High Court refuses disclosure of 53-year planning history, citing lack of relevance and procedural defects.
Legislator summary
AI generatedThe High Court refused the applicants' motion for interlocutory disclosure of forestry consent documents spanning over five decades. The court found the request overly broad and irrelevant to the specific planning issues at hand, noting that modern transparency requirements do not justify digging into historical records from 1970. Consequently, the application for discovery was struck out, and the State respondents were released from further participation.
Legislator headnote
AI generatedSection 50 of the Planning and Development Act 2000; Section 50 of the Planning and Development Act 2000: A court will not order disclosure of historical planning documents where the request is chronologically excessive, lacks specific relevance to the dispute, and fails to demonstrate a proportionate need for such extensive historical discovery.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2023] IEHC 579
THE HIGH COURT
JUDICIAL REVIEW
[H.JR.2022.1022]
IN THE MATTER OF SECTION 50 OF THE PLANNING AND DEVELOPMENT ACT 2000 (AS
AMENDED)
BETWEEN
CARROWNAGOWAN CONCERN GROUP, UTE RUMBERGER AND NICOLA HENLEY
APPLICANTS
AND
AN BORD PLEANÁLA, COILLTE CUIDEACHTA GHNÍOMHAÍOCHTA AINMNITHE, THE
MINISTER FOR HOUSING, LOCAL GOVERNMENT AND HERITAGE, THE MINISTER FOR
AGRICULTURE, FOOD AND THE MARINE, IRELAND, THE ATTORNEY GENERAL AND CLARE
COUNTY COUNCIL
RESPONDENTS
AND
FUTURENERGY CARROWNAGOWAN DESIGNATED ACTIVITY COMPANY (BY ORDER)
NOTICE PARTY
JUDGMENT of Humphreys J. delivered on Friday the 27th day of October, 2023
1. The applicants are seeking interlocutory disclosure of licences and similar documents relating
to forestry consents affecting specified lands going back to what looks at first sight like the arbitrary
date of 1st June, 1970, a period of 53 years. Perhaps this was unconsciously inspired by the
Jarndyce v. Jarndyce threshold of 54 years: see Lehane v. Wymes [2021] IEHC 427, [2021] 7 JIC
0206, para. 1. To untangle the applicants’ perspective we will need a whistlestop tour of the
evolution of European planning assessments.
2. EU law began to significantly impact on Irish planning procedures from the 1980s onwards.
The deadline for implementing the birds directive 79/407/EEC fell on 7th April, 1981, and for the
EIA directive 85/337/EEC on 3rd July, 1988.
3. The applicants seek certiorari of decisions going back to 1st June, 1988 relating to specified
forestry activities, although it is not altogether clear why that particular date was chosen either.
4. The deadline for implementation of the habitats directive 92/43/EEC fell on 10th June, 1994.
5. From the establishment of the forestry consent system in 2001, up to 2006, where
advertisement of applications was necessary this was done in a local newspaper.
6. Since December, 2006, notices of application for afforestation licences and grants have been
available online. Applications for forest roads have been online since 2011.
7. On 16th May, 2017, transposition of directive 2014/52 amending the 2011/92 EIA directive
fell due, and EIA reports since then are available on the Government’s central portal.
8. Since June, 2017, notices of application for felling licences have been available online.
9. On 30th November, 2020, Coillte lodged an application for permission (File Reference ABP-
308799-20) to construct a windfarm and associated works in the townlands of Ballydonaghan,
Caherhurley, Coumnagun, Carrownagowan, lnchalughoge, Killokennedy, Kilbane, Coolready and
Drummod, County Clare. The area is located north west of Killaloe, near the village of Bodyke (for
more on that village see Minogue v. Clare County Council [2021] IECA 98, [2021] 3 JIC 2902).
10. The application included a Natura Impact Statement for the purposes of the habitats
directive, and an EIA report for the purpose of the EIA directive 2011/92/EU.
11. The EIAR includes the following:
“7.3.4, The type and nature of the upland habitats, in the site and wider locality, has been
significantly modified by plantation forestry and this accounts for the occurrence of
(specialist) species including redpoll, crossbill and siskin. Hen harrier and merlin may benefit
from temporal availability of breeding sites and foraging habitat in conifer plantation, but for
these and for other species extensive open moorland is essential habitat.
While conifer plantation may have created new bird habitats for species such as hen harrier,
there are more serious implications in terms of the extent of upland moorland lost to natural
upland species using these habitat types, such as red grouse, and hen harrier. Moreover,
forest habitat and to some extent agriculture may encourage predator numbers to an
unbalanced level, particularly fox, pine marten, hooded crow and raven, affecting vulnerable
ground-residing species such as hen harrier and red grouse (Thompson et al. 1988).”
12. The citation is to Thompson, Des & Stroud, David & Pienkowski, Mike, “Afforestation and
upland birds: consequences for population ecology”, in Ecological change in the uplands (1988),
Nature Conservancy Council/British Ecological Society Symposium, 237-259. I note in passing that
this paper is available online at:
https://www.researchgate.net/publication/292972362_Afforestation_and_upland_birds_consequen
ces_for_population_ecology_In_Ecological_change_in_the_uplands. It concludes that at least 34
out of 71 upland species of British birds are at risk from afforestation.
13. The NIS concludes (p. 57) that the site is unlikely to be of inherent value for the SPA
population of Hen Harrier. It notes that Hen Harrier are associated with ground nesting and heather/
moorland areas, but in recent decades have been associated with young pre-thicket conifers on a
first or particularly second rotation (citing Mark W. Wilson, Sandra Irwin, David W. Norriss, Stephen
F. Newton, Kevin Collins, Thomas C. Kelly & John O’Halloran “The importance of pre-thicket conifer
plantations for nesting Hen Harriers Circus cyaneus in Ireland”, Ibis (2009), 151, 332–343).
14. I can pause to note in passing (without drawing any conclusions from it) that the full paper
cited is available online at:
https://www.ucc.ie/en/media/research/planforbio/pdfs/Wilsonetal2009.pdf, and while in no way
definitive does include the comment at p. 342 that:
“In Ireland, however, pre-thicket second rotation plantation forest is not only the most
commonly used nesting habitat, but is positively correlated with changes in breeding Hen
Harrier numbers over time. Coupled with the lack of evidence for any negative impact of
post-closure forest cover on Hen Harrier distribution within these areas, this gives some
reason to be optimistic about the long-term effects of afforestation on this species, at least
in Ireland.”
15. Forestry was identified as a high pressure impact on Mount Aughty Mountains SPA (p. 66)
An examination of other wind farms including Derrybrien indicated that Hen Harrier were not
significantly adversely effected. In this regard the NIS cites “Madden & Porter (2007)”, but there
is no Madden & Porter study referenced in the bibliography. This paper is however cited in the
bibliography subsequently contained in the response to the request for further information (Item 1
p. 28). The paper is Madden, B. & Porter, B., “Do wind turbines displace Hen Harriers Circus cyaneus
from foraging habitat? Preliminary results of a case study at the Derrybrien wind farm, County
Galway”, Irish Birds (2007) 8: 231-236.
16. Whilst Coillte was the applicant for planning permission, all development rights in respect of
Carrownagowan Wind Farm were transferred from Coillte to FEC, although the development lands
have not yet transferred. FEC’s onshore wind development rights in respect of the relevant Coillte
lands are held pursuant to an exclusive option for lease, which option allows for entry into a long-
term lease prior to commencement of the construction of Carrownagowan Wind Farm.
17. The second applicant made a submission on 12th January, 2021 and the first named
applicant made a submission received on 3rd February, 2021. While Hen Harrier are mentioned
briefly, it is hard to see much emphasis in that on either the remedial obligation generally or what
specific measures are required to assist the Hen Harrier in dealing with effects, if any, of
afforestation.
18. The Development Applications Unit (DAU) of the Department of Tourism, Culture, Arts,
Gaeltacht, Sport and Media made a submission raising issues about impacts on Hen Harrier. The
fifth point in that document states:
“The cumulative impact assessment needs to consider all pressures operating on the
surrounding environment and protected sites. Most specifically, analysis of proposed
forestry planting and felling licence applications in the area must be assessed.”
19. On foot of that submission the board requested further information from the developer.
20. The developer submitted such further information on 23rd December, 2021. This included
a Hen Harrier management plan which involved the improvement of nearby specified areas (Habitat
improvement lands A-G) in order to provide suitable lands for hen harrier foraging/ roosting. Site
A was initially afforested around 1992 (p. 10 of hen harrier management plan). The response noted
that nesting at forest edges was associated with an increased risk of predation (p. 7 citing NPWS
2015) so the improved lands would mitigate that problem. NPWS 2015 is cited in the response to
Item 1 bibliography as being NPWS, 2015, Hen Harrier Conservation and the Forestry Sector in
Ireland, 31/03/2015, Version 3.2.
21. The developer’s response to the need to assess forestry licence applications was that
“[b]aseline conditions at the site will not be significantly altered”. It stated that Coillte’s forestry
management plan for the area was reviewed, and private forest activity was estimated based on
aerial surveys. It provided figures which suggested that parcels likely to be felled and re-planted in
2040-45 would be 626 ha, and in 2050-58 would be 124ha. It concluded that foraging and nesting
habitat would remain relatively stable for the period of the project (2025-55). The meaning of all
this wasn’t immediately self-evident in that it wasn’t obvious how this conclusion follows from a table
that indicates significant variation and that does not address 2025-2040.
22. That section concluded (p. 10) with the comment that forestry licences were subject where
appropriate to EIA and AA. That is more a statement of legal theory rather than a reassurance as
to implementation in practice and is probably cold comfort to these applicants.
23. This further information was advertised, and the second and third applicants made
submissions on 14th and 16th February, 2022 respectively. Again these are rather light on the
remedial obligation and the Hen Harrier specifically albeit that there is some reference to Annex I
species.
24. The inspector prepared a Report dated 31st August, 2022. The section on EIA includes the
following:
“7.32 In response to concerns raised by the Department of Culture, Heritage, and the
Gaeltacht, the applicant has submitted an up-to-date breeding bird survey which
investigates concerns raised in relation to breeding Hen Harrier on proposed improvement
lands. I note that no breeding pairs have been recorded during this survey. Impacts to Hen
Harrier are examined in detail within both Section 7 of the EIAR which specifically examines
effects to Ornithology and the Appropriate Assessment section of this report hereunder.
7.33 I am satisfied, based on the information submitted with the file and discussed within
the Appropriate Assessment section below, that the applicant has adequately demonstrated
beyond reasonable scientific doubt that the proposed development would not adversely
affect the integrity of these SPAs and SAC in view of these sites Conservation Objectives.
7.34 Potential impacts on biodiversity associated with the proposed development include
loss of habitat and disturbance or displacement of species. It is important to note at this
juncture that impacts effecting the hydrological regime of the area are examined in section
8 of the EIAR and an assessment of the impacts on relevant habitat will be assessed in
further detail under this heading below.
7.35 The assessment of impacts is supported by an ecological assessment, a desk top study
was carried out and field surveys were completed between July 2018 and November 2019
to provide comprehensive overview of the baseline ecology in the study area. Relevant
sections of the study area were re-surveyed in January, and April 2020 and as mentioned
above additional breeding bird surveys were carried out in 2021. Detailed targeted surveys
were carried out for bats, habitats, mammals, invasive species and invertebrates owing to
the features and locations of potential ecological significance.”
25. The report includes a section headed “Ornithology” as follows:
“7.78 Section 7 of the EIAR submitted examines the potential for impacts to arise in
relation to Ornithology. It is important to state at the outset that a number of concerns were
raised within both the submissions from prescribed bodies and third parties in relation to the
presence of breeding Hen Harrier in the locality and the potential for the proposed
development to displace these species within a 1 km radius of the development. I note at
the outset that the proposed development site is located in a Non-Designated Regional Zone
for Hen Harrier and is c. 8km south of the Slieve Aughty Mountains SPA which is designated
for Hen Harrier and Merlin. 7.79 The DAU in their submission raised a number of concerns
in relation to the displacement of breeding Hen Harrier within 1km of the proposed wind
development and the viability of habitat enhancement areas. Concerns in relation to collision
risks were also raised, as was the extent of the cumulative assessment which is
recommended to cover a 20km radius.
7.80 In order to establish the potential for impacts to arise in relation to birds it was
necessary to establish the baseline conditions of the site and surrounds. A desktop survey
was undertaken, documents and mapping are referenced in Section 7 of the EIAR. The
development site was viewed within the bird sensitivity spatial tool and is largely within an
area identified as a ’Low Sensitivity Zone’. Moderate sensitivity zones are located towards
the eastern part of the site and there are no highest sensitivity zones within the site. It is
important to note that this tool is merely an indicator of sensitivity and is not relied on to
any significance within the assessment.
7.81 I note from Section 7.3.2.5 of the EIAR that breeding pairs of Hen Harrier declined
within the Slieve Aughty Mountains SPA between 2005 and 2015 but interestingly increased
within the same period within the Slievefelim to Silvermines Mountains SPA which [is]
located c. 16.7km to the southeast of the development. It is inferred by the applicant that
forestry, which is the main threat to Hen Harrier, is the cause of the decline within the Slieve
Aughty Mountains and that birds are relocating to a more favourable habitat in the
Slievefelim to Silvermines Mountains SPA.
7.82 Winter and Breeding Bird surveys were carried out between 2016 and 2020 with
summer 2020 surveys solely focused on hen harrier. Bird surveys also included wetland sites
within 10km of the development site, the survey area extended to 10km as greenland white-
fronted geese was identified as a potential target species within the wider surroundings of
the project mainly and Lough O’Grady. It is of note that the study area referred to within
section 7 of the EIAR extends to an area 500 metres out from the proposed development
boundary.
Hen Harrier Base Line conditions
7.83 With regard to hen harrier I note that surveys in 2016/2017 recorded 124 Hen Harriers
flights and of these it is stated that 53 were at potential collision height (PCH). In 2018/19
there was a total of 69 hen harrier observations and of these 20 were at PCH. A targeted
hen harrier breeding survey was also undertaken between the months of May, June, July
and August 2020 to determine the distribution and use of the site and general area by birds.
Breeding sites
7.84 One nest was recorded within the development site in 2017 which ultimately failed. No
other nests were recorded over the three years of surveys within the development site. The
location of this nest was c. 400 metres from the nearest turbine.
7.85 In 2018 a nest was recorded outside of the development boundary circa 600 metres
from the nearest proposed turbine. It is of note that this nest failed.
7.86 In 2020 three failed nests were recorded outside of the development boundary with
the nearest being 500 metres from the closest turbine.
7.87 Over the 3 year survey period other breeding sites were recorded outside of the
development boundary within a 2-5km distance from the development site. I note that only
one nest recorded was successful in 2019.
Roost Sites
7.88 Hen harrier was observed on five occasions during hen harrier roost surveys over the
winter periods of 2016/17 and 2017/18. Two of these observations were made during the
same survey on the 23rd March 2017. One was of a male travelling over an area of forestry,
while the other observation was of a female, recorded as likely going into roost in an area
of heather to the west of the site boundary. The remaining three observations were confined
to February and March 2018. There was no evidence of roosting hen harrier between October
2018 and March 2019. A hen harrier roost survey completed during the winter 2019/20 did
not identify hen harrier roosting within the study area.
7.89 The results outlined above would indicate that the study area was not used by hen
harrier in significant numbers during the winter survey periods.
Habitat loss
7.90 Hen harriers are ground nesting birds that breed in moorland, young conifer plantations
and other upland habitats. It is stated that Pre-thicket conifer plantation (first and second
rotation) may be used by breeding hen harriers and foraging harriers appear to avoid forest
stands less than 3 years and greater than 15 years of age.
7.91 In total c.684ha of forestry (of various rotations) occurs within the red line site
boundary of the project. Of this, 167.76ha (24.52% within the site boundary) will be
available for nesting hen harrier and 289.95ha (42.39%) will be available for foraging hen
harrier. The construction phase of the project will require the loss of c.67.66ha of forestry,
of which 18.18ha would be potentially available for nesting hen harrier, and 31.87 would be
available for foraging hen harrier (this is inclusive of nesting habitat) in this period. In
response to the DAU’s concerns the applicant has confirmed that a total of 31.87ha of
suitable habitat will be lost. It is stated that 149.58ha of suitable hen harrier nesting habitat
will remain within the development site, in addition to 258.08ha of suitable foraging habitat.
7.92 2,627ha of additional Coillte forestry within 5km of the development has the potential
to provide 379ha of nesting habitat and 638ha of foraging habitat. It is also proposed to
provide 6 enhancement areas within the surrounding area which will provide a total of 106ha
of additional suitable habitat. Enhancement lands will be examined in detail below.
7.93 I note from the information submitted that the most suitable traditional habitats for
breeding and foraging hen harrier will not be developed. It is stated that turbine T1 will
require loss of 0.9ha of cutover bog, and T8 will require the loss of 0.31ha of wet grassland
However, it is considered that this habitat loss is not significant, given the availability of
often more suitable, and traditional hen harrier habitat adjacent, and extending away from
the site, including the bogland protected within the Slieve Bernagh SAC extending away from
the site.
7.94 Any loss of currently suitable forestry habitat owing to the project will not be
significantly above that which would occur and does occur as a result of the forestry
operations at the project site. It is therefore considered the magnitude of the habitat loss
described will result in a Long-term, Slight Negative effect on hen harrier.”
26. Having dealt with effects of the turbines themselves and other matters, the report went on
as follows:
“7.106 With regard to cumulative impacts, I note the DAU raised concerns in relation to the
cumulative impact assessment and the consideration of all pressures operating in the
surrounding environment and protected sites. Particular reference is made to forestry
planting and felling licence applications. In response to these concerns the applicant states
that forestry will continue and will create temporal and spatial changes in hen harrier use as
is commonplace in commercial forestry operations.
7.107 It is noted at the outset that a forest management plan was not available for private
forestry in the area but a review of aerial photography demonstrated what areas of forestry
would likely be felled and replanted between 2025-2058. The details of Coillte’s forestry plan
were reviewed in the context of cumulative impacts. Overall analysis of forestry operations
suggests that the potential suitable foraging and nesting habitat available for nesting and
foraging hen harrier remains relatively stable over the lifetime of the wind farm (2025-
2055), with no significant reduction, and will remain available for the population of hen
harrier using the area.
7.108 Cumulative impacts assessment also includes windfarms within 20km of the proposed
development site, which are referred to both within section 4.1.6 of the further information
response and within section 7.7.2 of the EIAR. It is also stated that Section 7.7.2 of the EIAR
also refers to cumulative impacts arising from windfarms within 30km of the proposed
development. It is concluded that the project and other wind farms in the region are
separated by vast areas of agricultural grassland, and the River Shannon and built areas.
Due to the separation distance of over 20km it is unlikely that the project and other wind
farms in the region will result in cumulative habitat loss impacts on the hen harrier population
of the Slieve Bernagh to Keeper Hill Area, or other avian KERs identified. In relation to the
grid connection and delivery route all works will be within the public road and where
vegetation clearance is required it will be undertaken within outside of the breeding season.
7.109 Thus, having regard to the foregoing and given the nature of the development site
and the separation distance from the proposed development to the nearest recorded
successful nest I am satisfied that the applicant has demonstrated that the proposed
development will not displace or negatively impact hen harrier utilising the surrounding
area.”
27. The report then considered the putting in place of enhancement lands and concluded:
“7.122 Based on the foregoing and the information submitted within the further information
response, I am satisfied that the applicant has adequately addressed the concerns of the
DAU in relation to the proposed enhancement areas and I am further satisfied that the
proposed development and loss of 31.87ha of potentially suitable hen harrier habitat is
adequately addressed by way of the proposed 106ha of enhancement lands which will, as
mentioned above improve connectivity with the SAC and reduce edge effects at these
locations, providing an overall improvement of breeding and foraging conditions within the
general area for hen harrier.”
28. The section of the report dealing with AA addresses impacts on the Hen Harrier thus:
“8.82 The Slieve Aughty Mountains are a stronghold for Hen Harrier and support the second
largest concentration in the country. A survey in 2005 recorded 27 pairs, which represents
over 12% of the all-Ireland population.
8.83 The site also supports a breeding population of Merlin. The population size is not well
known but is likely to exceed five pairs. Red Grouse is found on many of the unplanted areas
of bog and heath – this is a species that has declined in Ireland and is now Redlisted.
8.84 The Slieve Aughty Mountains SPA is of ornithological significance, as it provides
excellent nesting and foraging habitat for nationally important breeding populations of Hen
Harrier and Merlin, two species that are listed on Annex I of the E.U. Birds Directive.
8.85 The potential for impacts to arise in relation to this SPA relate to ex-situ effects in
relation to roosting or breeding Hen Harrier. Hen harriers are ground nesting birds that breed
in moorland, young conifer plantations and other upland habitats. It is stated that Pre-thicket
conifer plantation (first and second rotation) may be used by breeding hen harriers and
foraging harriers appear to avoid forest stands less than 3 years and greater than 15 years
of age. The felling of suitable habitat has the potential to give rise to displacement effects
to this species in conjunction with constriction activities which may result in further
displacement of these birds from the site and surrounding area as a result of noise and
disturbance.”
29. In-combination effects were considered in connection with forestry:
“8.87 In combination effects are examined within section 4.3 of the NIS submitted. The
proposed works were considered in combination with impacts arising from forestry, habitat
alteration and fragmentation, peat harvesting and other development and windfarms in the
area.
8.89 In-combination effects have also been considered in the context of climate change and
the potential for climate change to impact erosion and therefore water quality within rivers.
8.90 The NIS submitted for the proposed project concludes, having considered the
aforementioned activities and development that subject to mitigation measures relating to
the protection of water quality and noise and vibration, no significant incombination effects
are identified with the proposed development.”
30. All of this culminates in a section on the Hen Harrier in an AA context:
“8.111 The project is outside the 2km core foraging range of the Slieve Aughty Mountains
SPA population of Hen harrier. The development site is within the maximum foraging range
(10km) of the Slieve Aughty Mountain SPA population of Hen harrier. It is possible that the
SPA population of Hen harrier occasionally loaf or commute towards the development site.
However, SNH (2016) guidance states that the maximum foraging range should only be a
consideration in impact assessment in ‘exceptional circumstances’. There is an abundance
of suitable habitat available inside the boundary of the Slieve Aughty Mountains SPA.
8.112 Notwithstanding the degree of afforestation within the SPA (c.one half), and the use
of pre-thicket forestry, the availability of these traditionally suitable habitats inside the SPA
together with the wider availability of similar habitats between the SPA and the development
site, indicates that the development site is unlikely to be of inherent value to the SPA
population of Hen harriers.
8.113 The design of the project was driven by a process of mitigation by avoidance as well
as a principle of using existing infrastructure to the maximum possible extent. Construction
of the project will be phased which will concentrate activity within the development site to
certain areas at a time, leaving other areas relatively less disturbed. The most valuable
foraging and breeding habitats for upland birds have been excluded from the developable
area and will be outside the areas of construction works. Connectivity within the
development site and between the development site and the SPA will therefore be
maintained during the construction phase.
8.114 A study at the Derrybrien wind farm in County Galway found that Hen harriers
continued to hunt over the area following construction of the wind farm, often passing within
10-50m of turbines (Madden & Porter 2007). The distance between each turbine in the
proposed Carrownagowan Wind Farm will be at least 500m.
8.115 A Collison Risk Model (CRM) was undertaken for the project. The collision risk for the
local Hen harrier population has been calculated at a rate of 0.056 collisions per year, or
1.65 birds over the 30 year lifetime of the wind farm. This corresponds to a 2% increase in
the background mortality rate of the local population and a 0.1% increase in the background
mortality rate of the national population. Therefore the magnitude of the collision effect is
considered Low.
8.116 While located within the 10km maximum foraging range, no exceptional circumstance
has been identified to indicate that the development site is an ecologically valuable resource
for the SPA population of Hen harrier. It is considered that there are no ecological processes
or pathways by which the project may significantly impact the SPAs resident population of
Hen harrier. Hen harriers frequently recorded within the study area during recent breeding
seasons are part of the Slieve Bernagh to Keeper Hill Regional population. The number of
breeding pairs recorded during surveys is consistent with NPWS data for this Regional Area.
It is also proposed to carry out a pre construction survey to identify roosts and to monitor
the area for hen harrier during the course of works. In the event that hen harrier are present
within the zone of influence works will cease. No works will be carried out within 500 metres
of hen harrier roosts or breeding sites.”
31. The board adopted a decision on 29th September, 2022 granting permission. The board
order agreed with the inspector that at screening there was the possibility of significant effects on
Slieve Bernagh Bog SAC (002312) and Slieve Aughty Mountains SPA (004168), and that on
appropriate assessment such effects could be ruled out. The inspector’s conclusion as to the effects
being acceptable following EIA was also agreed with.
32. I can finally note under this heading that forestry consents and associated documents such
as EIA reports, for decisions since September, 2021 are available on a Forestry Licence Viewer (FLV)
on the Minister’s website.
Procedural history
33. The proceedings challenging the decision and including a variety of other reliefs were
instituted on 23rd November, 2022 when papers were filed and the matter was opened before the
court. Liberty was given to amend the statement of grounds.
34. On 12th December, 2022 a further order was made allowing another amendment to the
statement of grounds.
35. Further liberty to amend was given on 30th January, 2023, although oddly this is not
referenced in the heading to the current amended statement of grounds. On 13th February, 2023
the time to comply with that order was extended, and the current statement of grounds references
that order rather than the order giving liberty to amend.
36. On the same date the court dealt with a motion from the applicant seeking further
information on a pre-leave basis. Paragraph 1 of the motion was adjourned generally. The extension
of time for the amended statement was granted under paragraph 2. Costs were reserved by consent.
37. Once the papers were in order to the necessary minimum extent, leave was granted on 20th
February, 2023. The curial part of that order reads:
“IT IS ORDERED that
1. The Applicant do have leave to apply by way of application for judicial review for the
Reliefs set forth in paragraph D 1 to 29 of the said amended Statement in the form hereafter
on the grounds set out in paragraph E therein without prejudice to any point that the
Respondents and Notice Party could have made
2. The Applicant shall serve the papers in these proceedings electronically on the
Respondents and the Notice Party in the case of State Respondents service being effected
on the Chief State Solicitor’s Office and issue and serve on the Respondents and the Notice
Party within 7 days of the date of the perfection hereof an originating Notice of Motion herein
said Motion returnable for the Commercial Planning and SID List on Monday the 6th day of
March 2023
3. Parties are requested and encouraged to agree to accept service of papers by email
and to co-ordinate with each other to ensure that appropriate email addresses are
exchanged
4. The Court’s default Directions Schedule will apply unless the parties agree otherwise
before the return date and notify the List Registrar default Directions being specified in 2(8)
of High Court PD 107
5. A party shall not recover the costs of any pleading affidavit exhibit or submission
delivered in breach of a time limit set out in an agreed or ordered direction unless the court
otherwise orders when making the final order as to costs
6. The Respondents and Notice Party are to indicate in writing in advance of the return
date whether they accept that the present proceedings are covered by the costs protection
provisions of section 50B of the Planning and Development Act 2000 as amended and/or
otherwise. And the Court Doth Certify for two Counsel in respect of the within application for
the purposes of legal costs adjudication Liberty to apply.”
38. The reference to two counsel was not part of the spoken order and was in fact surplusage
and while it is a usual formula it did not apply here so can be deleted at this stage under the slip
rule.
39. The notable thing for present purposes is that the order did not grant an extension of time
in the absence of a request for that.
40. On 6th March, 2023, Future Energy was added as a notice party and the matter was
adjourned to 24th April, 2023 to allow motions to be brought.
41. Separately, I can note that on 6th March, 2023, the applicants sought information on past
consents under the legislation implementing the AIE directive. Correspondence was then issued
seeking a narrowing of the requests on 14th March, and 5th April, 2023. The applicants declined
to do that. These requests were refused by the Minister on 19th April, 2023 and by Coillte on 4th
May, 2023. The applicants didn’t seek internal review of that let alone make an appeal to the
Commissioner for Environmental Information. The claim that this couldn’t have been done in time
for use in the proceedings seems of dubious merit as the proceedings will continue for some months
to come.
42. The matter was then heard commencing on 17th October, 2023. At the hearing it emerged
that some pages of the response to Item 1 of the request for further information had not been
exhibited formally so the developers agreed to file a short affidavit by 20th October, 2023 to exhibit
the full document.
Issues now before the court
43. The hearing involved an embarrassment of matters to be decided, which I can summarise
as follows and which include but are by no means limited to the formal notices of motion:
(i) a motion to strike out the proceedings to a specified extent brought by the
developers;
(ii) a motion to strike out the proceedings as against the State;
(iii) a motion for discovery from the applicants;
(iv) a preliminary request to amend the discovery motion;
(v) an issue about whether the applicants should be allowed to file a further affidavit;
(vi) a preliminary issue as to the applicability and extent of any remedial obligation as
referred to in sub-ground 10.19A;
(vii) a preliminary point about the preliminary issue was whether that issue could properly
be decided at this stage; and
(viii) consequential issues arising from the decision on the foregoing, in regard to the
format of the proceedings and the continuing role of certain parties.
44. We turn now to the pleadings, which are of crucial importance. The developers made the
overall point that the applicants’ case had the flavour of an academic symposium, and I’m afraid
there is a great deal of validity to that. The developers correctly point out that the parameters of
the case are fixed by the pleadings. A great deal of the oral submission sought to press hard at
those boundaries. The single most striking thing was that the whole centre-piece of the hearing was
the EU law remedial obligation. But that only gets a single, almost passing, reference in a single
sub-ground – not even a core ground – of the third amended statement of grounds. But what really
propels this case into the sphere of the academic symposium is the fact that the applicants’ emphasis
throughout was on the granular detail of the EU law obligation, at the expense of getting to grips
with whether it properly arose here at all. This conflates two applicants’ fallacies (and to avoid
misunderstandings, there are plenty of respondents’ fallacies out there also) – firstly, the
misconception that Europe in general (and latterly, the judgement of 4 December 2018, The Minister
for Justice and Equality and The Commissioner of An Garda Siochana v. Workplace Relations
Commission, C-278/17, ECLI:EU:2018:979 in particular) is always available to descend like a Deus
ex machina, as the developers put it, and secondly the belief that elaborate legal superstructures
rather than facts are of most interest to judges and will be more likely to determine the outcome of
cases.
45. On the first point, the erroneous view that Europe and WRC solve all problems for applicants
has been addressed elsewhere.
46. And on the second point, as regards an excessive focus on abstract law, like the plaintiff
who is strong on quantum but light on liability, the applicants spent very little time in either written
or oral submissions in dealing with the factual matrix which supposedly provided the premise on
which the whole tottering edifice of European argument was erected. But in the present case the
facts were crucial. Indeed that is normally the default position in litigation generally. There is very
little exaggeration in the aphorism offered by the late Edmund King QC in his post on Essex Court
Chambers website, “How to lose a case”: “Every single case is only ever won on the facts, even the
ones that supposedly aren’t”: https://essexcourt.com/publication/how-to-lose-a-case/. Perhaps
this is something to reflect on for those drafting submissions going forward – in an ideal world,
maybe the word count in terms of the fact:law ratio might be at least 1:2 if not 1:1.
Relief sought – substantive proceedings
47. What seems to be a local record-breaking 29 reliefs are set out in the third amended
statement of grounds as follows:
“D, Remedies
Preliminary Remedies
1. Directions requiring the First Respondent, the Board, pursuant to S146 of the
Planning and Development Act 2000 as amended, to put on its website within such time as
the Court may specify, all material relating to Board Decision file reference ABP-308799-20,
dated 29 September 2022, relating to a proposed windfarm development at Carrownagowan,
County Clare.
2. Directions permitting the Applicants to file an amended Statement of Grounds
containing such further particulars and further grounds as it may consider appropriate,
subject to leave of the Court in relation thereto, within the period of 8 weeks following the
placing on the Board's website in accordance with relief Dl above, of all material relating to
Board Decision file reference ABP-308799-20, dated 29 September 2022, relating to a
proposed windfarm development at Carrownagowan, County Clare.
3. Directions permitting the First Named Applicant to consider the further information
submitted by the Developer between June 2021 and December 2021 relating to Board file
reference ABP-308799-20, and granting liberty to the First Named Applicant to file an
Affidavit outlining such submission as it would have made had it been aware of the
determination of the Board that the said further information was significant and that it was
appropriate to allow the making of submissions in relation thereto, as provided for pursuant
to S37E(3)(a).
4. Directions of the type outlined at paragraph 81 of the decision in Reid v Bord
Pleanala, [2021] IEHC 362 requiring the Board to file an Affidavit providing, in respect of
Board Decision file reference ABP-308799-20, dated 29 September 2022, relating to a
proposed windfarm development at Carrownagowan, County Clare, details of the expertise
applied by the Board in respect of the issues raised, including but not limited to the expertise
applied by it to independently, demonstrably and impartially, deploy sufficient expertise,
detailed scrutiny and a high standard of investigation, and showing it had the resources with
which to do so, per paragraph §243 of the judgment of this Court in the case of
Environmental Trust Ireland v Bord Pleanala, [2022] IEHC 540.
5. Such mandatory order or injunction to the like effect as the Court may consider
appropriate.
6. Discovery
Substantive Remedies
7. An Order of Certiorari pursuant to Order 84 of the Rules of the Superior Courts 1986
as amended and Section 50 of the Planning and Development Act 2000 as amended quashing
the decision of the First Respondent, An Bord Pleanala (the Board), dated 29 September
2022, file reference ABP-308799-20, and there described as: Proposed Development: The
proposed development is for a ten-year permission that will constitute the provision af [sic]
the fa/lawing [sic]:
a) nineteen (19) number wind turbines (blade tip height up ta [sic] 169 metres);
b) nineteen (19) number wind turbine foundations and associated hardstand areas,
c) one (1) number permanent metearalagical [sic] mast (100 metre height) and
associated foundation and hardstand area,
d) one (1) number substation (110 kilovolts) including associated ancillary buildings
(electrical building including contra/ [sic], switchgear and metering rooms and the
operational building including welfare facilities, workshop and office), security
fencing and all associated works,
e) upgraded site entrance,
f) new and upgraded internal site service roads (8.4 kilometres of existing tracks to be
upgraded and 11.4 kilometres of new service roads to be constructed),
g) provision of an onsite visitor cabin and parking,
h) underground electrical collection and SCADA system linking each turbine to the
proposed on-site substation,
i) construction of new roadways and localised widening along the turbine delivery
route,
j) two (2) number temporary construction site compounds
k) three (3) number burrow pits to be used as a source of stone material during
construction,
l) three (3) number peat and spoil deposition areas (at burrow pit locations),
m) associated surface water management systems,
n) tree felling for windfarm infrastructure, and
o) all associated site development works.
All in the town/ands [sic] of Ballydonaghan, Caherhurley, Coumnagun, Carrawnagowan,
lnchalughoge, Killokennedy, Kilbane, Coo/ready [sic] and Drumnod, County Clare.
8. Such declaration(s) of the legal rights and/or legal position of the applicant and (if
and insofar as legally permissible and appropriate) persons similarly situated and/or of the
legal duties and/or legal position of the Respondents as the court considers appropriate.
9. A stay pursuant to Order 84 Rule 20(8)(b) of the Rules of the Superior Courts on
the operation of the above Board Decision of 29 September 2022, file reference ABP-
308799-20, pending conclusion of the present proceedings.
Forestry Consent Remedies
10. Directions of the type outlined at paragraph 81 of the decision in Reid v Bord
Pleanala, [2021] IEHC 362 requiring the Developer to file an Affidavit providing details of all
licences, permissions or other consents granted relating to projects for afforestation, felling
or reafforestation of any lands in the townlands of Ballydonaghan, Caherhurley, Coumnagun,
Carrownagowan, lnchalughoge, Killokennedy, Kilbane, Coolready and Drummod, County
Clare, from 1 June 1970 to date, the dates of such licences, of all forestry related works
carried out on those lands during that period (in particular the fire break between the Slieve
Bernagh SAC and the afforested area) and of all environmental impact assessments and
appropriate assessments carried out in relation to such licences, permissions or consents,
and all screening determinations relating to whether such assessments were required, and
to provide copies of all documents so identified.
11. Discovery
12. An Order of Certiorari pursuant to Order 84 of the Rules of the Superior Courts 1986
as amended and/ or Section 50 of the Planning and Development Act 2000 as amended
quashing all and/ or any decisions taken between 1 June 1988 and the present by the
Minister for Agriculture Food and the Marine or any other competent authority, authorising
the carrying out of any afforestation, felling and/ or reafforestation project, and all forestry
related works (in particular the fire break between the Slieve Bernagh SAC and the afforested
area), in the townlands of Ballydonaghan, Caherhurley, Coumnagun, Carrownagowan,
lnchalughoge, Killokennedy, Kilbane, Coolready and Drummed, County Clare.
13. An Order pursuant to Section 50(8) of the Planning and Development Act 2000 as
amended, or pursuant to Order 84 Rule 21(3) of the Rules of the Superior Courts 1986 as
amended, extending time for the bringing of any application referred to in the preceding
paragraph.
14. A Declaration for the purposes of S177B of the 2000 Act in relation to all and/ or
any such decisions taken between 1 June 1988 and the present by the Minister for
Agriculture Food and the Marine or any other competent authority, authorising the carrying
out of any afforestation, felling and/ or reafforestation project in the townlands of
Ballydonaghan, Caherhurley, Coumnagun, Carrownagowan, lnchalughoge, Killokennedy,
Kilbane, Coolready and Drummed, County Clare, to the effect that such decisions relate to
a development or project in the administrative area of Clare County Council for which
authorisation was granted by the Minister for Agriculture Food and the Marine or such other
competent authority as may appear to have issued such authorisation, or by the planning
authority or the Board, and for which - (a) an environmental impact assessment, (b) a
determination in relation to whether an environmental impact assessment is required, or (c)
an appropriate assessment, was or is required, that such consent was in breach of law,
invalid or otherwise defective in a material respect because of - (i) any matter contained in
or omitted from the application for consent including omission of an environmental impact
assessment report (or environmental impact statement) or a Natura impact statement or
both that report and that statement, as the case may be, or inadequacy of an environmental
impact assessment report or a Natura impact statement or both that report and that
statement], as the case may be, or (ii) any error of fact or law or procedural error.
15. A mandatory order or injunction requiring the Council, pursuant to the Order in the
preceding paragraph, to serve the notice specified in S177B of the Planning and
Development Act 2000 as amended in respect of all and / or any decisions taken between 1
June 1988 and the present by the Minister for Agriculture Food and the Marine or any other
competent authority, authorising the carrying out of any afforestation, felling and/ or
reafforestation project in the townlands of Ballydonaghan, Caherhurley, Coumnagun,
Carrownagowan, lnchalughoge, Killokennedy, Kilbane, Coolready and Drummod, County
Clare, and any other forestry related works (in particular the fire break between the Slieve
Bernagh SAC and the afforested area).
16. A Declaration pursuant to Order 84 Rule 18(2) of the Rules of the Superior Courts
as amended to the effect that, in authorising the carrying out afforestation, felling and / or
reafforestation projects in the townlands of Ballydonaghan, Caherhurley, Coumnagun,
Carrownagowan, lnchalughoge, Killokennedy, Kilbane, Coolready and Drummod, County
Clare, and any other forestry related works (in particular the fire break between the Slieve
Bernagh SAC and the afforested area), the Minister and / or the State has failed to consider
and determine whether the carrying out of such projects or works was compatible with the
preservation of a species listed in Annex I to the Birds Directives (79/409 and 2009/147),
namely hen harrier (Circus Cynaeus), and compatible with maintaining the population of
that species at a level which corresponds to ecological, scientific and cultural requirements,
or whether the authorisation of such projects or works was compatible with the requirement
to take the requisite measures to preserve, maintain or re-establish a sufficient diversity
and area of habitats for hen harrier, for the purposes of Articles 2 and 3 of those Directives.
17. A mandatory order or injunction pursuant to Order 84 Rule 18(2) of the Rules of the
Superior Courts 1986 as amended, S160 of the 2000 Act, A6(2) of the Habitats Directive,
A9(3) and (4) of the Aarhus Convention, A47 of the Charter, and A4(3) and A19(1) TEU,
and/ or some or all of those provisions, requiring the Developer to assess, identify and
remediate the negative environmental impacts identified in the Hen Harrier Programme
included with its Responses to Requests for Further Information between June and December
2021 (in which the Developer identified such effects in the context of proposals to carry out
works to provide compensatory habitat for hen harrier disturbed by the existing forestry
project on the site.)
18. Such mandatory order or injunction to the like effect as the Court may consider
appropriate.
Non-Transposition Remedies
19. A declaration that the State failed, in the period between I June 1988 and 2010
correctly to implement Al, A2, A3, A4, AS, A6, A8 and/ or A9 of Directive 85/337 on
environmental impact assessment as amended and A6 of Directive 92/43 on habitats, and
that S177B of the Planning and Development Act 2000 as amended should be interpreted
as applying retrospectively to any consent to afforestation, felling and/ or reafforestation
project in the townlands of Ballydonaghan, Caherhurley, Coumnagun, Carrownagowan,
lnchalughoge, Killokennedy, Kilbane, Coolready and Drummod, County Clare between 1 June
1988 and the present.
20. Such declaration(s) of the legal rights and/or legal position of the applicant and (if
and insofar as legally permissible and appropriate) persons similarly situated and/or of the
legal duties and/or legal position of the Respondents as the court considers appropriate.
Costs protection
21. A Declaratory Order pursuant to Section 7 of the Environment (Miscellaneous
Provisions) Act 2011 as amended, Order 99 of the Rules of the Superior Courts as amended,
the inherent jurisdiction of the Court, Article 47 of the Charter on Fundamental Rights of the
European Union, Articles 4(3) and 19(1) of the Treaty on European Union, and/ or Article 9
of the Convention on Access to Information, Public Participation In Decision-Making and
Access to Justice In Environmental Matters done at Aarhus, Denmark, on 25 June 1998 (the
Aarhus Convention), confirming that Section SOB of the Planning and Development Act 2000
as amended and/ or Sections 3 and 4 of the Environment (Miscellaneous Provisions) Act
2011 apply to the Grounds set out at Part E hereof.
Further Orders
22. Liberty to file further Affidavits containing further particulars or expert evidence in
support of the grounds already advanced.
23. Liberty to amend grounds on foot of expert advice if and when received.
24. Liberty to amend grounds on foot of any material added to the website of the Board
following commencement of the present proceedings.
25. Liberty to amend grounds on foot of any material obtained by the Applicants in
relation to the authorisations granted for the planting of forestry in the townlands of
Ballydonaghan, Caherhurley, Coumnagun, Carrownagowan, lnchalughoge, Killokennedy,
Kilbane, Coolready and Drummod, County Clare.
26. An order referring a question or questions of law for determination by the Court of
Justice of the European Union.
27. Further or other relief.
28. Discovery
29. Costs”
Grounds of challenge – substantive proceedings
48. The core grounds as set out in the third amended statement of grounds are as follows:
“E1. Core Grounds
National Law Grounds
1. The Board failed to put all the documents relating to the matter the subject of the
Decision on its website contrary to S146(5) and (7)(a) of the 2000 Act.
2. The Board failed to make a prior determination to the effect that the Proposed
Development would constitute strategic infrastructure for the purposes of S37A and
Schedule 7 of the 2000 Act, and failed to make a direction as to the plans, particulars or
other information which the Board will require for the purposes of consideration of an
application, as required by A210(2)(a) of the 2001 Regulations.
2A. The Impugned Decision is invalid because the Board failed to comply with S37E(3)(c)
of the 2000 Act and / or A213(1)(h) of the 2001 Regulations in that the Applicant failed to
notify Tipperary County Council and Limerick City and County Council of the application for
permission, both of which are local authorities from whose functional areas the Proposed
Development would be visible and which are therefore required. Additionally or in the
alternative the Board failed to obtain any evidence of that notification, and / or failed to
satisfy itself as to the making of that notification.
EU Law Grounds
3. The Impugned Decision is invalid because the Board failed to ensure it had sufficient
expertise to examine the EIAR in order to ensure its completeness and quality and to carry
out an assessment that would be as complete as possible, contrary to S172(1H) of the 2000
Act, and A6 of the EIA Directive and to carry out an assessment that would be as complete
as possible (5S171A, 5S172, A3(6)), and failed to give adequate reasons to establish that it
had access to such expertise (5S71A, 5S172, A8a).
4. In the alternative the Decision If the Impugned Decision is not invalid for the reasons
set out in the preceding Ground, it must nonetheless be set aside because the State has
failed to create an effective procedure of review, in breach of Article 9(4) of the Aarhus
Convention, All of the EIA Directive, A47 of the Charter, Article 19(1) of the TEU, and/ or
some or all of those provisions and a Decision that fails to comply with the EIA Directive but
that cannot be effectively reviewed is necessarily either invalid or incapable of having any
effect.
5. The Impugned Decision is invalid because the Impugned Decision is invalid because
it fails to incorporate environmental conditions into the decision, and fails to incorporate a
description of measures intended to avoid, prevent, reduce or offset effects contrary to
S37H(2A), S172(1H), and S172(11) of the 2000 Act read in light of A8a of the EIA Directive;
or those subsections constitute an inadequate transposition of A8a.
6. In the alternative the Decision If the Impugned Decision is not invalid for the reasons
set out in the preceding Ground, it must nonetheless be set aside because the State has
failed to adequately transpose A8a(1) of the EIA Directive contrary to A4(3) and 19(1) TEU
and a Decision adopted pursuant to provisions of an Act that fail to give effect to a Directive,
where the Board does not apply the interpretative obligation, and / or, where appropriate,
the set aside obligation, in order to correctly apply A8a of the EIA Directive, is invalid, void
and of no legal effect.
7. The Impugned Decision is invalid because the Board failed to investigate and analyse
the information submitted by the Developer, and/ or to carry out as complete an assessment
as possible, and therefore its EIA failed to meet the definition of an EIA in S171A when
interpreted in accordance with Articles 1, 2 and 3 of the EIA Directive.
8. In the alternative, the State failed adequately to implement the requirement that an
EIA must involve as complete an assessment as possible and thereby failed to give full effect
to A1(2)(g), A2(1) and A3 of the EIA Directive as required pursuant to A4(3) and A19(1)
TEU, and to A288 TFEU which provides that a Directive is binding as to the result to be
achieved and a Decision adopted pursuant to provisions of an Act that fail to give effect to
a Directive, where the Board does not apply the interpretative obligation, and / or, where
appropriate, the set aside obligation, to correct the defect, is invalid, void and of no legal
effect.
9. The impugned Decision is invalid because the Board failed to carry out a proper
screening for appropriate assessment of the Application and further information submitted
by the Developer for the purposes of S177S of the 2000 Act read in light of A6(3) of the
Habitats Directive.
10. The Impugned Decision is invalid because the Board failed to carry out as complete
an assessment as possible in that it failed to assess the cumulative effects of the Proposed
Development together with the effects of the existing forestry developments on the site, and
failed to have regard to the EIA and Appropriate Assessment(s), if any, carried out in respect
of those forestry developments and in so doing contravened A2, 3 and 4 of the EIA Directive,
and A6 of the Habitats Directive; the Developer erred in law by carrying out projects for
which prior EIA and Appropriate Assessment was required without those assessments being
carried out and in so doing contravened A5 of the EIA Directive, A6 of the Habitats Directive,
and A4(3) and A19(1) of the Treaty on European Union; and the State erred in law in
granting the underlying forestry consents for the application contrary to A2, 3 and 4 of the
EIA Directive, A6 of the Habitats Directive, and A2 and A3 of the 1979 and 2009 Birds
Directives, and substitute consent is required for the purposes of S177B of the 2000 Act.”
Relief sought – motions
49. The relief sought by Coillte and the notice party in their motion is as follows:
“1. An Order pursuant to the inherent jurisdiction of this Honorable Court setting aside
leave to apply by way of an application for judicial review in these proceedings granted by
Order of Mr Justice Humphreys made on 20 February 2023 and perfected on 27 February
2023, in so far as leave was granted in respect of the “Forestry Consent Remedies”, namely
reliefs 10 to 18 set out in Section D of the Third Amended Statement of Grounds filed on 16
February 2023, on the grounds set out at Core Ground 10 and §E2.10 to §E2.10.21.
2. An Order pursuant to Order 19, rules 27 and/or 28 of the Rules of the Superior
Courts and/or the inherent jurisdiction of his Honourable Court striking out the Applicants’
pleadings and/or dismissing the Applicants’ claim in so far as it relates to the “Forestry
Consent Remedies”, namely reliefs 10 to 18, sought in Section D of the Third Amended
Statement of Grounds filed on 16 February 2023, on the grounds set out at Core Ground 10
and §E2.10 to §E2.10.21.
3. Further or other Order.
4. An Order for the costs of this application, pursuant to section 50B(3) of the Planning
and Development Act 2000.”
50. The relief sought by the State respondents in their motion is as follows:
“1. An Order setting aside the Order of this Honourable Court (Humphreys J.) made on
20 February 2023 insofar as that Order grants the Applicants leave to apply for judicial
review as against the State Respondents;
2. In the alternative, an Order dismissing the proceedings as against the State
Respondents pursuant to Order 19, rules 27 and/or 28 of the Rules of the Superior Courts
and/or the inherent jurisdiction of the Court as being out of time and/or failing to disclose a
cause of action and/or being frivolous and/or vexatious and/or bound to fail;
3. Further or other order.
4. Costs.”
51. The relief sought by the applicants in their motion is as follows:
“1. An order pursuant to Order 31 of the Rules of the Superior Courts directing the
Second Respondent, Coillte CGA, to make discovery on oath of the documents which are or
have been in its possession, power or procurement relating to the precise categories of
documents set out in Part 1 of the First Schedule hereto, discovery of which is necessary for
the reasons set out in Part 2 of that Schedule.
2. An order pursuant to Order 31 of the Rules of the Superior Courts directing the
Fourth
Respondent, the Minister for Agriculture, Food and the Marine, to make discovery on oath of
the documents which are or have been in his possession, power or procurement relating to
the precise categories of documents set out in Part 1 of the Second Schedule hereto,
discovery of which is necessary for the reasons set out in Part 2 of that Schedule.
3. Directions of the sort referred to at paragraph 81 of the decision in Reid v Bord
Pleanala, [2021] IEHC 362 requiring the Second Respondent, Coillte, to file an Affidavit
providing details of all licences, permissions or other consents granted relating to projects
for afforestation, felling or reafforestation of any lands in the townlands of Ballydonaghan,
Caherhurley, Coumnagun, Carrownagowan, lnchalughoge, Killokennedy, Kilbane, Coolready
and Drummod, County Clare, from 1 June 1970 to date, the dates of such licences, of all
forestry related works carried out on those lands during that period (in particular the fire
break between the Slieve Bemagh SAC and the afforested area) and of all environmental
impact assessments and appropriate assessments carried out in relation to such licences,
permissions or consents, and all screening determinations relating to whether such
assessments were required, and all consideration given to the impact of such forestry works
on the conservation of wild birds, and to provide copies of all documents so identified.
4. Further or other order.
5. Costs.”
Whether the preliminary issue regarding the remedial obligation can be determined at
this stage
52. The applicants in written submissions suggested that the preliminary issue regarding the
nature and extent of any remedial obligation could not be determined at a preliminary stage and
would depend on discovery. That somewhat misunderstands the nature of what is involved here.
The issue is whether the applicants’ complaints about the remedial obligation even get off the
ground, having regard among other things to their failure to make this point to the board or the
Minister prior to brining proceedings. That issue of principle doesn’t depend on discovery so can be
decided now.
Assessment requirements for forestry
53. Before getting into the alleged remedial obligation due to allegedly defective assessment for
the forestry activities here, we need to consider the gradually tightening requirements applicable to
that process. I can endeavour to summarise these in the following table:
Period EU law Irish law
7/4/81-2/7/88 Birds directive 79/409 art. 4(4) Not transposed
requires efforts to avoid
pollution and deterioration of
habitats outside SPAs – there
was a dispute about whether
this involves some degree of
assessment and whether this
is directly effective
3/7/88 – 18/12/99 Directive 85/337, Annex II Not transposed. Agriculture
included initial afforestation was exempted development
and deforestation for the under the Local Government
purposes of conversion to (Planning and Development)
another type of land use – not Act 1963.
obviously directly effective due
to Annex II status
19/12/89-30/9/96 As above EIA required for initial
afforestation over 200 ha -
Habitats directive 92/43 European Communities
imposed additional (Environmental Impact
requirements for AA as of Assessment) Regulations 1989
10/6/94 (349/1989).
Normal planning permission
applied to developments over
that threshold (reg. 6).
1/10/96-20/9/99 As above EIA required for initial
afforestation over 70 ha -
101/1996, European
Communities (Environmental
Impact Assessment)
(Amendment) Regulations,
1996
26/2/97 habitats directive
transposed by S.I. No. 84 of
1997
21/9/99-9/12/01 As above plus CJEU finding in As above
Case C-392/96 that Irish law is
in breach of the directive by
reason of being based on fixed
thresholds and failing to
address cumulative impacts
10/12/01-20/9/11 Per 85/337 above Forestry consent system
Directive replaced by directive introduced by European
2011/92 but with similar Communities (Environmental
provision Impact Assessment)
(Amendment) Regulations,
2001, 538/2001. Applications
for initial afforestation required
a licence from the Minister for
the Marine and Natural
Resources and requires an EIS
if over 50 ha (regs. 4 and 15)
or if directed by the Minister
(reg. 21).
The 2001 regulations were
replaced by S.I. No. 558/2010
- European Communities
(Forest Consent and
Assessment) Regulations 2010
and ultimately the Forestry
Regulations 2017 no. 91 of
2017
21/9/11-date As above As above plus under art.
27(4)(b) of S.I. No. 477/2011
- European Communities
(Birds and Natural Habitats)
Regulations 2011, art. 4(4) of
the birds directive was
transposed.
54. Whether art. 4(4) of the birds directive requires an assessment was in dispute. The
applicants said it did, and the State respondents said:
“Article 4(4) does not require prior assessment of projects, and the obligation arising is
aspirational, rather than requiring a particular result. It is not accepted that a remedial
obligation could arise under that Article. (submissions on preliminary issue para. 98).”
55. In its judgment of 13 December 2007, Commission v. Ireland, C-418/04,
ECLI:EU:C:2007:780, the CJEU held that there had been a failure to transpose and give effect to
art. 4(4) of the birds directive. While the decision was mainly based on lack of factual
implementation, there was some reference to the lack of a legislative framework, for example para.
187:
“Lastly, with regard to the Wildlife Act, it is clear that the only provision of that act relevant
in this context and referred to by Ireland during the proceedings is section 11(1). However,
that provision is not sufficiently specific to be regarded as guaranteeing the transposition of
the second sentence of Article 4(4) of the Birds Directive.”
56. The judgment of 21 September 1999, Commission v. Ireland, C-392/96,
ECLI:EU:C:2012:834, calls for some brief comment. In that case the Commission impugned the 70
ha threshold for afforestation projects.
57. At para. 22 the CJEU notes the Commission’s argument that:
“The second factor is that the legislation fails to take account of the cumulative effect of
projects. A number of separate projects, which individually do not exceed the threshold set
and therefore do not require an impact assessment may, taken together, have significant
environmental effects.”
58. At para. 30 the court noted:
“The Commission acknowledges that S.I. No 101 of 1996 is an improvement on the previous
legislation inasmuch as it has lowered the threshold from 200 ha to 70 ha. Nevertheless, the
protection remains inadequate because the whole of a proposed NHA could, in theory, be
afforested without an impact assessment being required if the afforestation were carried out
by different developers who all kept within the threshold of 70 ha over three years. The Irish
legislation fails to take sufficient account of the cumulative effect of projects.”
59. Ominously for the State, the court found at para. 60 that:
“In order to prove that the transposition of a directive is insufficient or inadequate, it is not
necessary to establish the actual effects of the legislation transposing it into national law: it
is the wording of the legislation itself which harbours the insufficiencies or defects of
transposition.”
60. The critical findings are as follows:
“64. As far as the objection to thresholds is concerned, although the second subparagraph
of Article 4(2) of the Directive confers on Member States a measure of discretion to specify
certain types of projects which are to be subject to an assessment or to establish the criteria
or thresholds applicable, the limits of that discretion lie in the obligation set out in Article
2(1) that projects likely, by virtue inter alia of their nature, size or location, to have
significant effects on the environment are to be subject to an impact assessment
(Kraaijeveld, cited above, paragraph 50).
65. Thus, a Member State which established criteria or thresholds taking account only of the
size of projects, without also taking their nature and location into consideration, would
exceed the limits of its discretion under Articles 2(1) and 4(2)of the Directive.
66. Even a small-scale project can have significant effects on the environment if it is in a
location where the environmental factors set out in Article 3 of the Directive, such as fauna
and flora, soil, water, climate or cultural heritage, are sensitive to the slightest alteration.
67. Similarly, a project is likely to have significant effects where, by reason of its nature,
there is a risk that it will cause a substantial or irreversible change in those environmental
factors, irrespective of its size.
68. In order to demonstrate that Ireland has failed to fulfil its obligations in this regard, the
Commission has put forward several convincing examples of projects which, whilst
considered solely in relation to their size, may none the less have significant effects on the
environment by reason of their nature or location.
69. The most significant example is afforestation because, when carried out in areas of active
blanket bog, it entails, by its nature and location, the destruction of the bog ecosystem and
the irreversible loss of biotopes that are original, rare and of great scientific interest. In
itself, it may also cause the acidification or eutrophication of waters.
70. It was however necessary, and possible, to take account of factors such as the nature
or location of projects, for example by setting a number of thresholds corresponding to
varying project sizes and applicable by reference to the nature or location of the project.
71. Ireland's explanation that other environmental protection legislation, such as the
Habitats Regulations, made it unnecessary to assess afforestation, land reclamation
or peat extraction projects carried out in environmentally sensitive locations must be
dismissed. Nothing in the Directive excludes from its scope regions or areas which are
protected under other Community provisions from other aspects.
72. It follows that, by setting, for the classes of projects covered by points 1(d) and 2(a)of
Annex II to the Directive, thresholds which take account only of the size of projects, to the
exclusion of their nature and location, Ireland has exceeded the limits of its discretion under
Articles 2(1) and 4(2) of the Directive.
73. As regards the cumulative effect of projects, it is to be remembered that the criteria
and/or thresholds mentioned in Article 4(2) are designed to facilitate the examination of the
actual characteristics exhibited by a given project in order to determine whether it is subject
to the requirement to carry out an assessment, and not to exempt in advance from that
obligation certain whole classes of projects listed in Annex II which may be envisaged on
the territory of a Member State (Commission v Belgium, cited above, paragraph 42,
Kraaijeveld, cited above, paragraph 51, and Case C-301/95 Commission v Germany [1998]
ECR I-6135, paragraph 45).
74. The question whether, in laying down such criteria and/or thresholds, a Member State
goes beyond the limits of its discretion cannot be determined in relation to the characteristics
of a single project, but depends on an overall assessment of the characteristics of projects
of that nature which could be envisaged in the Member State concerned (Kraaijeveld,
paragraph 52).
75. So, a Member State which established criteria and/or thresholds at a level such that, in
practice, all projects of a certain type would be exempted in advance from the requirement
of an impact assessment would exceed the limits of its discretion under Articles 2(1) and
4(2) of the Directive unless all the projects excluded could, when viewed as a whole, be
regarded as not being likely to have significant effects on the environment (see, to that
effect, Kraaijeveld, paragraph 53).
76. That would be the case where a Member State merely set a criterion of project size and
did not also ensure that the objective of the legislation would not be circumvented by the
splitting of projects. Not taking account of the cumulative effect of projects means in practice
that all projects of a certain type may escape the obligation to carry out an assessment
when, taken together, they are likely to have significant effects on the environment within
the meaning of Article 2(1) of the Directive.
77. In order to demonstrate that Ireland has failed to fulfil its obligations in this regard, the
Commission has also provided various examples of the effects of the Irish legislation as
drafted.
78. Ireland has not denied that no project for the extraction of peat, covered by point 2(a)
of Annex II to the Directive, has been the subject of an impact
assessment, although small-scale peat extraction has been mechanised, industrialised and
considerably intensified, resulting in the unremitting loss of areas of bog of nature
conservation importance.
79. As regards initial afforestation, covered by point 1(d) of Annex II to the Directive, such
projects, encouraged by the grant of aid, may be implemented in proximity to one another
without any impact assessment at all being carried out, if they are conducted by different
developers who all keep within the threshold of 70 ha over three years.
80. The Commission has also cited the example of land reclamation projects, covered by
point 1(d) of Annex II to the Directive, whose cumulative effect is not taken into account by
the Irish legislation. Nor has it been disputed that much land clearance has taken place in
the Burren without a single impact assessment being carried out, although it is an area of
unquestionable interest. Limestone pavement, which is characteristic of the area, has been
destroyed, as have vegetation and archaeological remains, giving way to pasture.
Considered together, those interventions were likely to have significant environmental
effects.
81. As regards sheep farming in particular, the Commission has proved that, again
encouraged by the grant of aid, this has grown in an unrestrained fashion, which is a
development which may have adverse environmental consequences. However, it has not
demonstrated that sheep farming as practised in Ireland constitutes a project within the
meaning of Article 1(2) of the Directive.
82. It follows from all of the foregoing that, by setting thresholds for the classes of projects
covered by points 1(d) and 2(a) of Annex II to the Directive without also ensuring that the
objective of the legislation will not be circumvented by the splitting of projects, Ireland has
exceeded the limits of its discretion under Articles 2(1) and 4(2) of the Directive.
83. Consequently, the objection relating to infringement of Article 4(2) of the Directive in
respect of the classes of projects covered by points 1(d) and 2(a) of Annex II to the Directive
is well founded.”
Reliefs and grounds challenged
61. The developers challenge reliefs 10-18. The State challenge some albeit not all of those, as
well as relief 19.
62. So I will proceed on the basis that reliefs 1-9 and 20-29 are unchallenged in the present
applications. That is of course without prejudice to the obvious fact that they can be challenged at
the substantive hearing.
63. The State challenges core grounds 4, 6 and 8 (not specified in their motion but see written
legal submissions at para. 7) and the developers and the State both challenge core ground 10.
Reliefs 10 and 11 - interlocutory or unnecessary reliefs
64. With very limited exceptions like a claim for an extension of time, only substantive reliefs
need to be claimed in a statement of grounds, not interlocutory reliefs. Reliefs 10 and 11 claim such
interlocutory reliefs and are therefore unnecessary. They simply confuse an already complex picture.
I would propose to strike those out but that doesn’t prevent the applicants from making any
appropriate interlocutory application (including the matters covered by these reliefs) by motion or
other appropriate application; and indeed they are doing so.
Reliefs 12 and 16 – certiorari of forestry licences – are these claims in time?
65. I would propose to consider the opposing parties’ points firstly on the basis of whether they
are in time, and if not whether time should be extended. If both questions are answered no then
the leave order should be set aside. That is because an extension of time for an out-of-time case is
a prerequisite for leave.
66. As regards the viability of the applicants’ points that are within time, I would prefer to
consider those not on the basis of discharging the leave order but rather on the basis of the issue of
whether the applicant’s case, taken at its height, can succeed, such that if not it should be struck
out pursuant to the court’s inherent jurisdiction rather than any specific rule of court. If an action
can’t succeed, what’s the point in letting it go further, or quibbling about which precise jurisdiction
the order to that effect should invoke?
67. On the time issue, it is obvious that reliefs 12 (certiorari of consents from 1988-2022) and
16 (declarations regarding consents from 1988-2010) are out of time. That is beyond argument,
with the possible theoretical exception of consents covered by relief 12 granted in the 3 months
prior to the issue of the proceedings. However there is no basis to say that there are any such
consents, and this relief should not be allowed on such a purely speculative basis. The applicants
made no efforts to establish whether there were any such consents anyway so it becomes
speculation upon speculation.
Relief 13 - Whether an extension of time should be granted
68. Relief 13 seeks an extension of time. But there is no basis to extend time in relation to
reliefs 12 and 16. The applicants have not established that they were unaware of the possibility of
forestry works and would have remained unaware even exercising a reasonable degree of diligence
in the circumstances. Awareness of such works would have put them on notice of the likelihood of
the existence of consents. They didn’t take any steps to inform themselves on that, and it is notable
that the grounds make no reference to the AIE directive or implementing legislation.
69. Basically the notice party is correct that “[o]nce the Applicants knew that forestry activities
had been carried out on the lands, the existence of consents for forestry activities on the lands,
where required, became a probability rather than a mere possibility ... As such, the Applicants knew
or ought to have known of the existence of consents for Coillte’s forestry activities for several years
prior to the institution of the within proceedings” (para. 39). “Notwithstanding the Applicants’
awareness of the historic forestry activities for several years prior to the within proceedings, no
explanation is offered as to why the Applicants did not seek to challenge any forestry consents,
assert that Coillte “erred in law” by carrying out historic forestry activities, or even seek to obtain
details of such forestry activities or consents, prior to the institution of these proceedings.” (para.
40). This is what distinguishes the case from Marshall v. Kildare County Council [2023] IEHC 73.
In Marshall, the challengers knew only that the developers were preparing and intending to carry
out works. That implied the possibility of a consent having already been obtained but not a
probability. Time only began to run when that possibility hardened into a probability by the provision
of further information. But if the works actually begin, we are in probability territory. That’s the
situation here.
70. Yes it’s true that the applicants didn’t have all information at the outset. But the notice
party flattens this argument very effectively: “The Applicants knew or ought to have been aware of
the carrying out of historic forestry activities for several years. The Applicants did not attempt—let
alone attempt “diligently”—to obtain any further information or relevant documents since that time”
(para. 43).
71. The applicants didn’t attempt to acquaint themselves with the web search facilities for
relevant forestry consents, and only engaged with that after the links were provided by the State in
these proceedings. That isn’t consistent with acting diligently to follow up information that is publicly
available.
72. To repeat points made elsewhere, the problem with the applicants’ argument is the
commercial context of the time limit for planning cases: Kelly v. Leitrim County Council [2005] IEHC
11, [2005] 2 I.R. 404, [2005] 1 JIC 2704, (Clarke J.), Shell E & P Ireland Ltd v. McGrath [2013]
IESC 1, [2013] 1 I.R. 247, [2013] 1 JIC 2201 (Clarke J.) at §7.11, Drumquin Construction (Barefield)
Ltd. v. Clare C.C. [2017] IEHC 818, [2017] 12 JIC 1908 (Coffey J.). This is a broad principle that
applies in other commercial contexts: Arthropharm (Europe) Ltd v The Health Products Regulatory
Authority [2022] IECA 109 (Murray J.). This is a context where there is prejudice to private law
actors, not a purely human rights or public law context: O’Riordan v. An Bord Pleanála [2021] IEHC
1, [2021] 1 JIC 2102.
73. The inevitable conclusion is that the leave order for reliefs 12 and 16 should be discharged.
Reliefs 14 and 15 - Claim under s. 177B
74. Reliefs 14 and 15 claim reliefs under s. 177B. As noted above that is totally misconceived
because on the facts the section doesn’t apply due to the lack of consents previously issued by the
planning authority or the board. This is bound to fail and must be struck out. The applicants
positively asserted in oral argument that there weren’t any previous such consents. That being so,
the jurisdictional requirement for the section isn’t met.
Relief 17 - Claim for injunction to require developers to address information provided to
the board
75. Relief 17 seeks an imaginative injunction compelling the developers to address matters
arising from further information provided by them in the planning process.
76. In oral submissions the developers said compellingly that ”it’s the decision we have to
comply with, we will do that” and that a misconceived claim in relation to orders requiring a developer
to comply with material introduced in the planning process is “put in there to complicate and
confuse”. One has to have a lot of sympathy for that complaint.
77. Ultimately the problem for the applicants is that any materials in the consent process are
superseded by the actual consent granted. That is the operative instrument which can be enforced,
not subsidiary information introduced during the process. The information can and normally does
become binding as a condition, but only as viewed through the lens of compliance with the decision,
not under some separate free-standing duty.
78. The permission requires as condition 1 that it be carried out in accordance with the plans
and particulars submitted. That includes the Hen Harrier management plan and the additional
information. The idea that before a project has even commenced, an applicant can get some kind
of pre-emptive injunction compelling the developer to do what it is required to do anyway, without
even the slightest evidence that it isn’t going to do that, is simply a non-starter. That would be like
granting a s. 160 injunction under the 2000 Act against a developer, upon the grant of permission,
without any evidence that unauthorised development had been, was being or was going to be carried
out.
Relief 18 – general mandatory relief
79. Relief 18 seeks general and unparticularised mandatory relief that appears unnecessary and
I propose to strike it out on that basis. That isn’t meant to limit the power to grant further and other
relief if ultimately the applicants should be shown to be entitled to that.
Relief 19 – Non-transposition by virtue of alleged remedial obligation
80. Relief 19 claims non-transposition by the State of EU law obligations. This ties in to the
preliminary issue as to the scope and effect of the “remedial obligation” referenced in §10.19A of
the third amended statement of grounds.
81. Sub-ground 10.19A is as follows:
“10.19A. If and insofar as Irish law, properly interpreted in accordance with the
interpretative obligation, did not require the carrying out of an assessment which was
required by the EIA Directive or the Habitats Directive, or the making of a determination of
compliance for the purposes of A1 to A4 of the Birds Directive, the State has failed
adequately to implement the requirements of those Directives, and the Impugned Decision
is thereby invalid being cumulative with earlier consents that are invalid because they were
adopted pursuant to a deficient legal framework, and because the Impugned Decision fails
to comply with the remedial obligation in respect of those Decisions.”
82. What exactly this means on the specific facts was not altogether clear. One has to have a
lot of sympathy for the State’s response, which was that its submission “reflects the State
Respondents’ best attempts to identify the case that the Applicants seek to make based on the
remedial obligation. However, where there is no consistency or clarity in the Applicant’s own
articulation of its case, it is not possible to reply to each proposition or legal argument that has been
raised by the Applicants, in any coherent or concise manner.”
83. EU law has recognised a remedial obligation in the AA and EIA contexts. As yet that doesn’t
appear to have been established in relation to the birds directive. The State’s submission throws
down the gauntlet:
98. The Applicants allege that a remedial obligation must also arise under the second
sentence of Article 4(4) of the Birds Directive, which requires Member States to “strive to
avoid pollution or deterioration of habitats” outside of protected areas. However, Article
4(4) does not require prior assessment of projects, and the obligation arising is aspirational,
rather than requiring a particular result. It is not accepted that a remedial obligation could
arise under that Article.
84. I don’t need to decide that for reasons that will become fairly clear – essentially because the
applicants never called on anybody to carry out such a remedial procedure. They just presented
themselves to the court where they made that complaint for the first time.
85. Going back to remediation more generally, the really critical point is that the remedial
obligation goes beyond merely an ability to challenge the decision which lacked assessment, and
remains relevant even though such a challenge can be precluded by national time limits: see the
judgment of 17 November 2016, Stadt Wiener Neustadt, C-348/19, ECLI:EU:C:2016:882. There is
no contradiction between that and Krikke v. Barranafaddock Sustainable Electricity Ltd [2020] IESC
42, [2020] 7 JIC 1702, which upholds the validity of the relevant national time limits and does not
purport to collapse the remedial obligation into that one limited question.
86. What remains, even if national law precludes the late invalidation of a permission that failed
to involve a valid assessment, is an obligation “to nullify the unlawful consequences of that failure”:
see the judgment of 26 July 2017, Commune di Corridonia and Others, C-196/06 and C-197/16
ECLI:EU:C:2017:589.
87. The remedial obligation covers a multitude of concepts and needs to be understood as having
at least four strands which need to be considered:
(i) where a challenge is brought to a previous consent without assessment;
(ii) where a project which has been consented without a full assessment is subject to a
further consent application seeking extension or amendment of the previous
permission;
(iii) where the validity of the previous permission is not challenged but the State and
relevant actors are not taking action to remedy, review or carry out the inadequate
assessment; and
(iv) where infringement proceedings are brought by the Commission.
Strand 1 – where a defectively authorised project is challenged within time
88. Where assessment is defective in making a particular decision, an applicant can make that
point by way of challenge to the decision itself, provided that the challenge is brought within time
as fixed by domestic law. The remedial obligation does not have the consequence that any given
decision is invalid notwithstanding domestic time limits. Normal time limits apply (see the judgment
of 12 November 2019, Commission v. Ireland [Derrybrien II], C‑261/18, ECLI:EU:C:2019:955 Para.
95). The applicants don’t satisfy those here for reasons we will examine further later.
Strand 2 – where a defectively authorised project is sought to be continued
89. The judgment of 7 January 2004, Wells, C-201/02, ECLI:EU:C:2004:12 referred to the
remedial obligation in a context of the “resumption” of a project that wasn’t adequately assessed.
90. The CJEU said in the judgment of 10 November 2022, AquaPri, C-278/21,
ECLI:EU:C:2022:864:
“34 As is apparent from the case-law of the Court on the term ‘project’, within the
meaning of that provision, that concept is broader than that in Directives 85/337 and
2011/92, which refer to the existence of works or interventions involving alterations to the
physical aspect of a site. That concept also encompasses other activities which, without
being connected with or necessary to the management of a protected site, are likely to have
a significant effect on that site (see, to that effect, judgment of 7 November 2018, Coöperatie
Mobilisation for the Environment and Others, C‑293/17 and C‑294/17, EU:C:2018:882,
paragraphs 61 to 68 and the case-law cited).
35 However, where an activity likely to have a significant effect on a protected site has
already been authorised, at the planning stage, the continuation of that activity can be
regarded as a new or separate project which must be made subject to a new assessment
under the first sentence of Article 6(3) of Directive 92/43 only in the absence of continuity
between the authorised activity and the continued activity, having regard in particular to the
nature of those activities and to the location and conditions in which they are carried out
(see, to that effect, judgments of 7 November 2018, Coöperatie Mobilisation for the
Environment and Others, C‑293/17 and C‑294/17, EU:C:2018:882, paragraph 83, and of 29
July 2019, Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen, C‑411/17,
EU:C:2019:622, paragraphs 129 to 131).
36 In the event of the continuity of such an activity, its continuation must, in fact, be
regarded as forming part of a single project which has already been authorised, and which
does not need to be reassessed under the first sentence of Article 6(3) of Directive 92/43
(see, to that effect, judgments of 7 November 2018, Coöperatie Mobilisation for the
Environment and Others, C‑293/17 and C‑294/17, EU:C:2018:882, paragraphs 78 and 79;
of 29 July 2019, Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen,
C‑411/17, EU:C:2019:622, paragraph 128, and of 9 September 2020, Friends of the Irish
Environment, C‑254/19, EU:C:2020:680, paragraph 35).
37 In the present case, it follows from the clear and precise wording of the present
question that the referring court asks the Court about the applicability of the first sentence
of Article 6(3) of Directive 92/43 in a dispute concerning the continuation of the activity of
an operation which has already been authorised at the planning stage, under conditions
which are unchanged in relation to those in the light of which that authorisation had been
granted. There does not therefore appear to be, from that point of view, a new or separate
project which must be made subject to a new assessment under that provision, subject to
verifications which it is for the referring court alone to carry out.
38 In the second place, it must nevertheless be observed that, since the Member States
are required to comply with Article 6(3) of Directive 92/43 and, more specifically, the
assessment obligation laid down in the first sentence of that provision, it cannot be accepted
that a legal consequence may not be drawn from the infringement of that obligation in the
event that such an infringement is found, in a final decision, by the competent national
authority or court.
39 On the contrary, as the Court has stated with regard to the similar assessment
obligation established by Directive 85/337, even where the authorisation of a project which
has been adopted in breach of that obligation is definitive, that project cannot, however, be
regarded as having been lawfully authorised with regard to that obligation, such that the
Member State concerned is required, under the principle of sincere cooperation provided for
in Article 4(3) TEU, to eliminate the unlawful consequences of the breach which it has
committed by taking all measures necessary within the sphere of its competence to remedy
it (see, to that effect, judgment of 12 November 2019, Commission v Ireland (Derrybrien
Wind Farm), C‑261/18, EU:C:2019:955, paragraphs 71, 75, 80 and 90 and the case-law
cited).
40 In particular, as the Advocate General noted, in essence, in points 29 and 30 of her
Opinion, where a project has been authorised following an assessment which does not
comply with the requirements of the first sentence of Article 6(3) of Directive 92/43, the
competent national authority must carry out a subsequent review of the effects of the
implementation of that project on the site concerned, on the basis of Article 6(2) of that
directive, if that review constitutes the only appropriate measure for avoiding that
implementation from leading to deterioration or disturbance that could have had a significant
effect on the site concerned. (see, to this effect, judgment of 14 January 2016, Grüne Liga
Sachsen and Others, C‑399/14 EU:C:2016:10, paragraph 46).
41 However, such a subsequent review, based on Article 6(2) of Directive 92/43, is not
the only appropriate measure that the competent national authority may, in a situation such
as that at issue in the main proceedings, be called upon to adopt.
42 In fact, as is apparent from the case-law of the Court, EU law does not preclude that
authority from revoking or suspending the authorisation already granted in order to carry
out a new assessment in accordance with the applicable requirements, provided that those
measures take place within a reasonable period of time and that account is taken of the
extent to which the person concerned may have been able to rely on the lawfulness of that
authorisation, or even, in certain exceptional cases provided for by the applicable rules of
national law, for the authority to regularise the situation, which must then not only comply
with those requirements, but also take place under conditions which exclude any risk of
circumvention or non-application of the rules of EU law (see, to that effect, judgment of 12
November 2019, Commission v. Ireland (Derrybrien Wind Farm), C‑261/18, EU:C:2019:955,
paragraphs 75 to 77 and 92 and the case-law cited).
43 Furthermore, where a Member State has provided, either in a measure of general
scope, or in a measure of individual scope, that the continuation of an activity already
authorised must be the subject of a new authorisation, the competent national authority is
required to make that authorisation subject to a new assessment in accordance with the
requirements of the first sentence of Article 6(3) of Directive 92/43, where it appears that
that activity has not yet been the subject of such a compliant assessment, in which case
that authority will have to draw all the factual and legal consequences which that new
assessment entails in the context of the decision which it is called upon to adopt on any new
authorisation to be granted.”
91. In an interesting article commenting on this, “Unlawfully Authorised Projects under the
Habitats Directive: Remediation at All Costs?, Comment on the CJEU Judgment of 10 November
2022 in Case C-278/21 AquaPri”, Journal for European Environmental & Planning Law 20(1), 95-
113. https://doi.org/10.1163/18760104-20010005, Online Publication Date: 21 Mar 2023
(footnotes omitted), Lolke Braaksma and Thomas Haugsted write as follows:
“3.2.2 Rectification in the Context of a Later Consent Procedure
That an unlawful authorisation has become final does not mean, however, that the project
concerned can be regarded as having been lawfully authorised under Article 6(3). The
obligation on the national authorities to remedy the failure to carry out an assessment does
not go away as a result of the finality of the permit. Instead, it remains a contingent liability
for the national authorities. As the Court pointed out in AquaPri, this means that if a national
authority gets the opportunity to rectify the failure to carry out an appropriate assessment
in the context of a later consent procedure, the authority is obliged to do so. Or as the Court
put it: ‘where a Member State has provided, either in a measure of general scope, or in a
measure of individual scope, that the continuation of an activity already authorised must be
the subject of a new authorisation, the competent national authority is required to make
that authorisation subject to a new assessment in accordance with the requirements of the
first sentence of Article 6(3), where it appears that that activity has not yet been the subject
of such a compliant assessment.
This was the case in the main proceedings in AquaPri. As required by Danish legislation as
well as the 2006 permit, the fish farm concerned was required to apply for a new
authorisation, by the latest in 2014. Before granting this new authorisation, the Danish
authorities were therefore obliged to carry out an appropriate assessment even though the
mere continuation of the activity under unchanged conditions did not constitute a ‘project’
within the meaning of Article 6(3). As is apparent, this remediation measure is also
dependent on national law which has to provide for the renewal or reconsideration of existing
permits. However, it is not unthinkable that the duty to rectify a failure to carry out an
assessment at a later stage might also ‘awake’ under other circumstances than in AquaPri.
This could, for example, be the case if the operator wishes to make amendments to the
existing project requiring approval.”
92. Thus, if EU law assessments were not carried out properly in relation to an original
permission, and the developer (or someone benefitting from a previous consent) seeks an extension
of the consent, or an amendment of it, the remedial obligation may have the consequence that the
body giving consent to such subsequent application is obliged to rectify the failure to conduct a
correct assessment originally. If such rectification is not put in place, then a given applicant can
challenge the subsequent consent on that basis. This does not extend to a retrospective challenge
to the original consent.
93. It is hard to see any immediate support for the idea that this would apply to an unrelated
development, and the question of whether this is a related development was hotly contested both
substantively and in terms of pleadings and evidence. In the judgment of 17 March 2011, Brussels
Hoofdstedelijk Gewest, C-275/09, ECLI:EU:C:2010:154, the CJEU held that renewal of a permission
in a context where “that permit forms part of a consent procedure carried out in several stages”
could involve a remedial obligation. But contrary to the State’s submission here, that doctrine is not
to be construed as absolutely limited to a situation where there is a single consent procedure carried
out in several stages. That was just the potential fact situation in the Brussels Hoofdstedelijk Gewest
case.
94. I can park that controversy because even if it is resolved in favour of the applicants, they
face an insurmountable stumbling-block which is that they didn’t call on the board to consider an
extended form of assessment that would have identified and remediated any adverse effects on the
Hen Harrier of forestry activity within the area overall since 1981. That isn’t rocket science; it would
have required an expert to estimate the state of forest plantation in 1981 (or possibly 1988), the
state now, and that during the currency of the project, to infer from that the impacts on Hen Harrier
generally or in particular associated with the relevant European site, and to offer an expert view as
to what additional compensatory measures would be required.
95. Speaking of rocket scientists, the applicants’ response to the problem of their own failure to
make the point is effectively that of Werner von Braun, as scripted by Tom Lehrer, when confronted
with the destruction caused by his V-2 rockets: “That’s not my Department”. The applicants here
push the whole thing onto the board and call it an “autonomous obligation”. An autonomous
obligation? To sort through hundreds of consents over the 53 years identified by the applicants in
their motion and analyse the existence and extent of any assessments in each – with no route-map,
no parameters, no articulated concerns that would guide such an exercise? Law – even European
law one is tempted to facetiously add for the benefit of the applicants – must be workable, and this
preposterous procedure is so obviously unworkable that, to conclude the analogy, it simply self-
destructs on the launch-pad.
Strand 3 – where relevant actors are failing to remedy the defective assessment within
domestic law
96. The remedial obligation means that any effects of any breach of EU law should be rectified.
That presupposes it being established that there has been such a breach, that there are effects of
that breach, and that specified action is required to rectify those effects.
97. It also normally implies under this heading that such remedial action is possible under
domestic law, albeit the judgment of 14 January 2016, Grüne Liga Sachsen, C-399/14,
ECLI:EU:C:2016:10 suggests there may be directly effective obligations in relation to AA.
98. The CJEU said in The judgment of 7 January 2004, Wells, C-201/02, ECLI:EU:C:2004:12 :
“... it is for the national court to determine whether it is possible under domestic law for a
consent already granted to be revoked or suspended in order to subject the project to an
assessment of its environmental effects, in accordance with the requirements of Directive
85/337, or alternatively, if the individual so agrees, whether it is possible for the latter to
claim compensation for the harm suffered.”
99. Post-hoc assessment may also be an option, on clear conditions that respect EU law: the
judgment of 26 July 2017, Commune di Corridonia and Others, C-196/06 and C-197/16
ECLI:EU:C:2017:589.
100. And in a habitats context, such subsequent assessment may be mandatory if it is the only
means of enforcing EU law: see the trenchant findings of the CJEU in Grüne Liga Sachsen that an
AA-deficient project “must be the subject of a subsequent review, by the competent authorities, of
its implications for that site if that review constitutes the only appropriate step for avoiding that the
implementation of the plan or project referred to results in deterioration or disturbance that could
be significant in view of the objectives of that directive”.
101. The State’s attempt to “distinguish” this case into obscurity, on the grounds that it “was
concerned with the operation of the remedial obligation in a particular circumstance – where a site
was designated after the grant of consent”, is the classic lawyer’s manoeuvre of latching on a fact
that is irrelevant or peripheral to the actual logic of an unhelpful decision, and calling that the ratio.
The methodology of that bogus procedure is to invite any given judge to “seize on almost any factual
difference between this previous case and the case before him in order to arrive at a different
decision”: Glanville Williams in Learning the Law, 11th ed. (London, Sweet & Maxwell, 1982) p. 77,
cited in Doorly v. Corrigan [2022] IECA 6.
102. Exceptionally, the domestic competent authority can regularise the permission, but this
would involve an assessment in that context and compliance with EU law: the judgment of 10
November 2022, AquaPri, C-278/21, ECLI:EU:C:2022:864 para 42.
103. Thus a decision-maker may be under an obligation to review or revoke the decision within
their competence (para. 90), or to impose a requirement for an assessment after the event (see
para. 79, citing judgment of 17 November 2016, Stadt Wiener Neustadt, C‑348/15, EU:C:2016:882,
paragraph 38), including in the exceptional context of regularisation, but doing nothing isn’t an
option unless one of the other strands of remedy apply.
104. Can this be operationalised in judicial review at the suit of a private applicant? In principle,
yes, albeit that the State wanted to reserve the position to argue more vigorously against such a
procedure in a case where it properly arises.
105. On that premise, a litigant could in principle seek to call on the relevant consenting authority
to exercise any powers within its competence as to review, revocation or after-the-event
assessment, but such a request would be required to be evidentially sustainable, the onus being on
the applicant to show a defect in the original assessment that had an environmental effect that
required remediation. Recourse to court would only arise in the event of an unlawful failure to
exercise such powers.
106. An applicant can’t short-circuit the process by coming straight to court seeking exotic
declarations and reliefs. Firstly they need to put their request to exercise specified statutory powers
before the appropriate statutory decision-makers together with sufficient information to enable that
point to be made, and call on the decision-makers to exercise any relevant powers. Only if that is
unlawfully rejected could the applicants come to court seeking declaratory relief or mandatory orders
requiring those powers to be exercised.
107. On that analysis, the claim regarding the remedial obligation fails for multiple reasons:
(i) the applicants didn’t make any such request to the relevant consenting authority
prior to litigating;
(ii) the claim against the council under s. 177B of the 2000 Act is misconceived because
the council or board hasn’t been the relevant consenting authority for afforestation
since 2001 and didn’t in fact grant any permissions relevant to this in the period
prior to that, so can’t exercise powers under that section; and
(iii) the applicants haven’t come anywhere near even attempting to back up their point
with expert or other evidence or even particularising it to any acceptable extent.
108. The applicants have a number of lame excuses in reply.
109. Firstly they say they didn’t call on the council or Minister to do anything prior to bring the
proceedings because they were under time pressure to get the proceedings out within the time limit
applying to the certiorari claim. That is all well and good but all it means is that the mandamus-
type reliefs should have been properly set up and brought by separate proceedings. The actions
could have been be heard together to avoid excessive buck-passing between opposing parties.
110. Their second excuse predictably was that they don’t have the information that would enable
them to put forward such a request.
111. In principle, by analogy with Norwich Pharmacal Co. & Others v Customs and Excise
Commissioners [1974] A.C. 133, [1973] 3 W.L.R. 164, [1973] 2 All E.R. 943, an applicant who
intends to bring proceedings but lacks the information to do so can seek a pre-action order from the
court for the disclosure of any necessary information by a potential defendant. That needs to be
focused and specific if circumstances permit, even bearing in mind that only a certain amount of
specifics may be possible given the nature of such circumstances. Given the blunderbuss nature of
the applicants’ request, not much focus was engaged in as regards the present request. Nor am I
particularly convinced that it is appropriate for the applicants to seek AIE and then simply abandon
that process at the first hurdle and call on the court to solve the problem. Yes it can be a slog to
work one’s way through the AIE system but it could turn out to be the best way to resolve matters
and in any event is the primary statutory mechanism to resolve matters. But in this instance I’m
not refusing the demand for vast amounts of information because the applicants abandoned the AIE
process, or because theoretically they could try again with a less ambitious list of demands. I’m
refusing it under this heading because it doesn’t seem to be necessary, at least in terms of how
matters stand at the moment.
112. This could be a classic example of refusing to see the wood because one is too busy
complaining about the difficulty of counting trees. You don’t need detailed, millimetre-by-millimetre
3D models of every tree, or the life history of every twig or sapling, in order to make a map of a
forest. The exercise of estimating forest loss or growth since 1981 or whatever date the applicants
think is legally significant may be able to be done by an expert even without access to the consents
or assessments, because the growth of afforested areas over time and the existence or otherwise of
compensatory measures is something that could potentially be ascertained from other material or
visible on the ground. If the available material doesn’t facilitate that exercise, than any request for
information would be extremely specific and limited. If the compensatory measures are inadequate
then whatever assessments took place by definition (and subject to counter-argument in due course)
could be represented as being inadequate. That follows logically even without current access to the
individual consents and assessments.
113. Insofar as the applicants claim that they don’t know exactly when each element of the
afforestation took place, a complaint hindered by a lack of public domain material and not helped by
an objection to hearsay evidence that has been taken by the opposing parties, their ultimate point
doesn’t depend on knowing all of that granular detail.
114. And while the applicants don’t have all information, they had at all times quite a bit of
information from which highly focused questions could be asked. They knew that no planning
permissions were granted, so it follows by necessary implication that there were no assessments in
relation to forestry works prior to December, 2001 when planning permission ceased to apply. Why
not just ask for details of the areas afforested as of that date as compared with in 1981? And they
also know, unless I am misreading things, that there aren’t any EIA reports for forestry works in the
area on the central portal, which presumptively suggests that such assessments don’t exist in
relation to forestry consents from 2017 to date. So perhaps there are 16 years in the middle where
there might have been assessments, or maybe not, but either way the applicants are not totally in
the dark about all of this and could have extrapolated a lot about the adequacy of assessments to
date.
115. More fundamentally, in the absence of a proper complaint being made to the Minister, the
whole thing is premature in forensic terms so we don’t even get to the hearsay issue (although if we
did get to it, Ordnance survey maps would appear prima facie to be an exception to that). Insofar
as the applicants will end up, after reasonable inquiries, needing more information as to the extent
of afforestation in 1981 or 1988 or some other very specific date, the applicants are falling victims
to their own inflated demands for information which led to the AIE request being dismissed as
manifestly unreasonable. A short and focused request might well be replied to more constructively.
116. The developers characterise the complaint here as Kafkaesque - they (or the Minister or
both) are accused of getting something wrong, unspecified, at some point in time in the past,
unspecified, and are required to disclose a vast amount of material so that the applicants can then
decide whether and if so to what extent to provide particulars of the alleged wrong.
117. The applicants are strong on complaint but light on taking the lead to advance the complaint.
The really crucial thing is that they failed, prior to instituting the proceedings, to properly call on the
relevant decision-maker, in the scenario under discussion, the Minister for Agriculture, Food and the
Marine, to exercise relevant powers within that Minister’s competence, failed to specify what powers
exactly should be exercised and under what statutory jurisdiction or under what directly effective
EU law provision, and failed to present the decision-maker with a plausible factual basis for such a
demand. One does not simply walk into Mordor – or into the High Court. Before litigating one has
to set the case up properly. If mandatory orders are going to be sought, then generally speaking,
and assuming that rectification is a reasonable prospect, one should call on a proposed respondent
to rectify the alleged problem, having first supplied enough information to enable her to do so. The
approach of charging into the Central Office to file ones pleadings without laying that groundwork is
an example of the more general applicant’s fallacy that doing any of the hard work is always on
somebody else. It feels like that is normally put on the court itself, but if that becomes untenable
in any given case, it’s on the opposing parties, or someone else.
118. All that said, if the applicants want to pursue the Hen Harrier remediation issue (and the
State rather unsympathetically implied that Hen Harrier were really a flag of convenience, of major
interest only insofar as they helped challenge the windfarm project), there isn’t anything stopping
the applicants at some future point from putting together a properly structured request to the
Minister, based on expert evidence, at which stage the matter could be debated more thoroughly
depending on the reply to that. It mightn’t even be inconceivable that such a forensic debate could
include a more relevantly pleaded and factually grounded transposition complaint about whether the
statutory framework is sufficient. Of course, if they do that, the applicants will still have to face all
of the other objections that have been launched or intimated against such a process, but at least
they won’t fall foul of the threshold problem of never having properly made the point in the first
place. But none of those hypotheticals would affect the validity of the impugned planning
permission.
Strand 4 – where infringement proceedings are brought
119. As the Derrybrien proceedings indicate, time limits are not a problem that prevents
enforcement proceedings. But that doesn’t assist an applicant in domestic judicial review.
The complaint that Irish law constitutes defective transposition
120. The opposing parties complain that the pleaded non-transposition claim is very vague – for
example it doesn’t outline which Irish law we are talking about and is lacking in legal and evidential
specificity.
121. We need to look at what is actually pleaded very specifically. When we do so, what
immediately emerges is a massive contrast between the pleadings, which only make one lonely and
solitary passing reference to the remedial obligation, and the written and oral submissions which
made it the whole pivot of the applicants’ case. But the fragile fragment of language in the pleadings
just isn’t sufficient to bear the weight now being placed on it.
122. The first clause of sub-ground 10.19A is “if and insofar as Irish law, properly interpreted in
accordance with the interpretative obligation, did not require the carrying out of an assessment
which was required by the EIA Directive or the Habitats Directive, or the making of a determination
of compliance for the purposes of A1 to A4 of the Birds Directive ...”
123. While no particular time periods are specified in the ground, that is a valid presupposition
up to 2001, in the sense that the fact that initial afforestation was exempted development up to
1989 meant that there was no assessment under relevant directives, and the CJEU has already found
in effect that there was inadequate transposition at least up to the 2001 regime. If the clause is
intended to cover consents post-2001, it isn’t particularly plausible because the applicants haven’t
come up with anything to show how the transposing legislation does not (prospectively) require any
assessments that are necessitated by EU law.
124. Insofar as the applicants in oral submissions made the point that there is no retrospective
legislative provision to enable past developments to be revisited if either a required planning
permission wasn’t ever applied for (as may have been the situation here, they say, between 1981
and 2001) or where the consent was granted by someone other than the council or board (and hence
where s. 177B of the 2000 Act doesn’t apply, as was the situation here from 2001 onwards), this
complaint of a lack of transposition due to the failure to enact retrospective legislation simply isn’t
pleaded. Such a complex and involved argument can’t be magicked up at the hearing. It needs to
be thought through and expressly set out in the statement of grounds. That point, while interesting,
doesn’t properly arise.
125. The next clause is “... the State has failed adequately to implement the requirements of
those Directives ...”.
126. That conclusion follows if the presupposition is accepted, but no declaration is called for in
relation to purely historical matters, some of which have already been addressed by the CJEU. That
would be an academic exercise, and a declaration should not be granted on an academic point.
127. Things would be different if there was any plea of lack of legislative provision in that respect
that should be capable of being be invoked at this point, but there is no such plea, merely the bald
statement that the State has failed adequately to implement the directives.
128. The next clause is “... and the Impugned Decision is thereby invalid being cumulative with
earlier consents that are invalid because they were adopted pursuant to a deficient legal framework
...”.
129. To anticipate the discussion below on the time issue, the problem with that is that the earlier
consents aren’t invalid. They weren’t challenged during the specified time period and that can’t be
raised now – we will discuss this in more detail later. Therefore the point as phrased just doesn’t
arise. The ground is limited to invalidity due to being cumulative with invalid decisions, not due to
being cumulative with decisions that lacked proper assessment.
130. The next point is “[the Impugned Decision is thereby invalid] ... because the Impugned
Decision fails to comply with the remedial obligation in respect of those Decisions”.
131. That at least is potentially viable. But it is not a transposition complaint. It is a complaint
against the board in making the impugned decision for not remedying the alleged lack of previous
assessment. However the board was never called on to do so. This complaint fails for the reasons
set out above.
132. Matters become even more murky when one turns to the relief (no. 19), which does not in
fact correspond to the relevant ground.
133. The relief firstly seeks “A declaration that the State failed, in the period between I June 1988
and 2010 correctly to implement Al, A2, A3, A4, AS, A6, A8 and/ or A9 of Directive 85/337 on
environmental impact assessment as amended and A6 of Directive 92/43 on habitats ...”.
134. One can pause there to say that there is no particular need for such a purely historical
declaration as to the legal situation 13 years ago. Again that would be an academic exercise – that
is not the purpose of declaratory relief.
135. Oddly enough given that the applicants initially complained that art. 4(4) of the birds
directive has not been properly legislatively transposed, which if correct would be a continuing
complaint that applies to this day and that could be a proper subject of a declaration, they never
included this complaint in the non-transposition relief sought, which is limited to EIA and habitats.
However the applicants ultimately seemed to accept that the 2011 regulations constituted due
transposition.
136. The relief goes on to seek a declaration “... that S177B of the Planning and Development
Act 2000 as amended should be interpreted as applying retrospectively to any consent to
afforestation, felling and/ or reafforestation project in the townlands of Ballydonaghan, Caherhurley,
Coumnagun, Carrownagowan, lnchalughoge, Killokennedy, Kilbane, Coolready and Drummod,
County Clare between 1 June 1988 and the present.” That isn’t necessary because s. 177B does so
apply, provided that such works were the subject of a permission granted by the council or board
(on the facts, they weren’t here). The applicants don’t engage on the pleadings with the limitation
of the section to particular decision-makers, so any declaration regarding non-transposition doesn’t
arise. That said, it wouldn’t arise anyway due to the failure of the applicants to properly call on
anyone to exercise any appropriate legal powers before coming to court.
Conclusion on impugned reliefs
137. Having regard to the foregoing I consider that reliefs 10-19 are either out of time,
unnecessary or misconceived even taking the applicants’ case at its height, so relief 13 is refused,
the leave order should be discharged in the case of the out-of-time reliefs 12 and 16, and the other
impugned reliefs 10, 11, 14, 15, 17-19 should be struck out.
Implications of foregoing for the pleaded grounds
138. Having addressed the viability or otherwise of the various reliefs, we now turn to whether
the impugned grounds should be struck out. The grounds under challenge are core grounds 4, 6, 8
and 10 and the associated sub-grounds.
139. Any striking out of core grounds will also apply to the sub-grounds as applicable.
Core Ground 4 – alleged failure to create a review procedure
140. Ground 4, as noted above, provides:
“4. In the alternative the Decision If the Impugned Decision is not invalid for the reasons
set out in the preceding Ground, it must nonetheless be set aside because the State has
failed to create an effective procedure of review, in breach of Article 9(4) of the Aarhus
Convention, All of the EIA Directive, A47 of the Charter, Article 19(1) of the TEU, and/ or
some or all of those provisions and a Decision that fails to comply with the EIA Directive but
that cannot be effectively reviewed is necessarily either invalid or incapable of having any
effect.”
141. The basis of that is essentially what is stated in sub-grounds 4.2 and 4.3:
“4.2. It must be possible to establish whether the Board had access to and used sufficient
expertise in carrying out the EIA, for the purposes of AS(3) of the EIA Directive.
4.3. If that material is not available in the Decision, and not available by Order of the
Court, then there is no effective remedy in respect of a failure by the Board to comply with
the obligation to ensure it has access to sufficient expertise.”
142. The logical problem with that, of course, is that if disclosure of the expertise available to the
board is a requirement of EU law, then the court will order such disclosure. It would be illogical for
the court to hold that this information is required but that rather than be disclosed, the State should
be condemned for non-transposition. There is no need to have a ground covering such an
contradictory and implausible eventuality so this should be struck out.
Core Ground 6 – alleged non-transposition of art. 8a (information/ reasons)
143. Core ground 6 provides:
“6. In the alternative the Decision If the Impugned Decision is not invalid for the reasons
set out in the preceding Ground, it must nonetheless be set aside because the State has
failed to adequately transpose A8a(1) of the EIA Directive contrary to A4(3) and 19(1) TEU
and a Decision adopted pursuant to provisions of an Act that fail to give effect to a Directive,
where the Board does not apply the interpretative obligation, and / or, where appropriate,
the set aside obligation, in order to correctly apply A8a of the EIA Directive, is invalid, void
and of no legal effect.”
144. There are two problems with that. Firstly there is no basis whatever to suggest that any
provision of the legislation (and no provision is pleaded) would prevent the board from acting in
conformity with EU law. And secondly the plea of non-transposition is unacceptably general because
it fails to specify which exact provision of the directive has not been transposed or to engage in any
way with the granular detail of the transposing legislation.
Core Ground 8 – alleged failure to implement requirement that assessment be as complete
as possible
145. Core ground 8 provides:
“8. In the alternative, the State failed adequately to implement the requirement that an
EIA must involve as complete an assessment as possible and thereby failed to give full effect
to A1(2)(g), A2(1) and A3 of the EIA Directive as required pursuant to A4(3) and A19(1)
TEU, and to A288 TFEU which provides that a Directive is binding as to the result to be
achieved and a Decision adopted pursuant to provisions of an Act that fail to give effect to
a Directive, where the Board does not apply the interpretative obligation, and / or, where
appropriate, the set aside obligation, to correct the defect, is invalid, void and of no legal
effect.”
146. The phrase “as complete an assessment as possible” does not occur in the EIA directive but
derives from caselaw, specifically the judgment of 3 March 2011, Commission v. Ireland, C-50/09,
ECLI:EU:C:2011:109, para. 40. Transposing legislation is not normally defective merely because it
does not keep up with additional glosses and comments added by European jurisprudence. Nothing
has been pointed to whereby the legislation could plausibly preclude the board from properly
applying the EIA directive. The transposition claim in this regard assumes incorrectly that a lack of
language derived from a CJEU judgment equates to some failure by the State. That isn’t the case
generally and certainly isn’t the case here.
Core Ground 10 – cumulative effects
147. Core ground 10 provides as follows:
“10. The Impugned Decision is invalid because the Board failed to carry out as complete
an assessment as possible in that it failed to assess the cumulative effects of the Proposed
Development together with the effects of the existing forestry developments on the site, and
failed to have regard to the EIA and Appropriate Assessment(s), if any, carried out in respect
of those forestry developments and in so doing contravened A2, 3 and 4 of the EIA Directive,
and A6 of the Habitats Directive; the Developer erred in law by carrying out projects for
which prior EIA and Appropriate Assessment was required without those assessments being
carried out and in so doing contravened A5 of the EIA Directive, A6 of the Habitats Directive,
and A4(3) and A19(1) of the Treaty on European Union; and the State erred in law in
granting the underlying forestry consents for the application contrary to A2, 3 and 4 of the
EIA Directive, A6 of the Habitats Directive, and A2 and A3 of the 1979 and 2009 Birds
Directives, and substitute consent is required for the purposes of S177B of the 2000 Act.”
148. Insofar as this complains about failure by the board, this issue is so baroque that there
couldn’t workably be an autonomous obligation, so the board can’t be faulted for failing to do
something it was never asked to do. Examples of gaslighting the decision-maker don’t get much
better than this.
149. Insofar as the complaint is of error in law by the developers or the State as to the grant of
historical consents, that is impermissible if it is a collateral attack on those consents, and pointless
if it is not. It is academic either way in the circumstances. Even assuming for the sake of argument
that “the State erred in law in granting the underlying forestry consents for the application”, it does
not follow that “The Impugned Decision is invalid”. The applicants have missed a step namely the
requirement for them to call on the board to carry out a remedial assessment. Also it is not clear
what is meant by the “underlying” consents “for the application”.
150. Insofar as a complaint is made that substitute consent under s. 177B is required, that section
doesn’t apply for reasons explained.
Conclusion on impugned grounds
151. It follows from the foregoing that insofar as core ground 10 and associated sub-grounds
support the out-of-time reliefs 12 and 16, they are themselves out of time and no time extension is
appropriate. The leave order in relation to ground 10 should be set aside to that extent for that
reason.
152. Insofar as core grounds 4, 6, 8 and 10 (other than insofar as it relates to the out-of-time
reliefs 12 and 16) and associated sub-grounds support other reliefs they are misconceived even
taking the applicants’ case at its height. They must therefore be struck out.
Request to amend the discovery motion
153. The applicants sought to amend the discovery motion in order to refer to the 2001
regulations rather than the 2010 regulations. However since the discovery is based on the
impugned grounds which now fall away, the amendment becomes irrelevant.
Discovery/ disclosure motion
154. The applicants acknowledged that the discovery and disclosure was in support of the
impugned grounds. As those grounds now fall away the discovery/ disclosure motion no longer has
any basis because it is purely parasitical on those grounds, and so should be refused.
Further affidavit from applicants
155. The applicants also sought to file a further affidavits from Lorcan O’Toole and Dr Eimear
Rooney. Having heard the parties I allowed the affidavits to be filed without prejudice to any
argument as to their admissibility in due course, and on the basis that if such an issue is raised the
applicants will have to demonstrate that the affidavits should be admitted and that this exercise will
be conducted in advance of close of exchange of affidavits if so required by the opposing parties.
156. The affidavits are expert evidence as to effects on Hen Harrier and the developers anticipated
a need to challenge those in advance of the hearing with a view to deciding whether to reply.
Format of proceedings
157. There was no objection to the concept that the applicants might reformat their pleadings in
accordance with Stapleton v. An Bord Pleanála [2023] IEHC 344. The applicants should prepare a
clean and tracked version of the fourth amended statement of grounds, the clean version to be the
filed version and the tracked version being served for information. In addition the fourth amended
statement should:
(i) delete matters that have been struck out or refused, or where the leave order has
been discharged, and make any consequential rewording; and
(ii) change the heading so as to provide that the fourth amended statement is filed on
foot of the present order and the third amended statement was filed under the orders
of 30th January, 2023 and 13th February, 2023 rather than simply the latter.
Effect of the foregoing on parties
158. The only remaining reliefs affect the developers and the board. Therefore the State and the
council can be released from further participation in the proceedings with liberty to apply if they wish
to get involved for any reason.
159. Admittedly the council didn’t get involved in the present hearing but that doesn’t matter
because the developers were entitled to dispute the relief that affected both them and the council.
When that relief fell, the resulting vacuum has the logical consequence that there is no longer any
basis for the council to be involved. Their presence isn’t necessary and their rights are preserved
either way because the liberty to apply means they can continue to be involved if they want to be.
Order
160. For the foregoing reasons, it is ordered that:
(i) the leave order be amended under the slip rule so as to delete the reference to
certification of two counsel;
(ii) the application for an extension of time as set out in relief 13 be refused;
(iii) on foot of the motions by the opposing parties, the leave order be discharged in
respect of:
(a). reliefs 12 and 16; and
(b). core ground 10 and associated sub-grounds insofar as they relate to those
reliefs;
(iv) on foot of the motions by the opposing parties, the following be struck out:
(a). reliefs 10, 11, 14, 15, 17-19;
(b). core grounds 4, 6, 8 and associated sub-grounds; and
(c). core ground 10 and associated sub-grounds (other than insofar as they
relate to reliefs 12 and 16);
(v) the applicants’ motion for discovery and the application to amend that application
be refused;
(vi) the State respondents and the council be released from further participation in the
proceedings with liberty to apply;
(vii) subject to the foregoing, the applicants are to have liberty to file a further amended
statement of grounds within 2 weeks from the date of this judgment on the basis of
a clean version to be the filed version and a tracked version being served for
information:
(a). reformatting the pleadings in accordance with the format set out in Stapleton
v. An Bord Pleanála [2023] IEHC 344;
(b). deleting matters that have been struck out or refused, or where the leave
order has been discharged, and making any consequential rewording; and
(c). changing the heading so as to provide that the fourth amended statement
is filed on foot of the present order and the third amended statement was
filed under the orders of 30th January, 2023 and 13th February, 2023
rather than simply the latter;
(viii) the applicants have liberty to file further affidavits from Lorcan O’Toole and Dr
Eimear Rooney without prejudice to any argument as to their admissibility in due
course, and on the basis that if such an issue is raised the applicants will have to
demonstrate that the affidavits should be admitted and that this exercise will be
conducted in advance of close of exchange of affidavits if so required by the opposing
parties;
(ix) unless the parties apply otherwise by written submission within 7 days, the foregoing
order be perfected forthwith thereafter on the basis of no order as to costs; and
(x) the matter be listed for mention on a date to be notified by the List Registrar for
further case-management.