any of its future servants or agents are engaged in any
actions for the purposes of removing property and/or securing the property and/or demolishing the
unauthorised structure in accordance with the orders of this court that they would be prevented
from so doing. She asked for the court to make an order requiring the Gardaí to attend the premises
for the purposes of assisting the council, its servants or agents in the removal and/or relocation of
any moveable property on the lands and for the purposes of assisting the council, its servants or
agents to demolish the unauthorised structure.
130. She said she fully appreciated that the Gardaí would need advance notice and that would
obviously be facilitated from the council’s perspective.
131. Counsel for the applicant asked the court to direct that any protesters would be limited to
protesting at least 500 meters way form the entrance gates of the property to facilitate the council
and its servants or agents in entering safely, exiting with vehicles for the purposes of removing,
relocating and demolition purposes on the lands together, which personnel may find somewhat
intimidating if there were people protesting at close proximity to the gates of the property.
132. Finally, counsel for the applicant asked that in these circumstances where there was
evidence before the court that there had been further acts of contempt by the respondents and/or
agents on their behalf, the court would direct the Gardaí to use all reasonable endeavours to ensure
that the order for attachment is executed and that the respondents are brought before the court.
133. After some discussion the order was along the following lines:
(i) direct the council to commence demolition works within 48 hours;
(ii) the council are not under further obligation regarding removing moveable property
that the applicants have failed to remove to date;
(iii) the Gardaí are directed to be present to assist when the council, its servants or
agents were removing property or carrying out works;
(iv) in the event of any person being present at the property, the gardai be directed to
remove such persons from the property using reasonable force if necessary and
prevent them from re-entering and remove them from the property;
(v) that any protesters remain 500 m from the entrance; and
(vi) direct the Gardaí to use all reasonable endeavours to execute the order of
attachment.
134. Counsel for the applicant then said that she would ask for her costs. I said that she could
certainly ask, but I wouldn’t do that ex parte. I said I would give her a return date instead.
135. I said if the respondents were attached between then and the return date, the council should
come back to court.
136. Thus, in the light of the evidence, I ordered as follows:
(i) The council was to commence demolition works within 48 hours. While it is not
necessary or even appropriate to make any concluded factual findings as to
responsibility for the serious criminality reported to the court, it is a matter of
extreme concern and made it imperative in my view that the works ordered by
Edwards J. and the Supreme Court and the subject of sworn undertakings were
carried out as soon as possible, especially when placed in a context of ongoing
escalation of the response to the situation.
(ii) The council were not under any obligation to remove moveable property that the
respondents had failed to remove to date. In an ideal world it would have been
preferable to arrange for a more leisurely clearing out of the unauthorised structure
but the respondents had already had an inordinate time to do this – their last legal
excuse ran out three and a half years ago. The urgent need to commence works
meant that the respondents rather than the applicant will have to carry the loss for
the respondents’ failure to have removed any moveable property lost in the process,
but the applicant did assure me that it would take steps to remove what it could
within the constraints available. Again it was my view, which I emphasised to the
council, that further delay would lead to further escalation and problems, and that
the matter had dragged on for far too long. That was most certainly not an attempt
to thwart any application to the ECtHR and I didn’t see it as such an attempt on the
council’s part either. There has to be a line drawn sometime – and in fact the line
being drawn did appear to stimulate action by the respondents to remove all
property.
(iii) The Gardaí are directed to be present to assist when the council its servants or
agents were removing property or carrying out works. The Gardaí had no difficulty
with this.
(iv) In the event of any person being present at the property, the Gardaí be directed to
remove such persons from the property using reasonable force if necessary and
prevent them from re-entering the property. An order of this nature is essential
given that security has been driven off the property by mafia-type tactics.
(v) That any protesters remain 500 m from the entrance. The effect of the evidence
was that such an order would assist the execution of existing orders.
(vi) Direct the Gardaí to use all reasonable endeavours to execute the order of
attachment. Any previous latitude about enforcement has dissolved given the
matters that took place and the respondents will have to be brought before the court
to be dealt with appropriately.
(vii) Reserve costs. The council asked for an order for costs but I declined that on the
basis that it should be sought on notice rather than ex parte. The other orders were
of a sufficiently urgent nature to warrant being made ex parte especially in the
context of the need for enforcement of orders already made on notice.
(viii) Liberty to apply per previous order.
(ix) The matter returnable on 23 March 2026 with the respondents to be notified.
137. At 15:06 that day, the solicitor on record for the respondents in the proceedings made his
first communication to the court since the reactivated contempt process began in February 2026.
He requested that the matter be listed at 11:00 the following day as “there appears to be no
provisions made to ensure the orderly removal of our clients (the respondents) and their family
members, personal effects and belongings including certain fixtures in the property. Viral [sic]
private papers are still in the property”. The problem with that email was, of course, that it came
after five and a half years of opportunity to comply with the undertakings of 2020, not to mention
all of the previous opportunities. If parties fail to avail of opportunities that have been afforded to
take appropriate steps then those parties themselves may have to bear the consequences of that.
138. In the draft judgment process, the respondents commented:
“Para 118 The problem with the email, was of course that it came after jive [sic] and a half
years of opportunity to comply with the undertakings of 2020. This is disputed by the 23rd
March Motion and will be a matter for further evidence.”
139. Possibly I am misunderstanding this point but it seems to be linked to the legal submission
to be made that the order of Heslin J. nullified the undertakings, or as it was put in oral submissions,
rendered them “moot”. Again I may be misunderstanding things but that seems to be the central
(albeit in fairness not only) point of the respondents’ motion. All of that will be debated when the
motion is dealt with subject to the council’s preliminary objections.
140. It can also be noted at this point that the correspondence represents a slight escalation from
the previous position of having no domestic options – the respondents were now concerned at the
eleventh hour with “orderly removal” of property.
141. At 15:49 the applicant’s solicitor replied as follows:
“Arising from occurrences at the property overnight it was necessary for the Council to make
an Ex Parte application to the Court at lunchtime today and I attach a copy of the consequent
Order.
You will note from the Order that the Council are not obliged in advance of demolition to
remove contents however without prejudice to this it will use its best endeavours to remove
a limited numbers of your clients personal items and deliver them to a location provided by
your clients PROVIDED WE ARE GIVEN A MANAGBLE [sic] LIST BY 6PM TODAY.
Arrangements have been made for agents of the Council to attend the property at 6.30am
tomorrow the 19th March and a maximum of 2 hours up to 8.30am can be allocated to
address such list as your clients may provide and thereafter arrangements will be made to
implement the Court Order.
Should your clients wish to avail of this proposal it may remove the need for your proposed
Court application tomorrow
For the avoidance of doubt should your clients not take up this offer demolition will proceed
without the removal of any contents .
Finally for the purpose of enforcement of the Court Orders please provide current addresses
and contact details for both of your Clients the Respondents in these proceedings.”
142. The registrar replied stating that the court urged parties to resolve the matter by agreement
but failing that I would facilitate a remote mention at 09:15 on 19 March 2026.
143. When the matter was called on the latter date, the solicitor on record for the respondents
appeared. He indicated that he had been online on 9 March 2026 (when the order for attachment
was made). He also knew about the hearing of 16 March 2026, but was not able to log in. He made
a rather wider application than what had been envisaged in correspondence, and sought a date for
hearing of an application to effectively discharge the order of attachment. As time did not allow for
the matter to be fully heard at that point, given the expanded nature of the agenda being raised, I
resumed that hearing at 13:20 that day.
144. The respondents commented in the draft judgment process:
“Para 124 The reasons for non-appearance are explained and justified with legal arguments
to be provided in support of the 23rd March motion.”
145. Again this can be dealt with in the motion context as per the general saver above.
146. While the respondents laid stress on rule 39 of the ECtHR rules of procedure, I said that
from my encounters with Strasbourg jurisprudence this was not the type of thing that that court
tended to issue rule 39 indications about. Indeed that court was to say as much itself shortly
thereafter as set out below.
147. The council in reply noted that the solicitor was on record at all times and was served with
papers as far back as 13 February 2026, but only first appeared in court “at this late stage” on 19
March 2026. Even when served with orders, no attempt was made to correspond with the court or
the applicant as to the respondents’ whereabouts or to make representations on the contempt issue
(one can note that the council was informed as to the ECtHR application as noted above but that
was it). Any claim that the initial stay issued by Heslin J. when the 2022 proceedings were issued
had the effect of nullifying the undertaking was “confused”. There was a question as to his
entitlement to make any application where there was an unpurged order of attachment: Hadkinson
v. Hadkinson [1952] 2 All E.R. 567 (Somervell , Denning and Romer LJJ.). There was no rule of law
that an application to the ECtHR acted as a stay. Any affidavit could be filed before the next mention
date on 23 March 2026. The demolition was underway and the council hoped it would continue
unhindered. The Strasbourg point was unstateable and the application had not been furnished. As
solicitor on record for the respondents, the council’s view was that the solicitor “should have been
in court”. The proposition being put forward that the orders should not be implemented was
“extraordinary”.
148. Ultimately having heard the parties I said that I still wanted to keep the matter within the
bounds of civil rather than criminal contempt. I ruled that the respondents could submit an affidavit
but allowing time for that if it could not be done by Monday. I was not deciding at this stage whether
they had an entitlement to apply without submitting to the order of the court or whether they should
swear the affidavits personally. Insofar as there was a suggestion that the orders should not apply
in the meantime, the orders stood until discharged. Accepting that rights under art. 34 of the ECHR
should be respected, the enforcement of the orders did not in itself constitute an interference with
the right of application to Strasbourg. In the event that a rule 39 indication was issued, that should
be brought to the court’s notice and I would certainly pay attention to it immediately. I emphasised
that what particularly accelerated matters from my point of view in terms of the need to implement
the order as soon as possible was the evidence of serious criminality. The matter was thus left over
to the return date of Monday 23 March 2026.
149. The respondents commented as follows on the foregoing in response to the draft judgment:
“The following reservations and submissions arise
(a) The Court orally made an order on the 19th March at approximately 1.50pm, that it
would not pause the orders already made. It provided its reasons at that time for making
that order which are, one trusts, available to be more accurately ascertained precisely on
the DAR of the remote hearing on 19th March. Where that hearing that took place involving
the parties and the Court. Those extempore reasons amount to the Court's judgment issued.
The hearing dealt inter alia with other peripheral points made apart from the execution of
the order before the Court and concerned the attendance of the respondents, their
whereabouts and limitations imposed with regards to removal of contents and access to the
hearings.
The central issue however that arose, was the assertion by Counsel; quoted purely from the
writer's recollection (and subject to it being precisely verfied [sic] by the DAR) : stating:-
There is nothing in law at this point to prevent the Council which is about to commence the
demolition, proceeding with the demolition.
To which reply by the writer was made, again purely on recollection stating :-that is correct,
there is nothing in domestic law to prevent the Council proceeding to execute the orders of
the Court but there is however, in European Law, under Article 34 of the European
Convention of Human Rights which provides that
Article 34
The Court may receive applications from any person, non-governmental organisation or
group of individuals claiming to be the victim of a violation by one of the High Contracting
Parties of the rights set forth in the Convention or the Protocols thereto. The High
Contracting Parties undertake not to hinder in any way the effective exercise of this right.
The contents of the Article and its significance was explained and for emphasis the last
sentence (underlined) at least was read aloud to the Court and thereby placed on record to
support the assertion that if the Council did proceed with the demolition, that by doing so,
it was undermining the subject matter, purpose and effect of the Respondents' application
lodged to ECHR. The Court was then informed of the history to the inter-actions with ECHR
with the dates of the applications to Europe and the follow up in terms of the email sent on
the 7th March 2026 and the reference to this by Counsel for the Applicants on the 9th March,
and the inability to access remotely the transmission of the Court proceedings, on the 16th
March.
The submission was made that a supplemental Rule 39 application was lodged and that
interim measures were sought in relation thereto, this was in addition to the original
complaints made and lodged in time on 26th February.
Counsel for the Applicant then replied that the demolition on her instructions was at that
point already underway, that they did not intend to halt the process that the orders were
there to be enforced. The Court then after giving its reasons then proceeded to make its
order.
There was a great deal more said which in available on the DAR.
The above is only a rough summary of what traspired [sic] and it is essential in the interests
of accuracy and certainty that subject to the Court, that leave to take up the DAR audio of
the 19th March hearing be provided. This application will be made under the heading ‘of
any other order’ as referred to in the motion, that is subject to the Court and in the absence
of a separate motion to that effect being sought to be brought to the Court.
That said, the respondents are therefore severely hampered in making any substantive
submissions in relation to the record of the hearing which took place on the 19th March, and
what was stated. This is of crucial importance as it was a matter entirely for the Applicants
to decide whether or not they chose to consult with the Attorney General thereafter as to
whether or not they could or should, proceed with the demolition, and/or ignore what was
stated and argued in court. That they believed that by doing so, they would not be in
violation of what was robustly counter-argued and submitted to the Court, that they would
be deliberately violating Article 34 of the European Convention on Human Rights as an organ
of the State bound by its undertaking not to hinder a live application before that Court.
It is therefore the respondent's preliminary position with the utmost respect, in response to
the proposed Draft Judgment that (without prejudice to outlining whatever happened after
the 19th March 2026) it is an error to now conclude that ‘the position as it appeared to the
Court based on the material submitted up to consclusion [sic] of the hearing on the 23th
[sic] March, 2026 could be dealt with in the proposed Judgment’. The purpose of the
respondent's request is to allow the integrity of the record of what transpired on the 19th
March and all that was stated in that hearing and the ex tempore determination and order
‘not to pause the execution’ be allowed to speak for itself and stand on its own, without any
retrospective analysis, by the Court at this stage, some nine weeks after the decision was
made. It is of concern that this is not reinterpreted in a written judgment supplemental to
an otherwise final and conclusive ex tempore judgment process issued at that time.
It is submitted that the DAR record of the hearing should be allowed to stand as the record
of what occurred.. To issue now a retrospective review by way of analysis of what was
understood by the Court at the time without the parties who were involved having available
to them the benefit of the record of the DAR and to the extempore Judgment of the 19th
March 2026 would be prone to inaccuracy and would undermine the intergrity [sic] of
preservation of the contemporaneous record.
None of this in any way affects the Court in otherwise issuing its judgment from, after the
19th March up to conclusion of the order made on 23rd March 2026. At that point the
demolition was already done and beyond being any way reversed. It was a matter entirely
for the Applicant to as it were, push the button to activate the demolition process once the
order was made on the 19th March at 1.50pm where not, from the Court's point of view to
pause the order. It was up to the Applicants for their own reasons to act or not, with or
without taking cognisance of the inevitable potential breach of Article 34 of the convention
having been fore-warned that demolition would transgress Art 34 and be a violation thereof.
(b) In support of the above submission, there was no mention or suggestion, that the
Court on the 19th March, would make its order, and then give its reasons later for doing so.
There was no mention that the Court would at that time or subsequently opt to reserve its
judgment to review its reasons for making an order or not, to pause the orders of execution.
Unless the writer is wrong about this, the DAR will confirm the position for definite one way
or another.
This submission is entirely without prejudice to the Court's inherent jurisdiction to issue any
judgment in relation to what occurred on the 23rd March 2026 and is without prejudice to
the Court issuing an overarching judgment taking everything into account, having dealt with
the motions which are before the Court on the 18th March and thereafter. Again this with a
view in the light of concerns, first to preserve and protect the integrity of the original record
of what occurred in the hearings on the 19th March 2026.”
150. First of all I appreciate the measured way the respondents make this point even if I see
things slightly differently.
151. Secondly, whether the respondents are entitled to the DAR of 19 March 2026 is a matter
that can be decided in due course and I express no view of that.
152. Thirdly I agree that the DAR will indeed stand as the definitive record of the proceedings on
19 March 2026 if the court decides it needs a definitive record.
153. That said, I am not sure there is much dispute about what actually happened. It is absolutely
correct to say that the respondents made the submission that demolition while an ECtHR application
was pending would be a severe violation of art. 34 of the ECHR.
154. It is also correct that the council dismissed that out of hand, among other things because of
the fact that no copy of the application had been produced to the court (it still hasn’t been produced).
The council certainly did not consult the Attorney General before continuing with demolition, or do
anything of that kind.
155. I said that I agreed with the respondents that their right of access to the ECtHR should not
be interfered with. However the mere execution of an order (i.e., that was enforceable in domestic
law) the subject matter of an application to Strasbourg was not to be regarded as being in itself
such an interference (i.e., in circumstances such as we have here – we don’t need to be unduly
concerned about extreme hypotheticals like refusing to stay a death sentence, were such a procedure
to be permissible).
156. Thus the orders stood until discharged (an additional piece of context being that there was
no formal motion in that regard at that stage anyway).
157. It was made clear that the permissibility of execution of the order was very much subject to
rule 39. I indicated that in the event that a rule 39 indication was issued, that should be brought to
the court’s notice and I would certainly pay attention to it immediately. I appreciate the counter-
argument that rule 39 is not part of domestic law, but avoiding a breach of international law, even
though not incorporated, has to be of compelling weight in a discretionary decision (and it should
hardly be necessary to rely on Article 29.3 of the Constitution to come to such a conclusion).
158. So doing my best to see this from the respondents’ point of view, and maybe this is my
shortcoming, but I am still failing to see how there is any “retrospective analysis” or that the
proceedings of that date are being “reinterpreted”.
159. Incidentally there is a bit of a difference between retrospective analysis and reinterpretation.
If by retrospective analysis one means elaboration after the fact of a more summary oral
pronouncement, there isn’t anything wrong with that – see Walsh v. Walsh (No. 1) [2017] IEHC 181
(Unreported, High Court, 2 February 2017) and authorities cited. Jurisdiction to do so isn’t
dependent on the court reserving its rights expressly at the time like some sort of party to a contract.
Indeed calling this “retrospective” is a bit pejorative, as if any attempt to dispel misunderstanding
is branded as suspect from the off. Reinterpretation suggests that some rationale would be given
that is inconsistent with what was originally intended, but that isn’t how I see it I’m afraid.
160. If I were to engage in retrospective analysis I would say that the submission, in my view at
the time, misunderstood the architecture of the ECHR. There would be no need for rule 39 if
implementation of an order the subject-matter of an application under art. 34 was inherently
violative of the convention. In the absence of a rule 39 indication, implementation is generally lawful
both from a domestic and international law perspective. Maybe there are refinements that need to
be considered and that I wasn’t conscious of then or indeed now, but that was the general position
as I understood it at the time, even if I didn’t spell all that out. But that just repeats the point I
made at the time at slightly greater length.
161. What I am saying now and what happened then are totally consistent in all material respects.
I am sure, like any story that is repeated, one could find minor differences of wording. But there is
no difference of substance. If there is a difference of substance, what is it? That isn’t at all clear
from the respondents’ letter – rather it is a generalised objection to providing an account of
proceedings as opposed to saying that what happened can be determined from the DAR. I very
much fear that any further comment will just create additional minor variations that don’t make any
difference to anything but the essentials were:
(i) The respondents said that their right of access to the ECtHR under art. 34 should
not be interfered with – I agreed with that.
(ii) The council said in effect that the order was enforceable notwithstanding an
application under art. 34 – I agreed with that.
(iii) The council also objected that the application to the ECtHR had not been produced
– I did not rest the decision on that point.
(iv) The respondents said that demolition would in itself constitute an interference with
the right of access to the ECtHR – I rejected that.
(v) The respondents effectively said that demolition would interfere with their rule 39
application – I rejected that but said that if a rule 39 indication was issued I would
give it attention immediately.
(vi) At the highest level of generality, the respondents’ position was that demolition at
that point would breach Ireland’s international obligations under the ECHR. The
council said that demolition should go ahead – I went with the council’s submission
on that. Presumably if the ECtHR have a view on this in due course they will make
that known and if it is contrary to mine then I will stand to be corrected.
162. I am not sure what more the respondents expect from the DAR but if they disagree with the
above in some specific respect and on some specific and plausible basis and if the court thinks it is
necessary to make an order for the DAR then of course I agree with the respondents that the DAR
will speak for itself as to what happened on the day.
163. Returning to proceedings on 19 March 2026, I emphasised that what particularly accelerated
matters from my point of view in terms of the need to implement the order as soon as possible was
the evidence of serious criminality. The matter was thus left over to the return date of Monday 23
March 2026.
164. Later that afternoon, it was indicated that the respondents were now minded to present
themselves to court on the return date.
165. On Friday 20 March 2026, the council issued further correspondence indicating claims of
further criminal intimidation.
Step 6 – execution of the order of attachment
166. On Monday 23 March 2026, the matter came back on foot of the attachment order which
had been executed by the Gardaí.
Step 7 – the court satisfying itself as to whether contempt had been committed
167. On the same morning, the respondents issued (without leave of the court or even advance
warning) a motion seeking extensive reliefs as follows:
“TAKE NOTICE THAT on the 20th day of April 2026 at 10.30am in the forenoon or on the
first available opportunity thereafter on a date to be provided by the High Court, sitting at
the Four Courts Inns Quay, Dublin 7 an application will be made by Solicitor on behalf of the
Respondents to this Honourable Court for such orders as are set out hereunder as follows:-
1. An order to adjourn, the present proceedings to a date to be fixed for the attendance
by the respondents at liberty of their own volition.
2. An order that, the warrants for attachment of the respondents be deemed executed
with no further order.
3. That the Appearance by the respondents following their attachment, and by their
Solicitor remotely, on their behalf on the 19th March 2026, in these proceedings, is not
deemed to be an admission or acknowledgment by them or by their Solicitor, as to the
legitimacy or acceptance by the respondents, that the orders procured, by the Applicants
deeming; service to be good and sufficient were lawfully sought and obtained. Where it is
noted by the Court that the appearance in response thereto is without prejudice to such
order where substituted service is in dispute.
4. That the appearance by solicitor on record in these proceedings for the respondents
herein, entitles a right of audience, notwithstanding any challenge to the legitimacy of the
order for substituted service in the context to the applicants current motion previously
returnable to the 9th March 2026.
5. That the Court permit that, without prejudice to paragraph 3 that respondents may
apply under the rules of court and under the inherent jurisdiction of the Court to set aside
the order made by the Court deeming service to be effected.
6. That without prejudice to paragraphs 3 & 4 that pending investigation and enquiries
by voluntary discovery, the respondents be permitted time to ascertain from An Garda
Siochana, the Applicants the facts and details concerning and surrounding the execution,
perfection and service of the Court Order made on the 16th March, 2026.
7. That the respondents be granted an Order to take up the audio of the DAR in respect
of the two hearings on the 16 March 2026 owing to the absence of remote access to live
transmissions of said hearings.
8. That the respondents be granted an Order to take up the audio of the DAR in respect
of the ex parte applications made without notification to the respondents, on the 18th March
2026.
9. The pursuant to Section 5 (1) (2) of the European Convention on Human Rights Act,
2003 as amended, that the Court make a declaration that the actions of the applicant, an
organ of the state, with due regards to the applicants being put on notice of inevitable
violation of fundamental rights by the respondents under Article 34 of the European
Convention on Human Rights. That the Court make a declaration that the actions of the
applicants in the circumstances and in the absence of any other remedy are incompatible
with Section 3 (1) of the European Convention on Human Rights Act, 2003.
10. The pursuant to Section 5 (1) (2) of the European Convention on Human Rights Act,
2003 as amended. That the Court make a declaration that the actions of the applicant, an
organ of the state, with due regards to the applicant being put on notice of the certainty of
a violation of the respondents fundamental rights being caused and effected by the
applicants; deliberately proceeding with demolition of the respondents dwelling. This
notwithstanding, the applicants being on notice of complaints pending before the ECHR body.
Where demolition of the dwelling would effectively frustrate and vitiate the substance of the
respondents' complaints, in contravention of Articles 8, 6 and 13 of the European Convention
on Human Rights. More particularly where the applicants were previously put on notice of
pending Rule 39 of ECHR emergency applications pending for determination. That the Court
make a declaration that the actions of the applicants in the circumstances and in the absence
of any other remedy are incompatible with Section 3 (1) of the European Convention on
Human Rights Act, 2003.
11. That prior to the making of any declaration referred to under paragraph 9 and or 10
hereof that the Court direct the applicants as the party having carriage of these proceedings,
pursuant to the rules of Court to serve notice pursuant to Section 6 (1) of the European
Convention on Human Rights Act 2003 that the Office of the Attorney General to given notice
of the proceedings in accordance with the rules of Court.
12. That the applicants be directed to confirm on Affidavit if any contact was made
subsequent to the hearing on the 19th March 2026, with the Attorney General's office or its
staff, regarding the Council having being put on notice of its impending breach and violation
of Article 34 ECHR in respect of the respondents fundamental rights. Where such notice
informed the applicants that there continuance of demolition and execution of a Court order
to that effect in the circumstances, of the respondents dwelling, were claimed to be protected
against such action by the convention and thereby the execution of the demolition would be
a hindrance to be in breach of Article 34 of the convention.
13. That the respondents be given liberty to provide supplemental Affidavit arising from
the above pending developments and enquiries.
14. That the Court in the circumstances abridge the time for service of this motion to
the date hereof in accordance with its own inherent jurisdiction and due to the urgency of
these proceedings.
15. That in view of all of the above and of the substance and merits of the matters to
which the Court and the applicants have been put on notice that any further acts of
demolition and removal of materials be ceased forthwith, that this be communicated directly
by phone to the servants, agents, contractors and sub-contractors on site and to all persons
who may be acting in relation thereto and that any property on site or removed be protected,
retrieved and preserved pending further order of the Court.
16. That the Court accept the respondents' solicitor's undertaking by himself or his Town
Agent to stamp file this Motion and the Grounding Affidavit in the Central office of the Four
Courts at the earliest opportunity.
17. Such other order as to this court may been deemed appropriate.
18. Costs.”
168. This was a further unstructured escalation of the legal response. It may be recalled that
initially they corresponded stating that nothing further could be done in domestic legal terms. Then
they wrote with concerns about the contents of the unauthorised structure. At the next mention
date they escalated this without prior notice into wanting to put in an affidavit and wanting the
council to hold off on demolition. This mutated into a lengthy notice of motion by the following
mention date. It is not immediately obvious that the respondents can properly seek to set aside or
even interrogate orders of which they were on notice but at the hearing of which they did not attend
either personally or by their legal representative (listening online without making one’s presence
known does not constitute attendance for this purpose). But that can all be debated in due course.
The respondents claimed that the council were jumping the gun in seeking contempt remedies in a
way that would pre-empt the motion issued on 23 March 2026 – but a somewhat more obvious
interpretation, to be debated in due course, is that it is that belated motion that seeks, without
leave, to cut across a process already in train. Whether for example the council’s application should
proceed to finality by way of determination of costs before turning to the respondents’ motion is
something that can be discussed in due course.
169. The council submitted that on the issue of whether there was contempt, that had already
been decided on 9 March 2026, which was an order made on notice. That was made following
evidence of requests made which were not complied with, despite the giving of voluntary
undertakings which are more readily enforceable than orders: see Hussain v. Hussain [1986] 1 All
E.R. 961 (Sir John Donaldson M.R., Neill and Ralph Gibson LJJ.).
170. After some discussion with the legal representatives, the respondents adopted the approach
of reserving their rights to a proposed motion rather than of making an issue of whether contempt
had been committed for present purposes. Thus pursuant to O. 44 r. 4 RSC, I was satisfied (in fact
beyond reasonable doubt, but as it was civil contempt, the balance of probabilities would have
sufficed) that the respondents were in contempt of court as per the previous declaration of the court
and noting that the respondents were not making an issue of contempt for present purposes but
reserving their right to revisit that at a later stage in the context.
171. That said, no stateable ground as to why they were not in contempt was made apparent to
me as of the date of the order, but one can anticipate that there will be legal argument on the
respondents’ motion in due course. Notwithstanding that hypothetical, I was satisfied that the
respondents and each of them had committed contempt of court.
172. So that the respondents are not in any doubt, the fact that they want to revisit the issue of
contempt does not have the effect of making the undertakings conditional in some way. The
undertakings stand for all purposes unless and until the respondents are released therefrom by order
of the court. A hypothetical future finding upholding their legal submissions and discharging the
declaration that they are in contempt does not affect the validity and status of the undertakings
unless or until the court goes on from there to expressly release them from those undertakings. Nor
does the existence of motion prevent the undertakings from being enforced in the meantime – that
would be obviously unworkable.
Step 8 – receipt of further undertakings
173. The council then explained that the unauthorised structure had now been demolished and
there would be ongoing works to remove material. In addition, the council stated that a further
aggravating feature has occurred.
174. Detective Sergeant Mark Looby gave evidence of executing the order of attachment on 23
March 2026 at 09:40, and taking the respondents into custody. A complaint was made on Friday in
relation to subcontractors – one of the haulage contractors received a phone call on 20 March 2026
at 13:30 from an individual with a Northern accent not to have anything to do with taking rubble
away and if so there would be nothing left of his house. Members called to the site on 21 and 22
March 2026 and there were no subcontractors present. A complaint to Gardaí was not forthcoming.
He was aware that Sergeant David Bowen from Kells gave evidence in relation to prior threats to a
security company. No complaint was forthcoming. This was a phone call also after which the security
company removed themselves from the site. On 15 March 2026, trailers were parked across the
property. There was a van that was burned out being used by security.
175. Mr Murphy of the council also gave evidence. The main contractor informed him that one of
the hauliers got a threat that he would be burned out if he went on the site. As of Friday evening
the haulage company had pulled their services. The main contractor is responsible for all aspects
and it was proving difficult to source an alternative. The council were seeking undertakings to assist
it with complying with the court order including co-operation by the respondents. The council had
not sought further undertakings since 2020.
176. Following the council’s evidence the question arose as to whether the respondents’ solicitor
would tender his clients to answer the order of attachment. Their solicitor was unwilling to do so at
that point for various reasons, primarily by reason of having issued a motion earlier in the morning.
Nor were they offering any specific undertakings but were open to the court suggesting an alternative
wording. As of that point the respondents’ solicitor decided not to call them and I did not propose
to exercise the power to direct them to give evidence. So matters proceeded to submissions.
177. The council then submitted that given that matters as regards compliance with the
undertakings and orders had advanced and as possession had been secured, the council did not seek
any further orders regarding committal of the respondents other than via conditions of discharge.
The balance of the council’s notice of motion was defunct as the demolition had now been achieved.
The outstanding issue was costs and any additional costs in relation to execution of the demolition.
The only question the court has to consider is whether the manner in which they respondents have
approached the court is one the court wished to mark as an act of further contempt in not coming
before the court to explain themselves.
178. The council suggested that I discharge the order of attachment on the basis that the order
has been complied with subject to conditions under O. 44 r. 4 RSC specifically undertakings on oath.
179. On a without prejudice basis to the respondents’ legal points, Mr Murray gave evidence and
undertook that as far as he was concerned from this date forward he would for himself abide by
whatever orders are made by the court.
180. He said he was resident in the property up to the week before last. The land remains his
property. He was aware of the works the council was carrying out in the last number of days and
the personnel carrying that out. Skips came from a waste company – the first named respondent
phoned the company but not by way of threat. He did not make contact with the owner of the
security company. He was surprised that personnel were removing themselves. He had no difficulty
giving undertakings to fully cooperate with council and any subcontractors.
181. The council then read out the undertakings required by it, which he agreed to.
182. I might note here that given the way the matter evolved, the first named respondent was
not cross-examined in depth. There was certainly no explanation regarding the blockading of the
property by trucks (responsibility for which was not denied). And the admission of having been
resident at the property up to recently is on its face inconsistent with the claims made that both
respondents were abroad, and more specifically with the return of letters marked not known at the
address. However there is no need for any conclusions on those questions at this stage.
183. Ms Murray was then tendered as a witness. She last occupied the premises at the end of
February. The council read the undertakings to her which she also agreed to.
184. In the light of evidence and submissions and pursuant to O. 44 r. 4 RSC, I was satisfied that
the respondents were in contempt of court as per the previous declaration of the court and noting
that the respondents were not making an issue of contempt for present purposes but reserving their
right to revisit that at a later stage in the context, and discharged the respondents on condition that
they comply with the undertakings furnished by them on oath. The matter was then adjourned
generally but the question of costs and the respondents’ motion to be listed for mention (the initial
concept, later administratively adjourned, was that this would be on 20 April 2026) for purposes of
directions. The order for substituted service was to be replaced by substituted service via (a) the
solicitors’ email, (b) the emails for the respondents furnished that day, (c) ordinary post to the
address furnished that day and (d) by being affixed to the property.
185. I should emphasise that planning law is not totally inflexible and there can be room for
argument at the margins where a breach is just a technicality and/or can be satisfactorily remedied
in some acceptable and lawful way in the short-term. (Retention applications do not particularly
count for this purpose – since such applications are always possible, to pander to that would be to
nullify planning law, much as the possibility of seeking a revocation of a deportation order cannot
be a block on deportation because that possibility is always there.) In this case, the non-compliance
did not come into those categories so there was only ever one possible outcome to that. For that
reason, the respondents’ complaint that the council didn’t negotiate with them falls flat – given that
there could only be one outcome, negotiation didn’t arise. Furthermore, the council entered on the
unauthorised structure to carry out remediation as a last resort. I appreciate that the respondents
were unhappy that their son’s occupation of the unauthorised structure was disturbed in the process,
but such disturbance was the only remaining option given that the respondents thwarted all other
options (by failing to leave the unauthorised structure and latterly by ignoring orders and letters,
evading service and failing to attend court and make themselves known either in person or by their
solicitors on record). I also appreciate that this is the sort of case that sends Ireland’s standing
army of energetic but under-informed commentators scrambling to their keyboards to report for
combat duty, many with a pre-fabricated narrative of oppressive establishment versus plucky
individual, but more in the hope than the expectation of carrying out an educational role in that
regard, I will attempt to highlight why the council acted correctly. Because we live in a republic
based on equality before the law, the court can’t accept excuses from one person unless it is
prepared to accept such excuses from everybody. If housing shortages were to allow circumvention
of planning control then there is no planning control. Allowing this development to stand would
completely negate democratically-adopted planning legislation. People across the country who get
negative decisions are expected to comply with those – it would cause not just resentment but
lawlessness if they saw other people getting away with not doing so. Anything other than demolition
would come with a massive cost to equality before the law and to social cohesion. Apart from
exceptional scenarios at the margins such as where the breach is a technicality or can be readily
cured, it would generally be an improper exercise of discretion as well as in many cases a breach of
EU law to give anything less than decisive weight to the public interest in the integrity of the planning
system. In enforcing planning law, the council and those who assisted them were acting as
environmental defenders. Finally, the case also perhaps sends the practical message that the
Planning & Environment Court is available to deal with complaints about unauthorised developments,
and if upheld, to address those in as effective and appropriate a way as the parties request and the
law permits. The respondents should not feel particularly singled out – if for no other reason than
that this was a particularly egregious breach of the law – but if there are other alleged unauthorised
developments causing concern to anybody then they can be brought to the court’s attention in the
appropriate way and will be examined on their merits on the basis of the same rules of engagement
that apply to these respondents as they do to all litigants.
186. On 24 March 2026, the court requested some details of the ECtHR applications so as to
prepare a full procedural narrative. The respondents replied on 24 March 2026 by a number of
emails:
“From: Neil Mc Nelis <...>
Date: 24 March 2026 at 1:41:30 PM GMT
To: Rory McEntee <…>
Subject: Re: Application/s to the European Court of Human Rights in case 2007 76 MCA
[MEA143/0311] [Meath County Council Planning Dept] [Murray Michael M25023
Unauthorised dwelling house at Faughan Hill Bohermeen MEA114367, The High Court Record
No. 2007/76MCA
Dear Ms [Registrar]
We consent to the draft order provided. Please note we DO NOT consent to the reference
number for our Application to ECHR being released to any party. The Application to ECHR
at this time is a confidential process and it is of concern to us that no interference with our
application be enabled. As soon as we have a decision from ECHR both the Court and the
parties designated by ECHR will be notified in the normal way as per the instructions of ECHR
Regards
Neil Mc Nelis
MC NELIS & Co
Sent from my iPhone”
187. I pause to add here that while I totally agree with the respondents that their right of access
to Strasbourg should not be interfered with, the provision of the application details is not such an
interference. There is no basis whatsoever to suggest that the council or anyone else is going to try
to correspond with the ECtHR, but even if there was such a basis, that would be going nowhere.
The council have no standing in the Strasbourg proceedings, and any State correspondence would
only be entertained after the application was communicated to them. The ECtHR are not novices
and are going to ignore any hypothetically intermeddling correspondence in the extremely unlikely
event that anybody attempts that. So the suspicious approach of the respondents is misplaced and
exaggerated.
188. The respondents replied again:
“From: Neil Mc Nelis <...>
Sent: 24 March 2026 14:55
To: Planning & Environment <…>
Cc: Rory McEntee <…>
Subject: Fwd: Application/s to the European Court of Human Rights in case 2007 76 MCA
[MEA143/0311] [Meath County Council Planning Dept] [Murray Michael M25023
Unauthorised dwelling house at Faughan Hill Bohermeen MEA114367, The High Court Record
No. 2007/76MCA
Ms [Registrar]
Please be advised that we consent to the draft order as provided being perfected.
We DO NOT consent to the ECHR reference number provided to the Court being provided to
the Applicant or to any other third party.
The application process at this stage is confidential and it is a matter for ECHR to deal with.
In the event that we are advised of any response instructing us to notify the Applicant or
any other third party we will do as directed.
If you or the Court has any queries please advise us and we will respond.
Regards
Neil Mc Nelis
MC NELIS & Co”
189. The respondents replied again on the evening of 24 March 2026:
“RE Meath County Council-v- Chris Murray and Rose Murray.
Application for Rule 39 Ruling.
Dear Registrar and Mr. Mc Entee,
Please see decision of ECHR in respect of request for interim measures to be made prior to
and in anticipation of imminent demolition of our clients' dwelling.
This response is not to be confused with the Substantive Application. You will note that the
substantive application is referred to and will as it stated we will be informed of this in due
course.
This letter although dated the 20th March, was ascertained only by on line enquiry made
today and after 5pm on checking Court's Rule 39 website and was not was known prior to
today and it relates to all the communications to ECHR prior to 20th March 2026 when Rule
39 hard copy was delivered. It does not include, it appears the following up application,
made by fax transmission for urgent applications which was sent on Saturday 21st relating
to complaint concerning alleged breaches of Article 34 which was issued in light of Court
hearing on the 19th March 2026 , and in accordance with obligation of applicants to keep
ECHR informed of any developments. Which included reference to the demolition. Please
be advised that there were technical difficulties with the communication to ECHR which
resulted in fax transmissions being unsuccessful on the 20th inst.
It remains to be seen what further response will be issued in respect of the fax transmission
regarding alleged breaches of Articled 34 issued on Saturday 21st inst.
It is not known how long it will be before a decision on the substantive application or the
follow up 21.03.2026 notification will be made and in respect of that and application a
reference number has as yet to be allocated for either of these matters.
It is our insistence that no interference counter submissions or otherwise should be
undertaken. If the ECHR are minded to admit the applicants ' complaint they will issue
whatever instructions are necessary to the Government of Ireland.
Yours sincerely,
Neil Mc Nelis
Mc Nelis & Co
Solicitors
The Square
Miltown Malbay
Co Clare”
190. The attached decision reads as follows:
“Mr Neil McNelis Mc Nelis & Co The Square Miltown Malbay
Co. Clare V95 K259 REPUBLIC OF IRELAND
ECHR-LE2.0aR
PMC/GFG/jok
Our Ref. 9012/26
Rose Murray and Chris Murray
Dear Sir,
20 March 2026
BY POST AND E-TRANSMISSION
Rule 39 Site #8847
I acknowledge receipt of your correspondence received on 4 and 20 March 2026 by post,
and on 5 March 2026 via the Rule 39 Site, requesting the European Court of Human Rights
under Rule 39 of the Rules of Court to indicate interim measures in relation to enforcement
proceedings.
This request falls outside the scope of Rule 39 and therefore has not been submitted to a
judge for decision. The Court will not, therefore, indicate to the Government of Ireland the
interim measure sought.
The Court applies Rule 39 only where an applicant faces an imminent risk of irreparable
harm to a Convention right. In most cases where Rule 39 is applied, the evidence available
points to a clearly arguable case of a genuine threat to life and limb, with the ensuing real
risk of grave harm in breach of the core provisions of the Convention.
You will be informed in due course about your substantive application.
Yours faithfully, For the Registrar
… Legal Secretary”
191. On 26 March 2026, the parties were asked again about details of any previous ECtHR
applications. This issue was followed up again on 2 April 2026. The respondents replied as follows:
“Sent: 2 April 2026 14:52
To: Planning & Environment <…>
Cc: Rory McEntee <…>
Subject: Re: MCA_76_260323 revised4
Re Meath County Council and Chris Murray and Rose Murray
2007 MCA 76.
Mr. [Registrar]
Please see attached correspondence in reply to your query
Just to confirm the substantive applications made to ECHR on 26th February relate to the
applicants' 2022 proceedings which concluded on the 10th November 2025, with the
determination of the Supreme Court to deny leave to appeal, whereby the Applicants had
then exhausted all legal remedies.
The motion before the Court on 27th April, arises under the above 2007 MCA 76 proceedings.
Regards
Neil McNelis”
192. The attached letter provided:
“RE: In the matter of Section 160 of the Planning and Development Act 2000 as amended
and in the matter of an Application by The County Council of the County of Meath and Michael
Murray and Rose Murray.
2007 76 MCA.
In reply to the query concerning the applications submitted by Chris Muruay and Rose Murray
to ECHR the position is as follows.
The Substantive Applications as in, one for each applicant/complaint were posted by express
post on the 26th February 2026 and based on track and trace were received we believe on
the 4th March. 2026 in Strasbourg, as appears to be confirmed by the letter received in
response dated 20th March 2026.(attached).
On the 5th March 2026 a Rule 39 Application was submitted stating that the materials
relating thereto where being sent by post. This we believe generated the acknowledgement
by email confirming the allocation of a Reference No #8847. in respect of our on line
submission of our letter of the 5th March 2026.
On the Saturday 7th March, 2026 an email was sent to Mr Rory Mc Entee to confirm that
applications has been lawfully submitted within time to ECHR. The deadline for applications
being we believe, the 10th March 2026.
This email was produced in Courl on the 9th March 2026.
The letter of the 5th March. 2026 was we believe sent also by post when all of the Rule 39
hard copy documents were dispatched [related] and this [occurred] on the 13th March 2026.
These documents relating to the Rule 39 application it appears were received by ECHR on
20th March 2026 although the on line letter of the 5th March was earlier received as
confirmed by letter issued by ECHR.
The decision of the High Court on the 19th March 2026 was followed up by a letter being
dispatched by us by fax transmission on the 21st March, 2026 to inform the ECHR of the
ruling made and to allege it had been claimed that a breach of Article 34 of the Convention
has occurred, with confirmation that the matter was due to be listed in Court on the 23rd
March 2026.
On review of emails received on 24th March, 2026 it was noted that there was a
communication from ECHR, this on being opened on accessing the file disclosed the letter of
the 20th March 2026 and we have since by post only received a further letter from ECHR
which is attached hereto.
The net position is that a decision by ECHR on the [admissibility] of the Applicant/
Complainants substantive complaints submitted on the 26th February and received on 4th
March 2026 is awaited. The issues raised following commencement of demolition on 19th
March 2026, which led to a letter of the 21st March 2026 being issued by fax, is replied to
in a letter received on 31st March 2026 (attached). This letter was to keep ECHR informed
of unfolding events and with the response of the 31st ult concludes the Rule 39 issues raised.
The substantive applications before ECHR therefore await determination on their
[admissibility]. The outcome of the Motions listed before the High Court for the 27th April
2026 when dealt with, will if necessary be notified and if necessary referred to ECHR. That
depends on the outcome of such matters.
The ECHR as is required with any pending applications, will be kept informed of
developments. We trust that this clarifies the position.
Yours sincerely,
Neil Mc Nelis”
193. The email also enclosed letter of 20 March 2026 from the ECHR set out above, and a second
letter from the ECHR, dated 23 March 2026:
“Application no. 9012/26
Murray v. Ireland
Dear Sir,
I acknowledge receipt of your fax, received by the Court on 21 March 2026 at 10:24 am,
the content of which has been noted. I refer you to my letter dated 20 March 2026 sent via
the Rule 39 site and via post.
Where the Court has found that a Rule 39 request does not meet the criteria for granting an
interim measure, it cannot keep responding to further requests which simply repeat the
same facts and arguments. Consequently, the Court will not respond to any further Rule 39
requests from you on this matter unless they disclose evidence of an imminent risk of
irreparable harm to a convention right, which, on account of its nature, would not be
susceptible to reparation, restoration or adequate compensation.
Yours faithfully,
For the Registrar
…
Legal Secretary”
194. Meanwhile the draft order was sent to the parties on 23 March 2026. Minor comments were
made and a further draft was sent on 24 March 2026. Following responses and the provision of
contact details a further draft was sent on 25 March 2026. The respondents requested wording to
preserve their position regarding the motion:
“25th March 2026.
RE: : : In the matter of Section 160 of the Planning and Development Act 2000 as amended
and in the matter of an Application by The County Council of the County of Meath and Michael
Murray and Rose Murray.
2007 76 MCA.
Dear Mr [Registrar],
The email addresses as specified in the order are correct.
The draft order we respectfully submit when perfected must take account of two factors.
That on page three in the last paragraph the wording we respectfully submit ought to more
accurately reflect the position that the Order of Mr Justice Meenan made on the 24th
September 2024 [recte 2020] is contended, by the respondents' to have been superseded
by the Order of Mr Justice Heslin made on the 23rd September 2024 [recte 2022]. It is
submitted that the draft should reflect this state of affairs as was submitted during the
hearing.
This issue is central of the contention in respondents Motion and more particularly on the
respondents grounding affidavit of the 23rd March, 2026 filed and now returnable to the
revised date as directed by the Court as the 27th April 2026. The oral submissions made
on behalf of the respondents were to that effect. A true copy of the Order 23rd September
2024, of Mr Justice Heslin (which is a document of record) which directly affected the 2007
MCA 76 proceedings arguably suplanted [sic] the 24th September 2020 undertaking which
the Applicants seek to rely upon. This is still the issue of contention to be as yet resolved
by the pending motion listed for 27th April, 2026.
It is therefore respectfully submitted that the order (presently in draft) ought at least reflect
this as follows:
And the Court being satisfied as of the date hereof de bene esse that the Respondents and
each of them are in contempt of court for failing and/or refusing to comply with the
undertaking given under Oath to this Honourable Court on the 24th September, 2020, and
recited by the Order of Mr Justice Meenan therein .......
(part to be amended underlined)
A similar form of words in lieu of the words ‘de bene esse’ would pose no difficulty but such
were the words indicated by the Court.
At the time of each of the respondents providing their sworn undertaking on each occasion
the Court was specifically requested by Mr Mc Nelis to note that the undertakings were
provided ‘subject to the respondents motion.’ No objection was raised on either occasion
by the Applicants, to that caveat being noted as it were ‘for the record’.
We would appreciate that this be somehow taken into account in the wording of the order
as it is apprehended that this would otherwise be liable to being relied upon as res judicata.
Enc.”
195. The enclosure was an order in the 2022 proceedings in the following terms:
“THE HIGH COURT
Friday 23rd day of September 2022
BEFORE MR JUSTICE HESLIN BETWEEN
CHRIS MURRAY & ROSE MURRAY
2022 4876 P
PLAINTIFF
AND
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
DEFENDANT
Upon Motion of Solicitor for the Plaintiff made ex parte to the Court this day and upon reading
the Plenary Summons herein the Affidavit of Rose Murray filed this 23rd day of September
2022 and the exhibits referred to in said Affidavit and upon hearing said Solicitor
IT IS ORDERED that the Defendant the County Council of the County of Meath be restrained
until the 7th Day of November 2022 from taking any further action in the proceedings
entitled the County Council of the County of Meath and Michael Murray and Rose Murray
2007/MCA 76 and Appeal 127/2011. AND IT IS ORDERED that the Plaintiffs Solicitor be at
liberty to notify the making of this Order forthwith to the Defendant by email registered post
and ordinary pre-paid post
IT IS FURTHER ORDERED
1. that the Plaintiff be at liberty to serve short Notice of Motion for an interlocutory
injunction returnable on the 7th day of November 2022
2. That the Plaintiff do send a draft Notice of Motion to the Defendant on today's date
3. that the Plaintiff herein do have liberty to obtain a transcript of the digital audio
recording of the within proceedings on the 23rd September 2022 from Court 1 Four Courts
Complex from 11:46:40 to 11:54:52 and from 12:27:45 to 13:14:30 on condition that the
Plaintiff contact Epiq Global the service providers directly [at Tel: … - email: …] and pay any
costs incurred arising therefrom
And the Court doth reserve the question of costs
Mc Nelis & Company Solicitors for the Plaintiff
…
REGISTRAR
PERFECTED: 26th September 2022”
196. A fourth draft was then sent on the same date, in response to which the applicant stated
that the changes were unnecessary.
197. On 25 March 2026, the registrar wrote to the respondents seeking confirmation of the
physical address – as noted above the letter from the respondents only confirmed the emails.
198. A fifth draft of the order was sent on 25 March 2026. The applicant responded with some
minor changes. The respondents confirmed the address and agreed to the text. The order was then
perfected on 25 March 2026.
199. On 8 April 2026, the registrars again sought a word version of the respondents’ motion, and
this was provided on 14 April 2026.
200. The initial mention date was to be 20 April 2026 but this was administratively adjourned to
27 April 2026.
201. On 22 April 2026, the solicitors for the applicant wrote to the respondents’ solicitor:
“Re: High Court Record No. 2007/76MCA
Applicant -Meath County Council
Respondents — Michael and Rose Murray Dear Colleague, We enclose by way of email and
ordinary post the following in response to your client’s Notice of Motion herein dated the 23”
of March 2026 namely: 1. Affidavit of Brian Murphy sworn 22 April 2026. 2. Exhibit “BM1”
as referred to in the aforesaid Affidavit with the four internal tabs as recited in the aforesaid
affidavit. Yours faithfully”
202. On 24 April 2026, the court indicated to the parties that there would be a further
administrative adjournment to allow for circulation of an anticipated draft judgment.
203. On 11 May 2026, a draft of the present judgment was sent to the parties to give an
opportunity to identify any errors. The rules of engagement in such a situation are that the draft is
without prejudice to the right of the court ultimately to issue a judgment in whatever form or with
whatever content it considers appropriate.
204. Any comments must be emailed to the court and uploaded to ShareFile in writing by the
notified deadline, and should not be to reargue the substance (submissions to that effect will be
disregarded) but are confined to matters such as typographical and other errors and the like.
205. It is then entirely a matter for the court as to whether to list the matter for mention, or
whether to simply give judgment with or without amendment to respond to any such comments or
for any other reason that appears appropriate to the court. Any judgment may be given without
further notice following the expiry of the specified period, whether comments are made or not. That
period will not be extended save in exceptional circumstances. All parties involved are required to
positively confirm to the court the position including if they have no observations on the draft
legitimately falling within the foregoing parameters. Overall the draft judgment procedure is a
concession which parties can engage with but must do so with immediate dispatch, discipline and
focus – it is not the opening of a new phase of the litigation that gives rise to “an entitlement to
elaborate procedures at every point” (to use a phrase of O’Donnell C.J. (Dunne, Charleton and Baker
JJ. concurring) in O’Sullivan v. Health Service Executive [2023] IESC 11 (Unreported, Supreme
Court, 10 May 2023) at para. 39); and still less should the procedure invite the perhaps “serious
error, to which lawyers are prone, to approach any such case on the tacit assumption that only
procedures which approximate to a criminal trial are fair, and anything which departs from that is
somehow dubious” (O’Donnell J. in O'Sullivan v. Sea Fisheries Protection Authority [2017] IESC 75,
[2017] 3 I.R. 751, [2018] 1 I.L.R.M. 245, 780).
206. Draft judgments are not public domain materials and, while they can be shared between the
lawyers concerned and their clients, subject to the following, it is inappropriate for any person to
refer to them for any purpose other than to assist the court in relation to the finalisation of the
formal judgment. Therefore anyone with information as to the text, content or proposed outcome
of any draft is required not to publish or transmit such information to others save solely by way of
private transmission for the legitimate purposes of assisting in the finalisation of the judgment and
subject to a similar restriction on any recipient. Trial participants should take reasonable steps to
keep drafts confidential. On this topic, see Attorney General v. Crosland (No. 2) [2021] UKSC 58,
[2022] 1 W.L.R. 367, [24/01/2022] T.L.R. 1 which discusses why restriction on publication of draft
judgments is in the interests of the administration of justice; see also Baigent v. Random House
Group Ltd [2006] EWHC 1131 (Ch), [2006] 5 WLUK 45, (2006) 150 S.J.L.B. 603 (Smith J.); R.
(Counsel General for Wales) v. Secretary of State for Business, Energy and Industrial Strategy
[2022] EWCA Civ 181, [2022] 1 W.L.R. 1915, [2022] 4 All E.R. 599 (Sir Geoffrey Vos MR; Davies
and Dingemans LJJ. concurring); Public Institution for Social Security v. Banque Pictet & Cie SA and
others [2022] EWCA Civ 368, [2022] 3 WLUK 291, [2022] B.L.R. 349 (Carr LJ; Jackson and Simler
LJJ. concurring); Itkin v. Wood [2023] JRC 101 (Unreported, Royal Court of Jersey, 22 June 2023).
The contents of this paragraph constitute an immediately effective direction of the court to the
parties and anyone having notice of the draft judgment with effect from the date of circulation of
the draft.
207. The deadline for such comments from the parties was to be 16:00 on Wednesday 13 May
2026. The council had one short comment recorded above. The respondents provided a 5 page
letter with extensive commentary which goes a bit beyond what I had envisaged by way of an
invitation to correct errors. Nonetheless it was easier on this occasion, non-precedentially, to record
these comments above.
Order
208. For the foregoing reasons the order made on 23 March 2026 was that:
(i) pursuant to O. 44 r. 4 RSC it be determined, on the basis set out in the judgment,
that as of the date of the order the respondents were in contempt of court as per
the previous declaration of the court noting that the respondents were not making
an issue of contempt for present purposes but would be seeking to revisit the issue
in the context of their proposed motion;
(ii) the respondents be discharged from attachment on condition that they comply with
the undertakings furnished by them on oath;
(iii) the matter be adjourned generally other than as to the question of costs and the
respondents’ motion, and that such matters be listed for mention on 27 April 2026
for purposes of directions;
(iv) the order for substituted service be replaced by an order for substituted service via
(a) the respondents’ solicitors’ email, (b) the direct emails for the respondents
furnished that day, (c) ordinary post to the address furnished that day and (d) being
affixed to the property; and
(v) costs be reserved.
SCHEDULES – ORDERS
Schedule 1 – Section 160 order – 27 July 2010
THE HIGH COURT
2007 No 76 MCA
Tuesday the 27th day July 2010
BEFORE MR JUSTICE EDWARDS
IN THE MATTER OF SECTION 160 OF THE PLANNING & DEVELOPMENT ACT, 2000, AS AMENDED
BETWEEN
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
AND
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
Upon Motion of Counsel for the Applicant made unto the Court on the 8th day of March 2010 pursuant
to Notice of Motion herein dated the 4th day of July 2007 in the presence of the Counsel for the
Respondents
Whereupon and on reading the Pleadings herein and the Affidavits listed in the Schedule hereto and
the documents and exhibits therein referred to in the said Affidavits
And on hearing said respective Counsel The Court doth Reserve judgment herein
And the same coming on accordingly for judgment on 29th day of June 2010
IT IS ORDERED that
1. the Respondents and each of them, their respective servants or agents, licensees. or any persons
[acting] in consort with them. and all persons having knowledge of the granting or any Order herein,
be restrained from carrying out any unauthorized development of land owned and occupied by the
Respondents at Faughan Hill, Bohermeen, Navan, in the County of Meath. being part of the lands
comprised in Folio 14049 of the Register of Freeholders, County Meath (hereinafter referred to as
'the said lands').
2. the Respondents and each of them, their respective servants or agents, licensees or anyone acting
in consort with them and all persons having knowledge of the granting of any Order herein, be
restrained from continuing with the unauthorised use of the said lands and in particular the use of
the said lands for residential purposes.
3. the Respondents remove an unauthorised development from the said lands namely a residential
building constructed by or on behalf of the Respondents on the said lands.
4. the Respondents do forthwith restore the said lands to a condition suitable for agricultural use
being their condition prior to the carrying out of the unauthorized development on the said lands
namely the construction of a residential building.
And IT IS ORDERED that the Order herein be stayed for a period of twenty four months from the
date hereof the said Orders to be complied with in full before the expiry of the said stay
And there being no appearance by or on behalf of the Respective parties
IT IS FURTHER ORDERED that the question of the costs of this Action and Order be adjourned to 6th
day of July 2010
And the same coming on accordingly on the 6th day of July 2010 and on this day in the presence of
the said Respective Counsel
IT IS ORDERED that the Respondents do pay the Applicant the costs of the Action when taxed and
ascertained
...
REGISTRAR
PERFECTED: 11-03-2010 [sic]
Regan McEntee & Partners
Solicitors for the Applicant
Solicitors for the Respondents
SCHEDULE HEREINBEFORE REFERRED TO
Deponent Date Filed
Wendy Moffett 04/07/2002
Jimmy Young 04/07/2007
Colm Markey 18/03/2008
Michael Murray 14/04/2008
Michael Griffin 18/03/2008 (2)
20/07/2009
Schedule 2 – Order dismissing appeal – 25 May 2017
SUPREME COURT
No 127/1
Thursday the 25th day of May 2017
BEFORE
THE CHIEF JUSTICE
MR JUSTICE O'DONNELL
MR JUSTICE McKECHNIE
MISS JUSTICE LAFFOY
MS JUSTICE DUNNE
2007 No 76 MCA
BETWEEN
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
AND
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
The Motion on the part of the Respondents/Appellants pursuant to Notice of Appeal dated the 24th
day of March 2011 by way of appeal from the Judgment and
Order of the High Court (Mr Justice Edwards) given on. the 29th day of June 2010 and made on the
27th day of July 2010 which restrained the Respondents their agents and all persons having
knowledge of the said Order from carrying out any unauthorised development of land - and in
particular the use of the said lands for residential purposes owned and occupied by the Respondents
and Ordered that the Respondents remove an unauthorised development namely a residential
building constructed for the Respondents from the said lands and restore said lands to a condition
suitable for agricultural use and for an Order setting aside the said Judgment and Order on the
grounds and as set forth in the said Notice of Appeal coming on for hearing before this Court on the
17th day of October 2016
Whereupon and on reading the said Notice of Appeal the said Order the documents therein referred
to the judgment of the High Court and the written submissions filed on behalf of the respective
parties and on hearing Counsel for the Respondents and Counsel for the Applicant
IT WAS ORDERED that the case should stand for judgment
And the same being listed for judgment on the 19th day of May 2017 and being called on accordingly
in the presence of said respective Counsel
IT WAS ORDERED AND ADJUDGED that this appeal be dismissed and that the said Order or the High
Court do stand affirmed accordingly - said Order be stayed for a further twelve (12) months
And the question or costs having been adjourned and coming on accordingly this day
IT IS ORDERED that the Respondents/Appellants do pay to the Applicant the costs of this appeal
when taxed and ascertained - the Court NOTING that the Applicant is agreeable to a one year stay
on any Order for costs in its favour subject to the Appellants complying with this Court Order within
the one year specified - Compliance within the specified time and the stay would be permanent
…
ASSISTANT REGISTRAR
Perfected 30th May 2017
Schedule 3 – Order receiving undertaking – 24 September 2020
THE HIGH COURT
THURSDAY THE 24TH DAY OF SEPTEMBER 2020
BEFORE MR JUSTICE MEENAN
2007 No.76 MCA
IN THE MATTER OF SECTION 160 OF THE PLANNING & DEVELOPMENT ACT, 2000, AS AMENDED
BETWEEN THE COUNTY COUNCIL OF THE COUNTY OF MEATH
AND
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
Upon Motion of Counsel for the Applicant made unto the Court this day pursuant to Notice dated the
4th day of March 2019 in the presence of Counsel for the Respondents
And having received an undertaking under oath from each of the Respondents in the following
terms:-
An undertaking on their own behalf and on behalf of any person occupying the premises the subject
matter of the application with their permission,
to vacate the property on or before the 24th September 2022 and to facilitate the
demolition of the premises by the County Council or its agents
And on hearing said Counsel
IT IS ORDERED
1. That the stay on the Order of Mr Justice Edwards made herein on the 27th July 2010 be extended
for two years from the 24th day of September 2020
2. An Order granting the Applicant possession of the premises, the subject of the Order of the 27th
July 2010, for the purpose of carrying out
demolition works, in the event of the undertakings provided by the Respondents not being complied
with, such Order to take effect on the 25th September 2022 and such demolition works to be
completed as expeditiously as the circumstances allow
3. An Order that the Respondents do pay to the Applicant the costs of this Motion and Order when
taxed and ascertained to be adjudicated in
default of agreement, with a permanent stay on the Order for Costs in the event of the undertakings
by the Respondents being complied with
4. Liberty to apply
…
REGISTRAR
Perfected 03/12/2020
Regan McEntee & Partners Solicitors for the Applicant
Neil McNelis
Solicitors for the Respondents
Schedule 4 – Order for substituted service – 13 February 2026
PLANNING AND ENVIRONMENT
2007 76 MCA
Friday the 13th day of February 2026
BEFORE MR JUSTICE RICHARD HUMPHREYS
AND IN THE MATTER OF SECTION 160 OF THE PLANNING AND DEVELOPMENT ACT 2000, AS
AMENDED
BETWEEN
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
-AND-
MICHAEL MURRAY
ROSE MURRAY
RESPONDENTS
Upon application of Counsel for the Applicant being made ex parte unto the Court this day pursuant
to the Ex-parte docket filed on the 10th day of February 2026 seeking the following reliefs
“1. An Order pursuant to Order 10 Rule 1 of the Superior Court Rules, as amended (RSC) and/or
Order 103 Rule 18 of the RSC for an Order of substituted service, granting the Applicant liberty to
serve the first named Respondent, Michael Murray (otherwise known as Christopher /Chris Murray
), with the Orders made in the within proceedings, namely the Order made by Mr Justice Edwards
on the 27th July, 2010, the Order made by Mr Justice McKechnie 25th May 2017 and the Order made
by Mr Justice Meenan Order dated 24th September, 2020 respectively (‘the Orders’), with the penal
endorsement attached thereon, by the following means, namely;
i) The affixing of the Orders, with the penal endorsement attached thereon, to the entrance
gates of lands, situate at Faughan Hill, Bohermeen, Navan, County Meath, being part of the lands
previously comprised in Folio No 14049 of the register of Freeholders for the County of Meath and
which lands are now registered in Folio 59360F of the Register of Freeholders, County Meath and
which lands relate to the Orders made in the within proceedings (‘the lands’).
ii) Service of the Orders, on the first named Respondent, by means of ordinary pre-paid post
addressed to him at Faughan Hill, Bohermeen, Navan, County Meath.
iii) The service of the Orders on the Respondents solicitors, Messrs McNelis & Company
Solicitors, The Square, Milltown Malbay County Clare, A95 K259, Email: … by email and ordinary
pre-paid post
2. An Order permitting service of any further applications brought by the Applicants against both
Respondents in the within proceedings, seeking enforcement of any or all of the Orders made herein
in the manner provided for at paragraphs 1(i), 1(ii) and 1(iii) herein
3. Such further or other Orders as to this Honourable Court seem meet and just.
4. Order for costs.”
In the presence of Counsel for the Applicant
Whereupon and on reading the Ex-Parte docket and Affidavits (2) of David McEntee filed on the 10th
and 13th days of February 2026 and the Affidavit of Patrick Tully filed on the 10th day of February
2026 and the Affidavit of David McGlynn sworn on the 27th day of June 2017 and the Affidavit of
Martin Barrins sworn on 27th day of November 2012 and the exhibits therein referred to
And on hearing said Counsel
IT IS ORDERED that
1. the Applicant is granted liberty to serve the first named Respondent Michael Murray
(otherwise known as Christopher /Chris Murray) with the Orders made in the within proceedings
namely the Order made by Mr Justice Edwards on the 27th day of July 2010 and the Order made by
Mr Justice McKechnie on the 25th day of May 2017 and the Order made by Mr Justice Meenan on
the 24th day of September 2020 respectively (‘the Orders’) with the penal endorsement attached
thereon by the following means namely
(i) The affixing of the Orders with the penal endorsement attached thereon to the entrance
gates of lands situated at Faughan Hill of Bohermeen in Navan in County Meath being part of the
lands previously comprised in Folio No 14049 of the register of Freeholders for the County of Meath
and which lands are now registered in Folio 59360F of the Register of Freeholders in County Meath
and which lands relate to the Orders made in the within proceedings (‘the lands’)
(ii) Service of the Orders on the First-named Respondent by means of ordinary pre-paid post
addressed to him at Faughan Hill of Bohermeen in Navan in County Meath
(iii) The service of the Orders on the First-named Respondent’s solicitors namely Messrs McNelis
& Company Solicitors of The Square in Milltown Malbay in County Clare A95 K259 by email to … and
by ordinary pre-paid post
2. service is permitted of the within Order made on 13th day of February 2026 and any further
applications brought by the Applicant against the First-named Respondent in the within proceedings
seeking enforcement of any or all of the Orders made herein in a similar fashion and/or manner as
provided for at paragraphs 1(i) and 1(ii) and 1(iii) herein
3. the matter is admitted to Planning and Environment list
4. the matter is adjourned to the Planning and Environment list on Monday 23rd day of
February 2026
5. The costs are reserved
…
REGISTRAR
Perfected on: 16/02/2026
Regan McEntee and Partners
Solicitors for the Applicant
Schedule 5 – Order for attachment (perfected order as amended) – 9 March 2026
PLANNING AND ENVIRONMENT
2007 76 MCA
Monday the 9th day of March 2026
BEFORE MR JUSTICE RICHARD HUMPHREYS
IN THE MATTER OF SECTION 160 OF THE PLANNING & DEVELOPMENT ACTS, 2000 AS AMENDED
AND IN THE MATTER OF AN APPLICATION BY
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
-AND-
MICHAEL MURRAY
ROSE MURRAY
RESPONDENTS
Upon reading the Order of Edwards J dated 27th July 2010 perfected on 3rd March 2011
And upon reading the Order of the Supreme Court dated 25th May 2017 perfected on 30th May 2017
And upon reading the Order of Meenan J. dated 24th September 2020 perfected on 3rd December
2020 which said Order records that in the presence of counsel for the Respondents the Court received
an undertaking under oath from each of the Respondents in the following terms
An undertaking on their own behalf and on behalf of any persons
occupying the premises the subject matter of the application with their permission to vacate the
property on or before the 24th September 2022 and to facilitate the demolition of the premises by
the County Council or its agents
And whereas by the said Order made herein by Mr Justice Meenan dated 24th September 2020
following an undertaking given to the Court by Michael Murray the First-named Respondent and Rose
Murray the Second-named Respondent to vacate the property on or before the 24th September
2022 IT WAS ORDERED it was ordered that the Applicant take possession of the premises the subject
of the Order of the 27th July 2010 at Faughan Hill in Bohermeen in Navan in County Meath for the
purpose of carrying out demolition works in the event of the undertakings provided by the
Respondents not being complied with such Order to take effect on the 25th September 2022 and
such demolition works to be completed as expeditiously as circumstances allow
Now upon Motion this day made unto the Court by Counsel for the Applicant pursuant to Notice of
Motion herein filed on the 3rd March 2026 and on reading said Motion the undertaking given under
Oath by the First- and Second-named Respondents dated 24th September 2020 the Order of Mr
Justice Meehan dated 24th September 2020 the Supreme Court Order dated 25th May 2017 the
Order of Mr Justice Edwards dated 27th July 2010 the Order of Mr Justice Humphreys dated 13th
February 2026 the grounding affidavit of John Sweeney filed on the 3rd March 2026 and the exhibits
therein referred to the affidavit of David McEntee filed on the 3rd March 2026 and the exhibits therein
referred to the affidavit of Martin Barrins dated 27th November 2012 (unfiled) the affidavit of David
McGlynn dated 27th June 2017 (unfiled) the affidavits of Patrick Tully dated the 4th September 2025
(unfiled) and 10th February 2026 and the exhibits therein referred to the affidavit of service of this
Affidavit and Notice of Motion and the Affidavits of David McEntee filed on the 3rd March 2026 and
9th March 2026 and the Affidavits of John Sweeney filed on the 3rd March 2026 and 9th March 2026
and the Order of Mr Justice Meenan dated 24th September 2020
And upon hearing from Counsel for the Applicant and there being no appearance by or on behalf of
the Respondents
And the Court declaring service of the within application/proceedings on the First- and/or Second-
named Respondent good and sufficient having regard to the evidence of attempted personal service
of the within proceedings on the Respondents and the evidence of alternative methods of service
effected by the Council its servants or agents on the Respondents finding that the service of the
within motion on the Respondents as outlined to the Court on this day be deemed good and sufficient
service
IT IS ORDERED THAT there be an Order permitting service of the within Order and any further
papers in the proceedings on both Respondents in the within proceedings seeking enforcement of
any or all of the Orders made by the following means namely
i) The affixing thereon to the entrance gates of lands situate at Faughan Hill in Bohermeen in Navan
in County Meath being part of the lands previously comprised in Folio No 14049 of the register of
Freeholders for the County of Meath and which lands are now registered in Folio 59360F of the
Register of Freeholders County Meath and which lands relate to the Orders made in the within
proceedings
ii) Service by means of ordinary pre-paid post addressed to him at Faughan Hill in Bohermeen in
Navan in County Meath
iii) The service on the Respondents solicitors Messrs McNelis & Company Solicitors of The Square in
Milltown Malbay in County Clare A95 K259 Email: … by email and ordinary pre-paid post
The Court DOTH DECLARE that the First- and Second-named Respondents are in Contempt of Court
having failed and/or refused to comply with the undertaking given under Oath to Mr. Justice Meenan
on the 24th September 2020 by the said First- and Second-named Respondents on their own behalf
and on behalf of any persons occupying the premises with their permission being the premises
situate at Faughan Hill in Bohermeen in Navan in County Meath comprised in Folio No.14049 of the
Register of Freeholders for the County of Meath and which lands are now registered in Folio 59360F
of the Register of Freeholder in County Meath that the First- and Second-named Respondent vacate
the premises on or before the 24th September 2022 and facilitate the demolition of the premises by
the County Council or its agents in circumstances where the First- and Second-named Respondent
have failed and/or refused to vacate the premises and have failed and/or refused to facilitate the
demolition of the premises by the Council thereby preventing the Council from obtaining vacant
possession of the premises for the purpose of carrying out demolition works at the premises as
Ordered by Mr Justice Meenan by Order dated 24th September 2020 despite due service of the Order
of Mr Justice Meenan with the penal endorsement thereon on the Respondents
IT IS ORDERED that an Order of Attachment do issue directed to the Commissioner and Members of
the Garda Síochána to include the [Superintendent] of Navan Garda Station in Navan in County
Meath against the Respondents at Faughan Hill in Bohermeen in Navan in County Meath to have
each of the Respondents before the Court (Mr. Justice Richard Humphreys, Court number 24, Four
Courts, Inns Quay, Dublin 7) at 9.30 am on Monday the 16th March 2026 (or first opportunity
thereafter) to answer for the contempt of Court for failing and/or refusing to comply with the
undertaking given under Oath to this Honourable Court on 24th September 2020 and recited in the
Order of Mr Justice Meenan dated 24th September 2020
The Court DOTH DECLARE that the First- and Second-named Respondents are in Contempt of Court
having failed and/or refused to comply with the Order of Mr Justice Edwards made on the 27th July
2010 within the time provided by the Order of Mr Justice Edwards which Order was affirmed and
extended by the Order of the Supreme Court, dated 25th May 2017 and further extended by the
Order of Mr Justice Meenan dated 24th September 2020 in that the First- and Second-named
Respondents were Ordered to remove the unauthorised residential building constructed by the
Respondents at the premises and to restore the premises to a condition suitable for agricultural use
by the 24th September 2022 and in circumstances where that time frame has now expired and
despite its expiry the Respondents have failed and/or refused to remove the unauthorised residential
building constructed at the premises and have failed and/or refused to restore the premises to a
condition suitable for agricultural use in breach of the Order of Mr Justice Edwards as affirmed and
extended by Order of the Supreme Court dated 25th May 2017 and further extended by the Order
of Mr Justice Meenan despite due service of the Order of Mr Justice Edwards the Order of the
Supreme Court dated 25th May 2017 and the Order of Mr Justice Meenan with the penal
endorsements thereon on the Respondents
The Court DOTH ADJOURN the reliefs sought at paragraphs 4 and 6 and 7 and 8 and 9 and 10 and
11 of the Notice of Motion filed on the 3rd March 2026 and the reliefs sought insofar as concerns
committal to the ADV List of Mr. Justice Humphreys on Monday 16th March 2026
And the Court DOTH RESERVE the question of costs
…
REGISTRAR
PERFECTED: 10/03/2026
Regan McEntee and PTS Solicitors
Solicitors for the Applicant
Neil McNelis & Co.
Solicitors for the First- and Second-Named Respondents
[As amended under the slip rule on 12 March 2026]
Schedule 6 – Order of attachment from Central Office – 11 March 2026
No. 11.
0. 44, r. 1
THE HIGH COURT PLANNING AND ENVIRONMENT
Record no: 2007/76MCA
IN THE MATTER OF SECTION 160 OF THE PLANNING AND DEVELOPMENT ACT 2000 AS AMENDED
AND IN THE MATTER OF AN APPLICATION BY
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
AND
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
ORDER OF ATTACHMENT.
To the Commissioner and Members of the Garda Siochana (to include the Superintendent of Navan
Garda Station, Navan County Meath), greetings.
Whereas lately in the High Court by order of Mr Justice Humphreys on the 09th day of March 2026
it was adjudged that Michael Murray and Rose Murray, the Respondents herein, of Faughan Hill,
Bohermeen, Navan, County Meath(' the premises'), should be attached on the ground that they are
in default in that they have failed and/or refused to comply with the undertaking given under Oath
to this Honourable Court on 24th September, 2020 and recited in the Order of Mr Justice Meenan
dated 24th September 2020, whereby the first and second named Respondents undertook to vacate
the premises on or before the 24th September 2022 and to facilitate the demolition of the premises
by the Council, in circumstances where the Respondents have failed and refused to vacate the
premises and have failed and/or refused to facilitate the demolition of the premises by the Council,
in breach of their undertaking to the Court on the 24th September, 2020 and recited in the Order of
Mr Justice Meenan dated 24th September 2020.
You are hereby commanded to attach the said Michael Murray and Rose Murray so as to have them
before the High Court sitting at the Four Courts, Dublin 7 (Mr. Justice Richard Humphreys, Court
number 24), at 9.30 am on Monday the 16th March 2026 (or first opportunity thereafter) there to
answer for the contempt which by reason of such default it is alleged they have committed against
the High Court, as well as such other matters as shall then
and there be charged against them, and further to perform and abide such order as the High Court
shall make in [its] behalf, and have you then and there this order.
BY ORDER - the Honourable Donal O'Donnell, Chief Justice of Ireland, the 11th day of March Two
Thousand and Twenty-Six
Registrar
This order was issued by Regan McEntee & Partners LLP, 26 High St, Townparks North, Trim, Co.
Meath,. Solicitors for the Applicant, The County Council of Meath.
The said Rose Murray, is a lady and his place of residence is Faughan Hill, Bohermeen, Navan,
County Meath
The said Michael Murray, is a gentleman and his place of residence is Faughan Hill, Bohermeen,
Navan, County Meath
PRAECIPE ORDER OF ATTACHMENT
THE HIGH COURT
Record Number: 2007 76 MCA
Between:
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
-and-
MICHAEL MURRAY ROSE MURRAY
RESPONDENTS
This order was issued at the Central Office High Court Dublin 7
Seal an order of attachment directed to the Commissioner and Members of the Garda Siochana to
include the Superintendent of Navan Garda Station in Navan in County Meath
Against Michal Murray and Rose Munay with a place of residence at Faughan Hill Bohermeen Navan
County Meath for not complying with the undertaking given under Oath to this Honourable Court on
24th September 2020 and recited in the Order of Mr Justice Meenan dated the 24th September
2020.
Order Dated 11th day of March 2026
Regan McEntee & Partners
Solicitors for the Applicant
High Street
Trim
Co. Meath
Schedule 7 – Order for removal of obstruction – 16 March 2026
PLANNING AND ENVIRONMENT
2007 76 MCA
Monday the 16th day of March 2026
BEFORE MR JUSTICE RICHARD HUMPHREYS
IN THE MATTER OF SECTION 160 OF THE PLANNING AND DEVELOPMENT ACTS, 2000 AS AMENDED
AND IN THE MATTER OF AN APPLICATION BY
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
-AND-
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
Upon Motion of Counsel for the Applicant made unto the Court on this day pursuant to the Notice of
Motion herein dated the 3rd day of March 2026 seeking inter alia an Order pursuant to Order 44
Rules 1 and 2 and 3 of the Rules of the Superior Courts 1986 (as amended) (‘RSC’) and/or pursuant
to the inherent Jurisdiction of this Honourable Court giving liberty to the Council to issue an Order
for Committal to prison of the Respondents for failing and/or refusing to comply with the undertaking
given under Oath to this Honourable Court on the 24th day of September 2020 and recited in the
Order of Mr Justice Meenan therein whereby the first and second named Respondents undertook to
vacate the premises on or before the 24th day of September 2022 and to facilitate the demolition
of the premises by the Council in circumstances where the first and Respondents have failed and/or
refused to vacate the premises and have failed and/or refused to facilitate the demolition of the
premises by the Council which is in breach of their undertaking to the Court dated the 24th day of
September 2020 and recited in the Order of Mr Justice Meenan and despite personal service of the
Order of Mr Justice Meenan on the Respondents with the penal endorsement thereon on the 9th day
of June 2025
And there being no attendance from the said Respondents
And on reading the said Notice
Upon reading the Order of this Honourable Court (Mr Justice Edwards) dated 27th July 2010
perfected on 3rd March 2011
And upon reading the Order of the Supreme Court dated 25th May 2017 perfected on 30th May 2017
And upon reading the Order of this Honourable Court (Mr Justice Meenan) dated 24th September
2020 perfected on 3rd December 2020 which said Order records that in the presence of counsel for
the Respondents the Court received an undertaking under oath from each of the Respondents in the
following terms
An undertaking on their own behalf and on behalf of any persons
occupying the premises the subject matter of the application with their permission to vacate the
property on or before the 24th September 2022 and to facilitate the demolition of the premises by
the County Council or its agents
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 13th day of
February 2026 perfected on the 16th day of February 2026
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 9th day of
March 2026 perfected on the 10th day of March 2026 and amended under the slip rule on the 13th
day of March 2026
And on reading the Order of Attachment issued herein out of the Central Office on the 11th day of
March 2026
And the Court being satisfied as to the service of the said Notice and of the said Order of the Court
of the 24th day of September 2020 endorsed with the penal endorsement on the Respondents
And on reading the Affidavits (2) of John Sweeney filed on the 3rd day of March 2026 and on the
9th day of March 2026 and the exhibits therein referred to and the Affidavits (4) of David McEntee
filed on the 10th day of February 2026 and on the 13th day of February 2026 and on the 3rd day of
March 2026 and on the 9th day of March 2026 and the exhibits therein referred to and the affidavit
of Martin Barrins dated the 27th day of November 2012 (unfiled) the affidavit of David McGlynn
dated 27th day of June 2017 (unfiled) the affidavits of Patrick Tully dated the 4th day of September
2025 filed on the 13th day of March 2026 and the 10th day of February 2026 and the exhibits therein
referred to the affidavit of service of this Affidavit and Notice of Motion and the Affidavit of John
Sweeney sworn on the 13th day of March 2026 (unfiled) and the Affidavit of David McEntee sworn
on the 13th day of March 2026 (unfiled)
And on hearing the Counsel for the Applicant and upon hearing the oral evidence of the witness for
the Applicant Sergeant David Bowen
And the Court being satisfied that the Respondents have been guilty of contempt of this Court having
failed and/or refused to comply with the undertaking given under Oath to Mr. Justice Meenan on the
24th day of September 2020 by the said Respondents on their own behalf and on behalf of any
persons occupying the premises with their permission being the premises situate at Faughan Hill in
Bohermeen in Navan in County Meath comprised in Folio No.14049 of the Register of Freeholders
for the County of Meath and which lands are now registered in Folio 59360F of the Register of
Freeholder in County Meath (“the premises”) that the Respondents vacate the premises on or before
the 24th September 2022 and facilitate the demolition of the premises by the County Council or its
agents in circumstances where the Respondents have failed and/or refused to vacate the premises
and have failed and/or refused to facilitate the demolition of the premises by the Council thereby
preventing the Council from obtaining vacant possession of the premises for the purpose of carrying
out demolition works at the premises as Ordered by Mr Justice Meenan by Order dated the 24th day
of September 2020 despite due service of the Order of Mr Justice Meenan with the penal
endorsement thereon on the Respondents
IT IS ORDERED that
1. Without prejudice to existing powers of the Applicant whether under orders of Court or
otherwise the Applicant is authorised to remove and detain any and all vehicles and/or animals
and/or moveable property at the premises the subject of the within proceedings or obstructing
access thereto and retain them pending further order of the Court and the Applicant is authorised
to change any locks and to close or alter any openings
2. An Garda Síochána be required to attend at the premises with the Applicant at any
attendance by the Applicant and/or servants or agents of the Applicant at the premises and prevent
any obstruction of the Order of the Court and to endeavour to execute the aforementioned Order for
Attachment issued the 11th day of March 2026 and to otherwise assist within the scope their
functions
3. An Garda Síochána be permitted to use reasonable force to ensure compliance with the
orders of the Court and to Attach the First and Second Named Respondents
4. The within proceedings do stand adjourned to 13:00 on this day the 16th day of March 2026
or such later time as convenient to the court
5. For avoidance of doubt the existing orders for substituted service will apply to service of this
order
6. Costs reserved
…
REGISTRAR
PERFECTED 16/03/2026
Regan McEntee & Pts Solicitors
Solicitor for the Applicant
Neil McNelis & Co
Solicitor for the Respondents
Schedule 8 – Order adjourning proceedings – 16 March 2026
PLANNING AND ENVIRONMENT
2007 76 MCA
Monday the 16th day of March 2026
BEFORE MR JUSTICE RICHARD HUMPHREYS
IN THE MATTER OF SECTION 160 OF THE PLANNING AND DEVELOPMENT ACTS, 2000 AS AMENDED
AND IN THE MATTER OF AN APPLICATION BY
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
-AND-
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
Upon Motion of Counsel for the Applicant made unto the Court on this day pursuant to the Notice of
Motion herein dated the 3rd day of March 2026 seeking inter alia an Order pursuant to Order 44
Rules 1 and 2 and 3 of the Rules of the Superior Courts 1986 (as amended) (‘RSC’) and/or pursuant
to the inherent Jurisdiction of this Honourable Court giving liberty to the Council to issue an Order
for Committal to prison of the Respondents for failing and/or refusing to comply with the undertaking
given under Oath to this Honourable Court on the 24th day of September 2020 and recited in the
Order of Mr Justice Meenan therein whereby the first and second named Respondents undertook to
vacate the premises on or before the 24th day of September 2022 and to facilitate the demolition
of the premises by the Council in circumstances where the first and Respondents have failed and/or
refused to vacate the premises and have failed and/or refused to facilitate the demolition of the
premises by the Council which is in breach of their undertaking to the Court dated the 24th day of
September 2020 and recited in the Order of Mr Justice Meenan and despite personal service of the
Order of Mr Justice Meenan on the Respondents with the penal endorsement thereon on the 9th day
of June 2025
And there being no attendance from the said Respondents
And on reading the said Notice
Upon reading the Order of this Honourable Court (Mr Justice Edwards) dated 27th July 2010
perfected on 3rd March 2011
And upon reading the Order of the Supreme Court dated 25th May 2017 perfected on 30th May 2017
And upon reading the Order of this Honourable Court (Mr Justice Meenan) dated 24th September
2020 perfected on 3rd December 2020 which said Order records that in the presence of counsel for
the Respondents the Court received an undertaking under oath from each of the Respondents in the
following terms
An undertaking on their own behalf and on behalf of any persons
occupying the premises the subject matter of the application with their permission to vacate the
property on or before the 24th September 2022 and to facilitate the demolition of the premises by
the County Council or its agents
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 13th day of
February 2026 perfected on the 16th day of February 2026
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 9th day of
March 2026 perfected on the 10th day of March 2026 and amended under the slip rule on the 13th
day of March 2026
And on reading the Order of Attachment issued herein out of the Central Office on the 11th day of
March 2026
And on reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 16th day of
March 2026 perfected on the 16th day of March 2026
And the Court being satisfied as to the service of the said Notice and of the said Order of the Court
of the 24th day of September 2020 endorsed with the penal endorsement on the Respondents
And on reading the Affidavits (2) of John Sweeney filed on the 3rd day of March 2026 and on the
9th day of March 2026 and the exhibits therein referred to and the Affidavits (4) of David McEntee
filed on the 10th day of February 2026 and on the 13th day of February 2026 and on the 3rd day of
March 2026 and on the 9th day of March 2026 and the exhibits therein referred to and the affidavit
of Martin Barrins dated the 27th day of November 2012 (unfiled) the affidavit of David McGlynn
dated 27th day of June 2017 (unfiled) the affidavits of Patrick Tully dated the 4th day of September
2025 filed on the 13th day of March 2026 and the 10th day of February 2026 and the exhibits therein
referred to the affidavit of service of this Affidavit and Notice of Motion and the Affidavit of John
Sweeney sworn on the 13th day of March 2026 (unfiled) and the Affidavit of David McEntee sworn
on the 13th day of March 2026 (unfiled)
And on hearing Counsel for the Applicant and upon hearing the oral evidence of the witness for the
Applicant Sergeant David Bowen of Kells Garda Station
And the Court being satisfied that the Respondents have been guilty of contempt of this Court having
failed and/or refused to comply with the undertaking given under Oath to Mr. Justice Meenan on the
24th day of September 2020 by the said Respondents on their own behalf and on behalf of any
persons occupying the premises with their permission being the premises situate at Faughan Hill in
Bohermeen in Navan in County Meath comprised in Folio No.14049 of the Register of Freeholders
for the County of Meath and which lands are now registered in Folio 59360F of the Register of
Freeholder in County Meath (“the premises”) that the Respondents vacate the premises on or before
the 24th September 2022 and facilitate the demolition of the premises by the County Council or its
agents in circumstances where the Respondents have failed and/or refused to vacate the premises
and have failed and/or refused to facilitate the demolition of the premises by the Council thereby
preventing the Council from obtaining vacant possession of the premises for the purpose of carrying
out demolition works at the premises as Ordered by Mr Justice Meenan by Order dated the 24th day
of September 2020 despite due service of the Order of Mr Justice Meenan with the penal
endorsement thereon on the Respondents
IT IS ORDERED that
1. An Garda Síochána do furnish to the Applicant the phone numbers believed to be the mobile
numbers of the First and Second Named Respondents for the purpose of enabling the Applicant to
notify the First and Second Named Respondents via mobile phone of all the applications and Orders
made in respect of the within proceedings
2. The within proceedings be adjourned generally with liberty to apply with 24 hours notice in
accordance with the existing orders for substituted service and service via mobile phone to the
numbers as so furnished or on an ex parte basis in the case of urgency
3. Costs reserved
…
REGISTRAR
PERFECTED 16/03/2026
Regan McEntee & Pts Solicitors
Solicitor for the Applicant
Neil McNelis & Co
Solicitor for the Respondents
Schedule 9 – Order regarding arrangements for demolition – 18 March 2026
PLANNING AND ENVIRONMENT
2007 76 MCA
Wednesday the 18th day of March 2026
BEFORE MR JUSTICE RICHARD HUMPHREYS
IN THE MATTER OF SECTION 160 OF THE PLANNING AND DEVELOPMENT ACTS, 2000 AS AMENDED
AND IN THE MATTER OF AN APPLICATION BY
MEATH COUNTY COUNCIL
APPLICANT
-AND-
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
Upon Motion of Counsel for the Applicant made unto the Court on this day pursuant to the Notice of
Motion herein dated the 3rd day of March 2026 seeking inter alia an Order pursuant to Order 44
Rules 1 and 2 and 3 of the Rules of the Superior Courts 1986 (as amended) (‘RSC’) and/or pursuant
to the inherent Jurisdiction of this Honourable Court giving liberty to the Council to issue an Order
for Committal to prison of the Respondents for failing and/or refusing to comply with the undertaking
given under Oath to this Honourable Court on the 24th day of September 2020 and recited in the
Order of Mr Justice Meenan therein whereby the first and second named Respondents undertook to
vacate the premises on or before the 24th day of September 2022 and to facilitate the demolition
of the premises by the Council in circumstances where the first and Respondents have failed and/or
refused to vacate the premises and have failed and/or refused to facilitate the demolition of the
premises by the Council which is in breach of their undertaking to the Court dated the 24th day of
September 2020 and recited in the Order of Mr Justice Meenan and despite personal service of the
Order of Mr Justice Meenan on the Respondents with the penal endorsement thereon on the 9th day
of June 2025
And there being no attendance from the said Respondents
And on reading the said Notice
Upon reading the Order of this Honourable Court (Mr Justice Edwards) dated 27th July 2010
perfected on 3rd March 2011
And upon reading the Order of the Supreme Court dated 25th May 2017 perfected on 30th May 2017
And upon reading the Order of this Honourable Court (Mr Justice Meenan) dated 24th September
2020 perfected on 3rd December 2020 which said Order records that in the presence of counsel for
the Respondents the Court received an undertaking under oath from each of the Respondents in the
following terms
An undertaking on their own behalf and on behalf of any persons
occupying the premises the subject matter of the application with their permission to vacate the
property on or before the 24th September 2022 and to facilitate the demolition of the premises by
the County Council or its agents
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 13th day of
February 2026 perfected on the 16th day of February 2026
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 9th day of
March 2026 perfected on the 10th day of March 2026 and amended under the slip rule on the 13th
day of March 2026
And on reading the Order of Attachment issued herein out of the Central Office on the 11th day of
March 2026
And on reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 16th day of
March 2026 perfected on the 16th day of March 2026 and the Order of this Honourable Court (Mr
Justice Humphreys) dated the 16th day of March 2026 perfected on the 18th day of March 2026
And the Court being satisfied as to the service of the said Notice and of the said Order of the Court
of the 24th day of September 2020 endorsed with the penal endorsement on the Respondents
And on reading the Affidavits (2) of John Sweeney filed on the 3rd day of March 2026 and on the
9th day of March 2026 and the exhibits therein referred to and the Affidavits (4) of David McEntee
filed on the 10th day of February 2026 and on the 13th day of February 2026 and on the 3rd day of
March 2026 and on the 9th day of March 2026 and the exhibits therein referred to and the affidavit
of Martin Barrins dated the 27th day of November 2012 (unfiled) the affidavit of David McGlynn
dated 27th day of June 2017 (unfiled) the affidavits of Patrick Tully dated the 4th day of September
2025 filed on the 13th day of March 2026 and the 10th day of February 2026 and the exhibits therein
referred to the affidavit of service of this Affidavit and Notice of Motion and the Affidavit of John
Sweeney sworn on the 13th day of March 2026 (unfiled) and the Affidavit of David McEntee sworn
on the 13th day of March 2026 (unfiled)
And on hearing the Counsel for the Applicant and upon hearing the oral evidence of the witness for
the Applicant Sergeant David Bowen and Brian Murphy
And the Court being satisfied that the Respondents have been guilty of contempt of this Court having
failed and/or refused to comply with the undertaking given under Oath to Mr. Justice Meenan on the
24th day of September 2020 by the said Respondents on their own behalf and on behalf of any
persons occupying the premises with their permission being the premises situate at Faughan Hill in
Bohermeen in Navan in County Meath comprised in Folio No.14049 of the Register of Freeholders
for the County of Meath and which lands are now registered in Folio 59360F of the Register of
Freeholder in County Meath (“the premises”) that the Respondents vacate the premises on or before
the 24th September 2022 and facilitate the demolition of the premises by the County Council or its
agents in circumstances where the Respondents have failed and/or refused to vacate the premises
and have failed and/or refused to facilitate the demolition of the premises by the Council thereby
preventing the Council from obtaining vacant possession of the premises for the purpose of carrying
out demolition works at the premises as Ordered by Mr Justice Meenan by Order dated the 24th day
of September 2020 despite due service of the Order of Mr Justice Meenan with the penal
endorsement thereon on the Respondents
IT IS ORDERED that
1. The Applicant do commence demolition work on the premises the subject of the within
proceedings within 48 hours of this date
2. The Applicant is not under any obligation to remove moveable property from the premises
in circumstances where the Respondents have failed to remove same to date
3. An Garda Síochána be required to attend at the premises with the Applicant and/or servants
or agents of the Applicant to assist the Applicant and/or its servants or agents when the Applicant
and/or its servants or agents are removing property and/or carrying out the aforesaid demolition
works
4. In the event of any person being present at the premises An Garda Síochána be directed to
remove such persons from the premises using reasonable force if necessary and to prevent said
persons from re-entering the premises
5. Any protesters at the premises must remain 500m from the entrance of the premises
6. An Garda Síochána do use all reasonable endeavours to execute the aforementioned Order
of Attachment issued on the 11th day of March 2026
7. Costs reserved
8. Liberty to apply as per the Order of this Honourable Court dated the 16th day of March 2026
9. The within proceedings do stand adjourned to the Planning and Environment Court for
mention on Monday the 23rd day of March 2026 at 9:30am and the Applicant to inform the
Respondents of same
…
REGISTRAR
PERFECTED 18/03/2026
Regan McEntee & Pts Solicitors
Solicitor for the Applicant
Neil McNelis & Co
Solicitor for the Respondents
Schedule 10 – Order for respondents’ affidavits – 19 March 2026
PLANNING AND ENVIRONMENT
2007 76 MCA
Thursday the 19th day of March 2026
BEFORE MR JUSTICE RICHARD HUMPHREYS
IN THE MATTER OF SECTION 160 OF THE PLANNING AND DEVELOPMENT ACTS, 2000 AS AMENDED
AND IN THE MATTER OF AN APPLICATION BY
MEATH COUNTY COUNCIL
APPLICANT
-AND-
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
The within proceedings coming before the Court on this day by way of remote hearing pursuant to
the Notice of Motion of the Applicant dated the 3rd day of March 2026 seeking inter alia an Order
pursuant to Order 44 Rules 1 and 2 and 3 of the Rules of the Superior Courts 1986 (as amended)
(‘RSC’) and/or pursuant to the inherent Jurisdiction of this Honourable Court giving liberty to the
Council to issue an Order for Committal to prison of the Respondents for failing and/or refusing to
comply with the undertaking given under Oath to this Honourable Court on the 24th day of
September 2020 and recited in the Order of Mr Justice Meenan therein whereby the first and second
named Respondents undertook to vacate the premises on or before the 24th day of September 2022
and to facilitate the demolition of the premises by the Council in circumstances where the first and
Respondents have failed and/or refused to vacate the premises and have failed and/or refused to
facilitate the demolition of the premises by the Council which is in breach of their undertaking to the
Court dated the 24th day of September 2020 and recited in the Order of Mr Justice Meenan and
despite personal service of the Order of Mr Justice Meenan on the Respondents with the penal
endorsement thereon on the 9th day of June 2025
In the presence of Counsel for the Applicant and the Solicitor for the Respondents
And on reading the said Notice
And upon reading the Order of this Honourable Court (Mr Justice Edwards) dated 27th July 2010
perfected on 3rd March 2011
And upon reading the Order of the Supreme Court dated 25th May 2017 perfected on 30th May 2017
And upon reading the Order of this Honourable Court (Mr Justice Meenan) dated 24th September
2020 perfected on 3rd December 2020 which said Order records that in the presence of counsel for
the Respondents the Court received an undertaking under oath from each of the Respondents in the
following terms
An undertaking on their own behalf and on behalf of any persons
occupying the premises the subject matter of the application with their permission to vacate the
property on or before the 24th September 2022 and to facilitate the demolition of the premises by
the County Council or its agents
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 13th day of
February 2026 perfected on the 16th day of February 2026
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 9th day of
March 2026 perfected on the 10th day of March 2026 and amended under the slip rule on the 13th
day of March 2026
And on reading the Order of Attachment issued herein out of the Central Office on the 11th day of
March 2026
And on reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 16th day of
March 2026 perfected on the 16th day of March 2026 and the Order of this Honourable Court (Mr
Justice Humphreys) dated the 16th day of March 2026 perfected on the 18th day of March 2026
And on reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 18th day of
March 2026 perfected on the 18th day of March 2026
And the Court being satisfied as to the service of the said Notice and of the said Order of the Court
of the 24th day of September 2020 endorsed with the penal endorsement on the Respondents
And on reading the Affidavits (2) of John Sweeney filed on the 3rd day of March 2026 and on the
9th day of March 2026 and the exhibits therein referred to and the Affidavits (4) of David McEntee
filed on the 10th day of February 2026 and on the 13th day of February 2026 and on the 3rd day of
March 2026 and on the 9th day of March 2026 and the exhibits therein referred to and the affidavit
of Martin Barrins dated the 27th day of November 2012 (unfiled) the affidavit of David McGlynn
dated 27th day of June 2017 (unfiled) the affidavits of Patrick Tully dated the 4th day of September
2025 and filed on the 13th day of March 2026 and the 10th day of February 2026 and the exhibits
therein referred to the affidavit of service of this Affidavit and Notice of Motion and the Affidavit of
John Sweeney filed on the 18th day of March 2026 and the Affidavit of David McEntee filed on the
18th day of March 2026
And on hearing what was offered by the solicitor for the Respondents and Counsel for the Applicant
IT IS ORDERED that
1. The Respondents do have liberty to file affidavits in respect of the within proceedings
2. The within proceedings do stand adjourned to the Planning and Environment Court for
mention on Monday the 23rd day of March 2026 at 9:30am
…
REGISTRAR
PERFECTED 19/03/2026
Regan McEntee & Pts Solicitors
Solicitor for the Applicant
Neil McNelis & Co
Solicitor for the Respondents
Schedule 11 – Order discharging respondents from attachment – 23 March 2026
PLANNING AND ENVIRONMENT
2007 76 MCA
Monday the 23rd day of March 2026
BEFORE MR JUSTICE RICHARD HUMPHREYS
IN THE MATTER OF SECTION 160 OF THE PLANNING AND DEVELOPMENT ACTS, 2000 AS AMENDED
AND IN THE MATTER OF AN APPLICATION BY
THE COUNTY COUNCIL OF THE COUNTY OF MEATH
APPLICANT
-AND-
MICHAEL MURRAY AND ROSE MURRAY
RESPONDENTS
Upon reading the Order of this Honourable Court (Mr Justice Edwards) dated 27th July 2010
perfected on 3rd March 2011
And upon reading the Order of the Supreme Court dated 25th May 2017 perfected on 30th May 2017
And upon reading the Order of this Honourable Court (Mr Justice Meenan) dated 24th September
2020 perfected on 3rd December 2020 which said Order records that in the presence of counsel for
the Respondents the Court received an undertaking under oath from each of the Respondents in the
following terms
An undertaking on their own behalf and on behalf of any persons
occupying the premises the subject matter of the application with their permission to vacate the
property on or before the 24th September 2022 and to facilitate the demolition of the premises by
the County Council or its agents
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 13th day of
February 2026 perfected on the 16th day of February 2026
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 9th day of
March 2026 perfected on the 10th day of March 2026 and amended under the slip rule on the 13th
day of March 2026
And on reading the Order of Attachment issued herein out of the Central Office on the 11th day of
March 2026
And upon reading the Orders (2) of this Honourable Court (Mr Justice Humphreys) dated the 16th
day of March 2026
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 18th day of
March 2026
And upon reading the Order of this Honourable Court (Mr Justice Humphreys) dated the 19th day of
March 2026
And upon Motion of Counsel for the Applicant made unto the Court on this day pursuant to the Notice
of Motion herein dated the 3rd day of March 2026 seeking inter alia an Order pursuant to Order 44,
Rule 1, 2 and 3 of the Rules of the Superior Courts 1986, as amended, (‘RSC’) and/or pursuant to
the inherent Jurisdiction of this Honourable Court, giving liberty to the Council to issue an Order for
Committal to prison of the first named Respondent and Second named Respondent for failing and/or
refusing to comply with the undertaking given under Oath to this Honourable Court on 24th
September, 2020, and recited in the Order of Mr Justice Meenan therein, whereby the first and
second named Respondent undertook to vacate the premises on or before the 24th September 2022
and to facilitate the demolition of the premises by the Council, in circumstances where the first and
second named Respondent have failed and/or refused to vacate the premises and have failed and/or
refused to facilitate the demolition of the premises by the Council, in breach of their undertaking to
the Court dated 24th September, 2020 and recited in the Order of Mr Justice Meenan and despite
personal service of the Order of Mr Justice Meenan on the second named Respondent, with the penal
endorsement thereon, on the 9th June, 2025 and service pursuant to an order for substituted
service on the First Named Respondent of the said order with the penal endorsement thereon
And on reading the said Notice
And the Court being satisfied as to the service of the said Notice and of the said Order of the Court
of 24th September 2020 endorsed with the penal endorsement on the first and the Second Named
Respondents
And on reading the Affidavits (2) of John Sweeney filed on the 3rd day of March 2026 and on the
9th day of March 2026 and the exhibits therein referred to and the Affidavits (4) of David McEntee
filed on the 10th day of February 2026 and on the 13th day of February 2026 and on the 3rd day of
March 2026 and on the 9th day of March 2026 and the exhibits therein referred to and the affidavit
of Martin Barrins dated 27th November 2012 (unfiled) the affidavit of David McGlynn dated 27th
June 2017 (unfiled) the affidavits of Patrick Tully dated the 4th September 2025 (unfiled) and 10th
February 2026 and the exhibits therein referred to the affidavit of service of this Affidavit and Notice
of Motion
And on hearing Counsel for the Applicant and the Solicitor for the first and Second Named
Respondents
And upon hearing the evidence of the First and Second-named Respondents and the evidence of
Detective Sgt Mark Looby and Brian Murphy
And the Court being satisfied as of the date hereof that the Respondents and each of them are in
contempt of court for failing and/or refusing to comply with the undertaking given under Oath to
this Honourable Court on 24th September, 2020, and recited in the Order of Mr Justice Meenan
therein, whereby the first and second named Respondent undertook to vacate the premises on or
before the 24th September 2022 and to facilitate the demolition of the premises by the Council, in
circumstances where the first and second named Respondent have failed and/or refused to vacate
the premises and have failed and/or refused to facilitate the demolition of the premises by the
Council, in breach of their undertaking to the Court dated 24th September, 2020 and recited in the
Order of Mr Justice Meenan and despite personal service of the Order of Mr Justice Meenan on the
second named Respondent, with the penal endorsement thereon, on the 9th June, 2025 and service
pursuant to an order for substituted service on the First Named Respondent of the said order with
the penal endorsement thereon,
And the Court noting that the respondents do not contest the foregoing for the purposes of the
present Order in the light of their Notice of Motion dated 23rd March 2026
And the Court noting the position of the Respondents that they propose pursuant to the said Notice
of Motion to revisit the issue of contempt
And the Court noting the position of the Applicant that the Respondents are not entitled to apply for
the relief sought in the said Notice of Motion and that if which is denied the Respondents are entitled
to apply for the said relief the Respondents are not entitled to be granted the said relief
And the Court proceeding on the basis that its finding that at the present time it is satisfied as to
the Respondents being in contempt of court as aforesaid is not intended to in itself preclude any
future argument as to whether the Respondents are entitled to apply for any or all relief sought in
the said Notice of Motion and/or whether if so entitled the Respondents are entitled to be granted
any or all such relief
And the Court being informed that the First and Second Named Respondents were willing to give
undertakings to the Court
And the Court noting that such undertakings are not to be taken as in themselves precluding the
Respondents’ application for the relief in their Notice of Motion aforesaid
And the First and Second-named Respondents each undertaking as follows
1. To facilitate the Council, its servants or agents, with the continued demolition of the
residential dwelling situate at the property, to not directly or indirectly do or cause to be done
anything which obstructs, hinders, delays or otherwise interferes with the Council, its servants or
agents, contractors or employees in the carrying out of all demolition works at the property and in
the use of such accesses as are reasonably required for the execution of all demolition works and to
fully cooperate with the Council, its servants or agents, contractors or employees in ensuring that
the property is returned to an agricultural field.
2. To fully cooperate with An Garda Siochana in respect of any person/s who seeks to interfere
with the continued demolition of the residential dwelling on the property.
3. To provide such information as may be reasonably requested by An Garda Siochana to
identify persons who may be interfering with the continued demolition of the residential dwelling at
the property
4. To not require, assist or encourage any person to interfere with the demolition of the
residential dwelling.
5. This undertaking to apply from the date hereof until completion of all demolition works at
the property or until further order of the Court.
IT IS ORDERED pursuant to Order 44 rule 4 of the Rules of the Superior Courts that the Respondents
be discharged from the said Order of Attachment issued out of the Central Office dated the 11th day
of March 2026 on condition that they comply with the aforesaid undertakings
AND IT IS ORDERED that the said Order dated the 13th day of February 2026 for substituted
service be amended to provide that in lieu of service under the said order, substituted service of all
papers in the proceedings may be effected on the Respondents and each of them as follows
I. By email to Messrs McNelis & Company Solicitors of The Square in Milltown Malbay in County
Clare A95 K259 by email to …
II. By email to the email addresses provided to the Applicant on this day [viz: … and …] and via
ordinary pre-paid post the address provided on this day [viz: …]
III. If and for so long as entrance gates remain at the property, by affixing such papers to the
entrance gates of lands, or in such other reasonably [conspicuous] place at the entrance to the lands
situated at Faughan Hill of Bohermeen in Navan in County Meath being part of the lands previously
comprised in Folio No 14049 of the register of Freeholders for the County of Meath and which lands
are now registered in Folio 59360F of the Register of Freeholders in County Meath and which lands
relate to the Orders made in the within proceedings
And the court doth grant the Respondents liberty file a notice of Notice of Motion herein said
Motion returnable for the Planning and Environment List on Monday the 20th day of April 2026 for
directions
And the Court doth adjourn the within proceedings generally with liberty to reenter and with
the question of costs and the aforesaid Notice of Motion to be listed for mention for the directions of
the Court on Monday the 27th day of April 2026
And the Court doth reserve Costs
…
REGISTRAR
PERFECTED 26/03/2026
Regan McEntee & Pts Solicitors
Solicitor for the Applicant
Neil McNelis & Co
Solicitor for the Respondents