High Court orders reference to CJEU on nitrate derogation validity due to novel EU law issues.
Legislator summary
AI generatedThe High Court ordered a reference to the Court of Justice of the European Union regarding the validity of a Commission decision on nitrate derogations. The applicant raised novel and complex EU law issues that were not acte clair, while the court declined to determine the validity itself. Consequently, the court directed the parties to complete procedural steps for the reference while reserving costs.
Legislator headnote
AI generatedArticles 267(3) TEU; Article 276 TFEU: Where a domestic court encounters a question on the validity of an EU law measure that is not acte clair, it must refer the question to the Court of Justice of the European Union.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2024] IEHC 442
THE HIGH COURT
PLANNING & ENVIRONMENT
[H.JR.2022.0000458]
BETWEEN
AN TAISCE - THE NATIONAL TRUST FOR IRELAND
APPLICANT
AND
THE MINISTER FOR HOUSING, LOCAL GOVERNMENT AND HERITAGE, IRELAND AND THE
ATTORNEY GENERAL
RESPONDENTS
AND
THE MINISTER FOR AGRICULTURE FOOD AND THE MARINE, FEIRMEOIRÍ AONTUITHE NA
HÉIREANN IONTAOBAITHE TEORANTA AS TRUSTEE OF THE IRISH FARMERS'
ASSOCIATION AND FRANCIE GORMAN, TOM O'CONNOR, PATRICK MURPHY, JOHN
MURPHY AND FRANK ALLEN AS TRUSTEES OF THE IRISH CREAMERY MILK SUPPLIERS
ASSOCIATION (BY ORDER)
NOTICE PARTIES
(No. 3)
JUDGMENT of Humphreys J. delivered on Wednesday the 24th day of July, 2024
1. The present action is a challenge to the validity of domestic and European measures relating
to the derogation for the use of nitrates above and beyond standard levels. That challenge raises
significant issues of European law. To refer or not to refer is the primary question now, although it
isn’t a particularly difficult question, especially given that all contributing parties agree that almost
all of the questions are not acte clair. The applicant has raised what are clearly novel, complex and
important issues of EU law, culminating in a question regarding the validity of a Commission decision.
The court doesn’t have jurisdiction to determine the latter issue in favour of the applicant, and isn’t
particularly minded at the present time to determine it in favour of the respondents. While making
a reference to the CJEU is generally optional apart from for apex courts, a case where the validity
of an EU law measure is in issue can be an exception. Even a first instance court must refer such a
question if it considers that the European law measure should be declared invalid by the CJEU.
Judgment history
2. In An Taisce v. Minister for Housing (No. 1) [2024] IEHC 129, [2024] 3 JIC 0603 I decided
the preliminary pleading-type objections in Module I of the proceedings, and set out a revised issue
paper for Module II.
3. In An Taisce v. Minister for Housing (No. 2) [2024] IEHC 248, [2024] 5 JIC 0102, I decided
the preliminary evidential-type objections in Module II of the proceedings, and set out a revised
issue paper for Module III.
4. I now deal with the substantive EU law questions and will deal with the questions on the
basis of the latest issue paper.
5. While the judgments are getting shorter as we work through the issues (92,375 words +
65,318 words + 51,730 words) we are at a cumulative total of 209,423 words – exceeding Crime
and Punishment but falling short of J.K. Rowling’s Harry Potter and the Order of the Phoenix. There
the analogy with great literature ends I’m afraid (except perhaps for the punishment bit).
6. We ended up with 78 questions on an issue paper and a further 23 additional sub-questions
once further issues had been factored in, making a grand total of 101 issues, a definite record for
this List. On that basis it feels like a bit of a collective achievement to have winnowed that down to
single digits with only 9 questions for reference which will be set out in this judgment.
Procedural history
7. The proceedings were initiated in the judicial review list on 31st May 2022.
8. Under the procedures then operative, leave had not been granted in the judicial review list
in the 6-month period between May and November 2022.
9. A motion to admit the case to what is now the Planning and Environment List was issued,
returnable for 7th November 2022, and was granted on that date. Liberty to file an amended
statement of grounds was also granted having regard to the pleading requirements in the List.
10. On 21st November 2022, representatives of the Irish Farmers Association were added as
notice parties on the basis of being represented by a single legal team. The second named
respondent (Ecological Assessment Unit) was struck out on the grounds of not being a legal entity
and as being already covered by having named the relevant Minister. Relief 4 (certiorari of the
appropriate assessment as distinct from the actual plan) was struck out on the basis that it was
unnecessary to be claimed as a separate relief and would be deemed included in the overall claim
for certiorari. The approach to be taken with the main relief was that a declaration of invalidity
would normally be the appropriate relief for a measure of general application (like a statute,
statutory instrument, or policy document), but certiorari could be claimed as a fall-back (this
principle is now reflected in Practice Direction HC126.)
11. On 5th December 2022 I granted leave on the basis of allowing a further minor amendment
to the statement of grounds. The Irish Creamery Milk Suppliers Association was also added as a
notice party through its trustees.
12. The substantive notice of motion was returnable for 19th December 2022, at which point
directions were made for exchange of papers. The State’s opposition was directed to be filed by
20th February 2023, but in fact was not filed until 8th March 2023. Opposition by the notice parties
was filed on 31st March 2023 and 27th April 2023, and there were then further exchanges of
affidavits which went on until 17th July 2023. A hearing date commencing on 12th December 2023
was fixed and the matter was heard beginning on that date.
13. The case was in effect modularised so that the initial module related primarily to the large
number of pleading and evidential objections. The hearing concluded on 15th December 2023,
following which the matter was adjourned to the following Monday 18th December 2023, to finalise
the issue paper (that finalised version is set out in Schedule I to this judgment). The parties were
permitted to file supplementary written submissions in a sequence (the State by 26th January 2024,
notice parties by 2nd February 2024, and the applicant by 13th February 2024) to be completed by
a mention date on 19th February 2024. The final submissions were in fact delivered on the morning
of the latter date, at which point judgment was reserved. The No. 1 judgment was then delivered
on 6th March 2024.
14. As envisaged in the No. 1 judgment, written submissions on Module II were invited from all
parties on the issues in the updated issue paper. An oral hearing was then held on 9th April 2024
when judgment was reserved.
15. The No. 2 judgment was delivered on 1st May 2024.
16. Subsequent to the No. 2 judgment, the applicant, State and ICMSA delivered written
submissions on the present module. The IFA decided not to make a written submission in this
module but did helpfully attend and contributed economically to the hearing for the present module.
17. That oral hearing was held on Wednesday 26th June 2024, following which the parties asked
for and were given liberty to file further submissions clarifying certain issues (the historical and
current position regarding assignment of status to water bodies, and the extent to which mootness
or pleading issues would be raised). Judgment was thus in essence reserved subject to receipt of
these further clarifications, which were to be delivered by 3rd, 5th and 11th July respectively.
18. The State required further time for its response and a supporting affidavit, and delivered
that response on 8th July 2024. That response sets out further important evidential material for
present purposes. The IFA and ICMSA replied in line with the State’s position. The applicant then
outlined its position on 16th July 2024 in a submission to which I will refer later. That intimated a
possible amendment but no formal application was made. I can only work off what I have at any
given time.
19. Separately and to an extent simultaneously the court sought clarification from the parties
on 12th July 2024 as to the extent, if any, of disagreement in relation to remedies and discretion.
In response the State and ICMSA made further submissions on 17th July 2024, which was the
deadline requested by the court. In the absence of a reply from the IFA, the court informed the
parties that any further reply would need to be sent by 18th July 2024. The IFA indicated that they
would do so but in fact nothing was received. The List Registrar then wrote on 19th July 2024
stating that “as nothing was received from the Irish Farmers Association (IFA) by the deadline set
by the Court, the Court will assume that there are no further issues for determination and will
proceed to give judgment, indicatively in the next week or so”. In circumstances where judgment
had already been reserved over 3 weeks previously subject to final clarifications, a court has to be
allowed to proceed on the basis that if parties don’t take up the opportunity to raise issues that there
are no such issues. Silence is acquiescence in many contexts and this is one of them. For the
avoidance of doubt there is no problem with the IFA not contributing, but I simply want to make
clear that not contributing means the process moves on, not that a party can hypothetically lie doggo
and keep their powder dry for some future unheralded skirmish. I have no doubt that the latter is
not the IFA’s intention and that the non-response is merely because they don’t have any additional
issue to add, which is of course totally legitimate, but best to be clear about the procedure pour
encourager les autres. That procedure is particularly important where the court is considering a
reference to the CJEU, in which context massive prejudice would be caused to all other participants
if a given party hypothetically did not put its European propositions on the table so that the court
could form a unitary view of the case on the basis of all relevant issues of EU law. The alternative
is that new European points could be hoarded to be launched later on in the case with the possibility
of a second or subsequent reference. That would be an inappropriate procedure.
Relief sought
20. The relief sought in the amended statement of grounds filed pursuant to an order of 5th
December, 2022, is as follows (strike-throughs in original):
“1. An Order of Certiorari by way of application for judicial review quashing the Fifth
Nitrates Action Programme in a decision taken by the First Respondent.
2. A Declaration that the Fifth Nitrates Action Programme prepared, published or
adopted by the first named Respondent pursuant to the European Union (Good Agricultural
Practice for Protection of Waters) Regulations 2017 is contrary to law and/or ultra vires
and/or invalid.
An Order of Certiorari by way of application for judicial review quashing the decision of the
Respondents to publish and adopt part or all of the Fifth Nitrates Action Programme pursuant
to the European Union (Good Agricultural Practice for Protection of Waters) Regulations
2022.
2A In the alternative to Relief 2, an Order of Certiorari by way of application for judicial
review quashing the Fifth Nitrates Action Programme prepared, published or adopted by the
first named Respondent pursuant to the European Union (Good Agricultural Practice for
Protection of Waters) Regulations 2017.
3. A Declaration that the European Union (Good Agricultural Practice for Protection of
Waters) Regulations 2022 are contrary to law and/or ultra vires and/or invalid.
An Order of Certiorari by way of application for judicial review quashing the decision of the
Respondent to promulgate the European Union (Good Agricultural Practice for Protection of
Waters) Regulations 2022.
3A In the alternative to Relief 3, an Order of Certiorari by way of application for judicial
review quashing the European Union (Good Agricultural Practice for Protection of Waters)
Regulations 2022.
4. An order of Certiorari by way of application for judicial review quashing the
Appropriate Assessment Determination of the Environmental Assessment Unit dated 4 March
2022.
5. A Reference to the Court of Justice of the European Union pursuant to Article 267
TFEU to determine the validity of Commission Implementing Decision (EU) 2022/696
granting a derogation requested by Ireland pursuant to Council Directive 91/676/EEC
concerning the protection of waters against pollution caused by nitrates from agricultural
sources (OJ L 129, 3.5.2022, p. 37–45).
6. A Declaration that the Respondents breached Articles 3(1), 5(1), 10 of the SEA
Directive/SEA Regulations by adopting the Fifth Nitrates Action Programme without carrying
out a lawful environmental assessment in accordance with Articles 4 to 9 of the SEA
Directive.
7. A Declaration that the Respondents breached Article 6(3) of the Habitats Directive
by adopting the Fifth Nitrates Action Programme, without first concluding that it would not
adversely affect the integrity of European Site(s).
8. A Declaration that the Respondents breached Article 4(1) of the Water Framework
Directive (Directive 2000/60/EC) and/or Regulations 4 and 5 of the European Communities
Environmental Objectives (Surface Waters) Regulations 2009 (S.I. 272/2009) and/or
Regulations 4 and 5 of the European Communities Environmental Objectives (Groundwater)
Regulations 2010 (S.I. 9/2010) by adopting the Fifth Nitrates Action Program without
establishing that the NAP would not cause a deterioration of the status of a body of surface
water or would not jeopardise the attainment of good surface water status or of good
ecological potential and good surface water chemical status of a body of surface water,
and/or would not cause a deterioration of the status of a body of groundwater or would not
jeopardise the attainment of good groundwater status, and/or jeopardise the achievement
and/or maintenance of the standards and objectives for all bodies of surface and
groundwater comprising Protected Areas registered pursuant to Article 6 of the Water
Framework Directive.
9. An Order providing for the costs of the application and, where appropriate, an Order
pursuant to sections 3 and 7 of the Environment (Miscellaneous Provisions) Act 2011 in
respect of the costs of this application and/or a Declaration that the costs of the application
be Not Prohibitively Expensive pursuant to Article 9 of the Aarhus Convention.
10. Such further or other Order as this Honourable Court deems appropriate.”
Grounds of challenge
21. The core grounds of challenge are as follows:
“1. The decision to prepare and publish (‘the impugned decision’) the Fifth Nitrates
Action Program (‘the NAP’) is invalid because the NAP was authorised on the basis of an
appropriate assessment determination which was made in breach of Regulation 42A(11) of
the Birds and Natural Habitats Regulations 2011 and/or of Article 6(3) of the Habitats
Directive because it did not ensure that there was no reasonable scientific doubt as to the
absence of adverse significant effects from the NAP on the integrity of European Sites which
are likely to be affected by the NAP, further particulars of which are contained at Part B
below.
2. The impugned decision is invalid because the NAP was prepared and published in
breach of Article 4(1) of Directive 2000/60/EC of the European Parliament and of the Council
of 23 October 2000 establishing a framework for Community action in the field of water
policy (the ‘Water Framework Directive’) and/or Article 5 of Directive 2001/42/EC of the
European Parliament and of the Council of 27 June 2001 on the assessment of the effects of
certain plans and programmes on the environment (the ‘SEA Directive’) because the
Respondents did not ensure that the NAP would not cause a deterioration of the status of a
body of surface water or that it would not jeopardise the attainment of good surface water
status or of good ecological potential and good surface water chemical status and/or would
not cause a deterioration of the status of a body of groundwater or would not jeopardise the
attainment of good groundwater status, and/or jeopardise the achievement and/or
maintenance of the standards and objectives for all bodies of surface and groundwater
comprising Protected Areas registered pursuant to Article 6 of the Water Framework
Directive by the date laid down in the Directive or at all, further particulars of which are
contained at Part B below.
3. The decision to prepare and publish the NAP is invalid because the NAP was
authorised in breach of Articles 3(1), 5(1), 10 of the SEA Directive without carrying out a
lawful environmental assessment in accordance with Articles 4 to 9 of the SEA Directive. and
or the transposing provisions in the SEA Regulations 2004 (S.I. 436 of 2004), further
particulars of which are contained at Part B below.
4. As a consequence of the invalidity of the impugned decision Commission
Implementing Decision (EU) 2022/696 of 29 April 2022 granting a derogation requested by
Ireland pursuant to Council Directive 91/676/EEC concerning the protection of waters
against pollution caused by nitrates from agricultural sources (OJ L 129, 3.5.2022, p. 37–
45) is invalid, further particulars of which are contained at Part B below.”
Issue 8(a) – first question – scope of assessment
22. Issue 8(a) is:
“8. (a) Does art. 6(3) of directive 92/43, art. 4(1) of directive 2000/60 and/or art. 3(1) of
directive 2001/42 have the effect that an action programme under art. 5 of directive 91/676
that is assessed under or by reference to such directives is required to be assessed in relation
to the effects on the environment of the Nitrate-emitting agricultural activities which will be
carried out on foot of derogations granted consequent on the plan, either generally or insofar
as such effects are indirectly contributed to by the absence of more rigorous protective
measures in the plan, as opposed to being assessed by reference to the protective measures
the plan positively includes and those alone?”
23. The applicant submitted:
“Concise summary
Yes. The NAP is supposed to involve a global examination, at the level of the whole of the
national territory, of the environmental issues linked to nitrate pollution from agricultural
sources - Joined Cases C 105/09 and C 110/09 Terre Wallonne and Inter-Environnement
Wallonie. Here, the NAP includes the derogation – in the words of the Directive, it ‘allows’
an amount higher than the 170 kg N in the Directive. So the environmental issues linked to
nitrate pollution from the derogation fall within that examination. The assessments carried
out under the Habitats Directive, the WFD and the SEA Directive must consider the effects
on the environment of the Nitrate-emitting agricultural activities which will be carried out on
foot of derogations granted consequent on the plan. To confine such assessments to the
protective measures the plan positively includes, and those alone, would be contrary to the
nature of the NAP and the purpose of those assessments.
Acte Clair
The Applicant’s position is supported by case-law of the CJEU but the Applicant does not go
so far as to say it is Acte Clair, in the sense of precluding a reference.
Detailed answer
Introduction
1. The Court’s question addresses the assessments of a Nitrates Action Programme
carried out under the Habitats Directive, the WFD and the SEA Directive. The Court’s
question draws a distinction between:
• assessment of the effects on the environment of the Nitrate-emitting
agricultural activities which will be carried out on foot of derogations granted
consequent on the plan, either generally or insofar as such effects are indirectly
contributed to by the absence of more rigorous protective measures in the plan,
• assessment by reference to the protective measures the plan positively
includes and those alone.
2. It will be recalled that the State submissions on the pleading issues contended (p.7)
(emphasis added) ‘…the Respondents’ position is that what is being assessed under Article
6(3) is the potential effects on the environment of the protective measures put in place by
the NAP, not the underlying agricultural activities that are restricted by the NAP. In that
respect, protective measures may, despite being beneficial with respect to the targeted
environmental objective, still cause damage to another environmental objective. It is in that
context that AA of a protective measure remains essential.’
3. The Applicant submits that this approach is incorrect. The derogation cannot be seen
as a ‘restriction’ of agricultural activities; rather it is the facilitation of the application of
increased amounts of livestock manure to the land - in the words of the Directive, it ‘allows’
an amount higher than the 170 kg N in the Directive. To confine the analysis under the
relevant Directives to the effect of the allegedly protective measures on ‘another
environmental objective’ is to incorrectly narrow the scope of that analysis.
Nitrates Action Programme – legal provisions and purpose
4. It is first necessary to consider what a Nitrates Action Programme is, and what it is
supposed to do, especially in the context of a derogation.
5. By Recital 5 to the Nitrates Directive – ‘…the main cause of pollution from diffuse
sources affecting the Community's waters in [sic] nitrates from agricultural sources;’
6. In this regard, Kingston, Heyvaert and Čavoški, European Environmental Law (2017)
explain (p.371) that the Nitrates Directive ‘marked the first concerted effort by the EU to
control pollution from non-point sources. While point-sources, such as a pipe or a chimney,
are generally straightforward to identify, non-point source pollution that contaminates water
as a result of run-off (when soil is infiltrated to full capacity and excess water, from rain or
melted snow, flows over the land) or where pollutants leach through the ground into the
water below, have conventionally being harder to regulate (and even harder to enforce).
Non-point source pollution is caused both by atmospheric-borne pollutants with the
application of chemicals, particularly fertilizers, directly to the land surface… More recently,
a further concern is that nitrate pollution contributes to the eutrophication of waterways
leading both to the deterioration in ecological quality (due to the destruction of natural
habitats because of oxygen depletion) and the impairment of aesthetic qualities of water.’
7. By Recital 10 (emphasis added) – ‘… it is necessary for Member States to identify
vulnerable zones and to establish and implement action programmes in order to reduce
water pollution from nitrogen compounds in vulnerable zones’.
8. By Recital 11 Nitrates Directive (emphasis added) ‘… such action programmes should
include measures to limit the land-application of all nitrogen-containing fertilizers and in
particular to set specific limits for the application of livestock manure’.
9. By Article 3(1) ‘Waters affected by pollution and waters which could be affected by
pollution if action pursuant Article 5 is not taken shall be identified by the Member States in
accordance with the criteria set out in Annex I.’
10. So by Article 3(2), within the two-year period following notification of the Directive,
Member States were required to ‘designate as vulnerable zones all known areas of land in
their territories which drain into the waters identified according to paragraph 1 and which
contribute to pollution.’ They were to notify the Commission of this initial designation within
six months. Further designations might follow - Article 3(4).
11. However, Member States did not have to identify specific vulnerable zones, if instead
they established and applied Article 5 action programmes ‘throughout their national territory’
- Article 3(5). Ireland has adopted a ‘whole national territory approach’.
12. The whole territory approach is not an excuse to avoid identifying vulnerable zones,
or to have a more limited assessment on the basis that the location of the vulnerable zones
is not known or need not be identified.
13. Following enforcement action by the Commission - for inter alia failing to designate
vulnerable zones pursuant to Article 3(2) and/or Article 3(4); and failing to establish action
programmes in accordance with Article 5 - Ireland’s first Nitrates Action Programme (NAP)
came into force in 2006 .
14. By Article 5(1) – ‘Within a two-year period following the initial designation referred
to in Article 3 (2) or within one year of each additional designation referred to in Article 3
(4), Member States shall, for the purpose of realizing the objectives specified in Article 1,
establish action programmes in respect of designated vulnerable zones.’ (As Ireland applies
a whole territory approach, Ireland’s NAP applies throughout the ‘national territory’.)
15. Following enforcement action by the Commission - for inter alia failing to designate
vulnerable zones pursuant to Article 3(2) and/or Article 3(4); and failing to establish action
programmes in accordance with Article 5 - Ireland’s first Nitrates Action Programme (NAP)
came into force in 2006 .
16. As already noted, by Recital 11 Nitrates Directive ‘… such action programmes should
include measures to limit the land-application of all nitrogen-containing fertilizers and in
particular to set specific limits for the application of livestock manure’.
17. Article 5(4) addresses the content of action programmes -
a. ‘Action programmes shall be implemented within four years of their establishment
and shall consist of the following mandatory measures:
(a) the measures in Annex III;
(b) those measures which Member States have prescribed in the code(s) of good
agricultural practice established in accordance with Article 4, except those which
have been superseded by the measures in Annex III.’
18. An action programme should be ‘an organised and coherent system intended to meet
a specific objective’ – as the CJEU identified in Case C-396/01, Commission v Ireland:
‘ 59 It is clear that the measures cited by the Irish Government do not, viewed
overall, meet the requirements of Article 5 of the Directive.
60 Such a series of measures, varying in scale and applicability from region to region
and not constituting an organised and coherent system intended to meet a specific
objective cannot be described as an ‘action programme’ within the meaning of Article
5 of the Directive.’
19. This supports the idea that any assessment must take into account the agricultural
activities, in order to constitute ‘an organised and coherent system intended to meet a
specific objective’, ie the objectives specified in Article 1.
20. Turning then to Annex III, it is headed ‘MEASURES TO BE INCLUDED IN ACTION
PROGRAMMES AS REFERRED TO IN ARTICLE 5(4)(a)’.
21. By Annex III(1), ‘The measures shall include rules relating to’ matters thereafter
specified.
22. Crucially, Annex III(2) identifies what the measures are meant to achieve -
a. ‘These measures will ensure that, for each farm or livestock unit, the amount
of livestock manure applied to the land each year, including by the animals
themselves, shall not exceed a specified amount per hectare.
b. The specified amount per hectare be the amount of manure containing 170
kg N. However:
(a) for the first four year action programme Member States may allow
an amount of manure containing up to 210 kg N;
(b) during and after the first four-year action programme, Member
States may fix different amounts from those referred to above. These
amounts must be fixed so as not to prejudice the achievement of the
objectives specified in Article 1 and must be justified on the basis of objective
criteria...
c. If a Member State allows a different amount under point (b) of the second
subparagraph, it shall inform the Commission, which shall examine the justification
in accordance with the regulatory procedure referred to in Article 9(2).’
23. Thus the decision to ‘allow’ a different amount (in this case 250 kg N instead of 170)
is itself part of the Nitrates Action Programme. Indeed, it changes what the measures in the
NAP are intended to achieve. There is clearly no requirement to depart from the 170 kg N;
on the contrary, any such departure must be justified.
24. Only by ‘allowing’ a different amount in this way can a Member State avoid the
amount specified in the Directive, ie 170 kg N. Further, if allowing a different amount, there
is no requirement to choose 250 kg N – that is the maximum amount.
25. The decision to ‘allow’ a different amount, and the amount so ‘allowed’ must
therefore be assessed as part of the assessment of the NAP under the Directives cited in the
question. That necessarily entails assessment of the underlying agricultural activities. To
confine such an assessment to the protective measures would be contrary to the purposes
of those Directives.
26. In Case C 237/12 Commission v. France, the CJEU observed §130 (emphasis added)
–‘As is apparent from the eleventh recital in the preamble of that directive, the fixing of
specific limits for the land application of livestock manure is of particular importance to the
achievement of the objectives of reduction and prevention of water pollution by nitrates of
agricultural origin.’
27. In Case C 197/18 Wasserleitungsverband Nördliches Burgenland, the CJEU referred
to the concept of ‘nitrogen surplus’ and observed (§63) ‘Such a surplus is contrary to Article
5(4)(a) of Directive 91/676, read in conjunction with Annex III, point 1(3) to that directive.
Those provisions establish the principle of balanced fertilisation and require the foreseeable
nitrogen needs of crops and the amount of nitrogen supplied to those crops from the soil
and fertilisers to be brought into balance with one another. Therefore, they impose an
obligation on the Member States to determine the amounts of nitrogen that can be applied
by farmers in a precise manner (see, to that effect Commission v Germany, C 543/16 …
paragraphs 87, 88 and 92).’
28. Such ‘precision’ cannot be achieved if the focus is exclusively on the assessment of
so-called protective measures.
29. Further, the assessment triggered by ‘allowing’ an amount different to 170 Kg N -
whether there is prejudice to the achievement of the objectives specified in article 1 (namely
(i) reducing water pollution caused or induced by nitrates from agricultural sources and (ii)
preventing further such pollution) - must logically relate to the activities in question: to
confine any assessment ‘to the protective measures the plan positively includes and those
alone’ would not be consistent with the requirements of the Directives.
30. The AA screening assessment (Exhibits p.639) states (emphasis added) ‘Just over
half of Ireland’s monitored surface water bodies have satisfactory water quality and
agriculture is the most widespread and significant pressure impacting on the water
environment. The EPA report that nearly half of all river sites and one quarter of all
groundwater sites have elevated nitrate concentrations. Given the known and observed
significant impact that the previous Nitrate Action Programmes have had on water quality
and water dependent ecosystems, the fifth NAP is considered to have potential for significant
direct, indirect or cumulative effects to European Sites.’
31. This statement is difficult to reconcile with the contention that only the protective
measures the plan positively includes are to be assessed.
32. NIS 6.4 (Exhibits p.827) refers to ‘the inputs potentially arising as a result of the
NAP, namely elevated nitrogen concentrations within surface and groundwater and airborne
deposition of ammonia.’
33. Dr McGoff, in her 2nd affidavit, quotes from the NIS for the draft RBMP in relation
to ‘Assessment of Effects and Requirement for Mitigation’ in respect of the GAP Regulations
and the forthcoming NAP, now impugned in these proceeding. The entire quote need not be
repeated here but includes - ‘The actions arising from the new NAP have potential for
significant adverse effects on European Sites; particularly mindful of nutrient loss to water
from agriculture is one of the most significant pressures on water quality in Ireland.’
34. Most of the CJEU case-law on the Nitrates Directive has involved enforcement action;
however, Joined Cases C 105/09 and C 110/09 Terre Wallonne and Inter-Environnement
Wallonie involved a preliminary reference, and thus present the more detailed interpretative
analysis that tends to come with a reference.
35. The CJEU stated –
46 Thus, so far as the purpose of action programmes is concerned, it is apparent
from Directive 91/676, in particular the 9th to 11th recitals in the preamble, Articles
1 and 3 to 5 and the annexes, that those programmes involve a global examination,
at the level of vulnerable zones, of the environmental issues linked to nitrate
pollution from agricultural sources, and that they put in place an organised system
designed to provide a general level of protection against such pollution.
47 The specific nature of those programmes lies in the fact that they embody a
comprehensive and coherent approach, providing practical and coordinated
arrangements covering vulnerable zones and, where appropriate, the entire
territory, for the reduction and prevention of pollution caused by nitrates from
agricultural sources.’
36. So in Ireland’s case what is (supposed to be) involved is a global examination, at
the level of the whole of the national territory, of the environmental issues linked to nitrate
pollution from agricultural sources.
37. To confine any assessment ‘to the protective measures the plan positively includes
and those alone’ would not be consistent with the concept of a global examination, at the
level of the whole of the national territory, of the environmental issues linked to nitrate
pollution from agricultural sources.
38. Here the SEA Report at Page viii (Exhibits p.291) states - ‘The draft NAP is a
strategic national-level document which seeks to provide overall direction to policy and
decision-makers involved in agriculture and river basin management in Ireland. It also seeks
to put in place a clear and sustainable policy framework that supports communities, the
environment, the climate and the agri-food sector.’
39. This approach appears consistent with Terre Wallonne; but the limited assessments
proposed by the State are inconsistent with such an approach.
40. In Terre Wallonne, the CJEU’S focus was on Article 3(2)(a) SEA Directive, including
whether an NAP set the framework for development consent; accordingly, it did not find it
necessary to address the 2nd question referred, concerning Article 3(2)(b) SEA Directive,
and whether the requirement for SEA was triggered by the requirement for assessment
under the Habitats Directive.
41. However, Adv-Gen Kokott did address this (making clear at §85 that she was doing
so ‘in the alternative’.)
42. At §88 she observed - ‘Action programmes pursuant to Article 5 of the Nitrates
Directive are neither directly connected with or necessary to the management of areas of
conservation under the Habitats or Birds Directive. An environmental assessment is
therefore required where an action programme is likely to have a significant effect on areas
of conservation, either individually or in combination with other plans or projects.’
43. At §92 she observed - ‘It is not evident from the Nitrates Directive, on the other
hand, that an action programme pursuant to Article 5 necessarily influences the development
consent of projects likely to have significant effects on areas of conservation. The
compatibility of a project with an action programme does not provide any indication as to
whether it is permissible if it has effects on an area of conservation. That is determined by
the Habitats Directive.’
44. At §96 she observed - ‘None the less, it is not impossible that action programmes
will contribute to significant harm to areas of conservation.’
45. At §101 she concluded (emphasis added) - ‘Should the Court adopt a position on
the second question, its answer should therefore be that, under Article 3(2)(b) of the SEA
Directive, an environmental assessment must be carried out for an action programme
pursuant to Article 5 of the Nitrates Directive if it is likely to contribute to significant harm
to areas of conservation on the basis of its own rules, because of the conservation objectives
of the areas of conservation or under other provisions of domestic law.’
46. It is submitted that, if Adv-Gen Kokott’s analysis is adopted, the key phrase for
present purposes is ‘on the basis of its own rules.’ Here the NAP by its rules ‘allows a
different amount under point (b) of the second subparagraph,’ for livestock manure applied
to the land each year, ie 250 kg N per hectare rather than 170. An assessment confined to
the so-called “protective measures” would fail to address the rules of the NAP liable to have
significant effects on protected sites.
Habitats Directive
47. In terms of the Habitats Directive, the requirements of an AA are well known, eg
Case C-127/02 Waddenzee §54 – ‘Such an assessment therefore implies that all the aspects
of the plan or project which can, either individually or in combination with other plans or
projects, affect those objectives must be identified in the light of the best scientific
knowledge in the field.’ This requirement is expressly relied on by the CJEU in the context
of a ‘programmatic plan’ in Joined Cases C-293/17 and C-294/17 Coöperatie Mobilisation
(aka the ‘Dutch Nitrogen cases’), §95.
48. As identified at p.2, §1.2 of the NIS (exhibits, p523) ‘The overall purpose of the AA
process is to ensure that the NAP does not result in any adverse effects on the integrity of
any European sites in view of its conservation objectives.’ To exclude the agricultural
activities is to breach the ‘all aspects’ requirement.
49. The Commission 2021 Guidance says ‘The assessment must cover the impact of the
entire plan or project in question, with all the activities it comprises, and during all phases
(preparation, construction, operation and, where relevant, decommissioning or
reconditioning). The assessment must identify and differentiate the various types of impact,
including direct and indirect effects, temporary or permanent effects, short- and long-term
effects and cumulative effects’.
50. In Joined Cases C-293/17 and C-294/17 Coöperatie Mobilisation (aka the ‘Dutch
Nitrogen cases’) the CJEU considered a ‘programmatic plan’ which enabled the application
of fertilisers on the surface of land or below its surface and the grazing of cattle, to be
implemented without being subject to a permit requirement.
51. The scheme is helpfully summarised by Adv-Gen Kokott at §3 – ‘The specific point
at issue is that nitrogen deposition by individual farms in the Netherlands is not assessed
individually in certain protected sites, but is classified in a programmatic integrated plan,
which defines the extent to which nitrogen deposition is permitted on the basis of an
assessment of each individual protected site. It must be clarified not only whether such an
integrated plan is lawful, but also to what extent it is compatible with the protection of sites
to take into account measures to reduce nitrogen deposition from other sources, measures
to upgrade protected sites and future developments. It must also be examined how fertilising
of agricultural land and grazing are to be classified in the system relating to the appropriate
assessment of the implications for the site.’ At §142 she identified – ‘According to the request
for a preliminary ruling, the assessment was based on the actual and expected extent and
intensity of those activities and its outcome is that on average they would not cause an
increase in nitrogen deposition.’
52. At §90 the CJEU explained – ‘By the second question in Case C-294/17, the referring
court asks, in essence, whether Article 6(3) of the Habitats Directive must be interpreted as
precluding national programmatic legislation which allows the competent authorities to
authorise projects on the basis of an ‘appropriate assessment’ within the meaning of that
provision, carried out in advance and in which a specific overall amount of nitrogen
deposition has been deemed compatible with that legislation’s objectives of protection.’
53. The CJEU addressed this question at §91-103 – including at §95 (as already noted)
the ‘all aspects’ requirement.
54. It concluded at §104 – ‘In the light of the foregoing, the answer to the second
question in Case C 294/17 is that Article 6(3) of the Habitats Directive must be interpreted
as not precluding national programmatic legislation which allows the competent authorities
to authorise projects on the basis of an ‘appropriate assessment’ within the meaning of that
provision, carried out in advance and in which a specific overall amount of nitrogen
deposition has been deemed compatible with that legislation’s objectives of protection. That
is so, however, only in so far as a thorough and in-depth examination of the scientific
soundness of that assessment makes it possible to ensure that there is no reasonable
scientific doubt as to the absence of adverse effects of each plan or project on the integrity
of the site concerned, which it is for the national court to ascertain.’
55. So in the context of a programmatic approach, all the aspects of the plan or project
which can, either individually or in combination with other plans or projects, affect the
conservation objectives must be identified in the light of the best scientific knowledge in the
field.
56. Of note, the CJEU observed at §103 – ‘In circumstances such as those at issue in
the main proceedings, where the conservation status of a natural habitat is unfavourable,
the possibility of authorising activities which may subsequently affect the ecological situation
of the sites concerned seems necessarily limited.’
57. In this context, the following statements in the NIS are relevant -
58. Page 23 – Under the Heading ‘4.4 Conservation Status of EU Protected Habitats and
Species’ it is stated ‘Many freshwater habitats are considered unfavourable due to nutrient
loading within the catchment, however the Cycle 2 River Basin Management Plan [RBMP]
(2018-2021) will aim to ensure improved targeting of mitigation measures (Note: the Cycle
3 RBMP is currently in preparation and will cover the period 2021-2027)’.
59. Page 24 - The NPWS National Biodiversity Action Plan 2017-2021 reports that 85%
of Ireland’s EU protected habitats are at unfavourable status, with 46% showing ongoing
declines. Agricultural practices account for 70% of the negative impacts on habitats.
60. Page 45 (emphasis added) - On the basis of the above information, and on a
precautionary basis, it is considered that no specific SAC or SPA in Ireland can be discounted
in respect of the potential adverse effects arising via agricultural activity which would be
associated with the measures set out in the NAP, or the inadequate enforcement of this Plan.
However, certain SACs are known to be particularly sensitive to these potential adverse
effects, already subject to deteriorating conditions associated with such effects and in
unfavourable conservation condition. It is in this context that the assessment of the NAP
measures on their implications for European sites is undertaken, as set out below.
61. Page 76 (emphasis added) - The 3rd National Biodiversity Action Plan 2017 – 2021,
states that a 2013 assessment of the status of EU protected habitats and species in Ireland
showed that 91% of the 58 habitats assessed have unfavourable conservation status (50%
were ‘Inadequate’ and 41% were ‘Bad’), while for species, 20% were assessed as being
‘Inadequate’ and 12% as ‘Bad’ including the water dependent SAC protected species –
freshwater pearl mussel and sea lamprey. For Birds, the 2021 assessment of the status of
211 regularly occurring bird species placed 54 species on the Birds of Conservation concern
in Ireland Red List, 79 on the Amber list and 78 on the Green list. It is noted however that
the Regulations are solely concerned with the protection of water from agricultural pollution,
and therefore the success of the Regulations can only be evaluated in the context of their
ability to mitigate water specific impacts. In this regard, the River Basin Management Plan
identifies agriculture as being a significant pressure in 729 (64%) of river and lake water
bodies that are At Risk of not meeting their environmental objectives. Regional
Implementation Strategies are being developed, which will prioritise areas for action during
the 3rd cycle of River Basin Management Planning and will include for investigative
assessments to define local issues and inform mitigation measures. It is important to note
that the determination of risk through the characterisation process included protected area
requirements, and therefore the environmental supporting conditions for SAC and SPA were
included in the assessment.
62. See also the discussion of the third and fourth questions in Case C-293/17 in the
answer to 8(b) below.
WFD
63. In terms of the WFD, it must be recalled that measures required under the Nitrates
Directive (such as the NAP) are one of the basic measures which must be included in the
programme of measures under Article 11 WFD.
64. Further, in relation to diffuse sources of agricultural pollution in rural areas of the
State, the NAP is the key mechanism provided in the Article 11 Programme of Measures in
Ireland’s RBMP for ensuring the attainment of the environmental objectives of the WFD. In
that regard, the RBMP provides under ‘Principal Action’ that ‘The new, strengthened Nitrates
Action Programme (2018–2021) will be the key agricultural measure for preventing and
reducing water pollution from nutrients (nitrogen and phosphorus) arising from agricultural
sources.’
65. To assess WFD compliance with the environmental objectives in Article 4, without
considering the underlying agricultural activities is logically inconsistent with the nature of
the assessment required by the WFD.
SEA Directive
66. Regarding the SEA Directive – it will be recalled that under Article 5 an environmental
report is to be prepared ‘in which the likely significant effects on the environment of
implementing the plan or programme, and reasonable alternatives taking into account the
objectives and the geographical scope of the plan or programme, are identified, described
and evaluated. The information to be given for this purpose is referred to in Annex I.’
67. It is hard to see how any of this can be achieved if the analysis is confined to the
so-called protective measures but excludes the underlying agricultural activities. For
example, Annex 1(f) refers to the likely significant effects on water - in the case of an NAP
which establishes a derogation, how can the likely significant effects on water be identified,
examined and assessed if the agricultural activities ensuing from the derogation are
excluded?
General
68. The NAP inter alia regulates the conditions under which the cultivation of grassland
for the sustenance of cattle for agricultural production is facilitated through the application
of fertilisers on the surface of land or below its surface across the territory of Ireland,
including in the vicinity of, and by way of hydrological connectivity to, Natura 2000 sites. It
therefore determines the conditions under which farm-level projects for the grazing of cattle
and the application of fertilisers on the surface of land or below its surface may be carried
out. For the purposes of assessment, there is no valid distinction between the conditions and
the activity.
69. To draw an analogy with planning permission – the competent authority could not
say what has to be assessed is the difference between conditions and no conditions but the
development itself is best ignored.
70. The NAP is not independent of the activities it regulates, and indeed in the context
of the derogation, it ‘allows’.”
24. The State submitted:
“I. Summary
5. None of the cited provisions - Article 6(3) of Directive 92/43 (‘the Habitats
Directive’), Article 4(1) Directive 2000/60 (‘the WFD’), or Article 3(1) of Directive 2001/42
(‘the SEA Directive’) - requires that an action programme under Article 5 of Directive 91/676
(‘the Nitrates Directive’) be assessed by reference to the effects on the environment of the
Nitrate-emitting agricultural activities regulated by that action programme, either generally
or by reference to whether the protective measures in the action programme are sufficiently
rigorous to prevent such damage.
6. This does not mean that EU law does not require any assessment of whether an
action programme is sufficiently rigorous to meet the objectives of Article 1(1) of the Nitrates
Directive, or a programme of measures is sufficiently rigorous to meet the objectives of
Article 4(1) of the WFD. There are ongoing positive obligations on Member States in that
respect, under Article 5 of the Nitrates Directive and Article 11 WFD. However, the Applicant
has not challenged the State’s compliance with either of those obligations.
7. Rather, the Applicant seeks – impermissibly - to read across the positive substantive
obligations under Article 5 of the Nitrates Directive and Article 11 WFD, to the negative
obligations under Article 6(3) of the Habitats Directive and Article 4(1) WFD and the
procedural obligations under Article 3(1) of the SEA Directive. There is no basis in EU law
for doing so.
II. Acte Clair
8. It is accepted that this issue is not acte clair.
III. Substantive response
Overview
9. In Question 8(a), the Court addresses the nature of the assessment obligation under
each of the Directives, and draws a distinction between the following:
i. assessment of the adverse environmental effects of the positive measures
put in place by the plan,
ii. assessment of the adverse environmental effects of the underlying activities
causing the target environmental damage to be mitigated by the plan, and/or
iii. assessment of whether the protective measures in the plan are sufficiently
rigorous to avoid the target environmental damage.
10. The Respondents agree that this is an essential conceptual distinction, both in
determining these proceedings, and more generally when considering environmental
assessment under EU law.
11. In that respect, EU law puts in place a comprehensive, and complex, framework of
instruments aimed at environmental protection. It is often the case that more than one
legal instrument will apply to a particular facet of environmental protection, or to a particular
measure. The interaction between the obligations under those instruments can be complex,
as can the application of the same obligation to different but related measures.
12. That does not mean, however, that the nature and subject of the assessment under
each instrument can or should be conflated, as envisaged by the Applicant. On the contrary,
to ensure that proper effect is given to EU environmental law, it is essential that there is
conceptual clarity with respect to each applicable instrument, as to: (i) the nature of the
obligation imposed on Member States by the instrument that gives rise to the assessment
obligation, (ii) the subject of that obligation, and (iii) the nature of the assessment to be
carried out.
13. These issues are inter-dependent and, in particular, the nature and subject of the
obligation arising for Member States under a particular provision will typically determine the
nature of the assessment required under that provision. In that respect, a distinction can be
drawn between:
i. Positive obligations requiring Member States to adopt protective measures
that must achieve a specific aim;
ii. Negative obligations requiring Member States to refuse to authorise
measures that might cause specific environmental harm; and
iii. Procedural obligations requiring Member States to conduct assessments to
inform a decision but that do not require any particular substantive outcome.
14. In that respect, a positive obligation to adopt protective measures to achieve a
specific aim, such as the obligation under Article 5 of the Nitrates Directive or Article 11 of
the WFD, will primarily require assessment of the positive environmental effects of the
measures to be adopted, to determine whether they are sufficiently rigorous to achieve that
aim. This will involve consideration of the negative environmental effects of the underlying
activities causing the target environmental harm, albeit at a global as opposed to project
level.
15. In contrast, a negative obligation to refuse to authorise any measure that will cause
a specified harm, such as under Article 6(3) of the Habitats Directive, or the Weser obligation
under Article 4(1) of the WFD, will require assessment of the adverse environmental effects
of the measure, to determine whether the measure will cause the prohibited environmental
damage. Such a negative obligation imposes no requirement to assess the positive
environmental effects of the measure, to determine whether the measure is sufficiently
rigorous to prevent project level activities from causing the target environmental harm, nor
does it require Member States to refuse to authorise a measure should that be the case.
16. Finally, a procedural obligation such as arises under the SEA Directive may require
assessment of the positive and negative environmental effects of the measures to be put in
place by a plan. However, the purpose of such an obligation is to inform the decision-making
process, not to achieve any particular outcome, and there is no requirement that such an
assessment determine whether a measure aimed at environmental protection is sufficiently
rigorous to eliminate the target environmental harm, or require refusal of the measure if it
is not.
17. It is clear, in that respect, that the purpose of environmental obligations under EU
law, and it follows the nature of the assessment that arises under such obligations, can be
markedly different depending on the obligation at issue. Thus when multiple obligations
apply to a single measure, such as is the case with the NAP, it cannot be assumed – as the
premise of the Applicant’s argument assumes – that it is intended that the assessment under
each of those obligations will consider the same matters. On the contrary, where multiple
obligations apply to a single measure, those obligations are typically complementary, and
avoid duplication of assessment.
18. This is evident having regard to the measures at issue here. Article 5 of the Nitrates
Directive ensures that an action programme is sufficiently rigorous to achieve the aims of
the Nitrates Directive, and Article 11 of the WFD ensures that the action programme together
with the balance of the Programme of Measures is sufficiently rigorous to achieve the aims
of the WFD. However, neither Directive addresses: (i) procedural requirements with respect
to the consideration of environmental effects other than nitrates pollution prior to adopting
the programme, or (ii) assessment as to whether the measures in the NAP might themselves
cause environmental harm. Those assessments are the subject of other instruments, with
Article 3(1) of the SEA Directive ensuring that the environmental effects of the proposed
measures and reasonable alternatives are considered to inform the decision making process,
and Article 6(3) of the Habitats Directive ensuring that none of those measures will cause
an adverse effect on a protected site. In turn, neither the Habitats Directive nor the SEA
Directive are concerned with ensuring that a Member State’s obligations under the Nitrates
Directive and the WFD are achieved. Rather, those measures serve a clear, and separate,
purpose, and the assessment required by those measure is in turn distinct.
19. Clarity with respect to the nature of each obligation at issue is therefore essential to
correctly identify the assessment that is required with respect to that obligation, and thus
to responding to the Court’s question. The Applicant’s approach, of assuming without
analysis that the positive obligations arising under Article 5 of the Nitrates Directive and
Article 11 of the WFD are determinative of the nature of the assessment to be carried out to
comply with Article 6(3) of the Habitats Directive, the Weser obligation under Article 4(1) of
the WFD, and Article 3(1) of the SEA Directive, is in those circumstances unsupportable.
20. Finally, in addition to clarity as to the nature of the obligation, clarity with respect
to the subject of the obligation at issue is essential in determining the nature of the
assessment that is required. This may be of particular importance, for example, when
considering the assessment of separate but related measures at different stages of the
planning hierarchy.
21. The subject of the assessments here is the NAP, not the farm-level activities causing
the target environmental harm. The Court has already held in An Taisce – The National
Trust For Ireland v. The Minister for Housing, Local Government and Heritage & Ors (No. 1)
[2024] IEHC 129 (‘No. 1 Judgment’) that (§88) ‘by definition the AA relates to the NAP itself
and not directly to the activities by farmers to which the NAP relates’. The Court further
confirmed in the No. 1 Judgment that (§161) the NAP does not ‘authorise’ farm-level
activities, and that ‘[a] more accurate term would be something in the ball-park of ‘regulates’
or ‘mitigates’.
22. In light of those findings, the extent to which the assessment of the underlying
agricultural activities might nevertheless be indirectly relevant to the assessments to be
carried out under the relevant provisions is what requires to be determined in this module.
The Applicant does not, however, engage in any substantive manner with this issue. Rather,
it continues to proceed on the assumption that the subject of the assessment is the
underlying agricultural activities, and/or that the NAP must be assessed on the basis that it
authorises those agricultural activities, without engaging with the implications of the Court
having found that this is not the case.
23. When seen in light of the foregoing, it is clear that the Applicant’s submissions fail
to establish that the obligations contended for arise under Article 6(3) of the Habitats
Directive, Article 4(1) of the WFD, or Article 3(1) of the SEA Directive.
24. The Respondents’ response to the Applicant’s arguments with respect to each of
those provisions, in light of the foregoing discussion, is detailed below. For ease of reference,
the Respondents will follow the same headings as the Applicant.
Nitrates Directive
25. The State’s compliance with the Nitrates Directive is not at issue in the proceedings.
The Applicant nevertheless devotes 43 paragraphs of its submissions on Module III to
addressing the substantive requirements arising under the Nitrates Directive. The
Respondents do not understand the Applicant to be seeking to introduce a claim for breach
of the Nitrates Directive to the proceedings (and indeed it could not do so at this stage).
Rather, the Applicant addresses this issue on the premise that the substantive obligations
under the Nitrates Directive should inform the nature of the assessment under the Habitats
Directive. A consideration of the nature and purpose of the obligations under the Nitrates
Directive and the Habitats Directive makes clear that this argument is unsustainable.
26. The objective of the Nitrates Directive, as stated in Article 1 of that Directive, is
reducing water pollution caused or induced by nitrates from agricultural sources and
preventing further such pollution.
27. Article 5(1) of the Nitrates Directive requires Member States to establish an action
programme for the purpose of realising the objectives of the Directive. Article 5(3) requires
that action programme take into account available scientific and technical data, mainly with
reference to respective nitrogen contributions originating from agriculture and other sources,
and environmental conditions in the relevant regions of the Member States concerned.
Article 5(4) provides that an action programme is required to consist of inter alia the
mandatory measures in Annex III and the measures prescribed by Member States in their
code of good agricultural practice, unless superseded by the Annex III measures.
28. Article 5(6) requires Member States to draw up appropriate monitoring programmes
to monitor the effectiveness of their action programmes. Article 5(7) provides that an action
programme must be reviewed and if necessary revised at least every four years.
29. The obligation to keep the action programme updated is not limited to the obligation
under Article 5(7) to review the plan on a four-year cycle. Under Article 5(5), Member States
are also required to take, in the framework of their action programmes, such additional
measures or reinforced actions as they consider necessary if, at the outset or in the light of
experience gained in implementing the action programmes, it becomes apparent that the
measures specified in Article 5(4) will not be sufficient for achieving the objectives specified
in Article 1. The CJEU has confirmed that the obligation under Article 5(5) is not limited to
updating the action programme every four years in accordance with Article 5(7). Rather,
those measures must be adopted as soon as the need for them is recognised. This is
confirmed in Case C-197/18 Wasserleitungsverband Nördliches Burgenland and Others
EU:C:2019:824, at §§54–56; 70–72.
30. The Applicant makes a number of assertions with respect to the implications of those
obligations, as follows:
i. At §§18 and 19, the Applicant cites Case C-396/01 Commission v Ireland,
which held that an action programme should be ‘an organised and coherent system
intended to meet a specific objective’, and infers that this ‘supports the idea that
any assessment must take into account the agricultural activities, in order to
constitute ‘an organised and coherent system intended to meet a specific objective’,
ie the objectives specified in Article 1.’
ii. At §§23–25, the Applicant argues that the decision to grant a derogation
and thereby ‘allow’ an increase to 250 kg N ‘must therefore be assessed as part of
the assessment of the NAP under the Directives cited in the question. That
necessarily entails assessment of the underlying agricultural activities. To confine
such an assessment to the protective measures would be contrary to the purposes
of those Directives.’
iii. At §§26-28 the Applicant references Case C 237/12 Commission v. France
and Case C 197/18 Wasserleitungsverband Nördliches Burgenland, which state that
the provisions of the Nitrates Directive ‘impose an obligation on the Member States
to determine the amounts of nitrogen that can be applied by farmers in a precise
manner’. The Applicant concludes that “[s]uch ‘precision’ cannot be achieved if the
focus is exclusively on the assessment of so-called protective measures.’
iv. At §29, the Applicant again states that the derogation ‘allows’ an increase
to 250 kg N, and that the assessment triggered in that respect, as to “whether there
is prejudice to the achievement of the objectives specified in article 1 … must
logically relate to the activities in question: to confine any assessment ‘to the
protective measures the plan positively includes and those alone” would not be
consistent with the requirements of the Directives.’
v. At §§34-37 the Applicant cites Joined Cases C 105/09 and C 110/09 Terre
Wallonne and Inter-Environnement Wallonie (‘Terre Wallone’), which states that the
9th to 11th recitals and Articles 1 and 3 to 5 of the Nitrates Directive require ‘a global
examination, at the level of vulnerable zones, of the environmental issues linked to
nitrate pollution from agricultural sources’ and concludes that to ‘confine any
assessment ‘to the protective measures the plan positively includes and those alone’
would not be consistent with the concept of a global examination’;
31. In each case, the Applicant commences with a principle derived from the Nitrates
Directive, or judicial commentary on the positive substantive obligations arising under the
Nitrates Directive, and draws a conclusion with respect to ‘the Directives’ or ‘any
assessment’. From that, the Applicant appears to infer that all such assessments of the
NAP, under any EU environmental law instrument, such be directed at ensuring that the
action programme meets the objectives set out in Article 1(1) of the Nitrates Directive.
32. Insofar as those conclusions are intended to relate to Member States’ obligations
under the Nitrates Directive alone, the Respondents take no issue with them. For the
avoidance of doubt, the State does not suggest that consideration of the environmental
effects of nitrate-producing agricultural activities, and/or of whether an action programme
is sufficiently rigorous to meet the objective set out in Article 1(1) of the Nitrates Directive,
is not required for the purposes of the State’s compliance with its obligations under Article
5(1) of the Nitrates Directive when adopting an action programme. However, those
obligations do not arise for consideration here, where there is no challenge to the State’s
compliance with its substantive obligations under the Nitrates Directive.
33. However, insofar as those conclusions are intended to apply to the nature of the
assessment required for the purposes of the negative obligations under Article 6(3) of the
Habitats Directive and Article 4(1) of the WFD, or the procedural obligations under Article
3(1) of the SEA Directive, the Applicant’s argument is misconceived. As considered above,
the obligations under those provisions are of an entirely different nature, and serve a distinct
purpose. There is no basis to superimpose the positive substantive obligations under Article
5 onto the distinct obligations arising under those provisions, and the Applicant identifies no
authority, or rationale, for proceeding on that basis. Nor has the Applicant identified any
rationale for the contention that the same assessment, as to whether the NAP is sufficiently
rigorous to meet the objectives of the Nitrates Directive, which was carried out by the State
under Article 5 of the Nitrates Directive, and by the Commission in the context of the
derogation decision, should be repeated on no less than three occasions. This is not
consistent with the general approach of EU environmental law of avoiding duplication of
assessment.
34. In that respect, the authorities relied on by the Applicant, other than Terre Wallone,
address the Nitrates Directive only. The only authority cited by the Applicant that engages
with the relevant issue – the interaction between the Nitrates Directive, the NAP and the
Habitats Directive – is the Opinion of Advocate General Kokott in Terre Wallone, and that is
not supportive of the Applicant’s position.
35. Rather, in considering whether an action programme under the Nitrates Directive
required appropriate assessment and thus fell under Article 3(2)(b) of the SEA Directive so
as to require SEA, Advocate General Kokott drew a clear distinction between the action
programme adopted under the Nitrates Directive, and the authorisation of activities
regulated by the action programme. She recognised that an action programme does not
authorise such activities, nor does it determine the compatibility of such activities with the
Habitats Directive. She notes in that respect, that (§92): ‘the compatibility of a project with
an action programme does not provide any indication as to whether it is permissible if it has
effects on an area of conservation. This is determined by the Habitats Directive.’
36. Advocate General Kokott continued to recognise that there are circumstances where
an action programme could cause damage to a protected site, and she identifies three
examples of when that might occur: (i) where an action programme includes measures
additional to those required by the Nitrates Directive, that do have the effect of influencing
or determining development consent, (ii) where conservation objectives expressly reference
the action programme as setting appropriate standards for the purposes of the Habitats
Directive, or (iii) where domestic provisions characterise the action programme as
determining whether a measure is compatible with the Habitats Directive.
37. In other words, Advocate General Kokott concluded that where domestic law gives
the action programme a status beyond its function as an action programme, so that it
authorises activities or is determinative with respect to the authorisation of activities, it may
cause harm to protected sites. However, it is clear that she otherwise viewed action
programmes as protective measures that would not cause such harm, and that she did not
consider that the environmental effect of activities regulated by the action programme
required assessment for the purposes of an AA of an action programme, save in the
foregoing circumstances.
38. None of those circumstances arise here. There is no provision in domestic law, that
provides that compliance with the action programme is determinative of compliance with the
obligations under the Habitats Regulations, or disapplies the Habitats Regulations where a
measure complies with the action programme.
39. The Applicant’s interpretation of that dicta at §46 of its Submissions on Module III,
as meaning that where the action programme contains a derogation, the underlying
agricultural activities require assessment, is therefore not supported by the passage quoted,
when read in the context of the opinion as a whole.
40. In the circumstances, the Applicant’s reliance on the substantive obligations arising
under the Nitrates Directive, to argue that the relevant provisions require assessment of
whether the NAP is sufficiently rigorous to achieve the aims of the Nitrates Directive, should
be rejected.
Habitats Directive
41. As detailed above, the nature of the required assessment must be determined in
accordance with the obligation at issue.
42. Article 6(3) of the Habitats Directive introduces a negative obligation only, to refuse
authorisation for measures that might cause an adverse effect on the integrity of a protected
site.
43. Positive obligations do arise under Article 6(1), which requires conservation
measures to be put in place, and Article 6(2), which requires Member States to take
appropriate steps to avoid deterioration in protected sites. However, those positive
obligations do not arise under Article 6(3). In any event, they are not ad idem the positive
obligations that arise under the Nitrates Directive, and which the Applicant seeks to read
across to Article 6(3) of the Habitats Directive.
44. In that respect, the CJEU in the Dutch Nitrates case expressly drew a distinction
between the obligations under Article 6(2) and Article 6(3) of the Habitats Directive,
confirming that it is not intended that positive obligations would arise under the latter
provision:
‘87. As a preliminary point, it should be recalled that, while Article 6(2) and Article
6(3) are designed to ensure the same level of protection (judgment of 12 April 2018,
People Over Wind and Sweetman, C-323/17, EU:C:2018:244, paragraph 24 and the
case-law cited), the subject matter of those two provisions is different, in that the
first is intended to introduce preventive measures whereas the second establishes
an assessment procedure intended to ensure, by means of a prior examination, that
a plan or project not directly connected with or necessary to the management of the
site concerned but likely to have a significant effect on it is authorised only to the
extent that it will not adversely affect the integrity of that site (judgment of 17 April
2018, Commission v Poland (Białowieża Forest), C-441/17, EU:C:2018:255,
paragraph 108 and the case-law cited)’
45. Having regard to the nature of the obligation under Article 6(3), there is no basis to
conclude that an AA of the NAP should include an assessment of whether the measures in
the NAP are sufficiently rigorous to meet the obligations under Article 1(1) of the Nitrates
Directive, for all of the reasons already set out above.
46. A number of further observations arise in that respect, having regard to the
submissions made by the Applicant specific to the Nitrates Directive, at §§47-62 of its
Submissions on Module III.
47. First, the Applicant relies on dicta from Case C-127/02 Waddenzee, to the effect that
the assessment under Article 6(3) must include ‘all the aspects’ of the plan or programme
under assessment, and notes that this dicta is expressly relied on by the CJEU with respect
to its consideration of a ‘programmatic plan’ in the Dutch Nitrates case.
48. Relatedly, at §49 the Applicant cites Commission Guidance to the effect that’ ‘[t]he
assessment must cover the impact of the entire plan or project in question, with all the
activities it comprises’.
49. However, a requirement that an AA consider ‘all the aspects’ of a plan or programme
cannot require an AA to consider matters that do not form part of that plan or programme.
The same applies to the Commission Guidance cited at §49. The NAP does not authorise
agricultural activities, and therefore those agricultural activities are not ‘an aspect’ of the
NAP.
50. Second, the Applicant continues at §56 to note that the CJEU in the Dutch Nitrates
case observed, at §103:
‘In circumstances such as those at issue in the main proceedings, where the
conservation status of a natural habitat is unfavourable, the possibility of authorising
activities which may subsequently affect the ecological situation of the sites
concerned seems necessarily limited.’
51. At paragraph 52-61, the Applicant references aspects of the NIS intended, it
appears, to establish that there is a risk to protected sites from nitrates pollution, and thus
that the possibility of authorising activities which may affect those sites is ‘necessarily
limited’, in line with the dicta in the Dutch Nitrates case.
52. However, again, the NAP does not authorise agricultural activities, so this has no
relevance to the AA of the NAP.
53. More generally, in the context of the Dutch Nitrates case, the Applicant appears to
infer that, because the CJEU held that nitrates-producing agricultural activities could be
authorised by a programmatic measure, it follows that the NAP is a programmatic measure
authorising agricultural activities, comparable to the programmatic measure at issue in the
Dutch Nitrates case, and thus the obligations identified in that case apply to the AA of the
NAP.
54. That is not correct.
55. It is instructive, in that respect, to consider how the preliminary reference in the
Dutch Nitrates case arose. That case did not involve a challenge to the AA of an action
programme adopted under Article 5 of the Nitrates Directive; an action programme was not
involved in that case. Rather, that case involved a challenge to six authorisations with
respect to specific agricultural activities. Those authorisations were challenged based, inter
alia, on an argument that the programmatic consenting measure under which the
authorisations were granted (‘the PAS’) did not properly transpose Article 6 of the Habitats
Directive.
56. Importantly, therefore, the dicta of the CJEU in the Dutch Nitrates Case relates to
the AA of individual projects, not to the AA of an action programme and/or any other
measure regulating, as opposed to authorising, agricultural activity. The CJEU confirmed,
in that respect, that the matter at issue in that preliminary reference was ‘the authorisation
issued to the farms’ (§88). That authorisation issued under a programme expressly aimed
at authorising nitrogen-producing agricultural activities.
57. The Applicant’s attempt to directly apply that judgment of the CJEU to the
assessment of the NAP must therefore be rejected.
58. Third, the Applicant has, in the circumstances, identified no authority supportive of
the proposition it relies on, namely that Article 6(3) of the Habitats Directive requires that
the AA of a protective measure assess the environmental harm caused by the activities it
regulates, to determine whether the protective measure is sufficiently rigorous to prevent
those activities causing harm to a protected site.
59. The Applicant did previously rely on the Opinion of Advocate General Kokott in Case
C 434/22 AS ‘Latvijas valsts meži’, when making this argument. Where that Opinion is not
referenced in the Applicant’s Submissions on Module III it is unclear if the Applicant
continues to rely on it. Irrespective, it does not support the case the Applicant seeks to
make.
60. With respect to Case C 434/22 AS ‘Latvijas valsts meži’, in its original submissions
the Applicant argues:
‘Calling something ‘protective’ does not offer a way around the requirements of the
Habitats Directive - see Adv-Gen Kokott’s opinion in Case C 434/22 AS ‘Latvijas
valsts meži’ in the context of tree-felling in an SAC with a view to the ‘protection’ of
forest habitats in order to maintain/create infrastructure installations in accordance
with the legal requirements relating to forest fire protection.’
61. However, the Opinion relied on is entirely consistent with the Respondents’ position.
The Advocate General concludes that the felling of trees for the purposes of fire prevention,
despite being a measure aimed at environmental protection through fire prevention, required
assessment under the Habitats Directive. However, the assessment envisaged was not an
assessment of whether the planned felling of trees was sufficient to achieve the
environmental aim of fire prevention, or whether more could or should have been done to
achieve that aim. Rather, the assessment envisaged was whether the measure at issue, the
felling of trees and reduction in the frequency of fires, might itself cause environmental
harm, for example by damaging a habitat.
62. That Advocate General’s Opinion therefore does not support the Applicant’s position.
On the contrary, it is consistent with the Respondents’ position, and with the approach taken
to the AA of the NAP.
63. Finally, throughout its submissions on Module III, the Applicant relies on a
characterisation of the derogation decision as being a measure causing harm to protected
sites rather than a protective measure, to justify the proposition that the AA of the NAP must
ensure that the NAP is sufficiently rigorous, in light of the derogation, to achieve the aims of
Article 5(1) of the Nitrates Directive, and/or to ensure that no agricultural activity that avails
of the derogation will cause harm to any protected site. This attempt to distinguish the
measures in the NAP included on foot of the derogation decision, from the balance of the
measures in the NAP, should be rejected.
64. It is notable, in that respect, that the Applicant characterises the decision to apply
for the derogation, or the Commission’s decision to grant the derogation, as being the
measure that requires assessment. The logic appears to be that by reason of that decision,
the regulation of the underlying agricultural activities is less strict than if that decision had
not been taken, and the decision to seek or grant the derogation is therefore not protective,
but potentially caused harm that must be assessed under the Nitrates Directive.
65. However, the measure that requires to be assessed under Article 6(3) is not the
decision to apply for a derogation, but rather the measure included in the NAP on foot of the
derogation, which is a limit prohibiting nitrogen concentrations in excess of 250 kg N/ha (if
an application for a derogation is made and granted) and a limit of 170 N kg in all other
cases.
66. Again, a limitation on nitrogen concentrations cannot cause damage to a protected
site by reason of nitrogen pollution; it is the underlying agricultural activity that risks causing
that damage. This remains the case irrespective of whether the limit is 170 kg N/ha or 250
kg N/ha. The correct analysis of the obligation arising under the Habitats Directive with
respect to the NAP does not alter by reason of the upper limitation in nitrates concentration
being increased.
67. The other basis on which the Applicant appears to contend that the decision to adopt
the derogation alters the nature of the assessment under Article 6(3) is an inference that if
that were not the case, there would be no assessment of whether the derogation will
prejudice the objectives of the Nitrates Directive (§29 of the Applicant’s Submissions on
Module III).
68. Insofar as the Applicant seeks to make that case, it should be rejected. The relevant
analysis was necessarily carried out, having regard to Article 5 of the Nitrates Directive, by
the State in determining that a derogation should be sought, and the Commission in granting
that derogation. As noted by the Court in the Judgment in Module I:
‘189. The really critical point is that while superficially the nitrates directive gives
the impression that it is up to the member state to decide on acceptable
concentration levels, art. 5(2) and (3) of Regulation 182/2011 make it clear that the
Commission is the decision-maker, basing itself primarily on expert advice.’
69. The Commission therefore carried out the assessment that the Applicant contends
is necessary, and should be carried out under Article 6(3) of the Habitats Directive, and
concluded that the Derogation is ‘justified on the basis of objective criteria’, ‘will not
prejudice the objectives set out in [the Nitrates Directive]’ and ‘is coherent with the legally
binding targets of the WFD’.
70. Thus, even if the logic of the Applicant’s position – that a gap in a relevant
environmental assessment could alter the assessment obligations arising under a Directive
– were correct, which it is not, no such gap arises here.
71. In all of the circumstances, the Applicant’s claim with respect to the application of
Article 6(3) of the Habitats Directive, should be rejected.
Article 4(1) WFD
72. The Respondents understand that this question is to be addressed on the assumption
that an obligation to assess the NAP does arise under Article 4(1) of the WFD (which is not
accepted by the Respondents). The balance of this response proceeds on that basis.
73. The Respondents’ position is that even if that obligation did arise, it would require
no more than an assessment of whether the positive measures put in place by the NAP might
cause a deterioration in a water body. It would not require assessment of the underlying
agricultural activities, and the authorisation of the NAP would not be contingent on it being
established that the measures under the NAP are sufficient to prevent any future
deterioration in any water body. The Applicant’s position to the contrary is misconceived in
the context of the WFD, as it is misconceived in the context of the Habitats Directive, for the
following reasons.
74. First, that argument by the Applicant is premised on the application of the
assessment obligation recognised by the CJEU in Case C-461/13 Weser (‘Weser’), where the
CJEU held:
‘Article 4(1)(a)(i) to (iii) of Directive 2000/60 must be interpreted as meaning that
the Member States are required - unless a derogation is granted - to refuse
authorisation for an individual project where it may cause a deterioration of the
status of a body of surface water or where it jeopardises the attainment of good
surface water status or of good ecological potential and good surface water chemical
status by the date laid down by the directive.’
75. Assuming (contrary to the Respondents’ position) that this obligation arises at all
with respect to the NAP, it is a negative obligation, similar to that arising under Article 6(3)
of the Habitats Directive, to refuse authorisation where a project may cause a deterioration
in the status of a body of surface water or jeopardise the attainment of inter alia good water
status. All of the arguments set out above, as to why the Applicant’s positive obligations
under Article 5 of the Nitrates Directive cannot be read across as applying also to assessment
under Article 6(3) of the Habitats Directive, apply here also.
76. Second, this argument must be rejected where it assumes that the NAP is required
to prevent any deterioration to any water body. This is incorrect. While the NAP has a
significant role in contributing to the objectives of the WFD, it does not have the sole
responsibility for delivering these objectives. Rather, the achievement of good ecological
status under the WFD is complex, involving a range of environmental pressures, impacts
and management responses from the multiple sectors involved. The NAP is only one part of
one of the 12 basic measures required to be included in the programme of measures under
the WFD. The WFD therefore does not require that the NAP alone will deliver the objectives
of Article 4(1).
77. Third, and as a result, this is an impossible standard, that could never be met. The
proposition that the WFD would prevent a Member State from adopting a protective measure
required to be adopted by the same Directive, solely on the basis that it cannot be
established with certainty that it alone will prevent any deterioration of water quality, when
the WFD itself does not require that NAP to reach that standard, is plainly unsupportable.
Again, the Applicant’s contention here would result in a lowering of the standard of
environmental protection, as opposed to enhancing it.
78. Finally, the Applicant’s alternative argument, that this assessment should be
conducted cumulatively with other binding measures, must also be rejected, where it is
irreconcilable with the framework established by the WFD. This is addressed in more detail
in response to Question 37.
SEA DIRECTIVE
79. The purpose of the assessment of the environmental effects of plans or programmes
under the SEA Directive is to provide environmental information to inform the plan making
process at its early stages, and to consider reasonable alternatives to the proposed plan.
No substantive obligation, either positive or negative, arises.
80. It is accepted that some high-level consideration of the environmental impact of
underlying agricultural activities may arise in this context, in particular in the context of the
assessment of reasonable alternatives, and indeed the SEA of the NAP carried out did
consider this issue at a high-level.
81. However, the obligation as contended for by the Applicant, that absent an
assessment demonstrating that the plan is sufficiently robust to achieve the objectives of
the Nitrates Directive, the SEA will be invalid, is, nevertheless, unsupported. An assessment
of that nature is not required to achieve the purposes of the SEA Directive, and could not be
reconciled with the nature of the SEA Directive in providing for procedural obligations only.
Conclusion
82. In the circumstances, the answer to Question 8(a) must be no. The Applicant’s
argument is premised on an impermissible reading across of obligations from the Nitrates
Directive to the measures at issue, and an assumption that the subject of the assessment is
the underlying agricultural activities, and/or that the NAP authorises those activities. This
is evident throughout the Applicant’s submissions, and is confirmed in its conclusion on this
issue, where it states that the NAP:
‘… determines the conditions under which farm-level projects for the grazing of cattle
and the application of fertilisers on the surface of land or below its surface may be
carried out. For the purposes of assessment, there is no valid distinction between
the conditions and the activity.
To draw an analogy with planning permission – the competent authority could not
say what has to be assessed is the difference between conditions and no conditions
but the development itself is best ignored.’
83. Assessing the NAP based on the positive measures that will be imposed by that
programme, rather than the underlying agricultural activities, is not in any way comparable
to a competent authority assessing only the conditions to be attached to a development,
when granting development consent, and not the development itself. In that example, the
proposed development, rather than the measure regulating the conditions, is the subject of
the assessment by the competent authority. Here, the subject of the assessment is the
NAP. The analogy does not follow, and demonstrates the misconception that underlies the
Applicant’s case.”
25. The ICMSA submitted:
“9. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §5 to §83 of the State’s submissions.
10. In addition, ICMSA would merely note, and echo, the concern which the State
expresses at §77 regarding ‘an impossible standard that could never be met’. Much case law
inclines against impossible, or impracticable, standards. For example:-
o Hardiman J. stated in Maguire v Ardagh [2002] 1 IR 385 (p.669: ‘I do not
find appealing a line of argument which sets up a distinction between a universally
accepted state of fact in real life and a quite contrary state of law’.
o In An Taisce v An Bord Pleanála [2022] IESC 8, dismissing an appeal by An
Taisce from a judgment of Humphreys J. in a case concerning a cheese factory in
Kilkenny, Hogan J. stated (§103):
‘Such an open-ended interpretation of these words leads, however, to
conclusions which are not practicable or feasible. In the present case, for
instance, it is simply not possible to audit or assess the 4,500 Glanbia farms
– which, it may be useful to remind ourselves, are all independently owned
and operated …’”
26. My decision is as follows. It is accepted by the opposing parties that this is not acte clair.
In such circumstances a reference at some stage in the proceedings is all but inevitable so it is very
much in the interests of the most expeditious determination of the point that is practicable for such
a reference to occur at first instance, and I would propose to proceed in that way. The other criteria
for a reference are also satisfied.
27. I should note here that there will be some re-wording of the questions generally for the
purposes of the formal order and judgment for reference. In particular it is appropriate to make
express reference to the overarching principles of Article 3(3) TEU and/or Article 11 and/or 191(2)
TFEU and/or Article 37 of the Charter of Fundamental Rights.
Issue 8(b) – second question – scope of assessment in the absence of farm-level AA
28. Issue 8(b) is:
“(b) If the answer to the foregoing question in general is No, do the provisions referred to
have that effect where provisions in the domestic law of the member state concerned for
assessment of individual derogations granted consequent on a national action plan under
directive 91/676 are not operated in practice in that context so that there is in practice no
assessment carried out under directive 92/43 of individual derogations granted consequent
on the plan in terms of the effect on European sites of Nitrate-emitting agricultural activities
which will be carried out on foot of such derogations?”
29. The applicant submitted:
“Concise summary
Yes. The key issue in the question is the non-application in practice of the law. Where an
AA is performed of an NAP which establishes a derogation from the 170 kg N limit, but the
Habitats Directive is not in fact applied to individual derogation applications, it is imperative
that the AA of the NAP consider the underlying Nitrate-emitting agricultural activities which
will be carried out on foot of derogations granted consequent on the plan, rather than merely
the protective measures the plan positively.
Acte Clair
The Applicant’s position is supported by case-law of the CJEU but the Applicant does not go
so far as to say it is Acte Clair, in the sense of precluding a reference.
Detailed answer
71. In its judgment on Module II, this Court observed:
91. It is of note that the AA process in the WFD context includes the statement that
‘It will therefore be vital that any derogations which emerge from the NAP will be
subject to AA; which should include a robust assessment of in-combination adverse
effects’: Natura Impact Statement of draft River Basin Management Plan 2022-2027,
p. 45. Not just reasonable or even desirable – ‘vital’. Even if time passes, as the
ICMSA points out, or if hypothetically some contrary view is articulated by the
executive or another expert later in the process or in some other process, there’s
your scientific doubt right there.
92. The failure to dispel such doubt by not having in practice a process of derogation-
specific AA doesn’t mean that the NAP should have assessed every farm impacting
on a European site individually. But it does mean that any shortcoming in plan-level
AA, if there is any such shortcoming, could be more significant due to the lack of a
farm-level safety net.
93. Lest anybody misunderstand, that doesn’t mean that the AA of the NAP was
actually defective. The applicant will have to prove the assumption of the discussion,
which will be an agenda item for Module III.
72. The assumption in question was that the effects of the underlying agricultural
activities should be considered.
73. In Joined Cases C 105/09 and C 110/09 Terre Wallonne and Inter-Environnement
Wallonie the CJEU stated –
46 Thus, so far as the purpose of action programmes is concerned, it is apparent
from Directive 91/676, in particular the 9th to 11th recitals in the preamble, Articles
1 and 3 to 5 and the annexes, that those programmes involve a global examination,
at the level of vulnerable zones, of the environmental issues linked to nitrate
pollution from agricultural sources, and that they put in place an organised system
designed to provide a general level of protection against such pollution.
47 The specific nature of those programmes lies in the fact that they embody a
comprehensive and coherent approach, providing practical and coordinated
arrangements covering vulnerable zones and, where appropriate, the entire
territory, for the reduction and prevention of pollution caused by nitrates from
agricultural sources.’
74. The applicant submits that the assessment of the agricultural activities in the course
of the NAP, which per Terre Wallonne above is supposed to be ‘a global examination, at the
level of the whole of the national territory, of the environmental issues linked to nitrate
pollution from agricultural sources’, is the only way to address the absence of a farm-level
assessment.
75. The approach of the CJEU to waivers or exemptions from the provisions of the
Habitats Directive is instructive in this regard.
76. In Joined Cases C-293/17 and C-294/17 Coöperatie Mobilisation (aka the ‘Dutch
Nitrogen cases’) the CJEU considered a ‘programmatic plan’ which enabled the application
of fertilisers on the surface of land or below its surface and the grazing of cattle, to be
implemented without being subject to a permit requirement.
77. The issue is helpfully summarised by Adv-Gen Kokott at §3 – ‘The specific point at
issue is that nitrogen deposition by individual farms in the Netherlands is not assessed
individually in certain protected sites, but is classified in a programmatic integrated plan,
which defines the extent to which nitrogen deposition is permitted on the basis of an
assessment of each individual protected site. It must be clarified not only whether such an
integrated plan is lawful, but also to what extent it is compatible with the protection of sites
to take into account measures to reduce nitrogen deposition from other sources, measures
to upgrade protected sites and future developments. It must also be examined how fertilising
of agricultural land and grazing are to be classified in the system relating to the appropriate
assessment of the implications for the site.’ At §142 she identified – ‘According to the request
for a preliminary ruling, the assessment was based on the actual and expected extent and
intensity of those activities and its outcome is that on average they would not cause an
increase in nitrogen deposition.’
78. At §90 the CJEU explained – ‘By the third and fourth questions in Case C-293/17,
the referring court asks, in essence, whether Article 6(3) of the Habitats Directive must be
interpreted as not precluding national legislation, such as that at issue in the main
proceedings, which allows a certain category of projects, in the present case the application
of fertilisers on the surface of land or below its surface and the grazing of cattle, to be
implemented without being subject to a permit requirement and, accordingly, to an
individualised appropriate assessment of its implications for the sites concerned, since that
legislation is itself based on an ‘appropriate assessment’ within the meaning of that
provision.’
79. The CJEU concluded §120 – ‘Article 6(3) of the Habitats Directive must be interpreted
as precluding national programmatic legislation, such as that at issue in the main
proceedings, which allows a certain category of projects, in the present case the application
of fertilisers on the surface of land or below its surface and the grazing of cattle, to be
implemented without being subject to a permit requirement and, accordingly, to an
individualised appropriate assessment of its implications for the sites concerned, unless the
objective circumstances make it possible to rule out with certainty any possibility that those
projects, individually or in combination with other projects, may significantly affect those
sites, which it is for the referring court to ascertain’.
80. Such certainty cannot logically be ascertained without assessing the agricultural
activities as opposed to the protective measures.
81. The CJEU also addressed whether it was sufficient that, as Adv-Gen Kokott put it at
§3 that ‘on average an increase in nitrogen deposition can be ruled out.’ The CJEU identified
119 ‘ An average value is not, in principle, capable of ensuring that there are no significant
effects on any single protected site as a result of fertilising or grazing, as such effects seem
to depend, inter alia, on the extent and, as the case may be, the intensiveness of those
activities, the proximity which may exist between the place in which those activities are
carried out and the protected site concerned, and specific conditions, for example owing to
the interaction of other sources of nitrogen, potentially characterising that site.’
82. See also the discussion of the second question in Case C-294/17 in the answer to
8(a) above. As noted there, the CJEU observed at §103 – ‘In circumstances such as those
at issue in the main proceedings, where the conservation status of a natural habitat is
unfavourable, the possibility of authorising activities which may subsequently affect the
ecological situation of the sites concerned seems necessarily limited.’
83. In this context, the quotes from the NIS at Page 23, Page 24, Page 45, Page 76
(set out on the answer to 8(a) are relevant.
84. Miron and Cashman, ‘European Union case law on the Birds and Habitats Directives’
(2024) at p.81 observe ‘general waivers are likely to contravene Article 6(3)’ and in this
regard refer to a number of cases where waivers contravened Article 6(3) - Case C 98/03
Commission v Germany; Case C 241/08 Commission v France; Case C 538/09 Commission
v Belgium; Case C 661/20 Commission v Slovak Republic.
85. Returning to the analysis of Adv-Gen Kokott in Cases C 105/09 and C 110/09 Terre
Wallonne and Inter-Environnement Wallonie, she observed
92 It is not evident from the Nitrates Directive, on the other hand, that an action
programme pursuant to Article 5 necessarily influences the development consent of
projects likely to have significant effects on areas of conservation. The compatibility
of a project with an action programme does not provide any indication as to whether
it is permissible if it has effects on an area of conservation. That is determined by
the Habitats Directive.
93. Nor does the Habitats Directive indicate that action programmes are important
for the development consent of projects relating to areas of conservation. The
second sentence of Article 6(3) and Article 6(4) instead contain autonomous criteria
for the development consent of plans and programmes, which are not directly
connected with the objectives of action programmes.
86. However, where an AA is performed of an NAP which establishes a derogation from
the 170 kg N limit, but the Habitats Directive is not in fact applied to individual derogation
applications, it is logically imperative that the AA of the NAP consider the underlying Nitrate-
emitting agricultural activities which will be carried out on foot of derogations granted
consequent on the plan, rather than merely the protective measures the plan positively.
That is the only way the requisite certainty can be achieved where farm-level derogation
assessments are dispensed with.”
30. The State submitted:
“I. Summary
84. The provisions referred to do not have that effect, even where in practice there is
no assessment carried out of individual derogation decisions under the Habitats Directive.
85. An alleged failure to comply with obligations under the Habitats Directive with
respect to a downstream measure will, if established, result in consequences for that
downstream measure. However, there is no basis to contend that an upstream measure
would be invalidated in those circumstances, or that the obligations arising under the
Habitats Directive with respect to an upstream measure would alter on that basis.
86. There is no textual support for that position in the Habitats Directive, and a purposive
approach would not support that claim. The purpose of Article 6(3) is to prevent the
implementation of measures that will have adverse effects on the integrity of a site. Refusing
to authorise the NAP under Article 6(3) would only prevent the authorisation of the NAP. It
would have no effect on the underlying agricultural activities and, in particular, would not
prevent those activities from continuing. It would serve only to remove the regulation of
those activities that currently are in place under the NAP.
II. Acte Clair
87. It is not contended that this is acte clair.
III. Substantive response
88. The logic of the Applicant’s case is that if it is established that downstream measures
are not in practice subjected to assessment for the purposes of the Habitats Directive when
they should be, an upstream measure that regulates that downstream measure will be
invalidated, and/or the assessment requirements under Article 6(3) of the Habitats Directive
for that upstream measure will alter.
89. There is no basis for that contention. It is comparable to arguing that if it were
determined that a planning authority was not conducting AA screening or AA on a particular
category of development that should have been subject to such assessment, it would serve
to invalidate upstream programmatic measures regulating that category of development,
and/or fundamentally alter the requirements of conducting an AA of those measures.
90. That consequence clearly would not follow. A failure to carry out AA with respect to
a project, or category of projects, that requires AA will have implications at project level.
However, there is no basis to contend that it could alter the assessment obligations that
arise with respect to an upstream plan, still less invalidate that plan.
91. There is no textual basis for that contention in the Habitats Directive, and a
purposive approach would not support that claim. The purpose of Article 6(3) is to prevent
the implementation of measures that will have adverse effects on the integrity of a site.
Refusing to authorise the NAP under Article 6(3), and/or quashing the NAP, on the basis that
in practice there is no farm level assessment of agricultural activities in Ireland, would only
prevent the authorisation of the NAP. It would have no effect on the relevant agricultural
activities, and in particular it would not invalidate those activities or prevent them from
continuing. It would serve only to remove the regulation of those activities that is currently
in place under the NAP, and thus reduce rather than enhance environmental protection.
92. Thus the fact that appropriate assessment is not in practice being carried out with
respect to derogation decisions cannot of itself invalidate the NAP, or alter the requirements
for the AA of the NAP.”
31. The ICMSA submitted:
“11. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §84 to §92.”
32. My decision is as follows. Again the logic of the acceptance by all parties that the point is
not acte clair is that a reference is potentially appropriate. As with the other questions, I think that
the other criteria area also satisfied.
Issue 37(a)(i) – third question – interaction between assessments
33. Issue 37(a)(i) is:
“37. (a) (i)
Do
(I) art. 6(3) of directive 92/43 and/or
(II) art. 3(1) and/or 5(1) and/or 11(2) of directive 2001/42
have the effect that
assessment of a plan or programme that is subject to those articles and that is capable of
having environmental effects on a water body must include assessment by reference to art.
4 of directive 2000/60 either alone or together with other binding measures adopted by the
member state are sufficiently rigorous to ensure that the plan or programme will not cause
a deterioration of the status of a body of surface water or jeopardise the attainment of good
surface water status or of good ecological potential and good surface water chemical status
by the date laid down by directive 2000/60,
and if so,
do those provisions or either of them require such an assessment to state in express and/or
clearly ascertainable terms whether the relevant environmental objectives of directive
2000/60 will be met following adoption of the plan or programme;
either generally or in the specific case of the proposed adoption of a basic measure as defined
by art. 11(3) of directive 2000/60 and in particular a nitrates action programme under art.
5 of directive 91/676 (as referred to in Annex VI part A para (ix) of directive 2000/60 as
referenced in art. 11(3)(a) of that directive)?”
34. The applicant submitted:
“Applicant’s Summary Answer
There is an obligation to conduct the assessment identified in the Court’s question and to
refuse a proposed development unless the assessment is conducted and the requisite degree
of certainty (no change in status and no deterioration) is substantiated. That conclusion
must be expressly stated.
Acte clair
The general principles in Bund Naturschutz have been consistently re-iterated but the
Applicant does not go so far as to say it is Acte Clair, in the sense of precluding a reference.
Detailed answer
As identified in the first part of the Court’s first question there is already such an obligation
pursuant to Bund für Umwelt und Naturschutz Deutschland e.V. v Bundesrepublik
Deutschland (C-461/13)(§51) ‘Article 4(1)(a)(i) to (iii) of Directive 2000/60 must be
interpreted as meaning that the Member States are required—unless a derogation is
granted—to refuse authorisation for an individual project where it may cause a deterioration
of the status of a body of surface water or where it jeopardises the attainment of good
surface water status or of good ecological potential and good surface water chemical status
by the date laid down by the directive.’ That necessarily means that Member States must
also refuse to adopt a plan if the particular protections afforded by the plan either alone or
together with other binding measures adopted by the member state are insufficient to ensure
that the activities the subject of provisions contained in the plan will not cause a deterioration
of the status of a body of surface water or jeopardise the attainment of good surface water
status or of good ecological potential and good surface water chemical status.
87. Although the Applicant accepts that the Court of Justice has given judgement on this
issues comparatively rarely it has consistently reiterated this obligation. In IL v Land Nord-
Rhein Westfallen Case 535/18 the Court of Justice held (§§74-76):
‘Article 4 of Directive 2000/60 not only contains more long-term planning
requirements provided for by management plans and programmes of measures, but
also concerns specific projects to which the prohibition of deterioration of the status
of bodies of water also applies. A Member State is consequently required to refuse
authorisation for a project where it is such as to result in deterioration of the status
of the body of water concerned or to jeopardise the attainment of ‘good status’ for
bodies of surface water or groundwater, subject to the derogations also provided for
in Article 4 (see, to that effect, judgment of 1 July 2015, Bund für Umwelt und
Naturschutz Deutschland, C 461/13, EU:C:2015:433, paragraphs 47, 48 and 50).
More specifically, as the Court has held, when a project is liable to have adverse
effects on water, consent may be given to it only if the conditions set out in Article
4(7)(a) to (d) of that directive are satisfied. Without prejudice to the possibility of
judicial review, the national authorities which are competent to authorise a project
are required to review whether those conditions are satisfied before the grant of
such an authorisation (see, to that effect, judgment of 1 June 2017, Folk, C 529/15,
EU:C:2017:419, paragraphs 36 and 39).
It follows from the foregoing that, during the procedure for approval of a project,
and therefore before the decision is taken, the competent authorities are required,
under Article 4 of Directive 2000/60, to check whether that project may have
adverse effects on water which would be contrary to the requirements to prevent
deterioration and to improve the status of bodies of surface water and groundwater.
That provision therefore precludes such a check from taking place only after that
time.’
88. The Applicant emphasises both the requirements to prevent deterioration and the
necessity that the required level of certainty be established prior to the grant of the
development consent. The Court continued (§§80-82):
‘The information that the developer must, in any event, provide to the decision-
making authority includes, in accordance with Article 5(3)(b) and (c) of Directive
2011/92, a description of the measures envisaged in order to avoid, reduce and, if
possible, remedy significant adverse effects and the data required to identify and
assess the main effects which the project is likely to have on the environment.
Therefore, in the light of Article 3(b) of Directive 2011/92 and in view of the
mandatory nature of the check to be carried out pursuant to Directive 2000/60,
recalled in paragraphs 74 to 76 of the present judgment, and in view of the
importance which that directive attaches to the protection of waters, it must be held
that the information referred to in Article 5(3)(b) and (c) of Directive 2011/92 must
contain the data that are necessary in order to assess the effects of a project on the
status of the bodies of water concerned in the light of the criteria and requirements
laid down in, inter alia, Article 4(1) of Directive 2000/60.
89. Finally, in relation to the second part of the Court’s question the Court noted (§86)
the necessity to have full information in relation to potential impacts available for the
purposes of public participation:
‘Therefore, the documents in the file that are made available to the relevant public
must make it possible for that public to obtain an accurate impression of the impact
that the project at issue will have on the status of the bodies of water concerned in
order for it to be able to verify compliance with the obligations arising from, inter
alia, Article 4 of Directive 2000/60. In particular, the data provided must be such as
to show whether, having regard to the criteria established by that directive, the
project at issue is liable to result in a deterioration of a body of water.’
90. That is, it is respectfully submitted, an answer to the final part of the Court’s question
– it must be possible to understand from the data provided that the relevant environmental
objectives in the WFD will be met.
91. All of this, it is respectfully submitted makes very clear the necessity to refuse
permission for any project in respect of which there is any uncertainty in respect of the
possibility that a proposed plan or programme may cause a deterioration of the status of a
body of surface water or jeopardise the attainment of good surface water status or of good
ecological potential and good surface water chemical status by the date laid down by the
directive for the purposes of part (ii) of the Court’s question. The necessity to adopt a
precautionary approach was reiterated in Sweetman v An Bord Pleanala Case 301/22 where
the Court repeated Bund Naturschutz and held that even if a water body potentially affected
by a grant of development consent was not a water body within the ambit of Article 4 if it
was hydrologically linked to another water body that did fall within the ambit of the Directive
then the same principle applied (§59):
‘In that context, it should be recalled in particular that, in accordance with Article
4(8) of Directive 2000/60 as regards the application of, inter alia, Article 4(7)
thereof, a Member State is to ensure that the application does not permanently
exclude or compromise the achievement of the objectives of that directive in other
bodies of water within the same river basin district and is consistent with the
implementation of other EU environmental legislation.’
92. The Court’s conclusion is contained at §69:
‘In the light of all of the foregoing, the answer to the third question is that Article
4(1)(a) and Article 11 of Directive 2000/60 must be interpreted as requiring a
competent authority – when it decides on an application for development consent
for a project which potentially affects a lake in respect of which, because its surface
area is below 0.5 km², neither its type-specific reference conditions, nor a
programme for the monitoring of water status has been established pursuant to the
first indent of Article 5(1) and Article 8 of Directive 2000/60, read in conjunction
with Annexes II and V to that directive respectively – to satisfy itself, first, that the
achievement of such a project is not liable to cause, on account of its effects on such
a lake, a deterioration of the status of another surface water body which has been
or ought to have been identified by that Member State as constituting a surface
water body ‘type’, nor is it liable to compromise the attainment of good surface water
status or of good ecological potential and good chemical status of such other surface
water body and, second, that the achievement of that project is compatible with the
measures implemented pursuant to the programme established, in accordance with
Article 11 of that directive, for the river basin district concerned.’
93. In other words the obligation on the consent authority is to ensure that development
consent is refused if the proposed development ‘is liable to compromise the attainment of
good water status, or of good ecological potential’ and that the project is ‘compatible with
the measures implement pursuant to the programme of measures’.
94. All of this is in turn consistent with the precautionary approach adopted by Hyland
J. in Sweetman v An Bord Pleanala 2021 IEHC 16. Although the principle at issue – whether
non-classification of water bodies precluded an assessment for the purposes of the WFD -
in that case is not directly engaged by the Court’s question, the approach is the same. A
Member State is required to refuse authorisation for an individual project where it may cause
a deterioration of the status of a body of surface water or where it jeopardises the attainment
of good surface water status or of good ecological potential and good surface water chemical
status. That conclusion must be expressly stated, to establish (a) that the assessment has
been done and (b) to enable the public (and if necessary the courts) to understand the
reasons for the conclusion and assess their adequacy.”
35. The State submitted:
“I. Summary
93. Neither Article 6(3) of the Habitats Directive, nor Articles 3(1) and/or 5(1) and/or
11(2) of the SEA Directive require that, as part of the assessment of a Plan for the purposes
of those provisions, there is an additional assessment under Article 4(1) of the WFD. The
Applicant has identified no authority for that proposition.
94. Moreover, there is no obligation to assess the NAP under Article 4(1) of the WFD,
separate to the assessment of the Programme of Measures under Article 11 of the WFD,
under the principle established in Weser. The CJEU has never held that the Weser obligation
applies to plans or programmes. Even if it did, it could never apply to the assessment of
one part of the programme of measures adopted under Article 11.
95. Even if those provisions did require an assessment under Article 4(1), that
assessment would be limited to whether the positive measures to be implemented under the
NAP caused a deterioration in a body of water. There could be no requirement for an
assessment as to whether the NAP is sufficiently rigorous, either alone or together with other
binding measures, to ensure that there would be no deterioration of any water body in the
State.
96. Strictly without prejudice to the foregoing, if any such obligation arose, a measure
could not be invalidated by reason of a failure to state in express and/or clearly ascertainable
terms whether the objectives of the WFD will be met, once the necessary assessment was
completed in substance.
II. Acte Clair
97. It is not contended that this is acte clair.
III. Substantive response
No obligation under Article 6(3) of the Habitats Directive and/or Article 3(1) of the SEA
Directive
98. There is no basis for the contention that either Article 6(3) of the Habitats Directive
or Article 3(1) of the SEA Directive require, in addition to an assessment satisfying the
obligations arising under those sections, an assessment as to whether a plan is sufficiently
rigorous to achieve the aims of the WFD, under Article 4(1) of the WFD.
99. Article 6(3) of the Habitats Directive relates to adverse effects on protected sites. It
is not concerned with achieving the aims of the WFD, and it does not require Member States
to put in place protective measures sufficient to achieve that aim.
100. The SEA Directive introduces procedural obligations only. There is no basis to
suggest that it imposes an obligation to assess whether a plan is sufficiently ambitious to
meet the objectives of the WFD, or that authorisation for a plan must be refused where it
does not carry out that assessment. Such an obligation would be entirely contrary to the
procedural nature of the obligations arising under the SEA Directive.
101. The Applicant has identified no basis on which such an obligation, which is stated
nowhere in the Directives, could be implied. Moreover, the Applicant does not assert, in its
submission responding to this question, that such an obligation in fact arises under either
Article 6(3) of the Habitats Directive or Article 3(1) of the SEA Directive. Rather, the
Applicant relies in response to this question wholly on the Weser obligation, and does not
address the first part of the question at all.
102. The contention that Article 6(3) of the Habitats Directive or Article 3(1) of the SEA
Directive require an assessment as to whether a plan is sufficiently rigorous to achieve the
aims of the WFD under Article 4(1) of the WFD should be rejected.
The Weser obligation does not apply to the NAP
103. The Applicant now appears to rely, when contending that such an assessment was
required, solely on the obligation under Article 4(1) of the WFD with respect to individual
projects, recognised by the CJEU in Weser.
104. There is no dispute with respect to the existence of that obligation in the context of
individual projects. What requires to be determined is whether that obligation extends: (i)
to plans and programmes, and (ii) if so, to measures that are part of the programme of
measures adopted under Article 11 of the WFD, and in particular the NAP.
105. The Applicant does not address those questions in its submissions on this issue.
Instead, the Applicant proceeds to apply the Weser obligation as if the NAP were a project.
The Applicant concludes its submissions by stating that a consenting authority must ‘ensure
that development consent is refused if the proposed development ‘is liable to compromise
the attainment of good water status, or of good ecological potential’’ and that a Member
State ‘is required to refuse authorisation for an individual project where it may cause a
deterioration of the status of a body of surface water…’
106. This does not answer the issues raised in the Court’s question. The Respondents’
position on those issues is set out below.
107. With respect to the application of the Weser obligation to plans and programmes,
the Respondents note that when formulating, and re-stating, the Weser obligation, the CJEU
has consistently referred expressly to that obligation arising for an ‘individual project’, often
in juxtaposition to the programmatic measures to be adopted under Article 11. The CJEU
has never applied that principle to a plan, although it is accepted that the issue has not
arisen directly for determination.
108. It is respectfully submitted, however, that the Court need not decide that broader
issue now, where irrespective of how that issue is resolved with respect to plans generally,
it is clear that the Weser obligation could never apply to a measure that forms part of the
Programme of Measures, and thus to the NAP, for the following reasons.
109. First, the Applicant’s argument assumes that Article 4(1) WFD requires an
assessment of the sufficiency of individual protective measures adopted as part of the
programme of measures to meet the objectives of Article 4(1), on the adoption of those
individual measures, in addition to the global assessment of the sufficiency of those
measures to meet those objectives that is required under Article 11 WFD.
110. This is entirely contrary to the framework established by the WFD, and has no textual
support in the Directive. This is the case irrespective of whether the obligation is to establish
that the individual measure itself meets the objectives of Article 4(1), or to establish that it
does so together with other binding measures adopted by the Member State.
111. In that respect, Article 4(1) WFD and Article 11 WFD have clear and distinct functions
under the WFD.
112. Article 4(1) WFD sets out the objectives of the WFD that must be met by Member
States. It is entitled ‘Environmental objectives’, and it provides: ‘In making operational the
programmes of measures specified in the river basin management plans’ Member States
‘shall … implement the necessary measures to prevent deterioration of the status of’ water
bodies.
113. However, while Article 4 WFD sets out the objectives to be achieved by the
programme of measures, and requires that Member State ensure that those objectives are
achieved, it does not determine the protective measures that Member States are required
to put in place, or address how the sufficiency of those measures to meet the objectives of
Article 4 WFD is to be assessed, or how the programme of measures should be monitored,
and supplemented where necessary, to ensure those objectives are achieved.
114. Rather, those matters are addressed under Article 11 WFD, and are based on a
global assessment of the sufficiency of the programme of measures, rather than an
individual assessment of each measure that form part of that programme on its adoption.
115. In that respect, Article 11(1) requires Member States to put in place a programme
of measures, in order to achieve the objectives of the WFD established in Article 4:
‘1. Each Member State shall ensure the establishment for each river basin district,
or for the part of an international river basin district within its territory, of a
programme of measures, taking account of the results of the analyses required
under Article 5, in order to achieve the objectives established under Article 4. …’
116. Article 11(2) provides that Member States are required to include specified ‘basic’
measures in the programme of measures, and may also be required to include
‘supplementary’ measures, if those supplementary measures are necessary to achieve the
objectives of the WFD established in Article 4.
117. Article 11(3) sets out the eleven basic measures that Member States are in all cases
required to include in the programme of measures. The first of those basic measures is:
‘those measures required to implement Community legislation for the protection of water,
including measures required under the legislation specified in Article 10 and in part A of
Annex VI’.
118. The Nitrates Directive is referenced in both Article 10 WFD and part A of Annex VI
WFD. The State is therefore required by Article 11(2) and 11(3) WFD to include the NAP,
being the ‘measure required’ under the Nitrates Directive, in the programme of measures.
However, the NAP is only one part of the eleven basic measures, required to be put in place
to meet the Article 4(1) objectives.
119. Article 11(4) provides for supplementary measures, that may be required to meet
the objectives of Article 4(1), in addition to the basic measures. Part B of Annex VI sets out
a broad range of supplementary measures that Member States may choose to adopt as part
of the programme of measures required under Article 11(4). Where supplementary
measures are required to meet the objectives of Article 4(1), Member States must include
them in the programme of measures.
120. Article 11(5) then addresses the obligations on Member States where it appears that
the objectives of Article 4 will not be met with respect to any body of water:
‘5. Where monitoring or other data indicate that the objectives set under Article 4
for the body of water are unlikely to be achieved, the Member State shall ensure
that:
- the causes of the possible failure are investigated,
- relevant permits and authorisations are examined and reviewed as appropriate,
- the monitoring programmes are reviewed and adjusted as appropriate, and
- additional measures as may be necessary in order to achieve those objectives are
established, including, as appropriate, the establishment of stricter environmental
quality standards following the procedures laid down in Annex V.
Where those causes are the result of circumstances of natural cause or force majeure
which are exceptional and could not reasonably have been foreseen, in particular
extreme floods and prolonged droughts, the Member State may determine that
additional measures are not practicable, subject to Article 4(6)’.
121. It is clear that this procedure under Article 11(5) is intended to include a global
assessment, of all causes of the possible failure, with a reassessment and review of: (i) any
relevant permits and authorisations, (ii) the monitoring programme, and (iii) all relevant
aspects of the programme of measures in place. If supplemental measures, over and above
the measures already in place, are required, they must be implemented.
122. Thus Article 4 and Article 11 when read together make clear that the WFD does not
require any separate assessment process to determine whether each individual protective
measure is sufficient to meet the Article 4(1) objectives, either alone or in combination with
other binding measures adopted; that assessment is carried out under Article 11 at a
programmatic level, having regard to the suite of measures globally.
123. There is therefore no basis for an assumption that two obligations arise under the
WFD with respect to the assessment of the sufficiency of protective measures – one in Article
11 and one in Article 4.
124. Moreover, the proposed second obligation would not be reconcilable with the Scheme
established by the WFD.
125. Insofar as concerns the obligation initially proposed by the Applicant, whereby the
NAP could not be adopted unless it were established with scientific certainty, following a
separate assessment under Article 4(1), that it alone would prevent the deterioration of the
status of any water body in Ireland, that contention is entirely incoherent with the framework
established by the WFD, and significantly exceeds any obligation on the State under the
WFD.
126. The Applicant has sought to develop its argument to avoid that difficulty, by arguing
that the State could have regard to other measures when carrying out the assessment of
the NAP under Article 4(1), and carry out a cumulative assessment, on the adoption of the
NAP, to determine if the Programme of Measures cumulatively will satisfy the objectives of
Article 4(1).
127. However, this is again misconceived, and ignores that the relevant obligation to
ensure the global sufficiency of measures to meet the objectives of the WFD is already
expressly addressed, in Article 11 of the WFD. The Applicant in effect argues that an
assessment under Article 11 of the sufficiency of the measures in place must take place
every time any individual basic measure is adopted as part of the programme of measures.
128. The consequence of the Applicant’s argument would be that the Programme of
Measures would undergo multiple assessments, on every occasion a measure is adopted. If
it emerged that the Programme of Measures was no longer sufficient, the proposed measure
could not be adopted. It bears emphasising that refusing to adopt the measure at issue
might be entirely unnecessary, and inappropriate, should the basis on which the Programme
of Measures was no longer sufficient relate to a matter covered by a different measure. This
would result in a lowering of environmental protection.
129. In contrast, the system that is in place under Article 11 allows for ongoing monitoring
of the adequacy of the Programme of Measures, and the remedying of any inadequacy
identified, without requiring protective measures required as part of the programme of
measures to be refused, and without prejudicing environmental protection.
130. Thus, not only would the introduction of the obligation contended for by the Applicant
result in a duplication of assessment, but the additional assessment contended for would be
less beneficial environmentally, and would in fact interfere with the system established by
the WFD.
131. It is notable, in that respect, that the CJEU in Sweetman, at §§52-53, placed
significant emphasis on the fact that the Directive establishes ‘a complex process involving
a number of extensively regulated stages, for the purpose of enabling the Member States to
implement the necessary measures…’ and made clear that the Directive should not be
interpreted in a manner incompatible with that Scheme.
132. Moreover, the test that the CJEU held must be applied in Sweetman is worth noting:
‘61 It will be for the referring court to ascertain whether those other lakes or, as
the case may be, a stretch of coastal water have been or ought to have been
identified by Ireland as constituting surface water body ‘types’ and, if so, whether
the achievement of the project at issue in the main proceedings may affect the status
of those surface water bodies or, as the case may be, of another surface water body
which has been or ought to have been identified as being a surface water body ‘type’.
62 Furthermore, it will be for the referring court to ascertain whether the
achievement of the project at issue in the main proceedings is compatible with the
measures implemented pursuant to the programme established, in accordance with
Article 11 of Directive 2000/60, for the river basin district concerned.
133. It is illogical to contend that a measure adopted under the Programme of Measures
requires to be assessed to determine if it is ‘compatible with the measures implemented
pursuant to the programme established in accordance with Article 11 of Directive 2000/60.’
134. In the circumstances, the Applicant has therefore identified no dicta in Weser or any
other case that would justify implying – from the obligation to assess the potential harmful
effects of individual projects with respect to which the WFD is silent – an obligation of
assessment of the sufficiency of individual protective measures adopted as part of the
programme of measures, with respect to which the WFD sets out a clear and detailed
framework. On the contrary, such an obligation would be irreconcilable with the scheme in
fact put in place.
135. It is clear, having regard to the foregoing, that the purported obligation under Article
4(1) of the WFD relied on by the Applicant does not arise. The claim pleaded by the Applicant
in that respect should be rejected.
No obligation to assess whether NAP is sufficiently rigorous
136. Moreover, for the reasons set out in response to Question 8, even if any obligation
did arise to assess the NAP under Article 4(1) by reason of the Weser obligation, all that
would be required would be an assessment of whether the positive measures put in place
by the NAP might cause a deterioration in the status of a water body.
No requirement for express statement
137. Finally, in relation to the last part of the Court’s question, the Applicant cites the
following dicta in C-535/18 Land Nordrhein-Westfalen EU:C:2020:391, §86:
‘Therefore, the documents in the file that are made available to the relevant public
must make it possible for that public to obtain an accurate impression of the impact
that the project at issue will have on the status of the bodies of water concerned in
order for it to be able to verify compliance with the obligations arising from, inter
alia, Article 4 of Directive 2000/60. In particular, the data provided must be such as
to show whether, having regard to the criteria established by that directive, the
project at issue is liable to result in a deterioration of a body of water.’
138. The Applicant then concludes that this is ‘an answer to the final part of the Court’s
question – it must be possible to understand from the data provided that the relevant
environmental objectives in the WFD will be met’.
139. However, that does not address the Court’s question, as to whether Article 6(3) of
the Habitats Directive or Article 3(1) of the SEA Directive ‘require such an assessment to
state in express and/or clearly ascertainable terms whether the relevant environmental
objectives of directive 2000/60 will be met following adoption of the plan or programme’.
140. The dicta relied on in IL does not address whether an express statement in that
respect is required. Rather, it refers only to what the data provided must show.
141. It is well established that the requirements of the Habitats Directive and the SEA
Directive should not be applied with undue formalism. The relevant principles in that respect
were recently restated by the Court of Appeal in Friends of the Irish Environment v
Government of Ireland [2021] IECA 317, as follows:
‘114. Excessive formalism in the context of the Habitats Directive is inconsistent with
the spirit and purpose of EU environmental law. In the context of the EIA Directive,
in Case C-128/09 Boxus v. Région wallonne, Advocate General Sharpston stated
that:-
‘… [t]he EIA Directive is not about formalism. It is concerned with providing effective
EIAs for all major projects; and, in its amended form, with ensuring adequate public
participation in the decision-making process.’
115. In Cases C-43/18 CFE SA v. Région de Bruxelles-Capitale and C-321/18 Terre
wallone ASBL v. Région wallonne, Advocate General Kokott was of the view that
designation of European sites ought to have been the subject of an Environmental
Assessment under the SEA Directive but nonetheless held, at para. 104 that:-
‘…it will have to be examined in any case whether or not the requirements of the
SEA Directive were nevertheless complied with…’.
116. She had regard to the purpose of the SEA Directive and emphasised that what
was important was examining the substance of what was done, rather than quashing
decisions on the basis of formulistic non-compliance with any EU environmental
assessment requirement.
117. The rejection of formulism has been followed in the High Court. In Ó’Gríanna
v. An Bord Pleanála (No. 2) [2017] IEHC 7, McGovern J. stated:-
‘I entirely agree with the opinion of Advocate General Sharpston in Antoine Boxus
and Ors. v. Région wallonne where she stated that the E.I.A. Directive is not about
formalism but is concerned with providing effective E.I.A.s for all major projects and
with ensuring adequate public participation in the decision making process. The
principle of effectiveness is not a mandate for construing the Directive in the most
onerous manner possible. This involves the courts being astute to ensure the
objectives of the Directive are met but not in an overly pedantic way.’
118. In Kelly v. An Bord Pleanála [2019] IEHC 84, Barniville J. agreed with the dicta
of McGovern J. rejecting ‘an excessive degree of formalism’ in favour of looking at
the substance of an AA Screening Report and the details of the Inspector’s Report.
I accept that the approach of the High Court to the EIA Directive and the Habitats
Directive was correct and I adopt it here.”
142. It is respectfully submitted that this principle applies here. Once the substance of
the obligation (if any such obligation arose, which is denied) was complied with, the lack of
a statement in express and/or clearly ascertainable terms to that effect should not invalidate
the NAP.”
36. The ICMSA submitted:
“12. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §93 to §142.”
37. My decision is that the previous points apply. The parties agree this is not acte clair, and
the other criteria for a reference as also satisfied.
Issue 37(a)(ii) – fourth question – requirements of water framework directive in the
context of adoption of a plan
38. Issue 37(a)(ii) is:
“(ii) If:
(A) the answer to issue [37](a)(i) is such that that assessment of a plan or programme that
is subject to art. 6(3) of directive 92/43 and/or art. 3(1) of directive 2001/42 and that is
capable of having environmental effects on a water body must include assessment by
reference to art. 4 of directive 2000/60 and
(B) the answer to issue 8 is such that assessment for the purposes of directive 2001/42 in
terms of compliance with directive 2000/60 is required to include an assessment of the
effects on the environment of the Nitrate-emitting agricultural activities which will be carried
out on foot of derogations granted consequent on the plan and/or in particular the omission
of more rigorous provisions in a plan,
does art. 4(1) of directive 2000/60
(and specifically the principle that Member States are required, unless a derogation is
granted, to refuse authorisation for an individual project where it may cause a deterioration
of the status of a body of surface water or where it jeopardises the attainment of good
surface water status or of good ecological potential and good surface water chemical status
by the date laid down by the directive – as laid down in the judgment of 1 July 2015, Bund
für Umwelt und Naturschutz Deutschland e.V. v Bundesrepublik Deutschland, C-461/13,
ECLI:EU:C:2015:433)
have the effect that
(I) member states must also refuse to adopt a plan if the particular protections afforded by
the plan either alone or together with other binding measures adopted by the member state
are insufficiently rigorous to ensure that the Nitrate-emitting agricultural activities which will
be carried out on foot of derogations granted consequent on the plan will not cause a
deterioration of the status of a body of surface water or jeopardise the attainment of good
surface water status or of good ecological potential and good surface water chemical status
by the date laid down by directive 2000/60,
(II) either generally or in the specific case of the proposed adoption of a basic measure as
defined by art. 11(3) of directive 2000/60 and in particular a nitrates action programme
under art. 5 of directive 91/676 (as referred to in Annex VI part A para (ix) of directive
2000/60 as referenced in art. 11(3)(a) of that directive)?”
39. The applicant submitted:
“(I)
Applicant’s Summary Answer
There is an obligation to refuse to adopt a plan if the particular protective measures are not
sufficiently robust.
Acte clair
This is not acte clair.
Detailed answer
95. There is no basis in Article 4 or 11 to bifurcate a plan that results in nitrates emitting
activities and the protective measures designed to ameliorate the environmental effects of
those activities. Unless the particular protections are sufficiently rigorous to ensure that the
Nitrate-emitting agricultural activities which will be carried out on foot of derogations granted
consequent on the plan will not cause a deterioration of the status of a body of surface water
then permission for that plan must be refused. The obligation on Member States in Article
4(1)(a)(i) is a mandatory one (‘shall’) to implement the necessary measures to prevent
deterioration of all bodies of surface water and there is no basis to read the WFD as
permitting a position where because the nitrates emitting activities and the protective
measures have been administratively sub-divided that the test to be applied in relation to
the latter is any less rigorous than that identified in Bund Naturschutz and or that the
underlying activities can be permitted in the absence of protective measures that discharge
the Article 4 obligation.
(II)
Applicant’s Summary Answer:
There is an obligation to refuse to adopt a plan if the particular protective measures are not
sufficiently robust.
Acte clair
This is not acte clair.
Detailed answer
96. The Applicant repeats the answer above. It is important to re-emphasis the
functional inter-relationship between the derogation and the Nitrates Action Programme. The
latter exists in order to justify the former. As is made express in the Commission decision
granting the derogation, it is the NAP that justifies the exceptional grant of the derogation,
which permits derogation farms to stock to 250 kilograms of organic manure per hectare
whereas the default rule is 170 kilograms. Ireland is now the only Member State with a
Derogation as Denmark, like Ireland, has failed to reduce the discharge of nutrients into
water bodies and has correctly not sought to extend its Derogation past its expiry in July
2024. Unless the NAP, as a basic measure as defined by art. 11(3) of directive 2000/60 and
in particular a nitrates action programme under art. 5 of directive 91/676 (as referred to in
Annex VI part A para (ix) of directive 2000/60 as referenced in art. 11(3)(a) of that
directive), can discharge the Article 4 obligation then the Member State must also refuse to
adopt the underlying plan.”
40. The State submitted:
“I. Summary
143. There is no such obligation, for all of the reasons already set out in response to
Question 8 and Question 37.
II. Acte Clair
144. The Respondents do not assert that this is acte clair.
III. Substantive response
145. This question has already been answered in the context of Question 8 and Question
37(i). The Respondents rely on the responses to those questions with respect to Question
37(ii) also.”
41. The ICMSA submitted:
“13. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §143 to §145.”
42. My decision is as follows. The previous points apply here. It is agreed by the parties that
this is not acte clair. As with other questions, in a case such as this, a reference is therefore
inevitable at some stage so it is quicker all round if it takes place at first instance. The other criteria
are satisfied.
Issue 37(a)(iii) – fifth question – requirements of water framework in context of plan
adoption in the absence of farm-level AA
43. Issue 37(a)(iii) is:
“(iii) If the answer to question (i) and/or (ii) in general is No, do the provisions referred to
have the effect referred to where provisions in the domestic law of the member state
concerned for assessment of individual derogations granted consequent on a national action
plan under directive 91/676 are not operated in practice in that context so that there is in
practice no assessment carried out under directive 92/43 (whether by reference to art. 4 of
directive 2000/60 or otherwise) of individual derogations granted consequent on the plan
in terms of the effect on water bodies in the member state of Nitrate-emitting agricultural
activities which will be carried out on foot of such derogations?”
44. The applicant submitted:
“Applicant’s Summary Answer
Yes.
Acte clair
This is not acte clair
Detailed answer
97. If farm level permitting or assessments are not undertaken in order to assess at
farm level the potential impacts of the nitrates emitting activities that will result as a
consequence of individual derogations, the certainty required for the purposes of Article 4
WFD must be found in the assessments of the NAP itself. that is the only way in which the
requirements of Article 4 WFD can be achieved if the effects of individual derogations are
not assessed at farm level. The Applicant relies on the case-law identified in the answer to
question 8(b).”
45. The State submitted:
“I. Summary
146. No, for the same reasons as detailed in response to Question 8(b).
II. Acte Clair
147. It is accepted that this is not acte clair.
III. Substantive response
148. The Respondents’ position is that the answer to this question must be no, for the
same reasons that the answer to Question 8(b) is no.”
46. The ICMSA submitted:
“14. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §146 to §148.”
47. My decision is that the same situation applies as with the previous question.
Issue 46(a) – sixth question – requirement to assign reference conditions to water bodies
(to be re-worded)
48. Issue 46(a) is:
“46. (a) Does art. 4 of directive 2000/60 have the effect that a plan or programme (in
particular an NAP) with the potential to affect the status of any relevant water body cannot
be adopted by the competent authority of a Member State unless:
(i) all water bodies potentially affected with a surface area of 0.5 km 2 or more have
been assigned type-specific reference conditions or by the obligation to establish
programmes for the monitoring of water status, because in the absence of that it cannot be
ascertained as to whether a deterioration in such status would be caused by the activities
the subject of provisions contained in the plan; and/or
(ii) the competent authority is required to satisfy itself,
(I) first, that the adoption of the plan or programme is not liable to cause a deterioration
of the status of any surface water body which has been or ought to have been identified by
that Member State as constituting a surface water body ‘type’, nor is it liable to compromise
the attainment of good surface water status or of good ecological potential and good
chemical status of such a surface water body and,
(II) second, that the adoption of the plan or programme is compatible with the measures
implemented pursuant to the programme under directive 2000/60 established, in
accordance with Article 11 of that directive, for the river basin district concerned?”
49. The applicant submitted:
“(i)
Applicant’s Summary Answer
For the reasons identified by Hyland J. in Sweetman. outside of the de minimis exclusions,
there is such an obligation to assess the potential impacts on all water bodies; however,
based on the decision of the Court of Justice in Sweetman the answer to this question is
unclear. In the Weser case the Advocate General observed §53 ‘In the present case, it is
clear from the documents in the main proceedings that a management plan covering a
programme of measures was adopted for the Weser river basin district. Consequently, the
Court is not called upon to determine the effects of Article 4(1) of the WFD with regard to a
body of water in respect of which the assessment and planning measures required by Article
4 of the WFD have not been adopted.’
Acte clair
This is not acte clair.
Detailed answer
98. The Court of Justice in Sweetman v An Bord Pleanala considered two questions
which were included in the judgement in the following terms (§20):
‘Are Member States required to characterise and subsequently classify all water
bodies, irrespective of size, and in particular is there a requirement to characterise
and classify all lakes with a topological surface area below 0.5 km2?
To what extent is the position different with respect to water bodies in a protected
area, if at all?
If the answer to question 1(a) is yes, can a competent authority for the purposes of
development consent grant development consent for a project that may affect the
water body prior to it being categorised and classified?
If the answer to question 1(a) is no, what are the obligations on a competent
authority when deciding upon an application for development consent that
potentially affects a water body not characterised and/or classified?’
99. The CJEU, looking at in particular Annex II and the travaux prepartoire, concluded
that there was no obligation on Member States to assess lakes of less than 0.5 sq. km (§33)
in order to accord them a status or to establish programme for the monitoring of water
status (§41).
100. The obligation to classify does not extend to water bodies that fall outside Article 4
for the reasons identified by the Court of Justice – i.e. that the water body fails to satisfy
the minimum catchment length of overall size prescribed in Annex II to the Directive
(extracted at §10 of the Court’s judgement). However, in respect of water bodies that do
satisfy the minimum criteria in Annex II but are not characterised and/or classified, the Court
of Justice did not need to answer that question. In the Weser case the Advocate General
observed at §53 ‘In the present case, it is clear from the documents in the main proceedings
that a management plan covering a programme of measures was adopted for the Weser
river basin district. Consequently, the Court is not called upon to determine the effects of
Article 4(1) of the WFD with regard to a body of water in respect of which the assessment
and planning measures required by Article 4 of the WFD have not been adopted.’
101. The Applicant therefore respectfully suggests that this is a matter which the Court
should refer to the Court of Justice, on Worldport principles in circumstances where this
question was deemed to be necessary by Hyland J. and which was not answered by the
Court of Justice.
102. In the alternative in the Applicant’s respectful submission, outside of the de minimis
exclusions in Annex II the Court can conclude that there is such an obligation to assess the
potential impacts on all water bodies for the reasons identified by Hyland J. in Sweetman.
In that case the Court assessed Weser in detail (§91 onwards). The Court in that case noted
that the Inspector had conducted a form of proxy analysis on a waterbody, the status of
which was not characterised (§119). She held that this analysis was futile, in the absence of
such characterisation (§121), and could not be relied upon in place of the detailed analysis
required by the EPA (§127) before concluding:
‘[128] Further, to say that no evidence of deterioration was presented is to
misunderstand the scheme of the WFD. The Board, as an emanation of the State,
has an obligation under EU law to refuse permission if either a deterioration in status
or a jeopardization of the attainment of good water status will occur as required by
Article 4(1). Where the status has not been determined, a red light ought to have
gone off for the Board, and it ought to have realised that it could not evaluate
compliance with the requirements of Article 4 (1) until the EPA assigned the water
body a status.
[129] Moreover, both the Board and the notice party confined their argument to lack
of deterioration. But neither addressed the impossibility of the Board confirming that
the proposed development would not jeopardise the attainment of good water
status, good ecological potential and good surface water chemical status in
circumstances where the status of Loch an Mhuilinn had not been evaluated.’
103. The Applicant respectfully agrees with this conclusion and suggests that it applies to
these proceedings on the basis of well-known Worldport principles. It is self-evidently
impossible to conduct an assessment of the potential impact of the NAP on water bodies
which are required to be classified for the purposes of Article 4 but have not been so
classified.
104. It is respectfully submitted that nothing in the judgement of the Court of Justice
disturbs the approach adopted by Hyland J. If anything the Court’s approach bears this out
as it clarifies that even when assessing a proposed development which may affect a water
body that does not fall within the purview of Article 4(1) there remains an obligation to
assess whether that grant of permission is consistent with the programme of measures or
will impact a water body which has been classified, or should have been classified. There is
nothing in the judgement of the Court of Justice to suggest that Hyland J. was incorrect. On
the contrary, the precautionary approach of the Court of Justice is entirely consistent with
the approach adopted by ... Hyland J.
(ii)
Applicant’s Summary Answer
For the reasons identified by Hyland J. in Sweetman outside of the de minimis exclusions,
there is such an obligation to assess the potential impacts on all water bodies; however,
based on the decision of the Court of Justice in Sweetman the answer to this question is
unclear.
Acte clair
This is not acte clair.
Detailed answer
105. In the Applicant’s respectful submission, outside of the de minimis exclusions in
Annex II the Court can conclude that there is such an obligation to assess the potential
impacts on all water bodies for the reasons identified by Hyland J. in Sweetman. In that case
the Court assessed Weser in detail (§91 onwards). The Court in that case noted that the
Inspector had conducted a form of proxy analysis on a waterbody, the status of which was
not characterised (§119). She held that this analysis was futile, in the absence of such
characterisation (§121), and could not be relied upon in place of the detailed analysis
required by the EPA (§127) before concluding:
‘[128] Further, to say that no evidence of deterioration was presented is to
misunderstand the scheme of the WFD. The Board, as an emanation of the State,
has an obligation under EU law to refuse permission if either a deterioration in status
or a jeopardization of the attainment of good water status will occur as required by
Article 4(1). Where the status has not been determined, a red light ought to have
gone off for the Board, and it ought to have realised that it could not evaluate
compliance with the requirements of Article 4 (1) until the EPA assigned the water
body a status.
[129] Moreover, both the Board and the notice party confined their argument to lack
of deterioration. But neither addressed the impossibility of the Board confirming that
the proposed development would not jeopardise the attainment of good water
status, good ecological potential and good surface water chemical status in
circumstances where the status of Loch an Mhuilinn had not been evaluated.’
106. The Applicant respectfully agrees with this conclusion and suggests that it applies to
these proceedings on the basis of well-known Worldport principles. It is self-evidently
impossible to conduct an assessment of the potential impact of the NAP on water bodies
which are required to be classified for the purposes of Article 4 but have not been so
classified.
107. It is respectfully submitted that nothing in the judgement of the Court of Justice
disturbs the approach adopted by Hyland J. If anything the Court’s approach bears this out
as it clarifies that even when assessing a proposed development which may affect a water
body that does not fall within the purview of Article 4(1) there remains an obligation to
assess whether that grant of permission is consistent with the programme of measures or
will impact a water body which has been classified, or should have been classified. There is
nothing in the judgement of the Court of Justice to suggest that Hyland J. was incorrect. On
the contrary, the precautionary approach of the Court of Justice is entirely consistent with
the approach adopted by the Hyland J. and it is respectfully submitted that it is profoundly
illogical to require an assessment of not directly affected but hydrologically linked water
bodies which do meet the classification threshold for the purposes of WFD but not to require
an assessment of the receiving water body itself, irrespective of whether it meets the
minimum criteria in Annex II.”
50. The State submitted:
“I. Summary
149. The Respondents in respect of Issue 46(a) maintain their position that there is no
obligation to assess the compliance of the NAP with Article 4(1) of the WFD, and the
contention that the assessment obligation established in Weser and developed in Sweetman
applies to the adoption of an action programme under Article 5(1) of the Nitrates Directive
is misconceived.
II. Acte Clair
150. The Respondents accept that Issue 46(a) is not acte clair.
III. Substantive submissions
151. The Respondents’ position is that Article 4 of the WFD does not have the effect that
the NAP cannot be adopted by the Respondents unless Issue 46(a)(i) is complied with and/or
the requirements in Issue 46(a)(ii) are satisfied.
152. In the Advocate General’s Opinion, in Case C-301/22 Sweetman EU:C:2023:697,
Advocate General Rantos stated that the questions referred to the CJEU by the High Court
‘follow[s] on from the judgment’ in Weser.
153. Accordingly, the Respondents, in respect of Issue 46(a), maintain their position that
there is no obligation to assess the compliance of the NAP with Article 4(1) of the WFD and
the contention that the assessment obligation established in Weser applies to the adoption
of an action programme under Article 5(1) of the Nitrates Directive, which is one of the suite
of measures required by the WFD, and the objective of which is to contribute to achieving
the obligations under Article 4(1) of the WFD, is misconceived.
154. The Applicant’s submission in respect of Issue 46(a) fails to recognise that the NAP
requires assessment not as a project, but as a strategic national plan.
155. For the same reason, the Respondents disagree with the Applicant’s submission at
§102 of its Module III submissions that the Court can conclude that there is an obligation to
assess the potential impacts on all water bodies for the reasons identified by Hyland J in
Peter Sweetman v an Bord Pleanála, Ireland and The Attorney General [2021] IEHC 16.
156. In the High Court in Sweetman, Hyland J was considering the decision of An Bord
Pleanála granting permission to the proposed development on the basis of its failure to
comply with the requirements of the WFD.”
51. The ICMSA submitted:
“15. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §149 to §156.”
52. My decision is that the previous points generally apply here as well, notably the agreement
of all parties that this is not acte clair.
53. However it has now been established that the relevant water bodies had in fact been
assigned a status prior to the adoption of the NAP. The first part of the issue (para. (i)) therefore
does not arise and thus a re-worded question for the CJEU omitting that part is appropriate.
54. The applicant’s response dated 16th July 2024 to the information that a status had already
been assigned pre-NAP included the following:
4. The Applicant does not think that the legal point has been altered by the State’s
Affidavit, but if necessary to do so, or as required by the Court or the parties, the Applicant
will seek to amend its Statement of Grounds to reflect the information now adduced by the
State and to alter §43 of the SOG to reflect the fact that the waterbodies were classified
when the NAP was adopted but that the State was unaware of it.
55. The applicant also complained about the assignment of status based on modelling, and about
the lack of information on monitoring.
56. But particularly when we move beyond the kind of preliminary organising and formatting
discussions that can arise at leave stage, and into the zone of hotly contested inter partes trench
warfare, it’s not up to the court to encourage parties to amend their pleadings – they need to make
that decision themselves. And they need to do so with particular urgency where the case has already
been heard and judgment reserved subject to some modest clarifications. However all is not lost
for the applicant because its submissions of 16th July 2024 identify the essential issue as follows:
“3. The crux of the issue is whether the State could have been satisfied that the project
would jeopardise the attainment of good status of the water bodies.”
57. That issue remains as part of the question despite the inevitable dropping of the first
paragraph ((a)(i)) which is premised on the erroneous understanding that the water bodies had not
been assigned a status at the material time.
Issue 46(b) – impact of Sweetman issue on the facts
58. Issue 46(b) is:
“(b) If the answer to either or both limbs of the foregoing is Yes, does this affect the NAP on
the facts here?”
59. The applicant submitted:
“Applicant’s Summary Answer
Yes
Acte clair
N/A
Detailed answer
108. There has been no assessment of the water bodies potentially affected by the NAP.
The State is precluded from adopting the NAP because it has the potential to affect all, or
at the very least a significant number of, waterbodies in the jurisdiction, including all the
unclassified water bodies at the time of the adoption or approval of the decision, in the
absence of the relevant assessment and indeed where such an assessment was not possible
in the absence of classification/characterisation. In the absence of those water bodies being
classified prior to the mass designation of unclassified water bodies by the EPA on 22nd April
2022, the State could not have been satisfied that the project will not jeopardise the
attainment of good status of these water bodies or cause a deterioration of status of these
water bodies. In this regard the Applicant relies on the finding of fact that the NAP has the
potential to potentially affect all Natura 2000 sites, which are protected under Article 4(1)(c)
of the WFD. The Applicant does not understand that the State is making the argument that
the NAP will not impact water bodies that were required to be classified and were not, in
fact, so classified at the time of the adoption of the NAP.”
60. The State submitted:
“I. Summary
157. The Respondents accept that if the answer to either or both limbs in Issue 46(a) is
yes, this would affect the NAP on the facts.
II. Acte Clair
158. The Respondents accept that Issue 46(b) is not acte clair.
III. Substantive submissions
159. The Respondents accept that if the answer to either or both limbs in Issue 46(a) is
yes, this would affect the NAP on the facts.
160. However, the Respondents submit that in such a circumstance, the Court would be
entitled to decline to grant relief at all or alternatively to decline to make any order that
affects the validity of the NAP, in the exercise of the Court's discretion. The Respondents
rely on their response to Issue 69 in this regard.
161. Moreover, the Respondents note that in Case C-301/22 Sweetman EU:C:2024:347,
Hyland J referred the following to the CJEU (§20(2)):
‘If the answer to question 1(a) is yes, can a competent authority for the purposes of
development consent grant development consent for a project that may affect the
water body prior to it being categorised and classified?’
162. However, the CJEU considered that (§42) there was no need to answer the second
question referred, in light of the CJEU’s answer to the first question.
163. If this Honourable Court considers it necessary to refer a question to the CJEU
concerning Issue 46(a), the Respondents submit that a, suitably modified, similar question
to the second question referred by Hyland J in Sweetman would also be appropriate to refer
to the CJEU.”
61. The ICMSA submitted:
“16. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §157 to §163.”
62. My decision is as follows. In its own terms, as a matter of fact, the question doesn’t give
rise to a controversy between the parties given the State’s response since I can find as a fact (in the
light of that response) that if the answer to either or both limbs of question 46(a) is Yes, this does
affect the NAP on the facts here.
63. Insofar as the State want a further question referred here, I don’t see that as adding
anything to what was issue 46(a)(i).
64. Re-wording the State’s proposed question in terms of plans rather than projects, it would
read something like:
“If the answer to either or both limbs of question 46(a) is Yes, can a member state adopt a
plan or programme that may affect a water body prior to such water body being categorised
and classified for the purposes of directive 2000/60?”
65. But that replicates the previous question:
“(a) Does art. 4 of directive 2000/60 have the effect that a plan or programme (in particular
an NAP) with the potential to affect the status of any relevant water body cannot be adopted
by the competent authority of a Member State unless:
(i) all water bodies potentially affected with a surface area of 0.5 km2 or more have
been assigned type-specific reference conditions ...”
66. In such circumstances I don’t think an additional question would have been necessary. But
all of that has been superseded anyway by the new information that the relevant water bodies had
already been classified. So sub-paragraph (a)(i) falls away in any event and no reference of this
specific question arises on any view.
Issue 57 – seventh question – requirement to set out details of monitoring
67. Issue 57 is:
“57. Do art. 5(1) of and Annex I para. (i) to directive 2001/42 have the effect that the
environmental report itself must include a description of the measures envisaged concerning
monitoring in accordance with art. 10 in sufficient detail to demonstrate that art. 10 will be
complied with, including details of:
(i) how this monitoring will occur;
(ii) when it will be done; and/or
(iii) how the monitoring will be used and how any identified unforeseen adverse
environmental effects will be addressed?”
68. The applicant submitted:
“Concise Summary
Article 5(1) and Annex 1 paragraph (i) to Directive 2001/42 requires that the environmental
report must include a description of the measures envisaged for monitoring under Article 10
in sufficient detail to demonstrate how Article 10 will be complies with. This clear from the
wording of the directive, the context and the purpose of SEA. The public is entitled to
comment on envisaged monitoring measures and therefore ought to be given sufficient
information to verify that they are consistent with Article 10. Furthermore clarity in
monitoring serves other purposes such as avoidance of duplication by facilitating reuse of
monitoring in other plans or programmes or coordinating SEA monitoring activities into a
larger suite of environmental surveillance.
Acte Clair
As far as the Applicant can ascertain, the Court of Justice has not ruled on the interpretation
of Article 5(1) and Annex 1 paragraph (i), therefore the issue does not appear to be acte
clair. Nonetheless, a similar issue was pleaded before the Supreme Court in Friends of the
Irish Environment v Government of Ireland (Supreme Court No 1/2022). The Supreme Court
summarised the issue as ‘The appellant’s argument concerns the absence of detail as to
how monitoring will occur, who will do it, when it will be done, and how any identified or
unforeseen adverse environmental effects will be addressed.’ It held that the issue was one
of application of the provisions of the Directive and no interpretative difficulty requires
further clarification from the CJEU . The Supreme Court deferred further consideration of the
issue until after the Court of Justice gave its decision on other questions referred for a
preliminary ruling.
Detailed answer
109. The Commission Guidelines define monitoring as follows:
The Directive does not define the meaning of 'monitor'. Monitoring can, however, be
generally described as an activity of following the development of the parameters of concern
in magnitude, time and space. In the context of Article 10 and its references to unforeseen
adverse effects and remedial action, monitoring may also be a means of verifying the
information in the environmental report. Article 10 does not contain any technical
requirements about the methods to be used for monitoring. The methods chosen should be
those which are available and best fitted in each case to seeing whether the assumptions
made in the environmental assessment correspond with the environmental effects which
occur when the plan or programme is implemented, and to identifying at an early stage
unforeseen adverse effects resulting from the implementation of the plan or programme. It
is clear that monitoring is embedded in the context of the environmental assessment and
does not require scientific research activities. Also the character (e.g. quantitative or
qualitative) and detail of the environmental information necessary for monitoring depend on
the character and detail of the plan or programme and its predicted environmental effects
110. There does not appear to be any Irish or Court of Justice case law on Article 10 of
the SEA Directive, although the issue of the level of detail is currently pending before the
Supreme Court in Friends of the Irish Environment v Government of Ireland .
111. Article 5(1) and Annex I to the SEA Directive sets out the information to be contained
in the environmental report (as defined in Article 1). Paragraph (i) lists “a description of the
measures envisaged concerning monitoring in accordance with Article 10” as one of the
categories of information to be contained in the environmental report.
112. Article 5(2) requires that the environmental report shall include information that
may reasonably be required taking into account current knowledge and methods of
assessment, the contents and level of detail in the plan and programme, its stage in the
decision-making process and the extent to which certain matters are more appropriately
assessed at different levels in that process in order to avoid duplication of the assessment.
113. Article 6 requires that the draft plan or programme and the environmental report
must be made available to the public and that they be given an early and effective
opportunity to comment on the draft plan or programme and the environmental report
before its adoption.
114. Clearly the public is entitled to comment on the monitoring envisaged monitoring
measures and to offer views on their compatibility with Article 10.
115. Article 9(1) of the SEA Directive specifies the information on the decision which must
be made available to the public when a plan or programme is adopted. These are:
a. The plan or programme as adopted
b. a statement summarising how environmental considerations have been
integrated into the plan or programme and how the environmental report prepared
pursuant to Article 5, the opinions expressed pursuant to Article 6 and the results of
consultations entered into pursuant to Article 7 have been taken into account in
accordance with Article 8 and the reasons for choosing the plan or programme as
adopted, in the light of the other reasonable alternatives dealt with, and
c. the measures decided concerning monitoring in accordance with Article 10
116. Article 9(2) leaves it to the Member States to provide for the detailed arrangements
concerning this information.
117. Article 10(1) of the SEA Directive requires that Member States shall monitor the
significant environmental effects of the implementation of plans and programmes in order,
inter alia, to identify at an early stage unforeseen adverse effects, and to be able to
undertake appropriate remedial action. Article 10(2) gives Member States discretion to use
existing monitoring arrangements if appropriate with a view to avoiding duplication.
118. Thus it is clear that the measures envisaged for monitoring in compliance with Article
10 must be set out in the environmental report during the preparation of the plan and
programme and the measures decided when a plan or programme is adopted. In the former
case the public is entitled to an effective opportunity to comment on the proposed monitoring
measures. To be given an effective opportunity to comment, the public must be given
sufficient information to verify whether the monitoring measures envisaged are fit for
purpose having regard to the requirements of Article 10. It is submitted that this is clear
from the wording of the SEA Directive and the fact that envisaged monitoring measures are
part of the public consultation process.
119. In the case of the decision, the SEA Directive does not require that the monitoring
measures be included in the SEA Statement although this is equally not precluded. It does
however require that the public is informed of the monitoring measures at the same time as
the adopted plan or programme and SEA Statement are published.
120. It is clear from the language of paragraph (i) that the environmental report must
contain a description of the measures envisaged for monitoring in accordance with Article
10. Therefore such a description must be sufficient to demonstrate to the public how the
competent authority intends to satisfy the monitoring obligation under Article 10.
121. Article 10 requires that the monitoring of the significant environmental effects of the
implementation of the plan in order, inter alia, to identify at an early stage unforeseen
adverse effects, and to be able to undertake appropriate remedial action.
122. The purpose of monitoring under Article 10 is more than simply data gathering and
comprises a number of elements.
123. First monitoring must be of the significant environmental effects of the
implementation of a plan or programme. Therefore as a matter of logic the description of
the monitoring must identify what significant environmental effects are likely such that they
should be monitored. This would include positive, adverse, foreseen and unforeseen effects
124. Second the purpose of the monitoring must be defined. The SEA Directive requires
as a minimum that the monitoring must identify at an early-stage unforeseen adverse
effects. The Commission Guidance describes unforeseen adverse effects as “better
interpreted as referring to shortcomings of the prognostic statements in the environmental
report (e.g. regarding the predicted intensity of an environmental effect) or unforeseen
effects resulting from changes of circumstances, which have led to certain assumptions in
the environmental assessment being partly or wholly invalidated.”
125. However, the scope of Article 10 is not confined to unforeseen adverse effects. The
competent authority must therefore also document the specific objectives of the monitoring
programme decided upon adoption of the plan or programme. For example, it is conceivable
that there may be monitoring of positive effects on the environment, for example in terms
of water quality, strictly protected species or European Sites. It may be conceivable that the
monitoring of individual plans and programmes forms part of a larger suite of environmental
surveillance activities.
126. Third, there is a temporal aspect, at least for the mandatory objective. The
monitoring programme must identify unforeseen adverse effects on the environment at an
early stage and be able to undertake appropriate remedial action. Therefore the monitoring
measures must set out when the monitoring will take place and how it is capable of fulfilling
this requirement.
127. In the absence of this level of description neither the competent authority nor the
public will know whether the monitoring complies with both the letter and spirit of Article
10. In particular, the fact that details of envisaged monitoring is required to be made
available to the public in the environmental report indicates that the public has a part to play
in ensuring that the envisaged monitoring measures are effective.
128. The purpose of making available details of the decided monitoring also serves this
purpose and also the purpose of avoiding duplication of monitoring. Therefore, the
information to made available under Article 9(1)(c) must be such that another competent
authority can confidently rely on the monitoring of a plan or programme for the purposes of
using it under Article 10(2) in another plan or programme.
129. For all of the reasons set out above the answer to this question is yes.”
69. The State submitted:
“I. Summary
164. The Respondents’ position is that Article 5(1) of the SEA Directive does not contain
a bright line rule as to the level of detail that is required to be included in an environmental
report, which is to be determined on an individual basis, in light of the Respondents’
discretion pursuant to Article 5(2) of the SEA Directive to include the information in the
environmental report that may reasonably be required.
165. Accordingly, the Respondents disagree with the proposition that Article 5(1) of the
SEA Directive requires an environmental report to include a description of the measures
envisaged concerning monitoring in accordance with Article 10 of the SEA Directive in
sufficient detail to demonstrate that Article 10 of the SEA Directive will be complied with.
II. Acte Clair
166. The Respondents submit that Issue 57 is acte clair.
III. Substantive response
167. The Respondents’ position is that Article 5(1) of the SEA Directive does not contain
a bright line rule as to the level of detail that is required to be included in an environmental
report, which is to be determined on an individual basis.
168. Accordingly, the Respondents disagree with the proposition that Article 5(1) requires
an environmental report to include a description of the measures envisaged concerning
monitoring in accordance with Article 10 in sufficient detail to demonstrate that Article 10
will be complied with.
169. Article 5(1) of the SEA Directive provides that:
‘Where an environmental assessment is required under Article 3(1), an environmental report
shall be prepared in which the likely significant effects on the environment of implementing
the plan or programme, and reasonable alternatives taking into account the objectives and
the geographical scope of the plan or programme, are identified, described and evaluated.
The information to be given for this purpose is referred to in Annex I.’
170. Paragraph (i) of Annex I provides that:
‘The information to be provided under Article 5(1), subject to Article 5(2) and (3), is the
following:
…
a description of the measures envisaged concerning monitoring in accordance with Article
10;’ (Emphasis added).
171. The obligation to provide the information in paragraph (i) of Annex I for the purposes
of Article 5(1) is expressly ‘subject to Article 5(2) and (3)’, which qualify the general
obligation in Article 5(1) of the SEA Directive.
172. In particular, Article 5(2) of the SEA Directive provides that:
‘The environmental report prepared pursuant to paragraph 1 shall include the
information that may reasonably be required taking into account current knowledge
and methods of assessment, the contents and level of detail in the plan or
programme, its stage in the decision-making process and the extent to which certain
matters are more appropriately assessed at different levels in that process in order
to avoid duplication of the assessment.’ (Emphasis added).
173. Accordingly, the information to be provided in an environmental report for the
purposes of Article 5(1) is not static and is modulated depending on the particular
environmental report in question, having regard to what may reasonably be required.
174. The UK Supreme Court in R. (on the application of Friends of the Earth Ltd) v
Heathrow Airport Ltd [2020] UKSC 52 considered the information which is required to be
included in an environmental report pursuant to Article 5(1) and stated that (§59):
‘an ‘environmental report’, whether by article 5(1) itself or by that provision in
conjunction with Annex I, is qualified by article 5(2) and (3) in a number of respects.
First, the obligation is only to include information that ‘may reasonably be required’,
which connotes the making of a judgment by the plan-making authority. Second,
that judgment may have regard to a number of matters, including current knowledge
and assessment methods. In addition, the contents and level of detail in a plan such
as the ANPS, the stage it has reached in the decision-making process and the ability
to draw upon sources of information used in other decision-making, may affect the
nature and extent of the information required to be provided in the environmental
report for the strategic environmental assessment.’ (Emphasis added).
175. The Court continued to state that (§142):
‘It is common ground that the effect of article 5(2) and (3) is to confer on the
Secretary of State a discretion regarding the information to include in an
environmental report.’
176. The Respondents submit that:
(1) the measures envisaged for the monitoring of the NAP that are outlined in
Chapter 9 of the SEA Environmental Report and Chapter 6 of the SEA Statement
comply fully with the requirements of Article 5(1) of the SEA Directive; and
(2) the Respondents were fully entitled to have regard to the detailed and
prescriptive monitoring, as required by the Nitrates Directive and implemented by
inter alia Articles 27, 29 and 30 of the GAP Regulations when exercising their
discretion regarding the information to include in the SEA Environmental Report.
177. Moreover, the Commission Guidance relied on by the Applicant at §109 of their
Module III submissions states that, with respect to Article 5(2)–(3), that (§5.16):
‘The reference to ‘contents and level of detail in the plan or programme’ is a
recognition that, in the environmental report for a broad-brush plan or programme,
very detailed information and analysis may not be necessary, (for example, a plan
or programme at the top of a hierarchy which descends from the general to the
particular); whereas much more detail would be expected for a plan or programme
that itself contained a higher level of detail. So the environmental report for a
national plan might not need to assess the effects of the plan on, say, every river in
the country; but the environmental report underpinning a town plan would certainly
be expected to address its implications for rivers or other waterbodies in or near the
town.’
178. With respect to paragraph (i) of Annex I, the Commission Guidance states that
(§5.29):
‘According to Article 10 the significant environmental effects of the implementation
of the plan or programme shall be monitored and, since these effects are specified
in paragraph (f), the report should contain a description of how that monitoring is
to be undertaken. The description should refer to existing monitoring arrangements
if these are to be used. There is some overlap between paragraph (i) and the
requirement in Article 9(1)(c) to make available at the time of adoption information
on the 'measures decided concerning monitoring'. It is obvious that no definitive
statement about the final monitoring measures can be made when the
environmental report is still being prepared, since the content of the plan or
programme is not decided, and in any event the content of the environmental report
is subject to the criteria laid down in Article 5(2). Likewise, in some circumstances
the monitoring arrangements may need to be adapted as implementation of the plan
or programme proceeds. There appears to be nothing in the Directive to preclude
this in appropriate cases.’ (Emphasis added).
179. Accordingly, the Respondents submit that the Commission Guidance relied on by the
Applicant, in fact, supports the Respondents’ proposed answer to Issue 57.”
70. The ICMSA submitted:
“17. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §164 to §179.”
71. My decision is as follows. By contrast with other questions, the State contends that this
issue is acte clair. Unfortunately I don’t agree given the absence of material that suggests an
unambiguous answer to this particular point. A contestable interpretation of Commission guidance
doesn’t render the point acte clair. A reference appears appropriate here also.
Issue 63(a) – eighth question – scope of SEA assessment
72. Issue 63(a) is:
“63. (a) If the term ‘material assets’ in para. (f) of annex I of directive 2001/42 excludes
the value of such assets and/or in particular in the case of an action plan under directive
91/676 excludes the broad societal impacts of agricultural activities, the impact of the plan
or project on the agricultural industry, and on the output and income of farmers, the
sustainability of the agricultural industry in the member state concerned, the food supply
chain and the employment of a significant portion of the population, does directive 2001/42
have the effect that consideration of such matters is unlawful in assessing the effects of the
plan?
[This raises the issue of whether Leth has the effect of precluding the consideration of
matters that fall outside the definition of material assets, assuming that applies to SEA]”
73. The applicant submitted:
“Concise Summary
By analogy with the judgment in Case C-420/11, Leth the term ‘material assets’ in paragraph
(f) of Annex I to the SEA Directive excludes the value of material assets and in the case of
an action plan under Directive 91/676 excludes other economic or social impacts on the
agriculture sector and farmers except in so far as these factor have an impact on the
environment. Such an interpretation is not supported by the wording of the Directive and is
not consistent with the objective of the Directive.
Acte Clair
To the best of the Applicant’s knowledge the Court of Justice has not ruled on the
[interpretation] of the term ‘material assets’ in the SEA Directive but it has ruled in Leth on
the same term which is in the EIA Directive.
Detailed answer
130. Paragraph (f) of Annex 1 sets out a non-exhaustive list of the likely significant
effects on the environment which must be provided in the environmental report under Article
5. This list includes ‘material assets’.
131. The concept ‘material assets’ is one which makes no express reference to the law of
the Member States and is therefore it must be given a uniform and independent
interpretation throughout the European Union.
132. There is no specific guidance or case law on the definition of ‘material assets’ on the
SEA Directive. However it is submitted that a uniform definition of ‘material assets’ between
the SEA and EIA Directives should be adopted, in particular that such directives serve
complementary and overlapping purposes to ensure a high degree of environmental
protection in the EU , and that the SEA and EIA Directives are integrated insofar as plans
and programmes which set the framework for future development consent under the EIA
Directive must be subject to SEA.
133. In Case C-420/11, Leth the Court of Justice interpreted the concept of ‘material
assets’ under the EIA Directive. It held that under the EIA Directive ‘it is necessary to
examine, in particular, the effects of a project on the use of material assets by human beings’
and in that particular case the impacts on the use of buildings from projects liable to result
in increased aircraft noise.
134. The Court ruled that it could not be inferred from the wording of Article 3 of the EIA
Directive that the environmental assessment included an assessment of impact of the project
on the pecuniary value of material assets. The Court also held that it would not be in
accordance with the objectives of that directive.
135. The Court explained, having regard to the purposes of the EIA Directive, it is
necessary to take into account only those effects on material assets which, by their very
nature, are also likely to have an impact on the environment and therefore the assessment
under the EIA Directive does not include the assessment of the effects which the project
under examination has on the value of material assets.
136. It is submitted that by analogy the same definition of material assets must be
adopted under the SEA Directive. The purpose of the SEA Directive is also to integrate
environmental protection requirements into decision-making. It does this by setting out
measures of a procedural nature i.e. provision of information to the public, the carrying out
of consultations, taking into account the environmental report and the results of the
consultations in decision-making and the provision of information on the decision. The SEA
procedure does not dictate the ultimate decision and it is up to the competent authority to
weigh up all factors, environmental, economic and social in adopting a plan or programme.
137. Thus the SEA Directive provides an input into the decision-making process and in
particular EU law does not envisage it as a procedure which is intended to capture the entire
scope of relevant matters to be taken into account, but rather is confined to information on
the likely significant effects on the environment. In light of this objective it is important that
the SEA procedure is confined to environmental effects only and that the lines are not blurred
with further stages of the decision making process where non-environmental considerations
are brought to bear.
138. An important aspect of the SEA procedure is the consideration of reasonable
alternatives and it is a requirement under Article 5(1) that the environmental report shall
include the identification, description and evaluation of the likely significant effects on the
environment of implementing the plan or programme and reasonable alternatives. Thus it is
critical that only environmental effects are included in the SEA procedure as otherwise
economic or social factors could skew the analysis of reasonable alternatives.
139. In addition if economic or social benefits were to be considered under material assets
then it would also require the examination of adverse economic and social impacts within
the SEA, which is not consistent with what was intended by the Directive which is confined
to an examination and assessment of environmental factors only.
140. That is not to say that other factors such as economic factors are not relevant to the
decision-making, but rather the SEA procedure is limited to environmental effects. There is
no provision in the SEA Directive to take into account non-environmental effects, for example
when weighing up reasonable alternatives.
141. Therefore EU law (as interpreted in Leth) does preclude a consideration of impacts
on the value of material assets in the SEA procedure as well as specifically a consideration
of the broad economic and social impacts of agriculture activities, the impact on the
agriculture industry, and on the output and income of famers, the sustainability of the
agriculture industry, the food supply chain and the employment of a significant portion of
the population insofar as those effects do not have an impact on the environment.
142. The Applicant stresses that such non-environmental matters are not necessarily
irrelevant to the decision on the action plan under Directive 91/676 but rather they are
irrelevant to the assessment under the SEA Directive.
143. The concept of sustainable development aims to meet the needs of the present
without compromising the ability of future to meet their own needs by finding a balance
between the environment, the economy and society. The SEA Directive provides procedural
rights to integrate environmental considerations into decision-making which necessarily
involves three competing considerations. Therefore it would be contrary to the SEA Directive
to in effect take economic and social considerations into account other than insofar as these
[sic].”
74. The State submitted:
“I. Summary
180. Even if ‘material assets’ excludes a consideration of ‘critical infrastructure essential
for the functioning of society’ (which is not accepted), the Respondents submit that the
taking into account of ‘critical infrastructure essential for the functioning of society’ is still
permissible in an environmental report prepared pursuant to Article 5(1) of the SEA Directive
for the following reasons given that Article 5(2) provides that the environmental report
prepared pursuant to Article 5(1) shall include the information ‘that may reasonably be
required…’ and that paragraph f of Annex I of the SEA Directive, which refers to ‘material
assets’ is non-exhaustive.
181. The interpretation of ‘material assets’ in Leth is specific to the EIA Directive and not
capable of automatic transposition to an SEA Directive context in light of the fact that
environmental assessment at a strategic level is a fundamentally different process from that
at a project level.
182. However, in the context of the EIA Directive, the Applicant misapplies Leth by
conflating value diminution and economic interests in an attempt to import its interpretation
of Leth into the present proceedings by analogy.
183. Even if Leth is applicable in the context of the SEA Directive (which the Respondents
maintain that it is not), it would be supportive of the Respondents’ case in any event.
II. Acte Clair
184. The Respondents accept that this is not acte clair.
III. Substantive submissions
185. Even if ‘material assets’ excludes a consideration of ‘critical infrastructure essential
for the functioning of society’ (which is not accepted), the Respondents submit that the
taking into account of ‘critical infrastructure essential for the functioning of society’ is still
permissible in an environmental report prepared pursuant to Article 5(1) of the SEA Directive
for the following reasons:
(1) Article 5(2) provides that the environmental report prepared pursuant to Article 5(1)
shall include the information ‘that may reasonably be required…’; and
(2) Paragraph f of Annex I is non-exhaustive and states that:
‘Information referred to in Article 5(1)
The information to be provided under Article 5(1), subject to Article 5(2) and (3), is the
following:
…
‘the likely significant effects on the environment, including on issues such as biodiversity,
population, human health, fauna, flora, soil, water, air, climatic factors, material assets,
cultural heritage including architectural and archaeological heritage, landscape and the
interrelationship between the above factors;’
186. In responding to the Applicant’s submissions, the Respondents make the following
points.
187. First, the Applicant’s position is that ‘material assets’ must have a uniform
interpretation across all EU laws, which is not correct.
188. By virtue of this assertion, the Applicant seeks to import its interpretation of Case
C‑420/11 Jutta Leth v Republik Österreich, Land Niederösterreich EU:C:2013:166 (‘Leth’)
into the present proceedings by analogy.
189. In this regard, Counsel for the Applicant on Day 2 of the hearing stated that (p. 22):
‘So, 24, material assets has a uniform application in European law.
Then the example they give is aircraft noise, you assess the effects of the latter on the use
of buildings by human beings, but you don’t take into account the effect on the pecuniary
value of the material assets. So, the implication seems to be you would assess the impacts
of aircraft noise on the people in the building, but you wouldn’t say it was a rented
accommodation; you wouldn’t say we can’t do that, because that is going to diminish the
value of the landlord's asset.’ (Emphasis added).
190. Similarly, the Applicant’s submission in respect of Module II state that (§§131–132):
“The concept ‘material assets’ is one which makes no express reference to the law of the
Member States and is therefore it must be given a uniform and independent interpretation
throughout the European Union.
There is no specific guidance or case law on the definition of ‘material assets’ on the SEA
Directive. However it is submitted that a uniform definition of ‘material assets’ between the
SEA and EIA Directives should be adopted…’.
191. However, what §24 of Leth provides is that:
‘As regards the term ‘material assets’ within the meaning of Article 3 of Directive
85/337, it must be recalled that, according to settled case-law, it follows from the
need for a uniform application of European Union law that the terms of a provision
of European Union law which makes no express reference to the law of the Member
States for the purpose of determining its meaning and scope must normally be given
an Independent and uniform interpretation throughout the European Union, having
regard to the context of the provision and the objective pursued by the legislation
in question (see Case C-287/98 Linster [2000] ECR I-6917, paragraph 43, and Case
C-497/10 PPU Mercredi [2010] ECR I-14309, paragraph 45).’
192. Accordingly, to ensure a uniform application of EU law, the independent and uniform
interpretation of ‘material assets’ in Leth is specific to ‘material assets’ in the EIA Directive
itself.
193. Second, however, this is not to say that jurisprudence in respect of a particular EU
law may not have applicability by analogy in respect of the correct interpretation of a
provision in a different EU law. What the CJEU provides for is a qualitative examination to
be applied to guide this assessment.
194. Nonetheless even if the Court agrees with the Applicant’s interpretation of Leth for
the purposes of the EIA Directive, this interpretation is not capable of direct transposition to
the circumstances of the SEA Directive for the following reasons:
(1) Article 3(c) of the EIA Directive and Article 5(1) of the SEA Directive are not
equivalent provisions; and
(2) While the rationale and clearly-defined subject matters of the EIA Directive
and the SEA Directive are complementary, they do not converge.
195. An interpretation of ‘material assets’ for the purposes of Article 5(1) of the SEA that
would preclude a consideration of critical infrastructure essential for the functioning of
society is incorrect as a matter of EU law.
196. Moreover, it would also be inconsistent with the deference provided in Article 5(2)
of the SEA Directive to determine what reasonably may be required.
197. Third, Leth arose in a different context to that of the present case.
198. The decision of the CJEU in Leth concerned an applicant seeking compensation for
the diminution in value to a private property as a result of aircraft noise.
199. Accordingly, the referring court asked the CJEU to consider whether (§17):
‘… the duty of the competent authorities of the Member State concerned to carry out
an environmental impact assessment, laid down in both European Union law and
national law, is liable to protect the individuals concerned against purely pecuniary
damage caused by a project in respect of which such an assessment has not been
carried out.” (Emphasis added).
200. However, the present proceedings are not concerned with “purely pecuniary
damage’.
201. They concern the interpretation in the NAP of ‘material assets’, in line with EPA
guidance, to cover agricultural assets as critical infrastructure essential for the functioning
of society. In this regard, the Respondents reiterate that the agri-food sector is Ireland’s
largest indigenous exporting sector and in 2020, the sector accounted for over 6% of GNI,
9% of exports and employed 163,600 people.
202. Fourth, relatedly, the Applicant’s submissions conflate value diminution and
economic interests in an attempt to rely on Leth.
203. The Applicant’s submission in respect of Module III argues (§141):
‘Therefore EU law (as interpreted in Leth) does preclude a consideration of impacts
on the value of material assets in the SEA procedure as well as specifically a
consideration of the broad economic and social impacts of agriculture activities, the
impact on the agriculture industry, and on the output and income of famers, the
sustainability of the agriculture industry, the food supply chain and the employment
of a significant portion of the population insofar as those effects do not have an
impact on the environment.’
204. The Applicant has interpreted Leth too narrowly in any event as the CJEU held that
pecuniary damage, in so far as it is the direct economic consequence of the effects on the
environment of a public or private project, is covered by the objective of protection pursued
by the EIA Directive.
205. The Court in Leth stated that (§29):
‘… it is necessary to take into account only those effects on material assets which,
by their very nature, are also likely to have an impact on the environment.’
206. To this end, the CJEU continued to state that (§§35–36):
‘In circumstances where exposure to noise resulting from a project covered by Article
4 of Directive 85/337 has significant effects on individuals, in the sense that a home
affected by that noise is rendered less capable of fulfilling its function and the
individuals’ environment, quality of life and, potentially, health are affected, a
decrease in the pecuniary value of that house may indeed be a direct economic
consequence of such effects on the environment, this being a matter which must be
examined on a case-by-case basis.
It must therefore be concluded that the prevention of [pecuniary] damage, in so far
as that damage is the direct economic consequence of the environmental effects of
a public or private project, is covered by the objective of protection pursued by
Directive 85/337. As such economic damage is a direct consequence of such effects,
it must be distinguished from economic damage which does not have its direct
source in the environmental effects and which, therefore, is not covered by the
objective of protection pursued by that directive, such as, inter alia, certain
competitive disadvantages.’
207. The Applicant’s position in these present proceedings appears to be inconsistent with
its prior position in R. (on the application of An Taisce (National Trust For Ireland)) v
Secretary of State for Energy and Climate Change [2013] EWHC 4161 (Admin), where the
Applicant argued, for the purposes of the assessment pursuant to Article 7 of the EIA
Directive of whether Hinkley Point C was likely to have significant effects on the environment
in Ireland, that (§157): ‘… impact includes effects on socio-economic conditions resulting
from alterations to environmental factors’ and the Applicant relied on §36 of Leth to this
effect.
208. Even if Leth is applicable in the context of the SEA Directive (which the Respondents
maintain that it is not), it would be supportive of the Respondents’ case in any event.
209. In line with the Respondents’ interpretation of ‘material assets’, Advocate General
Kokott in Leth stated that (§§19-20):
‘The Commission is also correct in its view that, under Article 3 of the EIA Directive,
the effects of aircraft noise on the human utilisation of buildings have to be
examined, as such utilisation constitutes an interaction between the factors ‘human’
and ‘assets’, of which account has to be taken in the application of that provision.
However, as various parties rightly argue, an extension of the assessment to the
value of material assets is neither consistent with the purpose of the EIA Directive
nor set out in the wording thereof.’ (Emphasis added).
210. Moreover, this aspect of Advocate General Kokott’s Opinion was followed by the
CJEU, where the Court stated that (§26):
‘It follows that, in the assessment of projects such as those at issue in the main
proceedings, which are liable to result in increased aircraft noise, it is necessary to
assess the effects of the latter on the use of buildings by human beings.’ (Emphasis
added).
211. It is the utilisation of material assets that is central to this case—not the pecuniary
value of material assets.
212. The interpretation of ‘material assets’ as critical infrastructure essential for the
functioning of society necessarily involves an assessment of the utilisation of material assets.
213. In this regard, the Affidavit of Thomas O’Dwyer sworn on 6 April 2023 for and on
behalf of ICMSA states that (§7):
‘If my farm was not in receipt of a derogation, the number of cows I would be able
to milk would be 47, a raw reduction in cow numbers of 32 from my herd's present
size, or a reduction of over 40%.’ (Emphasis added).
214. Similarly, the Affidavit of Pat McCormack sworn on 6 April 2023 for and on behalf of
ICMSA states (§50) that without a derogation, a farmer with a stocking rate above 170kgs
of N per hectare will have the following options (§50):
(1) Reduce livestock numbers;
(2) Export slurry; and
(3) Buy or lease additional land.”
75. The ICMSA submitted:
“Summary of ICMSA’s position on Issue 63(a)
18. Issue 63(a) comprises two sub-questions within a question – essentially :
(i) does the term ‘material assets’ exclude impacts on agricultural activities, the
agricultural industry and farmers, and,
(ii) if so, does Directive 2001/42 ‘have the effect that consideration of such
matters is unlawful…?’.
19. As an initial matter, it should be noted that An Taisce’s submissions are relatively
light on the second sub-question within Issue 63(a) posed, which is at the core of the Issue
– namely whether, if the postulate in the first sub-question is satisfied, the effect is that
‘consideration of such matters is unlawful in assessing the effects of the plan.’
20. ICMSA adopts the State’s submissions on Issue 63(a), which are set out between
§180 and §214 of those submissions. Without prejudice to that, there are further reasons
still why An Taisce’s submission under this Issue does not withstand scrutiny. ICMSA will
focus on these, which, in summary are:-
o C-420/11, Leth merely concerns what is required to be included in an EIA.
It says nothing about what must not be included in such an assessment, much less
one for SEA purposes. An Taisce adduces no case law on this in the SEA context,
EIA context or any context.
o An Taisce’s arguments seem predicated on an assumption that readers of
the report are, in effect, so easily confused that they could not process or understand
the report if it contained anything other than environmental matters. There is no
warrant for this assumption, nor does An Taisce provide any.
o Even assuming arguendo that something had been included which ought not
to have been, An Taisce has not demonstrated that any ‘consideration’ which follows
is ‘unlawful’ as a result.
Acte clair
21. In common with the State, ICMSA does not assert that this point is acte clair.
22. However, for the avoidance of doubt, that certainly does not mean that a preliminary
reference on this, or any other issue, is ‘necessary’ for Article 267 TFEU purpose.
23. An Taisce itself has noted (§132, Module III submissions) that: ‘There is no specific
guidance or case law on the definition of ‘material assets’ on the SEA Directive.’
24. That seems to be the basis on which it invites regard to the EIA Directive and to
Leth.
25. To be clear, a lack of any case law by way of support for a particular proposition (not
least an extremely ambitious one, such as An Taisce’s here) does not mean that a reference
should ensue, such that that reference could hypothetically produce the case law which An
Taisce’s argument lacks.
26. If anything, and as will be submitted, the Leth case, upon which An Taisce heavily,
indeed exclusively, relies under Issue 63(a), undermines An Taisce’s arguments.
ICMSA’S SUBSTANTIVE RESPONSE ON ISSUE 63(a)
Relevant legal provisions
27. ‘Material assets’ comes from para. 1(f) in Annex I to the SEA Directive. It may assist
to quote the relevant provisions.
28. Annex I states:
‘Information referred to in Article 5(1)
The information to be provided under Article 5(1), subject to Article 5(2) and (3), is the
following:
…
(f) the likely significant effects(1) on the environment, including on issues such as
biodiversity, population, human health, fauna, flora, soil, water, air, climatic factors, material
assets, cultural heritage including architectural and archaeological heritage, landscape and
the interrelationship between the above factors; …’
29. Subparagraph (f) contains a Footnote (1) which reads as follows: ‘These effects
should include secondary, cumulative, synergistic, short, medium and long-term permanent
and temporary, positive and negative effects.’
30. It will be recalled that ‘material assets’ are not defined in the SEA Directive nor its
implementing Regulations but that the EPA’s ‘SEA Pack’ defines ‘material assets’ as ‘critical
infrastructure essential for the functioning of society’.
31. It is also helpful to recall aspects of this Court’s Module II Judgment.
32. Regarding Issue 61(b), the Court held at §148:
‘148. My decision is that no deficiency has been established as postulated. Assuming
for the sake of argument that, as proposed by the applicant, perhaps implausibly,
material assets are confined to critical infrastructure, the food supply chain and the
farming sector overall constitute such critical infrastructure. Therefore even on the
hypothesised restrictive interpretation of ‘material assets’, which for transparency I
very much doubt but of course I could be wrong, the State hasn’t gone outside that
for SEA purposes.’
33. The Court returned to this in its Summary at §192(vi) stating:
‘if the applicant is correct that material assets are confined to material infrastructure
(which is a contestable proposition), the material assets considered by the State in
SEA constitute such infrastructure so no issue arises in that respect;’
34. Article 5 of the SEA Directive reads:
‘1. Where an environmental assessment is required under Article 3(1), an
environmental report shall be prepared in which the likely significant effects on the
environment of implementing the plan or programme, and reasonable alternatives
taking into account the objectives and the geographical scope of the plan or
programme, are identified, described and evaluated. The information to be given for
this purpose is referred to in Annex I.
2. The environmental report prepared pursuant to paragraph 1 shall include the
information that may reasonably be required taking into account current knowledge
and methods of assessment, the contents and level of detail in the plan or
programme, its stage in the decision-making process and the extent to which certain
matters are more appropriately assessed at different levels in that process in order
to avoid duplication of the assessment.
3. Relevant information available on environmental effects of the plans and
programmes and obtained at other levels of decision-making or through other
Community legislation may be used for providing the information referred to in
Annex I.
4. The authorities referred to in Article 6(3) shall be consulted when deciding on the
scope and level of detail of the information which must be included in the
environmental report.’
35. Article 5, including Article 5(1), is merely concerned with the ‘Environmental Report’.
As considered below, nothing in the Article, nor in case law, requires non-environmental
matters to be excluded from the Report, much less prescribes that illegality will ensue were
that to occur.
What Leth holds and does not hold
36. An Taisce seeks to derive from Leth a proposition which Leth does not hold. The
CJEU stated at §29 that ‘…It is necessary to take into account only those effects upon
material assets which, by their very nature, are also likely to have an impact on the
environment.’
37. An Taisce seeks to transform that into a proposition that matters which are not
necessary to take into account must not be taken into account.
38. Leth nowhere so holds. Indeed, that is unsurprising when one considers that this
was not one of the Questions the subject of a preliminary reference in that case. Those are
listed at §18 of the Leth judgment as follows:
‘Is Article 3 of Directive 85/337 …, as amended by Directive 97/11 … and by Directive
2003/35 …, to be interpreted as meaning that:
1.) the term ‘material assets’ covers only their substance or also their value;
2.) the environmental impact assessment serves also to protect an individual against
pecuniary damage as a result of a decrease in the value of his property?’
39. When considering Issue 63(b), this Court’s Module II Judgment started with what
was decided in Leth (see Humphreys J. at §154-§156). The Court then correctly continued
at §157:
‘But Leth is about the minimum as to what needs to be assessed, not the maximum,
in the sense that the EIA, AA and SEA directives don’t on their own terms preclude
a State from assessing other matters (such as the effect of a plan on the economy).
We can consider whether there is an implicit preclusion in due course. But in fairness
to the applicant and sticking to the question here, assuming for the sake of argument
that there is such a preclusion, the applicant has done enough to show that the State
did consider such broader economic factors in the SEA process. Whether that has
any legal implications can be considered in Module III.’
40. Kingston, Heyvaert and Cavoski, European Environmental Law (Cambridge, 2017),
citing to Leth, comment at p.388:
‘The assessment under Article 3 of the directive need not include an assessment of
the effects of the project on the financial value of assets. Nevertheless, the CJEU
has recognised that a decrease in the financial value of an asset (in that case, a
decrease in the value of a house from noise pollution) is covered by the objective of
the Directive in cases where it is a direct economic consequence of the
environmental effects identified in the assessment’.
41. Browne, Simons on Planning Law (3rd ed., 2021) notes at §14-18:
‘The EIA Directive is not prescriptive in relation to the manner in which an EIA is to
be conducted but merely requires that certain matters are assessed in an
appropriate manner, in light of each individual case. As the Advocate General noted
in Leth, the EIA Directive does not preclude the implementation of a project even in
the case where the EIA establishes that there are significant negative effects on the
environment. In Balz v An Bord Pleanala [2018] IEHC 309 Haughton J. stated that
the reference to ‘in an appropriate manner’ in article 3 means that the assessment
required will vary and will depend on the subject matter and level of direct or indirect
effect.’
Non-sequiturs in An Taisce’s submission, and the submission’s incorrect assumption and
troubling consequences
42. An Taisce’s submissions here are replete with non-sequiturs. Consider the first
sentence of §137, which is as follows:-
‘Thus the SEA Directive provides an input into the decision-making process and in
particular EU law does not envisage it as a procedure which is intended to capture
the entire scope of relevant matters to be taken into account, but rather is confined
to information on the likely significant effects on the environment.’
43. The underlined words simply do not follow from the earlier part of the sentence.
44. Even the first part of the sentence is not a fully correct characterisation of Leth - and
a better and more exact description might be that EU law ‘does not envisage [the SEA
assessment] as a process which is required to capture the entire scope of relevant matters’.
45. The second sentence of §137 proceeds from this to a further non-sequitur –
asserting that it is ‘important’ that “the lines are not blurred with further stages of the
decision making process’. However, An Taisce makes no effort to explain how or why this
would necessarily be so.
46. No authority cited for this concept of ‘blurred lines’. Even worse, it seems to proceed
on the basis of an assumption that those conducting an analysis or reading the
environmental report would be easily confused if further matters were included in the report.
Is An Taisce’s contention that if other matters were referred to the relevant persons might
not notice, read or appreciate what was said about environmental effects? Patently, there
would be no merit to any such contention.
47. §138 notes the importance of consideration of reasonably alternatives, but then
leaps from that to assert: ‘Thus it is critical that only environmental effects are included …’.
That is another non-sequitur. The point is made that reference to economic or social matters
could ‘skew the analysis’ but, again, that is merely asserted. It also seems, again, to proceed
on a presumption of a low level of ability or discernment on the part of those conducting an
analysis or of readers. Again, that cannot be presumed.
48. It is accepted that Article 5(1) would not be complied with if ‘the likely significant
effects on the environment’ were excluded from, or not dealt with, in the report.
49. However, it is a leap from that to assert that that Article 5(1) requires only ‘the likely
significant effects on the environment’ – and nothing else at all – to be dealt with in the
environmental report.
50. Article 5(1) does not so state. Moreover, such an proposition could have troubling
consequences. It could lead to a clash with legal certainty – being a general principle of EU
law. For example, any report in any field, including an environmental report here, must
inevitably ‘set the scene’ to some extent and may have to deal with various contextual and
other matters. The exclusionary legal proposition which An Taisce invites this Court to
innovate is liable to cast a shadow of uncertainty over all such matters. The drafters of such
reports would be operating under the Sword of Damocles, and (on An Taisce’s case) possible
illegality, if they strayed too far from what An Taisce asserts to be the only permissible
content.
Second part of Issue 63(a): An Taisce has not established that consideration would be
‘unlawful’ even if the report had been over-inclusive
51. Turning to the second part of Issue 63(a), nothing in Article 5(1) purports to require
economic or social effects to be excluded from ‘consideration’ of the relevant matters. That
is so regardless of whether Issue 63(a)’s reference to ‘consideration’ refers to consideration
within the report itself, or subsequent substantive consideration.
52. Three points may be made under this sub-heading.
53. First, turning to consideration within the report, Leth stated at §25 regarding an EIA
that:
‘Pursuant to Article 3 of Directive 85/337, it is necessary to examine the direct and
indirect effects of a project on, inter alia, human beings and material assets and, in
accordance with the fourth indent of that article, it is also necessary to examine such
effects on the interaction between those two factors. Therefore, it is necessary to
examine, in particular, the effects of a project on the use of material assets by
human beings.’
54. While recognising that Leth was a case under the EIA Directive, and without
prejudice to what flows from that (including that An Taisce has pointed to no relevant case
law at all), it is submitted that there is no evident reason why ‘direct and indirect effects …
on … human beings and material assets’ could not extend to effects upon farmers, including
(if necessary) incomes of farming families.
55. Second, turning to subsequent substantive consideration, a different article of the
SEA Directive – Article 8 – is entitled ‘Decision making’. Article 8 reads:
‘The environmental report prepared pursuant to Article 5, the opinions expressed
pursuant to Article 6 and the results of any trans-boundary consultations entered
into pursuant to Article 7 shall be taken into account during the preparation of the
plan or programme and before its adoption or submission to the legislative
procedure.’
56. Case law clearly holds that there is not a requirement to select the most
environmentally friendly option. This is apparent from Leth where the CJEU stated at §46:
‘To that end, the nature of the rule breached must be taken into account. In the
present case, that rule prescribes an assessment of the environmental impact of a
public or private project, but does not lay down the substantive rules in relation to
the balancing of the environmental effects with other factors or prohibit the
completion of projects which are liable to have negative effects on the environment.
Those characteristics suggest that the breach of Article 3 of Directive 85/337, that
is to say, in the present case, the failure to carry out the assessment prescribed by
that article, does not, in principle, by itself constitute the reason for the decrease in
the value of a property.’
57. In a similar vein, Kingston, Heyvaert and Cavoski state at p.388 regarding the EIA
Directive and Leth:
‘Crucially however Article 3 does not lay down substantive rules on the balancing of
the environmental effects of a project with other factors, or prohibit the competition
of projects which are liable to have negative effects on the environment.’
58. Indeed, An Taisce does not seem to dispute any of that. Thus, An Taisce’s submission
states:-
o ‘The SEA procedure does not dictate the ultimate decision and it is up to the
competent authority to weigh up all factors, environmental, economic and social in
adopting a plan or programme’ (§136);
o ‘That is not to say that other factors such as economic factors are not
relevant to the decision-making …’ (§140);
o ‘The Applicant stresses that such non-environmental factors are not
necessarily irrelevant to the decision on the action plan under Directive 91/676 …’
(§142).
59. Third, An Taisce does assert that EU law ‘precludes’ a consideration of the matters
referred to (e.g. §141 of its submissions). However, An Taisce does not set out, at least
under its submissions here, how that would invalidate the SEA assessment undertaken.
60. Nor should it be assumed that follows. After all, taking An Taisce’s submission under
Issue 63(a) at its height, all that would have happened is that reference would have been
made to matters which should not have been referred to. Even under ‘regular’ administrative
law, it would not necessarily follow that a decision or assessment would be invalid as a
result. One would have to go further and to demonstrate, for example, that the matters in
question were actually material, or that their inclusion was such as to vitiate the
decision/assessment.
61. For example, the Court of Appeal has repeatedly underscored the requirement that
an error be ‘material’ if it is to warrant setting decisions of the Information Commissioner
aside (Grange v Information Commissioner [2022] IECA 153 at §52 and §97). Similarly,
with respect to the Financial Services and Pensions Ombudsman, the Court of Appeal
requires that an appellant show that
‘taking the adjudicative process as a whole, the decision reached was vitiated by a serious
and significant error or a series of such errors.’
(See, in that regard, Ulster Bank v Financial Services Ombudsman [2006] IEHC 323,
approved in Millar v Financial Services Ombudsman [2015] IECA 127, per Kelly at e.g. §33
of his judgment).
Conclusion regarding Issue 63
62. In conclusion under Issue 63(a), on the one hand An Taisce asserts that ‘non-
environmental’ considerations must (seemingly) not even be mentioned in an SEA
environmental report. That is supported by no authority, and indeed by nothing other than
an unwarranted assumption that unspecified persons would be so lacking in discernment
that they might become confused were such matters to be referenced.
63. However, on the other hand, An Taisce correctly accepts, on multiple occasions (e.g.
§136, §140 and §142 quoted above), that in decision-making there is no obligation to choose
the most environmentally friendly outcome and economic and social considerations can be
taken into account. An Taisce’s (correct) position on this second matter, sits uneasily with
the position it posits on the first point.
64. Moreover, even if An Taisce were correct, and that certain content was included
which ought not to have been, An Taisce has not established that any unlawfulness results
such as might vitiate the report, much less the subsequent decisions.
65. For all, or any, of the above reasons, it is submitted that Issue 63(a) should be
answered ‘No’, and that no requirement for a reference on the point arises or has been
demonstrated.”
76. My decision is as follows. There is much to be said for the ICMSA view that the applicants
are contending for what is in effect an “exclusionary rule” and are offering a troubling non-sequitur
to the effect that only strictly environmental considerations could be raised in SEA. Such a stance,
it was submitted, was liable to the riposte: “what should they know of England who only England
know?” (Rudyard Kipling, “The English Flag”, St. James’s Gazette and National Observer, April 4th,
1891). If this were the only question, I would be more tempted to follow the ICMSA suggestion to
decide the point myself. But given that a reference is happening anyway, my fear is that to do as
proposed would cause procedural confusion and delay ultimately. That is because, given the
concession that the point is not acte clair, not deciding it would set the stage for yet a further
reference in the context of any hypothetical appeal. In such a context, it might be implausible for
the opposing parties to effect a volte face on the status of the point as not being acte clair, so if
there was still a live issue at that stage, a further reference could be seen as mandatory. Simplicity
of procedure suggests a reference on this point also.
Issue 69(a) – discretion of the court
77. Issue 69(a) is:
“69. (a) Does art. 4(3) TEU have the effect that a domestic court does not enjoy a general
discretion, in the event of a breach of EU law by or on behalf of a member state being
established in relation to the making of a national action plan under Annex III to directive
91/676, to decline to grant relief at all or alternatively to decline to make any order that
affects the validity of the plan or implementing regulations, in the exercise of the Court's
discretion on judicial review, taking into account the general principle (as a matter of EU
law) of proportionality, and prejudice to third parties including by reference to any applicable
rights and interests of others, including under the Charter of Fundamental Rights, in
particular the right to work under art. 15, to conduct a business under art. 16, and to
property under art. 17, as well as Union policies generally including the CAP under art. 39
TFEU and Regulation (EU) 2021/2115 of the European Parliament and of the Council of 2
December 2021, and/or by reference to domestic law considerations?”
78. The applicant submitted:
“Applicant’s Summary Answer
The Court can in principle maintain the impugned measure for a limited period of time, but
only under strictly defined circumstances, and cannot refuse relief or an order affecting the
validity of the NAP permanently. Third parties may have a remedy against the State in
respect of their interests.
Acte clair
No, in the sense that only the Court of Justice may, in exceptional cases, for overriding
considerations of legal certainty, allow temporary suspension of the ousting effect of a rule
of EU law with respect to national law that is contrary thereto. If national courts had the
power to give provisions of national law primacy in relation to EU law contravened by those
provisions, even temporarily, the uniform application of EU law would be undermined - Case
C 411/17 Inter-Environnement Wallonnie ASBL and Bond Beter Leefmilieu Vlaanderen
Detailed answer
144. As per the Transcript, Day 2, p39 ‘…the aim for An Taisce in the proceedings is the
correct interpretation and implementation of the law. We accept, in principle, that if
certiorari is found to be the appropriate remedy, that there can be a stay on the grounds of
environmental prejudice or environmental protection on matters such as animal welfare -
because I totally appreciate that if animals are in calf then one can't immediately take away
the surroundings which were envisaged for them. And we would also accept that the
interests of the individual farmers are something that can be taken into account in the
context of a stay.’ The ‘stay’ referred to there is a stay on any order of certiorari.
145. The Applicant understands the Court’s current question to go beyond the question
of a stay on any order of certiorari, and instead to address refusal of relief altogether (on
the assumption that the case for relief has otherwise been made out).
146. In Berkeley v Secretary of State [2003] 3 All ER 897 Lord Hoffman stated at p.907:
‘Although s. 288(5)(b), in providing that the court 'may' quash an ultra vires planning
decision, clearly confers a discretion upon the court, I doubt whether....the court may
exercise that discretion to uphold a planning permission which has been granted contrary to
the provisions of the directive. To do so would seem to conflict with the duty of the court
under article 5 of the EC Treaty (now article 10 EC) to ensure fulfilment of the United
Kingdom's obligations under the Treaty.’
147. Art 10 EC is now Art. 4(3) TEU.
148. Case C-41/11 Inter-Environnement Wallonie is the principle authority here, and
expressly concerned breach of the SEA Directive in respect of a Nitrates Action Programme
149. It was a follow-up to Joined Cases C 105/09 and C 110/09 Terre Wallonne and Inter-
Environnement Wallonie - which were themselves a follow-up to Case C 221/03
Commission v Belgium, where the CJEU had found Belgium to be in breach of obligations
under the Nitrates Directive. The NAP challenged in Terre Wallonne was apparently an
attempt to comply with the judgment in those enforcement proceedings.
150. The Belgian Court in C-41/11 asked §29 whether it could ‘defer in time the effects
of the judicial annulment for a short period necessary for the redrafting of the annulled
measure in order to maintain in European Union environmental law a degree of specific
implementation without any break in continuity?’
151. The CJEU reformulated the question §39 – ‘By its question, and in view of the
developments in the main proceedings, the referring court asks in essence whether, in
circumstances such as those at issue in the main proceedings, where it has before it an
action for annulment of a national measure constituting a ‘plan’ or ‘programme’ within the
meaning of Directive 2001/42 and it finds that the plan or programme was adopted in breach
of the obligation laid down by that directive to carry out a prior environmental assessment,
but finds that the contested measure implements Directive 91/676 appropriately, it may
make use of a provision of its national law which would allow it to maintain some of the past
effects of the measure until the date on which measures designed to remedy the irregularity
which has been established entered into force.’
152. The Court referred §43 to the principle of cooperation in good faith laid down in
Article 4(3) TEU, and the obligation to nullify the unlawful consequences of a breach of
European Union law, owed, within the sphere of its competence, by every organ of the
Member State concerned.
153. It explained at §46 – ‘Consequently, courts before which actions are brought in that
regard must adopt, on the basis of their national law, measures to suspend or annul the
‘plan’ or ‘programme’ adopted in breach of the obligation to carry out an environmental
assessment …’.
154. However, it identified at §49 (emphasis added) – ‘According to the referring court,
maintaining the effects of the contested order, adopted in breach of the requirements set
out in Directive 2001/42, may be justified since annulling that order with retroactive effect
would deprive the Belgian legal order of any measure designed to transpose Directive 91/676
in the Region of Wallonia. Moreover, those effects would be maintained for a relatively short
time since this would cover only the period up to the date on which the new order entered
into force.’
155. The Court observed §55 – ‘…there is a risk that, in remedying the irregularity under
Directive 2001/42 affecting the procedure by which the contested order was adopted by
annulling that order, the referring court would create a legal vacuum incompatible with the
obligation on the Member State concerned to adopt measures to transpose Directive 91/676
as well as the measures required of it in order to comply with the judgment in Commission
v Belgium.’ So there was a clash of European obligations – the obligation to nullify the
unlawful consequences of a breach of European Union law on the one hand, and on the other
the duty adopt measures to transpose the Nitrates Directive (and indeed comply with the
original enforcement judgment).
156. The Court expressly noted §57 – ‘that the referring court does not rely on economic
grounds in order to be authorised to maintain the effects of the contested order, but refers
only to the objective of protecting the environment, which constitutes one of the essential
objectives of the European Union and is both fundamental and cross-cutting in nature (see,
to that effect, Case C 176/03 Commission v Council … paragraphs 41 and 42).
157. The Court then explained at §58 ‘In view of that objective, the referring court can,
given the existence of an overriding consideration relating to the protection of the
environment, exceptionally be authorised to make use of its national provision empowering
it to maintain certain effects of an annulled national measure, in so far as the following
conditions are met.’
158. Thus it appears that it was only reliance on the objective of protecting the
environment that justified the exceptional approach.
159. The conditions were set out at 59-62 and identified in the curial part as follows:
– that national measure is a measure which correctly transposes Council
Directive 91/676/EEC of 12 December 1991 concerning the protection of waters
against pollution caused by nitrates from agricultural sources;
– the adoption and entry into force of the new national measure containing
the action programme within the meaning of Article 5 of that directive do not enable
the adverse effects on the environment resulting from the annulment of the
contested measure to be avoided;
– annulment of the contested measure would result in a legal vacuum in
relation to the transposition of Directive 91/676 which would be more harmful to the
environment, in the sense that the annulment would result in a lower level of
protection of waters against pollution caused by nitrates from agricultural sources
and would thereby run specifically counter to the fundamental objective of that
directive; and
– the effects of such a measure are exceptionally maintained only for the
period of time which is strictly necessary to adopt the measures enabling the
irregularity which has been established to be remedied.
160. That appears to envisage that the question is one of maintaining the effects of the
national measure only for the period of time which is strictly necessary to adopt the
measures enabling the irregularity which has been established to be remedied; it is not a
question of declining to grant relief at all.
161. Case C 41/11 was considered in yet another Inter-Environnement Wallonnie case -
Case C 411/17 Inter-Environnement Wallonnie ASBL and Bond Beter Leefmilieu Vlaanderen,
which addressed whether the adoption of a law extending the period of industrial production
of electricity by nuclear power stations required various types of environmental assessment,
under the EIA Directive and the Habitats Directive, the Espoo and Aarhus Conventions.
162. One of the questions referred at §58(9) was ‘ If, on the basis of the answers to the
preceding questions, the national court should conclude that the Law [of 28 June 2015] fails
to fulfil one of the obligations arising under the abovementioned Conventions or directives,
and the security of the country’s electricity supply cannot constitute an imperative reason of
overriding public interest permitting a derogation from those obligations, might the national
court maintain the effects of the Law of 28 June 2015 in order to avoid legal uncertainty and
to allow the environmental impact assessment and public participation obligations arising
under those Conventions or directives to be fulfilled?’
163. The CJEU reformulated the question at §167– By Question 9, the referring court
asks, in essence, whether EU law allows a national court to maintain the effects of measures
such as those at issue in the main proceedings for the time necessary to remedy any
infringement of the EIA Directive and the Habitats Directive.
164. It addressed the question as follows:
‘177 It must be added that only the Court of Justice may, in exceptional cases, for
overriding considerations of legal certainty, allow temporary suspension of the
ousting effect of a rule of EU law with respect to national law that is contrary thereto.
If national courts had the power to give provisions of national law primacy in relation
to EU law contravened by those provisions, even temporarily, the uniform application
of EU law would be undermined (see, to that effect, judgments of 8 September 2010,
Winner Wetten, C 409/06, EU:C:2010:503, paragraphs 66 and 67, and of 28 July
2016, Association France Nature Environnement, C 379/15, EU:C:2016:603,
paragraph 33).
178 However, the Court has also held, in paragraph 58 of its judgment of 28
February 2012, Inter-Environnement Wallonie and Terre wallonne (C 41/11,
EU:C:2012:103), that a national court may, given the existence of an overriding
consideration relating to the protection of the environment, as applied in the case
giving rise to that judgment, and provided that the conditions specified in that
judgment are met, exceptionally be authorised to make use of a provision of its
national law empowering it to maintain certain effects of an annulled national
measure. It is thus apparent from that judgment that the Court intended to afford,
on a case by case basis and by way of exception, a national court the power to adjust
the effects of annulment of a national provision held to be incompatible with EU law,
with due regard to the conditions laid down by the Court’s case-law (see, to that
effect Association France Nature Environnement, C 379/15 …paragraph 34).
179 In this instance, in accordance with the case-law cited in paragraph 177 of
the present judgment, it is for the Court of Justice alone to determine the
circumstances in which it may be justifiable, by way of exception, to maintain the
effects of measures such as those at issue in the main proceedings on account of
overriding considerations relating to the security of the electricity supply of the
Member State concerned. In that regard, such considerations could justify
maintaining the effects of national measures adopted in breach of the obligations
under the EIA Directive and the Habitats Directive only if, in the event that the
effects of those measure were annulled or suspended, there was a genuine and
serious threat of disruption to the electricity supply of the Member State concerned,
which could not be remedied by any other means or alternatives, particularly in the
context of the internal market.
180 It is for the referring court to assess whether, given the other means and
alternatives available to the Member State concerned for the purpose of ensuring
electricity supply within its territory, the need to respond to such a threat justifies
maintaining, exceptionally, the effects of the measures contested before that court.
181 In any event, the effects may only be maintained for as long as is strictly
necessary to remedy the breach.
165. In Case C-24/19 A and Others (Wind turbines at Aalter and Nevele) the CJEU
concluded ‘Where it appears that an environmental assessment within the meaning of
Directive 2001/42 should have been carried out prior to the adoption of the order and circular
on the basis of which a consent, which is contested before a national court, was granted for
the installation and operation of wind turbines with the result that those instruments and
that consent do not comply with EU law, that court may maintain the effects of those
instruments and that consent only if the national law permits it to do so in the proceedings
before it and if the annulment of that consent would be likely to have significant implications
for the electricity supply of the whole of the Member State concerned, and only for the period
of time strictly necessary to remedy that illegality. It is for the referring court, if necessary,
to carry out that assessment in the case in the main proceedings.’
166. The Applicant is not aware of any case where the right to work under art. 15, to
conduct a business under art. 16, and to property under art. 17, made any difference to the
approach above, and it is hard to reconcile same with the approach of the CJEU.
167. In terms of the impact on third parties, the approach of the CJEU appears to envisage
compensation. In Case C 278/21 AquaPri, which concerned a breach of Article 6(3) Habitats
Directive. the CJEU identified - ‘…it is important to clarify that, whatever measure is used
to erase the unlawful consequences of a breach of an assessment obligation such as that
provided for in the first sentence of Article 6(3) of Directive 92/43, the Member State
responsible for that breach may be held liable, if such a measure results in the revocation
or amendment of the authorisation granted as a result of that breach, to make good any
damage which its conduct may have caused to the economic operator who benefited from
that authorisation, which is maintained in this case by AquaPri and which it is for the
competent national court to verify.’
168. So it would appear that protection of economic interests may be achieved by the
Member State responsible for the relevant breach being held liable to make good any
damage which its conduct may have caused.
169. The existence of the Common Agricultural Policy, or the treaty provisions in respect
of same, do not support or justify the refusal of relief. By Article 11 TFEU (emphasis added)
– ‘Environmental protection requirements must be integrated into the definition and
implementation of the Union's policies and activities, in particular with a view to promoting
sustainable development.’ The CAP cannot be operated in a manner inconsistent with
environmental protection requirements, and does not justify a breach of them.
170. If the Applicant is understanding the last part of the question correctly, domestic law
considerations do not appear to have any relevance beyond what was considered in Case C
411/17 Inter-Environnement Wallonnie ASBL and Bond Beter Leefmilieu Vlaanderen – ie
they cannot oust European Law.
171. Finally, the Court may wish to consider whether the need (if established in
accordance with the case-law above or by reference to the CJEU) to temporarily maintain
certain aspects of the NAP requires it to maintain all aspects.”
79. The State submitted:
“I. Summary
215. Article 4(3) TEU may have the effect that a domestic court does not enjoy a general
discretion in the event of a finding of a breach of EU law to decline to grant relief at all but,
alternatively, does not have the effect that a domestic court does not enjoy a general
discretion to decline to make any order that affects the validity of the plan or implementing
regulations.
216. The Applicant errs by conflating the requirement, pursuant to Article 4(3) TEU, to
nullify the unlawful consequences of a breach of EU environmental law with the specific
remedy of certiorari.
217. If the unlawful consequences of an infringement of EU law may be nullified without
the quashing of a national action plan, the Court retains a discretion to order this course of
action. In deciding whether to exercise its discretion, it is submitted that the Court may take
into account a range of factors in deciding which remedy is appropriate, including
proportionality, prejudice to third parties, Union policies generally and domestic law
considerations.
218. Where a national court decides to remedy a breach of EU law by annulling a national
measure, the national court retains an exceptional jurisdiction to maintain certain effects of
an annulled measure having regard to an overriding consideration relating to the protection
of the environment.
II. Acte Clair
219. The Respondents accept that this is not acte clair.
III. Substantive submissions
220. Article 4(3) TEU may have the effect that a domestic court does not enjoy a general
discretion in the event of a finding of a breach of EU law to decline to grant relief at all but,
alternatively, does not have the effect that a domestic court does not enjoy a general
discretion to decline to make any order that affects the validity of the plan or implementing
regulations.
221. Moreover, the Respondents respectfully submit that the Applicant has erred in its
submissions by conflating the requirement, pursuant to Article 4(3) TEU, to nullify the
unlawful consequences of a breach of EU environmental law with the specific remedy of
certiorari.
222. Pursuant to the principle of sincere cooperation pursuant to Article 4(3) TEU, Member
States are required to nullify the unlawful consequences of an infringement of EU
environmental law.
223. Significantly, EU law is not prescriptive as to how this nullification of the unlawful
consequences of an infringement of EU environmental law is to occur.
224. In C-411/17 Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen
EU:C:2019:622, the Court stated that (§§169–170):
‘However, neither the EIA Directive nor the Habitats Directive specify what action
should be taken in the event of infringement of the obligations laid down by those
directives.
Nonetheless, under the principle of sincere cooperation laid down in Article 4(3) TEU,
Member States are required to nullify the unlawful consequences of that
infringement of EU law. The competent national authorities are therefore under an
obligation to take all measures necessary, within the sphere of their competence, to
remedy the failure to carry out an environmental impact assessment, for example
by revoking or suspending consent already granted in order to carry out such an
assessment (see, to that effect, judgment of 26 July 2017, Comune di Corridonia
and Others, C‑196/16 and C‑197/16, EU:C:2017:589, paragraph 35 and the case-
law cited).’
225. The Court continued to hold that (§§173–§177):
‘It is true that the Court has also held that EU law does not preclude national rules
which, in certain cases, permit the regularisation of operations or measures which
are unlawful in the light of EU law (judgment of 26 July 2017, Comune di Corridonia
and Others, C‑196/16 and C‑197/16, EU:C:2017:589, paragraph 37 and the case-
law cited).
However, such a possible regularisation would have to be subject to the condition
that it does not offer the parties concerned the opportunity to circumvent the rules
of EU law or to refrain from applying them, and should remain the exception
(judgment of 26 July 2017, Comune di Corridonia and Others, C‑196/16 and
C‑197/16, EU:C:2017:589, paragraph 38 and the case-law cited).
Consequently, in the event of failure to carry out an assessment of the
environmental impact of a project required under the EIA Directive, although
Member States are required to nullify the unlawful consequences of that failure, EU
law does not preclude regularisation through the conducting of such an assessment
while the project is under way or even after it has been completed, on the twofold
condition, first, that national rules allowing for that regularisation do not provide the
parties concerned with an opportunity to circumvent the rules of EU law or to refrain
from applying them, and second, that an assessment carried out for regularisation
purposes is not conducted solely in respect of the project’s future environmental
impact, but must also take into account its environmental impact since the time of
completion of that project (see, to that effect, judgments of 26 July 2017, Comune
di Corridonia and Others, C‑196/16 and C‑197/16, EU:C:2017:589, paragraph 43,
and of 28 February 2018, Comune di Castelbellino, C‑117/17, EU:C:2018:129,
paragraph 30).
By analogy, it must be held that EU law does not preclude such regularisation,
subject to the same conditions, in the event of failure to conduct a prior impact
assessment of the effects of the project concerned on a protected site, as required
by Article 6(3) of the Habitats Directive.
It must be added that only the Court of Justice may, in exceptional cases, for
overriding considerations of legal certainty, allow temporary suspension of the
ousting effect of a rule of EU law with respect to national law that is contrary thereto.
If national courts had the power to give provisions of national law primacy in relation
to EU law contravened by those provisions, even temporarily, the uniform application
of EU law would be undermined (see, to that effect, judgments of 8 September 2010,
Winner Wetten, C‑409/06, EU:C:2010:503, paragraphs 66 and 67, and of 28 July
2016, Association France Nature Environnement, C‑379/15, EU:C:2016:603,
paragraph 33).’
226. In Case C-261/18 Commission v. Ireland EU:C:2019:955, the CJEU referred to
revocation or suspension as an ‘example’, not a requirement (§75):
‘Under the principle of sincere cooperation provided for in Article 4(3) TEU, Member
States are nevertheless required to eliminate the unlawful consequences of that
breach of EU law. That obligation applies to every organ of the Member State
concerned and, in particular, to the national authorities which have the obligation to
take all measures necessary, within the sphere of their competence, to remedy the
failure to carry out an environmental impact assessment, for example by revoking
or suspending consent already granted, in order to carry out such an assessment
(see, to that effect, judgments of 7 January 2004, Wells, C‑201/02, EU:C:2004:12,
paragraph 64, and of 26 July 2017, Comune di Corridonia and Others, C‑196/16 and
C‑197/16, EU:C:2017:589, paragraph 35).’ (Emphasis added).
227. The Respondents submit that if the unlawful consequences of an infringement of EU
law may be nullified without the quashing of a national action plan, the Court retains a
discretion to order this course of action. In deciding whether to exercise its discretion, it is
submitted that the Court may take into account a range of factors in deciding which remedy
is appropriate. These range of factors may include:
(1) proportionality as a matter of EU law;
(2) prejudice to third parties, including by reference to any applicable rights,
interests and freedoms of others, including those in inter alia the Charter of
Fundamental Rights and Freedom of the European Union; and
(3) European Union policies generally, including the CAP under Article 39 TFEU
and Regulation (EU) 2021/2115 of the European Parliament and of the Council of 2
December 2021; and
(4) domestic law considerations.
228. Moreover, even where a national court decides to remedy a breach of EU
law by annulling a national measure, the national court retains an exceptional
jurisdiction to maintain certain effects of an annulled measure having regard to an
overriding consideration relating to the protection of the environment.
229. Quashing the NAP and/or the GAP Regulations would result in a legal vacuum that
is incompatible with Ireland’s obligations to adopt measures to transpose the Nitrates
Directive.
230. This would lead to a lower level of protection of water against pollution caused by
nitrates from agricultural sources, which would run specifically counter to the fundamental
objective of the Nitrates Directive.
231. The environmental damage caused by quashing the NAP and the GAP Regulations
would therefore be more harmful to the environment than maintaining their effects pending
any remedial measures coming into effect.
232. In those circumstances, were the Court to consider that the NAP is invalid (which is
denied), the Court would be permitted to, and the Respondents plead that it should, exercise
its discretion to maintain exceptionally the effects of the NAP and/or the GAP Regulations,
pending the implementation of remedial measures.
233. In this regard, in Case C-41/11 Inter-Environnement Wallonie ASBL and Terre
wallonne ASBL v Région wallonne EU:C:2012:103, the CJEU stated that (§§58–62) in view
of the objective of protecting the environment:
‘… the referring court can, given the existence of an overriding consideration relating
to the protection of the environment, exceptionally be authorised to make use of its
national provision empowering it to maintain certain effects of an annulled national
measure, in so far as the following conditions are met.
First, the contested order must be a measure which correctly transposes Directive
91/676.
Secondly, the referring court must determine whether the adoption and entry into
force of the new order providing, in particular in Article 8, for certain acts adopted
on the basis of the contested order to be maintained do not enable the adverse
effects on the environment resulting from the annulment of the contested order to
be avoided.
Thirdly, annulment of the contested order must result in a legal vacuum in relation
to the transposition of Directive 91/676 which would be more harmful to the
environment, a matter which is for the referring court to determine. That would be
the case if annulling the order resulted in a lower level of protection of waters against
pollution caused by nitrates from agricultural sources, given that this would run
specifically counter to the fundamental objective of that directive, which is to prevent
such pollution.
Fourthly and finally, the effects of such a national measure can be exceptionally
maintained only for the period of time which is strictly necessary to adopt the
measures enabling the irregularity which has been established to be remedied.’
234. Finally, with respect to overriding considerations not related to the protection of the
environment, the Respondents submit that the CJEU may recognise such overriding
considerations. See: C-411/17 Inter-Environnement Wallonie and Bond Beter Leefmilieu
Vlaanderen EU:C:2019:622, §§177–180.”
80. The ICMSA submitted:
“Summary of ICMSA’s position
66. For convenience, the treatment of Issue 69 may be subdivided into two parts:-
o The first part of the Issue, concerns the Court’s jurisdiction regarding relief
the Court. ICMSA submits that the Court has a wide jurisdiction and discretion in
this regard, and that both EU law and national law point in a similar direction in this
respect. An Taisce’s response focuses on CJEU case law on maintaining the effects
of measures found to be unlawful.
o The second part of the Issue concerns fundamental rights, other EU policies
and other matters. Essentially, An Taisce merely makes a very brief reference at
§166 and, even then, only to fundamental rights. It also refers at §169 to the
Common Agricultural Policy, but in a manner which actually doesn’t address the
relevant point at all, because An Taisce proceeds to refer only to environmental
protection).
67. On one view, it might be thought that there is little enough between the parties in
this regard. An Taisce expressly accepts as follows (§144, submissions, quoting its prior oral
submissions):-
‘And we would also accept that the interests of individual farmers are something that
can be taken into account in the context of a stay.’
68. ICMSA submits that this is too limited – this is not a ‘can’, but a ‘must’. ICMSA makes
the same observation regarding §277 of the State’s submissions, as has already been noted
in the Introduction above.
69. Other than that very minor point, ICMSA adopts the points in the State’s submissions
and makes the following further submissions which are set out below.
70. For the avoidance of doubt, all submissions which follow are premised upon some
illegality actually having been established by An Taisce, and are strictly without prejudice to
ICMSA’s overall position that that is not the case.
Acte Clair
71. Like the State, ICMSA does not assert that this precise issue is acte clair – although,
as set out below, ICMSA contends that it is very clear that account must be taken of matters
such as effects on fundamental rights.
ICMSA’S SUBSTANTIVE RESPONSE ON ISSUE 69
An Taisce’s submissions regarding maintaining measures in force
72. An Taisce quotes extensively from Case C-41/11 Inter-Environnement Wallonie. At
§156, An Taisce quotes §57, where the CJEU noted ‘... the referring court does not rely on
economic grounds in order to be authorised to maintain the effects of the contested order,
but refers only to the objective of protecting the environment …’.
73. Of course, this means precisely what it says, and only what it says – namely that in
that case, non-environmental concerns were not put before the CJEU. That does not mean
that it would be somehow be impermissible for non-environmental concerns to form a basis
for maintaining the effects of a measure.
74. To be fair, An Taisce does not suggest otherwise – indeed it expressly accepts (§144)
that farmers’ interests can be taken into account in this respect. Moreover, at §164 of its
submissions An Taisce quotes from §179 of the CJEU’s judgment in the later case of Case
C-411/17 Inter-Environnement Wallonie ASBL and Bond Beter Leefmilieu Vlaanderen which
held that a ‘… genuine and serious threat of disruption to the electricity supply …’ could
justify maintaining the effects of unlawful national measures. That is clearly not an
environmental consideration.
75. The then President of the ICMSA, Mr. McCormack, averred in his Affidavit (§59):
‘All of this is to say that the NAP is but one aspect of a delicate balance which the State has
attempted to strike between multiple, complex competing economic, environmental, and
social interests. That balance will not, of course, be perfect. At the very least, however, the
reliefs sought by the Applicant, if granted, risk upsetting that balance as it currently stands.’
76. This, and other such averments, have not been controverted. It is submitted that
the undoubted undermining of the balance which would ensue were the NAP to be struck
down is directly analogous to the concerns regarding ensuring the absence of ‘legal vacuum’
which have been influential in the CJEU case law An Taisce has referred to.
This Court’s wide discretionary jurisdiction on judicial review
77. ICMSA does not assert that EU obligations could be in any way ignored, whether as
part of the Court’s discretion on judicial review or otherwise.
78. However, the undoubted jurisdiction as a matter of EU law regarding maintaining in
effect measures which might be unlawful, harmonises with this Court’s wide discretion on
judicial review.
79. In De Roiste v Minister for Defence [2001] 2 ILRM 241 Denham J. stated (p.260):
‘The general rule is that an order of certiorari is a discretionary remedy. The
circumstances of each case have to be considered. The general course is to grant
certiorari if, for example, a criminal conviction has been ordered in excess of
jurisdiction. However, the circumstances of the case are considered by the court in
exercising its discretion and the court has a discretion to refuse the relief if, for
example, the conduct of the applicant disentitles him or her to that relief. The facts
and circumstances of each case have to be considered. Whereas the applicant is in
a stronger position if he has been particularly aggrieved, the court retains its
discretion in all applications.’
80. In R v Lincolnshire CC and Wealden DC ex p. Atkinson, Wales and Stratford (1996)
8 Admin L.R. 529 Sedley J. stated (p.55):
‘To refuse relief where an error of law by a public authority has been demonstrated is an
unusual and strong thing; but there is no doubt that it can be done.’
81. Hare, Donnelly and Bell eds, De Smith’s Judicial Review (9th ed, 2023) state (§18-
057):
‘In some cases the court has withheld a remedy from a claimant on the basis that
he has been caused no harm (the term ‘prejudice’ is often used) by the unlawful act
of the public authority. Under this head a minor technical breach of a statutory
requirement may be too insignificant to justify relief. The court has also taken into
account the fact that the public authority would invariably have made the same
decision even if the legal flaw had not occurred.’
82. On the latter point, it is submitted that it would be entirely appropriate for this Court
to consider whether any relief which it might be minded to grant could occasion more ‘harm’
than good.
83. In that regard, An Taisce’s purpose in bringing the proceedings is relevant. §10 of
Ms. Goff of An Taisce’s First Affidavit averred:
‘The Applicant is taking these proceedings primarily to attempt to protect our
streams, rivers, lakes, estuaries and coastal waters from the severe environmental
harm caused by excess nitrate pollution’.
84. Bearing in mind An Taisce’s starting point as so described by Ms. Goff, ICMSA
submits that any quashing of the NAP (if that is seriously being sought or pursued), would
not advance, and may even undermine, the stated purpose of the proceedings. Accordingly,
and even allowing for the status of An Taisce as an environmental advocacy association,
there would be no ‘prejudice’ to it, or to its objectives, if the quashing of the NAP and GAP
were refused.
85. De Smith also states (§18-055):
‘The court may exercise discretion not to provide a remedy if to make an order would
serve no useful purpose.’
86. ICMSA submits that that is indeed the position here, at least insofar as any quashing
of purely protective measures such as the NAP and GAP are concerned.
87. In Habte v Minister for Justice [2020] IECA 22 Murray J. stated at §123 of his
judgment:
‘And if all of this is wrong, I would refuse relief on this ground for the simple reason
that I do not believe it would serve any useful purpose. If the Minister decides in the
light of the decision of the Court that he does enjoy a power to cancel the certificate
and to simultaneously issue a new certificate that he does not want to pursue
revocation under section 19, he is free to determine that process. If he wishes to
press ahead with the procedure under section 19, on the basis of the other
conclusions I have reached here he is free to recommence it even if the present
process were arrested. I do not believe that it can be said that had the Minister
understood the correct legal position he would have reached any different decision
(see Smith v. Minister for Justice [2013] IESC 4)…’
88. In Prendergast v Higher Education Authority [2010] 1 IR 490 Charleton J. stated
(§§66-67):
‘Were I to strike down the existing Fottrell scheme as an unconstitutional inequality,
I must consider the effect that it would have. I am not entitled to act in an unthinking
way. Furthermore, I am only entitled to act within the limit of my authority, which
is to correct legal wrongs and not to set government policy. ...
Is the court, on that basis, to strike down a carefully thought through government
policy based merely on looking at one side of the situation? To do so would be to
replace one alleged inequality with a different but very real and unjust inequality.’
89. Accordingly, it is submitted that Irish and EU law regarding remedies point in a
broadly similar direction. While any breach of EU law (were it to be established) certainly
cannot be ignored, regard must be had to the nature of the breach, and to the effects which
the grant of relief might have. The Court has a level of discretion regarding the formulation
of relief, and in particular can grant a stay which might maintain in effect for a time measures
that were otherwise contrary to aspects of EU environmental law.
90. It is also submitted that regard must be had to aspects of EU law beyond
environmental law alone. The remainder of these Submissions will consider that matter.
Plurality of EU values and objectives
91. Issue 69, and An Taisce’s position thereunder, flows from Article 4(3) TEU which
provides as follows:-
‘Pursuant to the principle of sincere cooperation, the Union and the Member States
shall, in full mutual respect, assist each other in carrying out tasks which flow from
the Treaties.
The Member States shall take any appropriate measure, general or particular, to
ensure fulfilment of the obligations arising out of the Treaties or resulting from the
acts of the institutions of the Union.
The Member States shall facilitate the achievement of the Union's tasks and refrain
from any measure which could jeopardise the attainment of the Union's objectives.’
92. It is submitted that the words underlined above, clearly refer, and must logically
refer, to EU law as a whole. Accordingly, in this case, the relevant matters cannot properly
be atomised to obligations under EU environmental law alone.
93. Article 3(3) TEU provides inter alia:
‘The Union shall establish an internal market. It shall work for the sustainable
development of Europe based on balanced economic growth and price stability, a
highly competitive social market economy, aiming at full employment and social
progress, and a high level of protection and improvement of the quality of the
environment. It shall promote scientific and technological advance.
…
It shall promote economic, social and territorial cohesion, and solidarity among
Member States. It shall respect its rich cultural and linguistic diversity, and shall
ensure that Europe's cultural heritage is safeguarded and enhanced.’
94. Given how essential the agricultural sector is to Ireland’s community life and cultural
heritage, as ICMSA has previously submitted and averred without contradiction, the latter
underlined words are clearly relevant.
95. For example, Mr McCormack of the ICMSA avers (§57):
‘Social and community impacts may also arise if the viability of family farms is
imperilled, or even cast into doubt. For example, dairy co-operatives have invested
heavily in rural areas which, generally, are lacking in other forms of investment.
Should the viability of these co-operatives be threatened, it is unlikely that the areas
in which they currently operate would benefit from other forms of replacement
investment.’
96. EU law and policy are not, and are not permitted to be, myopic. Article 7 TFEU
provides:
‘The Union shall ensure consistency between its policies and activities, taking all of
its objectives into account...’
97. Thus, the diversity of cultures (Article 167(4) TFEU), ensuring cohesion among
regions (Article 175 TFEU), promoting a high level of employment (Art. 9 TFEU and Art.
147(2) TFEU), shall be ‘taken into account’ in the definition and implementation of all Union
policies and activities.
98. Another of the tasks and activities of the EU is the Common Agricultural
Policy. Accordingly, it is submitted that this, and any effects on same, must also be
relevant for Article 4(3) TEU purposes. Article 39 TFEU provides:
‘1. The objectives of the common agricultural policy shall be:
(a) to increase agricultural productivity by promoting technical progress and by
ensuring the rational development of agricultural production and the optimum
utilisation of the factors of production, in particular labour;
(b) thus to ensure a fair standard of living for the agricultural community, in
particular by increasing the individual earnings of persons engaged in agriculture;
(c) to stabilise markets;
(d) to assure the availability of supplies;
(e) to ensure that supplies reach consumers at reasonable prices.
2. In working out the common agricultural policy and the special methods for its
application, account shall be taken of:
(a) the particular nature of agricultural activity, which results from the social
structure of agriculture and from structural and natural disparities between the
various agricultural regions;
(b) the need to effect the appropriate adjustments by degrees;
(c) the fact that in the Member States agriculture constitutes a sector closely linked
with the economy as a whole.’
99. In Case 230-78 SpA Eridiana EU:C:1979:216 the then ECJ, in the context of the
authorities’ powers to alter quotas, stated that Article 39 of the then Treaty concerning the
CAP expressed the desire (§31):
‘not only to ensure a fair standard of living for the agricultural community but also
to increase agricultural productivity, stabilize markets, assure the availability of
supplies and ensure that supplies reach consumers at reasonable prices.’
100. In the most recent iteration of the CAP – i.e. Regulation (EU) 2021/2115 of the
European Parliament and of the Council of 2 December 2021 - Recital 24 states:
‘The Union needs to foster a modern, competitive, resilient and diversified
agricultural sector which reaps the benefits of high-quality production and resource-
efficiency and which ensures long-term food security as part of a competitive and
productive agri-food sector while safeguarding the family farm model.’
101. Moreover, environmental protection and economic activity are incommensurable
values. The choice of by how much one might be limited to advance the other cannot be
assessed by reference to legal standards. Accordingly, it is an inherently political question,
and it is not accepted that that issue is a justiciable one.
102. For example, Advocate General Bot in Case C-283/11 Sky Osterreich EU:C:2013:28
(§49):
‘the Community legislature must be allowed a broad discretion in an area such as
that involved in this case, which entails political, economic and social choices on its
part, and in which it is called upon to undertake complex assessments.
Consequently, the legality of a measure adopted in that sphere can be affected only
if the measure is manifestly inappropriate having regard to the objective which the
competent institutions are seeking to pursue.’
103. It is submitted that this, of itself, further inclines in favour of maintaining the effects
of the NAP here, even if any lack of lawfulness (which is denied) were established.
The general importance of fundamental rights as a matter of EU law
104. At §166 of its Module III submissions, An Taisce says that it is ‘not aware’ of any
case where rights under Articles 15, 16 or 17 of the Charter ‘made any difference’ to
maintaining the effects of unlawful measures, and asserts that this would be ‘hard to
reconcile with the approach of the CJEU.’
105. However, ICMSA submits that any proposition that such Charter rights would or
could be ignored is what is ‘hard to reconcile’ with EU law.
106. It is clear from the Treaties themselves that fundamental rights – such as those
under Articles 15, 16 and 17 of the Charter – cannot be disregarded when considering Art.
4(3) TEU (which has been quoted above) and therefore whether Art. 4(3) TEU requires that
measures be maintained, or not maintained, in effect.
107. Article 2 TEU provides:
‘The Union is founded on the values of respect for human dignity, freedom,
democracy, equality, the rule of law and respect for human rights, including the
rights of persons belonging to minorities. These values are common to the Member
States in a society in which pluralism, non-discrimination, tolerance, justice,
solidarity and equality between women and men prevail.’
108. Considering fundamental rights, Lenaerts and van Nuffel, EU Constitutional Law
(Oxford, 2022), state at §25.002:
‘Moreover, all provisions of Union law have to be interpreted in light of these
fundamental rights.’
109. It is well established that national courts have a crucial role in protecting EU
fundamental rights, and, accordingly, are obliged to have regard to, and to apply, such
rights. In C-224/01 Köbler v Austria ECLI:EU:C:2003:513, the CJEU stated (§33):
‘In the light of the essential role played by the judiciary in the protection of the rights
derived by individuals from Community rules, the full effectiveness of those rules
would be called in question and the protection of those rights would be weakened if
individuals were precluded from being able, under certain conditions, to obtain
reparation when their rights are affected by an infringement of Community law
attributable to a decision of a court of a Member State adjudicating at last instance.’
Right to Work (Article 15 of the Charter)
110. Article 15 of the Charter provides:
‘1. Everyone has the right to engage in work and to pursue a freely chosen or
accepted occupation.
2. Every citizen of the Union has the freedom to seek employment, to work, to
exercise the right of establishment and to provide services in any Member State.’
111. Long before the adoption of the Charter, the freedom to pursue an occupation of
one’s choice was held to be protected under EU law.
112. In Case 234/85 Keller [1986] ECR 2897, the then ECJ stated:
‘the freedom to pursue one's trade or profession is part of the general principles of
law, the observance of which it ensures. Just as, in the public interest, limitations
are laid down on the exercise of that right by the Member States, it is protected
within the Community legal order only subject to the limits justified by the general
objectives pursued by the Community, on condition that the substance of the right
is left untouched.’
113. While recognising the freedom is not absolute, in that its subject to limitation, it is
important to note any such limitation: i) must be in furtherance of the public interest; ii) it
must be justified by the general objectives of Union; and iii) it must leave the substance of
the right untouched (per Article 52 of the Charter).
114. In other words, if a legal measure were so burdensome that it raised existential
threats to the economic viability for the practice by many persons of an occupation (even if
it remained theoretically possible to pursue that occupation) there would be a strong case
not only that Article 15 of the Charter had been disproportionately interfered with, but that
the very essence or substance of the right itself had been transgressed. Such a situation is
of a different genus to a situation where a certain occupation ceases to become profitable
due to economic or market factors such as loss of demand or unavailability of supplies. The
distinction is where the legal measure (or legal act, which could include a judgment) itself
brings about the difficulty.
115. If, and to the extent that, An Taisce seeks or presses for relief in these which would
pose a substantial threat to the economic viability of dairy farming in Ireland, it is the
ICMSA’s position that Irish farmers’ right to work under Article 15 would be
disproportionately interfered with. Accordingly, it is submitted that such an interpretation
could not lawfully be acceded to.
Evidence bearing upon farmers’ right to work
116. In his affidavit, the then President of the ICMSA, Mr. McCormack outlined numerous
concerns regarding the viability of dairy farming as a profession if the Nitrates Directive
Derogation ceased to be available.
117. Mr McCormack noted (§6): ‘Some 6,900 farmers applied for a derogation in 2022.
The ICMSA expects the number of such applications to increase in 2023.’
118. He noted (§48):
‘I say and believe that very serious consequences would ensue for many farmers
and farming families, and for the rural economy more generally, were the derogation
to be removed or placed in jeopardy.’
119. In particular, if the Derogation were to be imperilled consequent upon the grant of
any relief in these proceedings, many dairy farmers would incur unsustainable levels of debt
which would make the profession of a dairy farmer unworkable.
120. Mr McCormack further averred at §54:
‘if all derogation farmers were stocked to the maximum level of 250kg N per hectare
and had to reduce their stocking rate to 170kg N per hectare, this would mean that
stock levels on their farms would have to reduce by close to 50%.’
121. This would result in a need to reduce cow numbers which would give rise to further
losses. With the assistance of data supplied by the Irish Cattle Breeding Federation, Mr
McCormack illustrated by way of a table the losses which would occur to Irish farmers if the
cow numbers were reduced by 20% to be €1,057,199,060 and by 10% to be €528,599,530.
122. This data is borne out by ICMSA members’ perspectives of how any loss of the
Derogation could affect their livelihoods. Although the maximum limit of the derogation has
now been reduced to 220kg N per hectare, the data illustrates that further losses would be
borne if farmers were bound to reduce their rate to 170kg N per hectare.
123. Mr O’Dwyer who runs a family farm with 79 cows in Roseborough, Co. Tipperary
averred in his affidavit (§7):
‘My debt level per cow is, at present €837. If my farm was not in receipt of a
derogation the number of cows I would be able to milk would be 47, a raw reduction
in cow numbers of 32 from my herd’s present size or a reduction of over 40%.
Additionally my debt per cow would increase to €1,413. The figure on cow reduction
is based on the assumption that other stock numbers would remain at 2022 levels.’
124. Mr O’Dwyer further averred (§8):
‘Consequently, any steps which would place in jeopardy the derogation which has
been granted to Ireland, could have significant adverse implications for me, my
farm, and my family. In particular, I believe that my total net margin would be
reduced by 41%.’
125. In addition, another ICMSA member, Mr Keohane - who runs a family farm in West
Cork with approximately 200 acres, which had approximately 166 cows in 2022 - also
attested to the importance of the derogation.
126. Mr Keohane averred (§7):
‘My debt level per cow is, at present, €6,000. If my farm was not in receipt of a
derogation, the number of cows I would be able to milk would be 82, a raw reduction
in cow numbers of 84 from my herd's present size, or a reduction of over 50%.
Additionally, my debt per cow would increase to €12,130. The figure on cow
reduction is based on the assumption that other stock numbers would remain at
2022 levels.’
127. Accordingly, it is submitted that if the Derogation were imperilled as a result of any
relief which might be granted in these proceedings, a disproportionate interference with Irish
farmers’ right to work could occur.
128. As the above affidavits illustrate, this would not only undercut the economic viability
of the sector, but would also produce adverse effects on families, the local community and
Ireland’s cultural heritage which are undeniably more difficult to measure (see e.g. §57 of
Mr. McCormack’s Affidavit, already quoted above).
Freedom to conduct a business (Article 16, Charter)
129. Article 16 of the Charter provides:
‘The freedom to conduct a business in accordance with Union law and national laws
and practices is recognised.’
130. Case C-426 Alemo-Herron EU:C:2013:521 held the freedom to conduct a business
would be disproportionately interfered with if a transferee was prevented from participating
in pay negotiations with its employees’ collective bargaining body. The CJEU held (§35):
‘In those circumstances, the transferee’s contractual freedom is seriously reduced
to the point that such a limitation is liable to adversely affect the very essence of its
freedom to conduct a business.’
131. Although the present facts are of course different, it is submitted that this case
illustrates that serious reductions upon one’s operating freedom are liable to affect the very
essence of the Article 16 right.
132. In C-201/15 Aget Iraklis ECLI:EU:C:2016:972 a company sought an annulment of a
ministerial decision which refused to authorise collective redundancies following an opinion
from the Supreme Labour Council advising against it. The applicant argued the decision
infringed Directive 98/59 and Articles 49 and 63 TFEU read in conjunction with Article 16 of
the Charter
133. The CJEU held the decision undoubtedly interfered with applicant’s freedom to
conduct a business and then went on to consider whether the interference was justified. The
Court said the decision concerned a ‘sensitive area’ which sought to strike a fair balance
between the interests of workers and of employment, and those relating the ‘freedom of
economic operators to conduct a business’ in particular protection against unjustified
dismissal (§90).
134. The CJEU, held, in applying identical reasoning to its analysis of the Treaty provisions
and Article 16 of the Charter, that a prohibition on effecting collective redundancies in pursuit
of an economic aim cannot justify a restriction on Article 16 (§§97 and 103).
135. This case accordingly, once again, underscores the fundamental importance of
protecting the guarantee of freedom of business in the Union.
Evidence regarding farmers’ freedom to conduct a business
136. For similar reasons to those already set out above in relation to the right of work,
the ICMSA contends that if the derogation were imperilled consequent upon any relief that
might be granted in these proceedings their freedom to conduct a business would be
disproportionately interfered with. Moreover, the statements noted above from Case 230-
78 SpA Eridiana regarding the importance of agricultural productivity and ensuring the
availability of supplies at reasonable prices to the consumer would all be unjustifiably
undermined.
137. The Fifth NAP, in itself, has posed substantial difficulties for dairy farmers. As Mr
McCormack avers at §§40-41 of his affidavit:
‘Some of the changes under the 5th NAP are already hugely significant from an
economic perspective for farmers. To take just one example, §68(ii) of Mr. Flynn's
Affidavit refers to 'cow banding' or three new excretion rates for cattle being
introduced in 2023.
Moreover, it is proposed under the 5th NAP to reduce the relevant figure of 250kg
nitrogen / ha per year, to 220kg nitrogen / ha per year, under certain circumstances.’
138. The stark consequences of the diminishing allowance regarding stocking rates is
illustrated at §50 of Mr McCormack’s affidavit:
‘Without a derogation, a farmer with a stocking rate above 170kgs of N per hectare
will have the following options: a. Reduce livestock numbers; b. Export slurry; c.
Buy or lease additional land.’
139. It is submitted that one of the implications of the fundamental guarantee of freedom
to conduct a business under the Charter is that entrepreneurs are incentivised to take risks
and invest in their businesses, as the guarantee provides an assurance that such bona fide
endeavours will not be unjustly stymied but rather will be protected by the Union.
140. The affidavits of Mr Keohane and Mr O’Dwyer both disclose substantial investments
in their respective farms. It is a common practice to avail of debt-financing to run a farm
and Mr Keohane and Mr O’Dwyer both attest to a significant debt per cow. Such debts would
substantially increase on both farms if they were not in receipt of the derogation and if they
were compelled to sell cows.
141. Beyond the two deponents, the reference to the National Farm Survey at §§35-36
of Mr McCormack’s affidavit discloses a trend of large degree of investment and consequent
debt burdens across the farming sector as a whole:
‘The National Farm Survey outlines the level of investment on Irish farms in 2021,
and, among other things, reveals the following:-
a) On-farm investment increased by 46% in 2021. On aggregate, this totalled
over €1.49 billion across the farms represented by the survey.
b) Investment on dairy farms was highest; at an average spend of €45,320 per
farm in 2021. Investment on dairy farms accounted for almost half of total
investment in 2021 and was up 36 percent compared to 2020.
c) The level of investment by dairy farmers in the last 7 years is over €3 billion
resulting in increased employment in rural areas and economic activity.
Other points emerging from the 2021 National Farm Survey include the following:
a. Two-thirds of Dairy farms had borrowings in 2021, compared to one-third
(approximately) of Cattle farms.
b. When farms without debt are excluded, the average Dairy farm debt in 2021
increased by 20% year-on-year to €139,031.
c. The majority of farm related debt was classified as medium to long-term in
2021 (72%), with a further 18% relating to hired purchase or leasing and the
remaining 8% considered to be short-term debt e.g. overdrafts.
d. On average, 77% of Dairy farm debt was considered medium to long-term.’
142. Accordingly, any imperilling of the Derogation could have a devastating effect not
only on the businesses of farmers but may also expose them to the risk of personal
insolvency/bankruptcy or at least the possible risk of having to sell land assets.
143. Were such an eventuality to arise, not, as a result of market conditions, or even
government policy, but rather from strained and unsound interpretations of EU legislative
instruments, it is submitted that this would give rise to a disproportionate interference with
farmers’ freedom to conduct their businesses under Article 16.
Right to property (Article 17, Charter)
144. Farmers also possess property rights under Article 17 of the Charter. Article 17
states:
‘1. Everyone has the right to own, use, dispose of and bequeath his or her lawfully
acquired possessions. No one may be deprived of his or her possessions, except in
the public interest and in the cases and under the conditions provided for by law,
subject to fair compensation being paid in good time for their loss. The use of
property may be regulated by law in so far as is necessary for the general interest.’
145. In Case 44/79 Hauer [1979] ECR 3727, the then ECJ held that measures seeking to
control the use of the property are only permitted in certain circumstances (§19):
‘Thus the protocol accepts in principle the legality of restrictions upon the use of
property, whilst at the same time limiting those restrictions to the extent to which
they are deemed ‘necessary’ by a State for the protection of the ‘general interest’.’
146. In Hauer, a restriction on planting new vines was held to be justified as it had the
legitimate aim of establishing (§25):
‘a lasting balance on the wine market at a price level which is profitable for producers
and fair to consumers and, secondly, to obtain an improvement in the quality of
wines marketed, in order to attain that double objective of quantitative balance and
qualitative improvement…’
147. As Hauer clarifies, measures requiring controls on a landowner’s use of property
amount to an interference with the landowner’s property rights under Article 17. The decisive
question, however, is whether that interference is justified with respect to the objectives
pursued by the relevant measure. Here, the Union legislature has legislated for a derogation
from the requirement for 170 N/kg, which, of itself, lucidly indicates that such a requirement
is not necessary in all circumstances.
148. If relief were to be granted which imperilled the Derogation, a disproportionate
interference with ICMSA members’ property rights under Article 17 could ensue.
Evidence relevant to farmers’ property rights
149. As was stated at §50 of Mr McCormack’s affidavit, dairy farmers will be forced to
buy/lease more land or export slurry to maintain the same number of cows in the event of
a reduced allowance.
150. This reality illustrates the degree to which the income earning ability per hectare of
dairy farmers will be substantially reduced. Contrary to cases such as Case C-283/11 Sky
Osterreich - where a relatively slight interference with Sky’s property rights arose, and the
Charter was held not to be breached - the interference possibly arising here would be of a
radically different order. It would amount to an assault on the raison d'être for dairy farmers’
possessing such landholdings, namely the cultivation of those for dairy farming purposes.
151. Moreover, §49 of Mr McCormack’s affidavit states:
‘The consequences of cow banding in 2023 provides an insight into just one of the
likely outcomes of Ireland not having a derogation. Cow banding in 2023 has
resulted in an over-heated land market and more land moving into dairy as farmers
need more land for the same number of cows.’
Proportionality as a general principle of EU law
152. Lenaerts and van Nuffel, EU Constitutional Law (Oxford, 2022) comment at §5.035:
‘The principle of proportionality also guides the Court of Justice in resolving possible
conflicts between objectives of Union policy, such as between agricultural policy and
fundamental rights including the right to property and freedom of expression or
between several fundamental rights in order to strike a ‘fair balance between them’.’
153. It is submitted that this clearly extends to the legal obligations and instruments
(largely of a procedural nature) which An Taisce relies upon in these proceedings, as well as
what An Taisce asserts to be the consequences of any breach of such Union law.
154. A ‘fair balance’ should be struck. It is not the case that one aspect of Union policy –
here environmental protection – has been afforded paramountcy over everything else.
155. No fair balance would be struck here by the invalidation of the NAP on account of
the essentially procedural points raised by An Taisce.
156. Moreover, Article 5(4) TEU states:
‘Under the principle of proportionality, the content and form of Union action shall not
exceed what is necessary to achieve the objectives of the Treaties.’
157. This, of itself, reveals that a singular focus upon environmental considerations to the
exclusion of all else would not be appropriate or permissible. Applying the principle of
proportionality must admit of a weighing in the balance any adverse effects upon farmers,
the agri-food sector and/or rural economies and communities. Moreover, proportionality
entails that, where interests are to be balanced, an outcome in which one interest is not
abrogated or unduly subrogated to another should be striven for.
158. ICMSA accepts, as it must, that rights under the Charter are not absolute and can
be balanced with other interests such as environmental protection.
159. However, here, on the other side of the ‘proportionality ledger’, it is reasonable to
surmise that any removal or disapplication of the nitrates derogation would have a minimal
effect on improving water quality in Ireland. As Mr McCormack states at §41 of his affidavit,
referring to the Teagasc report, the reduction under Fifth NAP to reduce to the figure of
250kg N / ha per year, to 220kg N / ha per year ‘will have a very limited impact on water
quality. Page 6 of the said report indicates that there would only be a 3.6% reduction in N
leaching as a consequence of the move from 250 to 220kgs of N.’
160. Moreover, as §30 of ICSMA’s Statement of Opposition has noted, taking a longer-
term view, even the possible environmental consequences of alternatives could be unhappy
ones. That option could include many family farms being at risk of becoming unviable. In
that event, such family farms would be liable, and perhaps even likely, to be taken over by
larger farms.”
81. My decision is as follows. There appear to be essentially three issues as follows:
(i) the domestic law power of the court to refuse relief or in particular to refuse
certiorari;
(ii) the limitation on that power in the case of breach of EU law; and
(iii) the domestic law power of the court to grant relief not specifically claimed as an
alternative to the relief that is claimed.
82. The first issue is a matter of domestic law. Judicial review is a discretionary remedy. The
court can therefore in principle decline to make any order or in particular decline to make an order
of certiorari, provided that that is the lawfully correct step to take. Indeed there are situations
where a court has a discretion to make no order even where there is a breach of a constitutional
provision: McMenamin v. Ireland 1997 WJSC-SC 1557, [1996] 3 I.R. 100, [1994] 2 I.L.R.M. 368,
[1996] 12 JIC 1902 (Hamilton C.J.). In considering such discretion the court can take into account
all of the circumstances including matters such as the general principle (as a matter of EU law) of
proportionality, and/or prejudice to third parties including by reference to any applicable rights and
interests of others, including under the Charter of Fundamental Rights, in particular the right to work
under art. 15, to conduct a business under art. 16, and to property under art. 17, and/or Union
policies generally including the CAP under art. 39 TFEU and Regulation (EU) 2021/2115 of the
European Parliament and of the Council of 2 December 2021. Of course, circumstances favouring
relief such as the overriding need for environmental protection will also be relevant. And a discretion
in judicial review is not an at-large matter – it must be exercised on a fairly limited basis as set out
in existing domestic jurisprudence.
83. On the second issue, there is no dispute between the applicant and the State on the
proposition that insofar as there is a discretion vested in a national court by domestic law to:
(i) decline to grant relief at all, or
(ii) decline to make any order that affects the validity of a measure under challenge,
such discretion is only exercisable if and to the extent that the judgment and order of the court
effectively remedies the effects of any breach of EU law (if there is a breach, which is denied by the
opposing parties). EU law is clear that the obligation to remedy the effects of any breach of EU law:
art. 4(3) TEU, Case, and see e.g., judgment of 28 July 2016, Association France Nature
Environnement, C‑379/15, EU:C:2016:603, paragraphs 31 and 32, judgment of 12 November 2019,
Commission v Ireland (Derrybrien Wind Farm), C‑261/18, EU:C:2019:955, judgment of 25 June
2020, A & Others v Gewestelijke stedenbouwkundige ambtenaar van het departement Ruimte
Vlaanderen, afdeling Oost-Vlaanderen, C-24/19, ECLI:EU:C:2020:503. Of course that only applies
if there is a breach and if there are effects, both of which are inevitably denied by the opposing
parties. Thus there is no EU law issue for reference. The ICMSA agrees with the State. The IFA
didn’t raise any issue about this having been given the opportunity to do so – silence is acquiescence.
So there is no issue remaining for the court to decide.
84. The third issue is also one of domestic law. As regards alternative remedies, the law is clear
that the court can grant an unpleaded relief (e.g., in this instance, perhaps an order directing further
assessments) as long as the relief remains within the scope of the pleaded grounds: Concerned
Residents of Treascon v. An Bord Pleanála [2024] IESC 28 per Murray J. The State and ICMSA didn’t
dispute that either. Again the IFA didn’t take up the opportunity to clarify if it was raising any issue,
so this can also be decided now.
85. Indeed this isn’t just a standard case of potentially granting alternative relief. It is a case
where the opposing parties will be asking for alternative relief rather than the certiorari that the
applicant is looking for. An opposing party can’t play Catch-22 by submitting that alternative relief
is more appropriate and also opposing such relief on the grounds that it is not pleaded. Fortunately
the State didn’t try to go down that route, but they did bridle somewhat at my formulation of the
court not being in a position to refuse such relief proposed by a respondent on the grounds that it
is not pleaded. But the notion of the court being precluded from creating a Catch-22 follows from
the fact that the alternative relief in the scenario we are talking about is something that the opposing
parties are urging on the court, as opposed to a more conventional situation where an applicant is
asking the court for a relief not pleaded. In the latter and more normal case, it makes more sense
to think in terms of a power to grant unpleaded relief.
86. So the domestic legal position here is that if the grant of a remedy is otherwise appropriate
(which is denied by the opposing parties), and if the opposing parties persuade the court that a relief
other than that pleaded would be more appropriate, the court may not refuse to grant such a remedy
within the scope of the case as defined by the pleaded grounds but alternative to the relief pleaded
(e.g. an order directing further assessments) on the basis that the applicant only pleaded an order
quashing the decision and did not plead the remedy that is contended to be more appropriate by an
opposing party.
87. On the foregoing basis there is no issue outstanding and thus no need for a reference under
this heading.
Issue 75(a) – ninth question – validity of Commission decision
88. Issue 75(a) is:
“75. (a) If the answers to the previous issues have the consequence that the adoption of
the NAP involved a breach of directives 92/43, 2000/60 and/or 2001/42, is Commission
decision 2022/696 invalid?”
89. The applicant submitted:
“Concise answer
The validity of the Commission decision is exclusively a matter for the CJEU. The issue for
this Court is whether it has doubt as to the validity of the Commission decision.
Acte clair
The need to refer if the Court has doubt as to the validity of the Commission decision is acte
clair.
Detailed answer
172. Recitals 9 and 10 of the Commission Implementing Decision indicate that Ireland
has adopted a new National Action Programme with additional reinforced measures to
comply with the objectives of the Nitrates Directive; and that Ireland applies this action
programme throughout the entire territory in conformance with Article 5 of the Nitrates
Directive.
173. Article 14 of the Commission Implementing Decision states: ‘This Decision shall
apply in the context of the Irish Action Programme as implemented in the Statutory
Instrument No 113 of 2022, European Union (Good Agricultural Practice for Protection of
Waters) Regulations 2022.’
174. Therefore, it is doubtful in light of Recital 9 and Article 14 that the Commission
Implementing Decision would continue to be valid if there was a breach of the Habitats
Directive, the WFD or the SEA Directive.
175. While the High Court does not have jurisdiction to determine whether the
Commission Implementing Decision is valid in that eventuality, if it shares the Applicant’s
doubts in that regard it is required to make a preliminary reference to the Court of Justice
pursuant to Article 267 TFEU asking the Court of Justice to determine whether the
Commission Implementing Decision is valid in light of the quashing of the NAP.
176. The legal test which the Applicant must meet in order for the matter to be referred
is clear – this Court must share the doubts of the Applicant. The question is succinctly
summarised in the 2019 version of the ‘Recommendations to national courts and tribunals
in relation to the initiation of preliminary ruling proceedings’ at §7:
‘It follows, moreover, from settled case-law that although national courts and
tribunals may reject pleas raised before them challenging the validity of acts of an
institution, body, office or agency of the Union, the Court has exclusive jurisdiction
to declare such acts invalid. When it has doubts about the validity of such an act, a
court or tribunal of a Member State must therefore refer the matter to the Court,
stating the reasons why it has such doubts.’
177. The relevant threshold in respect of this issue is readily identifiable. The applicable
principles were helpfully identified, albeit in a different context in Dempsey v An Bord
Pleanála . Simons J found that Krizan Case C-416/10 (§64) had identified the jurisdiction in
the following terms (references excluded):
As regards the other aspects of the first question referred, it is settled case-
law that Article 267 TFEU gives national courts the widest discretion in referring
matters to the Court if they consider that a case pending before them raises
questions involving interpretation of provisions of European Union law, or
consideration of their validity, which are necessary for the resolution of the case
…
A reference for a preliminary ruling is based on a dialogue between one court
and another, the initiation of which depends entirely on the national court's
assessment as to whether that reference is appropriate and necessary’
178. However, the reference did not proceed for reasons explained in a later judgment .
179. Similar sentiments were reflected by CJEU in British American Tobacco at §34:
‘In that regard, it is to be remembered that when a question on the validity of a
measure adopted by the Community institutions is raised before a national court, it
is for that court to decide whether a decision on the matter is necessary to enable it
to give judgment and consequently whether it should request the Court to rule on
that question. Accordingly, where the national court's questions relate to the validity
of a provision of Community law, the Court is obliged in principle to give a ruling
(Case C-408/95 Eurotunnel and Others [1997] ECR I-6315, paragraph 19).’
180. As per the State’s Opposition (§176) ‘Having an NAP in place is a pre-requisite to
the granting of a derogation and the derogation will apply in the context of that NAP.’
181. The threshold that the Applicant has to meet is to raise a doubt in the Court’s mind
such that the matter has to be referred to the Court of Justice. In circumstances where the
Derogation expressly relies on the NAP, if the adoption of the NAP involved a breach of the
Habitats Directive, the WFD or the SEA Directive that raises (at the very least) a doubt
whether the Derogation remains valid.”
90. The State submitted:
“I. Summary
235. If the answers to the previous issues have the consequence that the adoption of the
NAP involved a breach of the Habitats Directive, WFD and/or SEA Directive, the Commission
Implementing Decision (EU) 2022/696 of 29 April 2022 granting a derogation requested by
Ireland pursuant to Council Directive 91/676/EEC concerning the protection of waters
against pollution caused by nitrates from agricultural sources (the ‘Commission Decision’)
nonetheless remains valid.
236. The Applicant’s challenge is an extraordinary validity challenge without basis in
national law or EU law. Each of the Directives is addressed to the Member States, and not
the Commission. The Commission Decision itself states that it shall ‘apply in the context of
the [NAP]’ (Article 14 of the Decision). Accordingly, the validity of the Commission Decision
is not affected if the adoption of the NAP were to be found to have breached a Directive. The
validity of the Commission Decision may be reviewed against standards which the
Commission itself was obliged to comply with when making, and directly concerning, that
decision, namely those relevant substantive and procedural requirements entailed by the
Nitrates Directive, none of which is relied on by the Applicant. Further, that the Applicant
contends Core Ground 4 as being live only if it succeeds in obtaining primary relief
underscores that Core Ground 4 is irrelevant.
II. Acte Clair
237. The Respondents accept that Issue 75(a) is not acte clair.
III. Substantive submissions
238. If the answers to the previous issues have the consequence that the adoption of the
NAP involved a breach of the Habitats Directive, WFD and/or SEA Directive, the Commission
Decision remains valid.
239. By the Applicant’s pleaded case in the Statement of Grounds, it is clear that (§64)
‘[t]his Core Ground is consequential on the Applicant succeeding in having the NAP quashed’.
240. The Respondents accept that in a preliminary reference pursuant to Article 267 TFEU
concerning the validity of an EU Act, the referring national court is not limited to the grounds
specified in an action for annulment pursuant to Article 263(2) TFEU: Lenaerts, Gutman and
Nowak, ‘EU Procedural Law’ (2nd ed., OUP, 2023), §10.14.
241. That being so, the Respondents nevertheless submit that the grounds for seeking
annulment in Article 263(2) TFEU are instructive in guiding this Court’s assessment of Issue
75(a).
242. Article 263(1)–(2) TFEU provides that:
‘The Court of Justice of the European Union shall review the legality of legislative
acts, of acts of the Council, of the Commission and of the European Central Bank,
other than recommendations and opinions, and of acts of the European Parliament
and of the European Council intended to produce legal effects vis-à-vis third parties.
It shall also review the legality of acts of bodies, offices or agencies of the Union
intended to produce legal effects vis-à-vis third parties.
It shall for this purpose have jurisdiction in actions brought by a Member State, the
European Parliament, the Council or the Commission on grounds of lack of
competence, infringement of an essential procedural requirement, infringement of
the Treaties or of any rule of law relating to their application, or misuse of powers.
…’
243. The Applicant has not identified a lack of competence on the part of the European
Commission, an infringement of an essential procedural requirement, an infringement of the
Treaties, an infringement of any rule of law relating to the application of the Treaties or a
misuse of powers by the European Commission.
244. Rather, the Applicant in the Statement of Grounds at §65 pleads that ‘[t]he
consequence of the Court quashing the NAP is that the [Commission Decision] is invalid
since it depends on the validity of the NAP’.
245. However, the Applicant’s challenge is an extraordinary validity challenge, without
basis in either national law or EU law. Each of the Directives – Habitats Directive, WFD and
SEA Directive - is addressed to the Member States, and not the Commission.
246. In the present proceedings, the Applicant does not suggest that the Commission
Decision is not validly authorised by its parent in the main legislation: paragraph 2 of Annex
III in the Nitrates Directive.
247. Rather, the Applicant’s position is that the Commission Decision depends on the
validity of the NAP because the Commission Decision refers to the NAP, which is entirely
artificial.
248. In this regard:
(1) Recital 9 explains that Ireland has adopted the NAP; and
(2) Article 14 provides that the Commission Decision shall apply in the context
of the NAP.
249. With respect to Recital 9, the artificiality of the Applicant’s position can be seen by
analogy with the jurisprudence of the CJEU relating to the interpretation of recitals. In Case
C-162/97 Nilsson and Others [1998] ECR I-7477, the CJEU stated that (§54):
‘It must be stated that the preamble to a Community act has no binding legal force
and cannot be relied on as a ground for derogating from the actual provisions of the
act in question.’
250. As a recital in an EU law has no binding legal force and cannot be used as a ground
to derogate from the actual provisions of the EU law in question, the Applicant’s proposition
that the validity of the Commission Decision depends on the validity of the text in Recital 9
is unfounded.
251. The Commission Decision itself states that it shall ‘apply in the context of the [NAP]’
(Article 14 of the Decision). Accordingly, the validity of the Commission Decision is not
affected if the adoption of the NAP were to be found to have breached a Directive. The
validity of the Commission Decision may be reviewed against standards which the
Commission itself was obliged to comply with when making, and directly concerning, that
decision, namely those relevant substantive and procedural requirements entailed by the
Nitrates Directive, none of which is relied on by the Applicant
252. The Respondents’ position is that quashing the NAP and/or the GAP Regulations
would entail consequences for the implementation of the Commission Decision and
application of the derogation pending remedial measures coming into effect. However, it is
denied that the validity of the Commission Decision would be affected.
253. The Respondents submit that the Applicant contends Core Ground 4 as being live
only if it succeeds in obtaining its primary relief underscores that Core Ground 4 is irrelevant.
254. In a different context, in C-203/15 Tele2 Sverige EU:C:2016:970, the CJEU held that
(§§130–132):
‘However, in accordance with the Court’s settled case-law, the justification for
making a request for a preliminary ruling is not for advisory opinions to be delivered
on general or hypothetical questions, but rather that it is necessary for the effective
resolution of a dispute concerning EU law (see, to that effect, judgments of 24 April
2012, Kamberaj, C‑571/10, EU:C:2012:233, paragraph 41; of 26 February 2013,
Åkerberg Fransson, C‑617/10, EU:C:2013:105, paragraph 42, and of 27 February
2014, Pohotovosť, C‑470/12, EU:C:2014:101 paragraph 29).
In this case, in view of the considerations set out, in particular, in paragraphs 128
and 129 of the present judgment, the question whether the protection conferred by
Articles 7 and 8 of the Charter is wider than that guaranteed in Article 8 of the ECHR
is not such as to affect the interpretation of Directive 2002/58, read in the light of
the Charter, which is the matter in dispute in the proceedings in Case C‑698/15.
Accordingly, it does not appear that an answer to the second question in Case
C‑698/15 can provide any interpretation of points of EU law that is required for the
resolution, in the light of that law, of that dispute.’ (Emphasis added).
255. To this end, while it is solely for this Court to determine both the need for a
preliminary reference and the relevance of the questions it submits to the CJEU, the CJEU
retains a jurisdiction to rebut the presumption that a question referred for a preliminary
ruling is relevant in exceptional cases: Case C‑617/10 Åklagaren v Hans Åkerberg Fransson
EU:C:2013:105, §40
256. The Respondents respectfully submit that a preliminary reference in respect of Core
Ground 4 is not necessary for the effective resolution of the within proceedings.
257. Further, at §69 of the Statement of Grounds, the Applicant pleads that:
‘While the High Court does not have jurisdiction to determine whether the
Commission Implementing Decision is valid in that eventuality, if it shares the
Applicant’s doubts in that regard it is required to make a preliminary reference to
the Court of Justice pursuant to Article 267 TFEU asking the Court of Justice to
determine whether the Commission Implementing Decision is valid in light of the
quashing of the NAP.’ (Emphasis added).
258. The Applicant has not pleaded that Core Ground 4 is consequential on a finding that
the adoption of the NAP involved a breach of the Habitats Directive, WFD and/or SEA
Directive.
259. In circumstances in which this Court held in the No. 2 Judgment ([2024] IEHC 248)
that §196(ix) there could be a final Module IV on remedies and remaining issues in due
course if it becomes necessary, the Respondents respectfully submit that any referral of a
question concerning the validity of the Commission Decision ought not occur until after the
Court has given judgment in respect of Module IV and concluded that the NAP should be
quashed.”
91. The ICMSA submitted:
“161. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §235 to §259.”
92. My decision is as follows. There are three basic sub-issues to be addressed – must I refer
this, if not, can I refer this, and if I am permitted but not obliged to refer, should I refer this? To
avoid undue repetition, these will be addressed in the formal judgment for reference but the bottom
line is that the question is going to be referred. Further details will be set out in that judgment.
Issue 75(b) – Eurobolt jurisdiction
93. Issue 75(b) is:
“(b) Should the court seek any information from the Commission (and/or other EU
institutions) under the Eurobolt jurisdiction (judgment of 3 July 2019, Eurobolt BV, C-
644/17, ECLI:EU:C:2019:555) prior to deciding on whether the issue of the validity of
Commission decision 2022/696 should be referred?
[Note if any party suggests an affirmative answer to this, their submission should set out an
outline of the nature of the questions to be posed, bearing in mind that this would ultimately
be a matter for the court if this option were to be pursued]”
94. The applicant submitted:
“183. The Applicant does not (at this point anyway) propose any questions for the
Commission (and/or other EU institutions).”
95. The State submitted:
“I. Summary
260. The Respondents does not consider that this Court should seek information from the
European Commission prior to deciding on whether the issue of the validity of Commission
Decision should be referred.
II. Acte Clair
261. A response as to whether Issue 75(b) is acte clair is not necessary.
III. Substantive submission
262. The Respondents do not consider that this Court should seek information from the
European Commission prior to deciding on whether the issue of the validity of Commission
Decision should be referred.”
96. The ICMSA submitted:
“162. ICMSA adopts the submissions made by the State Respondents under this Issue.
Those run from §260 to §262.”
97. My decision is as follows. One can see a compelling argument that like the discretion to
refer, a court has discretion to invoke Eurobolt on its own motion, but it can still have regard to the
position of the parties. In the absence of any request from any party to do so here, I would not
proposed to invoke that jurisdiction in this particular case. Had anyone wanted me to do that I
would have been inclined to hold off on a reference and obtain the Commission’s perspectives and
assistance on some of the issues, but as I say nobody suggested that. So the breaking of any new
procedural ground in that regard will have to await some other case.
Summary
98. In outline summary, without taking from the more specific terms of this judgment:
(i) 9 of the 12 questions in this module seem appropriate for reference to the CJEU,
with some potential re-wording, especially given that almost all of those are agreed
not to be acte clair;
(ii) as regards the other 3 questions:
(a). the question at issue 46(b) is not in fact in dispute;
(b). the question at issue 69(a) is not in dispute as a European proposition and
can be resolved now as a domestic proposition;
(c). as regards issue 75(b), in the absence of a request to invoke the Eurobolt
jurisdiction I do not propose to do so here, although it would have been
open to the court in principle to do so motu proprio.
(iii) as regards the State’s proposed additional question, that was adequately covered
by issue 46(a) but in any event no longer arises on the facts;
Order
99. For the foregoing reasons, it is ordered that:
(i) there be in principle a reference to the CJEU which will be addressed in a separate
judgment and order for reference;
(ii) the parties be required to complete the CJEU contact sheet set out in guidance notes
to Practice Direction HC126 within 7 days and submit that sheet to the List Registrar
copying the relevant judicial assistant;
(iii) the natural persons who are parties in their capacity as trustees be required to
inform the court by Friday 26th July 2024 (by email the List Registrar copying the
relevant judicial assistant) as to whether they wish their names to be anonymised
for the purposes of the CJEU proceedings and judgment;
(iv) the parties be directed to prepare agreed electronic books of necessary pleadings
for the CJEU (not including authorities or written submissions) in accordance with
technical requirements set out in Practice Direction HC126 and guidance notes and
generally comply with such guidance notes so that all papers are received by the
List Registrar by 31st July 2024;
(v) the parties be required to comply with the directions to keep the referring court
informed of progress of the reference as set out in para. 100(vii) of Eco Advocacy
CLG v. An Bord Pleanála [2021] IEHC 265, [2021] 5 JIC 2704;
(vi) the matter be listed for mention on 9th September 2024 to confirm progress; and
(vii) the costs of the proceedings to date be reserved until further order.