High Court dismisses Ryanair's challenge to An Bord Pleanála's airport underpass decision under the Planning and Development Act 2000.
Legislator summary
AI generatedThe High Court dismissed Ryanair's application challenging An Bord Pleanála's permission for an airport underpass under the Planning and Development Act 2000. Ryanair argued the decision failed to address the Water Framework Directive's prohibition on environmental deterioration, while the respondent contended the inspector's report correctly classified the issue as a matter of justification rather than materiality. The court held that the applicant lacked factual evidence to demonstrate a separate issue under the second limb of the Water Framework Directive test or to prove the inspector's findings were unlawful.
Legislator headnote
AI generatedSection 37(2) of the Planning and Development Act 2000; Section 50 of the Planning and Development Act 2000; The court held that where a Local Area Plan is contravened, the planning authority must decide whether to grant permission notwithstanding the conflict, and the inspector's classification of the issue as one of justification rather than materiality is legally significant and valid.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2025] IEHC 74
THE HIGH COURT
PLANNING & ENVIRONMENT
[H.JR.2024.0000745]
IN THE MATTER OF SECTION 50, 50A AND 50B OF THE PLANNING AND DEVELOPMENT
ACT 2000
BETWEEN
RYANAIR DESIGNATED ACTIVITY COMPANY
APPLICANT
AND
AN BORD PLEANÁLA
RESPONDENT
AND
DAA PLC
NOTICE PARTY
JUDGMENT of Humphreys J. delivered on Friday the 14th day of February 2025
1. The Water Framework Directive (WFD) requires that a planning decision-maker should
refuse permission for a project if it may cause a deterioration of the status of a body of surface water
or jeopardise the attainment of good surface water status or of good ecological potential and good
surface water chemical status. Taking time out from running one of the world’s largest and most
successful airlines in order to commendably champion the strict enforcement of European
environmental law, with the benefit, quite rightly, of the costs protection of the Aarhus Convention
in so doing, Ryanair complains that the wording of the board’s decision granting permission for an
airport underpass and related works doesn’t expressly address the latter limb of the prohibition. The
primary issue is whether that point is effectively academic because the applicant hasn’t established
anything on the facts that would require such consideration or that would raise an issue under that
limb that doesn’t arise under the first limb.
Geographical context
2. This relates to a development on four sites located within lands in the ownership of daa,
including two sites at the airfield in the townlands of Collinstown, Coultry and Huntstown, Co. Dublin.
The proposed development will consist of the construction of a subterranean underpass of runway
16/34 and all associated and ancillary works. The planning application is accompanied by an
environmental impact assessment report (EIAR) and a Natura Impact Statement (NIS)
(https://www.pleanala.ie/en-ie/case/316138).
3. As stated in the EIAR:
“1.1.2 The Airport is unofficially divided into an Eastern Campus and a Western Campus,
with the Crosswind Runway (16/34) bisecting the two. Passenger activity is concentrated in
the Eastern Campus which hosts key Airport infrastructure, including the Terminal buildings,
passenger piers, and the majority of aircraft stands. The primary infrastructure supporting
surface access to the Airport operates on the East also, including the Ground Transportation
Centre, short-term car parking, taxi holding area and main access roads. Operations in the
Western Campus are currently focused on the West Apron which is mainly used for cargo
operations, General Aviation, and contingency stands, as well as transit and business
aviation.
1.1.3 The current means of access from the Eastern Campus to the Western Campus –
the West Apron Surface Crossing, directly over Runway 16/34 - will no longer be viable once
the new North Runway becomes operational in 2022, as Runway 16/34 will be required as
an additional taxiway as well [as] having a continuing role for essential occasional use in line
with the terms of Condition 4 of the North Runway Planning Permission. The Irish Aviation
Authority (IAA) has also advised that the continued use of the Surface Crossing after the
opening of the North Runway is, unsustainable from a safety perspective. All traffic to and
from the West Apron will, as described in Chapter 3: Proposed Development, then have to
use the 8km Perimeter Road.
1.1.4 The permanent solution which best suits the operational and regulatory requirement
to provide safe, efficient, dedicated access to the West Apron, that avoids interfaces with
operational runways and taxiways, is to construct an underpass beneath the taxiways and
Runway 16/34. Compared with the other alternatives that have been studied, this has the
advantage of providing quick, safe access from the eastern campus to the western campus.
Alternatives are discussed in more detail in Chapter 2: Alternatives.”
A brief outline of the timeline of the present application
4. The notice party made the application to Fingal County Council (the council) for permission
for inter alia the construction of a subterranean underpass on 1st September 2022.
5. The applicant made a submission on the planning application on 3rd October 2022.
6. A planner’s report was prepared by the council on 26th October 2022, and recommended
that further information be sought from the notice party.
7. The notice party submitted further information on 21st December 2022.
8. The applicant made a submission on the further information provided by the notice party on
20th January 2023.
9. A second planner’s report was prepared by the council on 27th February 2023, which
considered the further information and recommended that permission be granted for the proposed
development subject to conditions.
10. By decision dated 27th February 2023, permission for the proposed development was
granted by the council.
11. The applicant lodged an appeal to the board of the council’s decision on 24th March 2023.
12. The notice party lodged an appeal to the board in respect of a number of conditions imposed
by the council and an appeal was also lodged by SMTW Environmental DAC.
13. The notice party made submissions on the appeals on 24th April 2023.
14. The board sought further submissions on 17th May 2023 from the parties to the appeals.
15. The notice party lodged a responding submission on 1st June 2023.
16. A s. 132 notice was issued by the board on 7th July 2023.
17. The notice party made a submission in respect of that request on 25th July 2023.
18. The applicant made a submission on the notice party’s s. 132 submission on 12th September
2023.
19. The board’s scientist also prepared a report on the proposed development dated 12th
December 2023.
20. The board’s ecologist prepared a report on the proposed development dated 14th December
2023.
21. The board’s inspector prepared a report following a site inspection on 22nd November 2023,
and that report is dated 19th December 2023.
22. A board direction was made on 8th March 2024 (BD-015770-24), in which it was recorded
that the board had decided to grant permission generally in accordance with the inspector’s
recommendation.
23. By order dated 17th April 2024 (ABP-316138-23), the board granted permission for the
proposed development subject to 13 conditions.
A brief outline of the timeline of the related infrastructure application
24. Following the making of the present application, a separate application (F23A/0781) was
made (the infrastructure application), which involves daa seeking to increase the passenger cap,
and put in place infrastructure including the underpass at issue here. That was made on what was
described a “precautionary” basis, although in that context daa is also seeking permission for
additional stands (so the material contravention issue argued in the present case wouldn’t
presumably arise).
25. The infrastructure application was made to the council on 15th December 2023.
26. In the infrastructure application, following the bullet-point list under Project Element 11:
Junction Improvements it is stated that: “Overall the proposed development will result in a [loss] of
4no. Narrow Body Equivalent (NBE) stands (2no. at Pier 3 and 2no. at Pier 4), however there will be
an overall net increase of 33no. NBE stands across the airfield resulting in a total capacity of 167no.
NBE.”
27. A request for further information was made by the council on 16th February 2024.
28. That request was responded to by daa on 13th November 2024.
29. The council considered that response to further information to be “significant additional
information”, hence advertisement was required.
30. The final date for third-party observations/submissions was 8th January 2025, and the
matter remains before the council.
Procedural history
31. These proceedings were issued on 7th June 2024.
32. The applicant was given leave to commence judicial review proceedings on 24th June 2024
(the order being perfected on 27th June 2024).
33. The applicant issued an originating notice of motion on 28th June 2024, with a return date
of 8th July 2024.
34. The opposing parties accepted that s. 50B of the Planning and Development Act 2000 applies
to the proceedings.
35. On 21st October 2024, a hearing date was allocated in February 2025 by way of the
expedited procedure.
36. The board filed its opposition papers on 8th November 2024.
37. The notice party filed its opposition papers on 14th November 2024.
38. The applicant served its written submissions on 13th January 2025.
39. The board served its written submissions on 22nd January 2025.
40. The notice party served its written submissions on 28th January 2025.
41. The applicant served its replying written submissions on 31st January 2025.
42. The matter was listed for hearing on 6th February 2025 for 3.5 hours, after which judgment
was reserved.
Relief sought
43. The reliefs sought in the statement of grounds are as follows:
“1. An order of Certiorari by way of application for judicial review quashing the Board
Order of 17th April 2024 (ABP Ref 316138-23) granting the Notice Party permission for the
construction of a tunnel and associated works at Dublin Airport.
2. Such declaration(s) of the legal rights and/or legal position of the applicant and/or
persons similarly situated as the court considers appropriate.
3. A Declaration that Section 50B of the Planning and Development Act 2000 as
amended, and/or Sections 3 and 4 of the Environment (Miscellaneous Provisions) Act 2011
and/or that the interpretative obligation set out in Case C-470/16 North East Pylon Pressure
Campaign Limited v. An Bord Pleanála whereby in proceedings where the application of
national environmental law is at issue, it is for the national court to give an interpretation of
national procedural law which, to the fullest extent possible, is consistent with the objectives
laid down in Article 9(3) and (4) of the Aarhus Convention, apply to these proceedings.
4. Further or Other Order.
5. Costs.”
Grounds of challenge
44. The pleaded core grounds of challenge are as follows:
“Domestic Law Grounds
1. The decision of the Board of 17th April 2024 (ABP Ref 316138-23)(‘the impugned
decision’) granting the Notice Party permission for the construction of a tunnel and
associated works at Dublin Airport is invalid as no notice was given to statutory consultees
pursuant to Article 28(g) of the 2001 Regulations in respect of a development that might
have a significant effect on waterways, further particulars of which are contained at Part 2
below.
2. The impugned decision is invalid as the Board did not comply with the requirements
of section 15 of the Climate Action and Low Carbon Development Act 2015 (as amended)
and/or failed to have regard to relevant considerations and/or had regard to irrelevant
considerations and/or failed to adequately consider Climate Action Plan 2023 and/or Carbon
Budgets and/or Sectoral Emissions Ceilings and/or failed to provide any or any adequate
reasons and/or less carbon intensive alternatives, further particulars of which are contained
at Part 2 below.
3. The impugned decision is invalid in that it contains a material legal error, as the
Board incorrectly concluded that the proposed development was consistent with the Dublin
Airport Local Area Plan 2020, and/or took into account irrelevant considerations, and/or
failed to take into account relevant considerations, and/or failed to give adequate reasons,
further particulars of which are contained at Part 2 below.
European Law Grounds
4. The impugned decision is invalid because planning permission was granted in breach
of Article 4(1) of Directive 2000/60/EC of the European Parliament and of the Council of 23
October 2000 establishing a framework for Community action in the field of water policy (the
‘Water Framework Directive’) and/or Regulations 4 and 5 of the European Communities
Environmental Objectives (Surface Waters) Regulations 2009. This is because the Board did
not ensure that the grant of planning permission would not cause a deterioration in the
status of a body of surface water, or that it would not jeopardise the attainment of good
surface water status or of good ecological potential and good surface water chemical status
and/or the Board could not have arrived at that conclusion in the absence of the classification
of the receiving water bodies for the purpose of the Surface Water Regulations and/ or the
Board failed to identify describe and assess the significant environmental impacts for the
purposes of section 171A and 172 of the Planning and Development Act and the EIA
Directive, further particulars of which are contained at Part 2 below.
5. The impugned decision is invalid as the Board failed to consider adequately or at all
the environmental effects of the proposed development on the environment in terms of
impacts on bat fauna for the purposes of section 171A and 172 of the Planning and
Development Act 2000 and/or had no objective information before it to support a conclusion
of no significant effects on the environment for the purposes of that EIA assessment and/or
contained lacuna, further particulars of which are contained at Part 2 below.
6. The impugned decision is invalid because the Board erred in law in excluding the
possibility of significant effects on the Northwest Irish Sea SPA (Site Code 004236) at
Screening Stage and/or unlawfully relied on mitigation measures for the purposes of that
assessment and/or the Board’s conclusion of no significant effect is irrational and
unreasonable and/or the Board failed to provide any or any adequate reasons, further
particulars of which are contained at Part 2 below.”
45. Helpfully, the applicant has withdrawn the challenge other than in respect of core grounds 3
and 4.
Domestic law issues
Core ground 3 – inconsistency with LAP
46. Core ground 3 is:
“3. The impugned decision is invalid in that it contains a material legal error, as the
Board incorrectly concluded that the proposed development was consistent with the Dublin
Airport Local Area Plan 2020, and/or took into account irrelevant considerations, and/or
failed to take into account relevant considerations, and/or failed to give adequate reasons,
further particulars of which are contained at Part 2 below.”
47. The parties’ positions as recorded in the statement of case are summarised as follows:
“Core Ground 3
Applicant’s Position –
The Board’s Inspector concluded that the proposed development was a contravention but
not a material contravention of the relevant LAP on the sole basis that the reduction in
aircraft stands that would result from the proposed development would be short term of
temporary.
The loss of the stands is material by reference to the test in Roughan and was raised as a
contravention of the LAP by the Applicant on three separate occasions. Furthermore, there
was no evidence that such a loss of stands would in fact be short term or temporary and the
Board erred and/or relied on irrelevant considerations in concluding otherwise
Board’s Position –
The LAP seeks to provide ‘[s]afe and efficient vehicular access between the eastern and
western campus’ – which the Proposed development achieves. It also promotes further
development of aircraft stands over the plan period and beyond (2050). The proposed
development, which involves the temporary loss of two aircraft stands (as the evidence
before the Board demonstrated), whilst determined to be a contravention of the objectives
in the LAP in relation to aircraft stands, is not a material contravention on an appropriate
construction of the LAP and the Board was entitled to so conclude.
As recognised by the Inspector (when the Inspector’s Report is holistically read) and the
Board (and the Council), there are various objectives in the LAP which seek to advance the
Vision for Dublin Airport and in respect of which a balance must be achieved, or where a
planning ‘judgment call’ has to be made, in terms of the weight to be attached to each in
the context of any particular development proposal seeking to promote/achieve same – per
Four Districts Woodland Habitat Group v An Bord Pleanála [2023] IEHC 335. In this case,
there was nothing irrational about the judgment call of the Board.
The Proposed Development will not frustrate, prohibit or preclude the facilitation of further
stands during the LAP period and beyond – the Proposed Development does not make these
objectives unattainable or ‘imperil’ same. The loss of two stand is not a material
contravention in such circumstances and, in this respect, noting Ballyboden TTG v An Bord
Pleanála [2023] IEHC 722, in this particular case, no objections, including from Ryanair, to
the Proposed Development reached the level of describing the proposal as a material
contravention; and the planning authority did not find same to be the case.
Notice Party’s Position –
The Notice Party adopts the position of the Board. The Council, the Inspector, the Board
(and the Applicant in its submissions) all found that the temporary reduction in 2 aircraft
stands would result in a contravention of the Airport LAP. No party made a submission to
the Council or the Board that the loss of 2 airport stands (temporary or otherwise) amounted
to a material contravention of the Airport LAP. The Inspector and the Board correctly
interpreted the Airport LAP and lawfully determined that a contravention (but not a material
contravention) arose. The reduction of 2 aircraft stands (temporary or otherwise) is not a
material contravention and does not meet the test in Roughan and the Board was entitled
to so conclude.
The Board did not err in taking account of the fact that the Notice Party stated that it intended
to apply for permission to replace the aircraft stands (which it has done and with such an
application pending before the Council). However, the determination by the Inspector and
the Board that no material contravention arose was determined in light of the provisions of
the Airport LAP. Strictly without prejudice to the foregoing, even if the Applicant is correct
and the loss of 2 aircraft stands (temporary or otherwise) is a material contravention of the
Airport LAP, it does not form a basis to quash the Board’s decision and/or the Court ought
not, in the exercise of its discretion, quash the Board’s decision on this basis.”
48. One important principle to note at the outset is, as stated in numerous previous cases
included in the court’s common list of authorities, a decision must be read in a way that makes sense
and is lawful – it is not the case that decisions must be read in the most erroneous way possible so
that applicants can get their order of certiorari (e.g. Rostas v. DPP [2021] IEHC 60 (Unreported,
High Court, 9th February 2021) at §50; St. Margaret’s Recycling v. An Bord Pleanála [2024] IEHC
94 (Unreported, High Court, Phelan J., 20th February 2024) at §57). Related to that is that a
decision should be read in a way that renders it valid rather than invalid: see Mulloy v. An Bord
Pleanála [2024] IEHC 86 (Unreported, High Court, Holland J., 12th March 2024) at §178 (citing
O’Donnell v. An Bord Pleanála [2023] IEHC 381 (Unreported, High Court, 1st November 2023); M.R.
(Bangladesh) v. The International Protection Appeals Tribunal & Anor [2020] IEHC 41 (Unreported,
High Court, 29th January 2029) at §7; Save Roscam Peninsula CLG v. An Bord Pleanála (No. 6)
[2024] IEHC 335 (Unreported, High Court, 7th June 2024) at §64). A decision should be read “not
solely from an applicant’s point of view (an impossible standard), but from the starting point of it
being valid rather than invalid where possible. One has to stand back and ask what the decision is
fundamentally saying (O’Donnell & Ors v. An Bord Pleanála [2023] IEHC 381 [Unreported, High
Court, 1st November 2023] (para. 54): St. Margaret’s Recycling v. An Bord Pleanála [2024] IEHC
94 (Unreported, High Court, Phelan J., 20th February 2024) at §57; thus for example “unhelpful”
statements should not be read as inconsistent with statutory factors if the decision can be read as
valid – E.M. v. Minister for Justice and Equality [2024] IESC 3 (Unreported, Supreme Court, 21st
February 2024) per Dunne J.
49. The Dublin Airport local area plan (LAP) (https://www.fingal.ie/dublin-airport-local-area-
plan-2020) was adopted in January 2020.
50. The relevant provisions of the LAP that are allegedly contravened are set out in the statement
of grounds as follows:
“21. By way of further particulars of the claim, §3.2.1.3 of the Dublin Airport Local Area
Plan 2020 identifies in relation to Aircraft Parking Stands that ‘The DTTAS Review indicates
significant increase in stand capacity is required at the Airport with between 39 – 89 new
stands required up to 2050.’ This is effectively repeated at §3.3 and §7.7.1 and §7.2.4 the
latter of which states ‘To meet forecast air traffic demand, …. Increased provision of aircraft
parking stands, piers and gates capacity will become increasingly important during the plan
period to facilitate the Airport’s strategic role as a European hub airport.’. Objectives SBG01
and SBG02 of the Dublin Airport Local Area Plan 2020 include references to ‘the development
of new stands’ and ‘improved and expanded parking facilities for aircraft’ respectively.”
51. The relevant objectives are:
“AIRCRAFT PARKING STANDS, PIERS AND BOARDING GATES
To meet forecast air traffic demand, additional aircraft stands and passenger boarding gates
as well as modifications to this existing infrastructure will be required during the plan period
to provide greater capacity. To serve upgraded and additional aircraft parking stands,
additional piers and modifications to existing pier buildings which accommodate boarding
gates will also be required. Increased provision of aircraft parking stands, piers and gates
capacity will become increasingly important during the plan period to facilitate the Airport’s
strategic role as a European hub airport.
AIRCRAFT PARKING STANDS, PIERS AND BOARDING GATE OBJECTIVES
OBJECTIVE SBG01
Facilitate the development of new stands, piers and boarding gates in line with the expansion
of associated runway and terminal capacity across the Airport having regard to the need to
protect key operational areas.
OBJECTIVE SBG02
Provide improved and expanded parking facilities for aircraft.”
52. There is also language supportive of safe permeability between the two campuses of the
airport. The inspector noted (inter alia, §9.3.2):
“…there is policy in the LAP (Objective AV01) to support improved safety and operations in
the airport. Safe and efficient vehicular access between the eastern and western parts of
the airport is specifically referenced in relation to the movement of ‘airside’ support vehicles
and that this will be supported and facilitated…
…
The Dublin Airport Local Area Plan 2020 identifies the need for safe and efficient vehicular
access between the eastern and western parts of the airport.
In conclusion, the proposed development…is consistent with the aims of the county and local
area plans to provide for safe, efficient access for airside vehicles between the eastern and
western parts of the airport and is consistent with the zoning objective.”
53. What the inspector said was:
“9.9.2. I recognise that there will be a constraint on aircraft operations during the course of
construction and until such time period as the replacement stands are provided. This is
clearly a significant issue for aircraft operators. As the planning authority identified, the
reduction of aircraft stands is a contravention of the LAP. I would concur with this
assessment. However, I do not consider this a material contravention as the intention is not
to permanently reduce the number of aircraft stands. Therefore, the short-term reduction
in aircraft stands is not, in my opinion, a reason to refuse planning permission.”
54. The basis of the holding that the contravention wasn’t material was that the removal of
stands was temporary. But the temporariness on the facts arose from an intention to apply for a
future grant of permission for different stands. The actual stands being removed by the present
permission will be permanently removed. Thus I would tend to agree with the applicant that if
s. 37(2) of the 2000 Act applied, the inspector’s reasoning would somewhat conflate the issues of
materiality of the change versus justification for it. A hypothetical future grant of permission for
different stands on the basis of a hypothetical future application for such permission seems legally
more relevant to the justification issue as opposed to being a solid basis for a finding on the
materiality issue.
55. However, the false premise of the applicant’s complaint is the assumption made in the
pleaded case that s. 37(2) of the 2000 Act applies in the first place.
56. That subsection applies to development plans:
“(2) (a) Subject to paragraph (b), the Board may in determining an appeal under this section
decide to grant a permission even if the proposed development contravenes materially the
development plan relating to the area of the planning authority to whose decision the appeal
relates.
(b) Where a planning authority has decided to refuse permission on the grounds that a
proposed development materially contravenes the development plan, the Board may only
grant permission in accordance with paragraph (a) where it considers that—
(i) the proposed development is of strategic or national importance,
(ii) there are conflicting objectives in the development plan or the objectives are not
clearly stated, insofar as the proposed development is concerned, or
(iii) permission for the proposed development should be granted having regard to
regional spatial and economic strategy for the area, guidelines under section 28,
policy directives under section 29, the statutory obligations of any local authority in
the area, and any relevant policy of the Government, the Minister or any Minister of
the Government, or
(iv) permission for the proposed development should be granted having regard to
the pattern of development, and permissions granted, in the area since the making
of the development plan.
(c) Where the Board grants a permission in accordance with paragraph (b), the Board shall,
in addition to the requirements of section 34(10), indicate in its decision the main reasons
and considerations for contravening materially the development plan.”
57. Section 2 defines development plan:
“‘development plan’ means a development plan under section 9(1);”
58. That doesn’t include an LAP, which puts a very different complexion on the complaint under
this heading.
59. Such a conclusion is reinforced by s. 9(6) of the Planning and Development (Housing) and
Residential Tenancies Act 2016 which provides (in the strategic housing development (SHD) context
exclusively) for express material contravention of an LAP or a development plan – whereas in regular
planning such as here, the 2000 Act refers to material contravention of the plan only.
60. That interpretation is also reinforced by s. 34(6) of the 2000 Act (as amended by the
Planning and Development (Amendment) Act 2010) which provides for a procedure to be gone
through by a planning authority in relation to material contravention of an LAP or a plan:
“(6) (a) In a case in which the development concerned would contravene materially the
development plan or local area plan, a planning authority may, notwithstanding any other
provision of this Act, decide to grant permission under this section, provided that the
following requirements are complied with before the decision is made, namely—
(i) notice in the prescribed form of the intention of the planning authority to consider
deciding to grant the permission shall be published in at least one daily newspaper
circulating in its area and the notice shall specifically state which objective of the
development plan or local area plan, as the case may be, would be materially
contravened by granting this permission,
(ii) copies of the notice shall be given to each of the following—
(I) the applicant,
(IA) the regional assembly for the area in which the planning authority is
situated,
(II) a prescribed body which has been notified of the application by the
planning authority, and
(III) any person who has made a submission or observation in writing in
relation to the development to which the application relates,
(iii) any submission or observation as regards the making of a decision to grant
permission and which is received by the planning authority not later than 4 weeks
after the first publication of the notice shall be duly considered by the authority
(iiia) not later than 6 weeks from the publication of the notice under subparagraph
(i), the chief executive shall prepare a report for the members of the planning
authority—
(I) stating the main reasons and considerations on which the proposal to
grant permission is based,
(II) summarising the issues raised in any submissions or observations in
accordance with subparagraph (iii), and
(III) advising the members of his or her opinion regarding the compliance
or otherwise of the proposed development with any relevant Ministerial
guidelines under section 28 or any relevant policies or objectives of the
Government or Minister of the Government or with any regional spatial and
economic strategy,
and the report shall be considered by the members before a resolution is passed
under subparagraph (iv), and
(iv) a resolution shall be passed by the planning authority approving the proposal of
the chief executive to grant permission.
(b) It shall be necessary for the passing of a resolution referred to in paragraph (a) that the
number of the members of the planning authority voting in favour of the resolution is not
less than three-quarters of the total number of the members of the planning authority or
where the number so obtained is not a whole number, the whole number next below the
number so obtained shall be sufficient, and the requirement of this paragraph is in addition
to and not in substitution for any other requirement applying in relation to such a resolution.
(ba) Where a resolution referred to in paragraph (a) has been passed by a planning authority
in accordance with paragraph (b), the planning authority shall—
(i) send to the regional assembly for the area and the Office of the Planning
Regulator a copy of the notice under paragraph (a) that relates to the resolution,
and
(ii) at the same time, inform the regional assembly for the area and the Office of the
Planning Regulator in writing that the resolution was passed.”
61. So the contrast is clear – where a council is materially contravening an LAP in a normal
planning context, or where the board is doing so in a SHD context, there is a reasoning procedure
to be gone through. No such procedure applies to contravention of an LAP by the board in normal
planning. Maybe that’s an anomaly, maybe it isn’t, but that’s what s. 37(2) of the 2000 Act says
and the clear wording is reinforced by contrast with other provisions of legislation which are phrased
very differently.
62. Had s. 37(2) applied, there would be a clear legal distinction between materiality of a
contravention and the justification for the contravention. In the absence of the application of that
provision, the distinction is not legally significant. So when the inspector says that the intended
temporariness of the reduction makes it immaterial, we can regard that as in substance equivalent
to saying that any contravention of the LAP is not a reason to refuse permission. Indeed the
inspector says that expressly: “Therefore, the short-term reduction in aircraft stands is not, in my
opinion, a reason to refuse planning permission”. In line with the caselaw referred to above, the
decision should be read in a way that makes sense and is valid if such a reading is available – and
it is here.
63. Thus in the absence of an applicable legal requirement that makes the distinction between
materiality and justification determinative or particularly legally relevant in the specific legal context
we are dealing with here, the inspector’s wording overall, while not perhaps ideal, isn’t sufficiently
flawed so as to warrant certiorari.
EU law issues
Core ground 4 – breach of the WFD
64. Core ground 4 is:
“4. The impugned decision is invalid because planning permission was granted in breach
of Article 4(1) of Directive 2000/60/EC of the European Parliament and of the Council of 23
October 2000 establishing a framework for Community action in the field of water policy (the
‘Water Framework Directive’) and/or Regulations 4 and 5 of the European Communities
Environmental Objectives (Surface Waters) Regulations 2009. This is because the Board did
not ensure that the grant of planning permission would not cause a deterioration in the
status of a body of surface water, or that it would not jeopardise the attainment of good
surface water status or of good ecological potential and good surface water chemical status
and/or the Board could not have arrived at that conclusion in the absence of the classification
of the receiving water bodies for the purpose of the Surface Water Regulations and/ or the
Board failed to identify describe and assess the significant environmental impacts for the
purposes of section 171A and 172 of the Planning and Development Act and the EIA
Directive, further particulars of which are contained at Part 2 below.”
65. The parties’ positions as recorded in the statement of case are summarised as follows:
“Applicant’s Position –
The Board failed to consider the proposed development by reference to the correct WFD
status – heavily polluted - of the Cuckoo Stream that flows through the site and which will
be culverted and diverted during construction. The status brings with it certain obligations
pursuant to the Surface Water Regulations which, consequently and axiomatically, the Board
also did not consider the proposed development in the context of its impacts on a heavily
polluted waterbody.
Secondly, and without prejudice, the Board reached a conclusion in respect of impacts on
the Cuckoo Stream in relation to half of the test in Article 4(1) WFD as interpreted by the
Court of Justice in. Bund fur Umwelt. The Board’s conclusion is a necessary but not sufficient
conclusion for the purposes of a lawful decision for the purposes of Article 4.
Board’s Position –
This ground is abstract and lacking in any evidential/factual substance – as evidenced by
the Applicant’s Submissions which assert that ‘the Applicant does not require evidence in
order to make that case’ (Submissions, §38).
The evidence before the Board (which the Applicant ignores) was presented and premised
on express consideration of the objectives of the WFD and Surface Water Regulations (per
the EIAR and Appendices to same, including the WFD Assessment), and detailed that there
would be no adverse effects on water. The Board agreed with this evidence (having assessed
same and noting the absence of any contrary evidence) – which clearly demonstrated that
the Proposed Development would not contravene or frustrate the objectives of the WFD or
the Surface Water Regulations. Noting that the evidence demonstrated that there would no
adverse effects on water, there can be no ‘adverse effects…which would be contrary to the
requirements to prevent deterioration and to improve the status of bodies of surface water
and groundwater’ or the objectives of the Surface Water Regulations.
Notice Party’s Position –
The Notice Party adopts the position of the Board. The Board did not err in its application
of the test set out in Article 4 of the Water Framework Directive (‘WFD’) or in respect of its
assessment having regard to the WFD status of the Cuckoo Stream. The Notice Party
submitted a Water Framework Directive Assessment as appendix 7-1 to its EIAR, which
addressed both the test set out in Article 4 of the WFD and the Surface Water Regulations
and concluded that the proposed development would cause no adverse effects on water. No
complaint is made by the Applicant: (i) that the Cuckoo Stream was misclassified and / or
(ii) that any relevant assessments were not carried out by the Notice party. Neither has the
Applicant, either in these proceedings or before the Board, presented any evidence to
contradict the conclusions in respect of such assessments (which were ultimately adopted
by the Board).”
66. In general terms EU law doesn’t require an applicant to make European law points during
the process before challenging a decision so I think we can assume that this isn’t disqualifying. The
opposing parties accepted that anyway.
67. Starting with the argument of failure to apply the Water Framework Directive test, we
need to be clear what the “test” is. In the judgment of 1 July 2015, Bund für Umwelt und Naturschutz
Deutschland e.V. v Bundesrepublik Deutschland, C-461/13, ECLI:EU:C:2015:433 (commonly known
by reference to the River Weser, the 744 km-long federal waterway in Lower Saxony to which the
case related), the CJEU (Grand Chamber) ruled:
“1. Article 4(1)(a)(i) to (iii) of Directive 2000/60/EC of the European Parliament and of
the Council of 23 October 2000 establishing a framework for Community action in the field
of water policy must be interpreted as meaning that the Member States are required —
unless a derogation is granted — to refuse authorisation for an individual project where it
may cause a deterioration of the status of a body of surface water or where it jeopardises
the attainment of good surface water status or of good ecological potential and good
surface water chemical status by the date laid down by the directive.
2. The concept of ‘deterioration of the status’ of a body of surface water in Article
4(1)(a)(i) of Directive 2000/60 must be interpreted as meaning that there is deterioration
as soon as the status of at least one of the quality elements, within the meaning of Annex V
to the directive, falls by one class, even if that fall does not result in a fall in classification of
the body of surface water as a whole. However, if the quality element concerned, within the
meaning of that annex, is already in the lowest class, any deterioration of that element
constitutes a ‘deterioration of the status’ of a body of surface water, within the meaning of
Article 4(1)(a)(i).”
68. The core argument in the applicant’s legal submissions is:
“34. The test is two-fold. It refers to both a diminution in status and the possibility of
jeopardising the attainment of good water status. While there is a single concluding line in
the EIAR (as quoted above) that identified that the proposed development would not
jeopardise the attainment of good surface water status, nowhere in the analysis of the Board,
via the Inspector or the Appendix to the Inspector’s Report from Mr Smyth, did it consider
whether the proposed development would jeopardise the attainment of good status for the
waterbody. Instead the Board wrongly confined its analysis to whether the proposed
development would lead to a change in status.”
69. The applicant puts this in argument as an autonomous obligation – the board has to satisfy
itself of the Weser tests anyway. That is valid insofar as it goes but autonomous obligations can’t
be allowed to get out of hand. There has to be something making such an obligation relevant (the
onus of proof as to which lies – as always – on an applicant) before a decision could be quashed for
failure to address that obligation.
70. The context is an acceptance that the Cuckoo Stream is polluted. The inspector stated:
“11.12.7. The Cuckoo Stream is classed as having a Bad Ecological WFD status.”
71. The inspector said at para. 11.9.26:
“I am satisfied that the mitigation measures set out are sufficient to ensure that proposed
development would not cause a deterioration to the ecological status of surface waterbodies
or the groundwater status of the waterbodies. The removal of any historic contamination in
the subsoil would be beneficial.”
72. And went on to say:
“11.9.30. I am satisfied that the proposed development will not give rise to further
deterioration of surface water or groundwater.”
73. Thus the context here is that the board found that there wasn’t going to be a deterioration
in the status of the Cuckoo Stream. In such a context and even bearing in mind the acceptance that
the stream was of poor status it is hard to see immediately how this project (as opposed to some
hypothetical other project), which doesn’t cause deterioration, could nonetheless somehow
jeopardise the attainment of good surface water status. In particular, the applicant hasn’t shown
anything specific to suggest that there was anything about this particular project that while not
causing a deterioration of the status of the stream could have jeopardised the attainment of good
water status. In that context, this technical complaint isn’t a plausible basis to hold that the board
failed to consider something it was required to consider. Even in the case of autonomous obligations,
the board can’t do all the work – an applicant still has an onus to overcome to show that there was
something needing express treatment. This applicant hasn’t done that here.
74. In that regard I entirely agree with Holland J. in Salmon Watch Ireland CLG v. Aquaculture
Licences Appeals Board [2024] IEHC 421 (Unreported, High Court, 12th July 2024) in relation to an
analogous complaint there:
“1097. The [relevant] Applicants’ pleas … are entirely abstract and theoretical. While they
correctly identify matters not considered by [the decision-maker], they do not state any
basis for the implied premise that those matters required consideration. They do not lay
any basis in particulars or facts for any case for certiorari.”
75. Such a conclusion is also consistent with An Taisce v. An Bord Pleanála (No. 1) [2021] IEHC
254, [2021] 4 JIC 2003 (Unreported, High Court, 20th April 2021) and Concerned Residents of
Treascon and Clondoolusk v. An Bord Pleanála [2022] IEHC 700, [2022] 12 JIC 1609 (Unreported,
High Court, 16th December 2022).
76. Insofar as there is a separate point that seems to suggest that the WFD requires the
board to take positive steps in any development consent decision in order to restore or improve
the status of the stream, that isn’t what EU law requires. There is no principle that permission must
be refused if a project doesn’t contribute positively to the attainment of WFD objectives. In Weser,
the CJEU has phrased the requirement negatively. There is no authority to support that and such
authority as exists firmly rejects that notion, which is purely a figment confected by the applicant
here.
77. In R. (Tarian Hafren Severn Shield CYF) v Marine Management Organisation [2022] EWHC
683 (Admin), [2022] P.T.S.R. 1261, [2022] 3 W.L.U.K. 375, Holgate J. rejected this argument:
“163. There is nothing in the language of Article 4(1)(a) [of the WFD] or in the decision in
Bund fur Umwelt to suggest that a regulatory approval must be refused unless the project
would itself contribute (e.g. positively) towards the attainment of a good surface water
status, or good chemical status. Those legal sources do not indicate that, for example, a
proposal must contribute to that objective by reducing existing chemical levels which cause
the current status of the water body to be less than ‘good’, a fortiori where there is no
evidence to indicate that either the proposal, or the project of which it forms a part, would
contribute to those chemical levels.
164. The legal issues in the Bund fur Umwelt case were concerned with very different
matters, in particular whether article 4(1)(a) applies to decision-making on regulatory
project approvals as well as water management planning, and whether Article 4(1)(a) is
infringed where a proposal would cause the quality of a water body to deteriorate without
reducing its ‘status class’. The requirement laid down by the CJEU in relation to the second
objective of Article 4(1)(a) is that a project should not jeopardise the attainment of good
surface water status. ‘Jeopardise’ means endanger or put at risk.
165. [Counsel for the applicant] did not explain how this proposal, which would not cause
any harm to the chemical quality of the water body (including the two chemicals for which
it is currently failing), could itself jeopardise, let alone ‘would be bound to jeopardise’, its
enhancement from a moderate to a good status. For that reason alone ground 5 [alleging
breach of the WFD on this basis] should fail.”
78. A similar logic applies here. The applicant hasn’t pointed to anything in EU legislation or
jurisprudence or that of member states or former member states to support such an interpretation
– that isn’t a surprise because such an interpretation is obviously unworkable. A vast number of
projects won’t contribute positively to water quality – the directive only requires that they don’t
make things worse. This isn’t a point on which any reasonable doubt arises.
79. Insofar as the applicant makes a further point that the information in the EIA was
inadequate, that exaggerates the extent to which certainty is attainable or to which acknowledged
uncertainty is an obstacle to a lawful grant of permission.
80. Yes the inspector does acknowledge some uncertainty as to the available information:
“11.9.26. The impacts of the proposed Underpass on Water are adequately described
and suitable mitigation measures are proposed. The Third Party has argued that the
Conceptual Design Model is lacking in detail and I would agree with that. The pump test
data is not provided, but is, in any case, limited. However, under the circumstances that
the majority of the proposed Underpass is beneath an operational runway, this lack of detail
is understandable. I am satisfied that the mitigation measures set out are sufficient to
ensure that proposed development would not cause a deterioration to the ecological status
of surface waterbodies or the groundwater status of the waterbodies. The removal of any
historic contamination in the subsoil would be beneficial.”
81. But total certainty isn’t a requirement of EIA or of pretty much anything. The inspector
expressly finds that the “lack of detail is understandable”. That is an evaluative judgement that is
reasonably open in principle to a decision-maker and certainly hasn’t been shown to be unlawful
here. The context for that has to include the information provided from daa, which in principle the
board was permitted to accept. The response by daa dated 24th April 2023 at §1.5.2 states:
“It is right and proper to acknowledge uncertainty in an EIAR as sometimes data is limited,
hence the EIAR notes that there is ‘very limited’ information available on the depth of
groundwater. This in no way detracts from the soundness of the assessment presented
since, as the Third Party notes, robust assumptions were made in the design process. The
EPA Guidelines provide (page 25), that: ‘Where uncertainty arises then an EIAR needs to
describe the “worst case” scenario of the accumulation of effects that could arise from these
other projects.’ As demonstrated throughout the application, the worst case has been
considered.
Ground investigations to date indicate a GWL at approximately 3-4 mbgl. The same ground
investigations also indicate the glacial till at that level is relatively impermeable. Any
groundwater rise during construction within the glacial tills may not necessitate any specific
change in construction methods. However, it should be noted that all groundwater control
during construction is completely the contractor's responsibility.
If the water table does rise into the more permeable made ground above the glacial till,
gasketed sheet piles (as one option) could be installed to provide a positive barrier against
groundwater intrusion, or a temporary dewatering system may also be considered by the
contractor. It should also be noted that any reduction in groundwater levels from what has
already been observed will be beneficial to construction.
Final design of the proposed structure normally considers worst case scenario where
groundwater level is at existing ground level, therefore it would not be impacted by higher
groundwater levels as the majority of the structure is completely submerged, based on
observed groundwater table, and any rise in groundwater would be above the proposed
Underpass, and therefore not increasing buoyant forces on the proposed Underpass itself.
During the 2022 ground investigation, standpipes were installed in the 11 boreholes and two
pump tests were conducted to monitor the seasonal groundwater levels and assess the
hydraulic conductivity of the soil.
As stated above, ground investigation can increase in scope as design/construction develops.
The proposed Underpass, at this stage, has had a typical initial ground investigation that
covers the area of the preferred alignment. The ground investigation conducted in 2022
included 11 boreholes along the approx.1 km project plan length. This is considered
sufficient at this stage, and it is in accordance with EN 1997-2: 2007: Eurocode 7 -
Geotechnical design - Annex B.3 examples of recommendations for the spacings and depth
of investigations. Depending on the variability of the ground (i.e., strata levels consistent
at all borings or lenticular material indicated by different ground at the same level at adjacent
or nearby borings), the designer may choose to complete additional ground investigations
to provide further ground information to inform their detailed design.
When a project progresses to detailed design, it is understood that the design is at a
preliminary stage and further information may be required. This commonly includes further
ground investigations. For the proposed Underpass, a ground investigation for a reasonable
cross section of the area of the preferred alignment has been performed in 2022, which
provided enough information to verify the preferred alignment was feasible and could be
constructed. This is in accordance with EN 1997-2: 2007: Eurocode 7- Annex 8.3, which
recommends for linear structures a borehole spacing of 20m to 200m. As discussed above,
the designer will determine how much additional ground information is required to inform
their detailed design and their construction methods. This ground investigation could vary
from two to three targeted boreholes to a more comprehensive plan across the entire
alignment. The scope of the additional investigations can be driven by the construction
methods and temporary works of the chosen contractor as much as by a requirement to
refine the detailed design rather than alter the overall design.”
82. It’s inherent in science generally that certainty isn’t available: see for example Friends of
the Irish Environment v. Minister for the Environment & Ors. [2025] IEHC 61 (Unreported, High
Court, 7th February 2025). The inspector’s judgement that the limitation on the information
available was understandable hasn’t been shown to be unlawful here.
83. Finally under the overall heading of core ground 4, reference to Luxembourg wasn’t sought
by any party in the statement of case, although was belatedly raised by the applicant in literally the
closing seconds of the hearing. But the issue raised hasn’t been shown to arise on the facts.
Therefore a reference would not be “necessary” within the meaning of art. 267 TFEU and any
purported reference would be inadmissible. And insofar as the argument of an implausible positive
obligation to promote good water status is concerned, no reasonable basis – indeed no basis
whatsoever – for doubt as to the EU law position has been demonstrated. The reference procedure
isn’t there for any and every EU law point someone could dream up on a given day. It is only where,
in particular, there is a reasonable basis for doubt as to the correct position and where the question
properly arises on, and is necessary having regard to, the findings of fact. Both criteria are lacking
here.
Summary
84. In outline summary, without taking from the more specific terms of this judgment:
(i) Section 37(2) of the 2000 Act doesn’t apply to material contravention of an LAP.
Therefore there isn’t any legally significant distinction between materiality of a
contravention or justification for it. In the event of contravention of an LAP, the
issue for the board is whether permission should be granted notwithstanding any
such conflict.
(ii) In such a context, the wording of the inspector’s report on this issue is not a basis
for certiorari because the classification of the proposed temporary nature of the
removal of stands under the heading of materiality rather than justification (on the
basis of a hypothetical future permission decision) doesn’t go to any legally
significant distinction. The decision should be read in a way that is valid rather than
invalid if that is available, as it is here, and thus as equivalent to saying that the
intended temporary nature of the overall loss of stands means that contravention of
the LAP is not a reason to refuse permission.
(iii) The applicant hasn’t demonstrated any factual basis to suggest that the second leg
of the WFD test as interpreted by the CJEU applies in this case or raises any separate
issue warranting discussion by the board, or any factual basis to demonstrate as
unlawful that the inspector’s finding that any lack of detail in the EIA was
understandable.
(iv) The argument that the WFD requires refusal of permission unless any given
permission positively contributes to the restoration of good status to any relevant
water bodies lacks any authority whatsoever and is clearly unworkable.
(v) A reference to the CJEU would be inadmissible in the absence of a factual foundation
for the argued issues, and insofar as the proposed unworkable positive obligation to
promote good water status is concerned would be inappropriate as no authority or
other plausible for such an interpretation of EU law has been shown and no
reasonable or any doubt arises. Such authority as exists firmly rejects that position.
Order
85. For the foregoing reasons, it is ordered that:
(i) the proceedings be dismissed;
(ii) unless any party applies otherwise by written legal submission within seven days
from the date of this judgment, the foregoing order be perfected forthwith thereafter
on the basis of no order as to costs; and
(iii) the matter be listed on Monday 24th February 2025 to confirm the foregoing.