High Court dismisses costs protection claim against council and state regarding CPO and development consent.
Legislator summary
AI generatedThe High Court refused an application for costs protection against An Bord Pleanála, Clare County Council, and the Attorney General. Applicants argued that the Compulsory Purchase Order (CPO) and underlying development consent were challenged under EU environmental law directives. The court held that the CPO legislation and the Board's costs policy do not constitute domestic environmental law giving effect to those directives. Consequently, the court found no legal basis for costs protection for these specific challenges, ordering relief refused except for a separate rights of way issue.
Legislator headnote
AI generatedSections 50, 50A and 50B of the Planning and Development Act 2000; Section 78 of the Housing Act 1966: A challenge to a Compulsory Purchase Order and its underlying development consent does not qualify for costs protection under EU environmental law directives where the impugned legislation or policy does not constitute domestic environmental law giving effect to those directives.
Keywords
AI generatedCited Legislation
AI generatedCited Case Law
AI generatedRelated Decisions
AI generatedFull text
[2023] IEHC 464
THE HIGH COURT
JUDICIAL REVIEW
[2022 No. 983 JR]
IN THE MATTER OF AN APPLICATION PURSUANT TO SECTIONS 50, 50A AND 50B OF THE
PLANNING AND DEVELOPMENT ACT 2000 AND IN THE MATTER OF SECTION 78 OF THE
HOUSING ACT 1966, AS AMENDED
BETWEEN
JOHN CLANCY AND SHEENA CLANCY
APPLICANTS
AND
AN BORD PLEANÁLA, CLARE COUNTY COUNCIL, IRELAND AND THE ATTORNEY GENERAL
RESPONDENTS
(No. 2)
JUDGMENT of Humphreys J. delivered on the 28th day of July, 2023
Judgment history
1. In Clancy v. An Bord Pleanála (No. 1) [2023] IEHC 233 (Unreported, High Court, 8th May,
2023) I refused an application for costs protection as against the county council in the context of a
challenge to a compulsory purchase order (CPO).
2. I am now dealing with the applicants’ claim for costs protection as against the other parties.
Facts
3. In or about August, 2016, the council proposed to carry out a development under Part XI of
the Planning and Development Act 2000 and Part 8 of the Planning and Development Regulations
2001 for an inner relief road for Ennistymon, including a new vehicular bridge crossing the
Inagh/Cullenagh River. The route is located centrally in Ennistymon from approximately 180 metres
west of Blake’s Corner on the N85 national road to a point approximately 180 metres east of Blake’s
Corner on the N67 national road.
4. The board decided that a Natura Impact Statement (NIS) was not required and further
decided on 5th October, 2016 that an environmental impact assessment (EIA) report was not
required.
5. The development was advertised in early 2018 and the applicants made submissions on 23rd
February, 2018.
6. The elected members decided to approve the development on 9th April, 2018, or more
formally they decided not to veto the development pursuant to s. 179(4) of the 2000 Act. The Chief
Executive’s decision on foot of that constitutes the development consent.
7. A CPO was made in light of that consent on 12th June, 2020, entitled N67 /N85 Inner Relief
Road Ennistymon (Blake's Corner) Compulsory Purchase Order 2020, providing for the acquisition
of land on both sides of the Lahinch Road, Bogbere Street, New Road, covering specified properties
on Bridge Street including the applicants’ dwelling house and business premises. The main operative
provisions of the CPO are as follows:
“WHEREAS in pursuance of the provisions of section 76 of and the Third Schedule to the
Housing Act, 1966 as extended by section 10 of the local Government (No. 2) Act, 1960 (as
substituted by section 86 of the Housing Act, 1966 as amended) and as amended and
extended by section 6 and the Second Schedule to the Roads Acts, 1993 - 2015 and the
Planning and Development Acts, 2000-2019 and in particular by section 222 of the Planning
and Development Act, 2000 and in exercise of the powers conferred upon it by the above
mentioned legislation and in particular section 213 of the Planning and Development Act,
2000 (as amended), Clare County Council (hereinafter referred to as ‘the Local Authority’)
has decided to effect the acquisition of the land to which this order relates:
NOW THEREFORE IT IS HEREBY ORDERED THAT: -
1. Subject to the provisions of this order, the Local Authority is hereby authorised-
a) to permanently acquire compulsorily, for the purposes of road construction and
improvement comprising of development of an Inner Relief Road in Ennistymon
including a new vehicular bridge crossing of the Inagh/Cullenagh river approximately
80 metres upstream of the existing bridge crossing. The overall route runs from a
point located approximately 170 metres south east of Blake's Corner on the NBS
national road to a point located approximately 180 metres west of Blake's Corner on
the N67 national road, via Bogbere Street. The development includes the
pedestrianisation of the existing bridge, the inclusion of a roundabout at the western
end of the proposed new bridge crossing on the L-1084, the relocation of the existing
public car park adjacent to New Road (NBS) and all associated site works through
the townlands of Deerpark West, Ardnacullia North and Ennistymon in the County of
Clare, the land described in the First Schedule hereto which land is shown on the
map marked: Drawing no. EIRR-RODA-LCA-SW_AE-DR-LN-400001 marked Clare
County Council N67/N85 Inner Relief Road Ennistymon (Blake's Corner) Deposit Map
for Compulsory Purchase Order 2020 and sealed with the seal of the Local Authority
and deposited at:
• Clare County Council, West Clare Municipal District Offices, Ennis Road, Deerpark
Lower, Ennistymon, Co. Clare V95 YX81
• Clare County Council, Aras Contae an Chlair, New Road, Ennis, Co. Clare V95 DXP2
(hereinafter referred to as ‘the deposit map’),
b) to extinguish the public and private rights of way described in the Second
Schedule hereto, by order made relating to the public rights of way after the
acquisition of the land, where the said rights of way are over the land so acquired or
any part thereof, or over land adjacent to or associated with the land so acquired or
any part thereof.
2. The land described in the First Schedule hereto, coloured grey, and outlined in red
on the said deposited map is land other than land consisting of a house or houses unfit
for human habitation and not capable of being rendered fit for human habitation at
reasonable expense.
3. Subject to any necessary adaptations, the provisions of-
(a) the Lands Clauses Acts (except sections 127 to 132 of the Lands Clauses
Consolidation Act, 1845, and article 20 of the Second Schedule to the Housing of the
Working Classes Act, 1890), and
(b) the Acquisition of Land (Assessment of Compensation) Act, 1919, as amended by
the Acquisition of land (Reference Committee) Act, 1925, the Property Values
(Arbitrations and Appeals) Act, 1960, and the local Government (Planning and
Development) Act, 1963 (as amended) (as applied by section 265(3) of the Planning and
Development Act, 2000) and the Planning and Development Acts 2000-2019
as modified by the Third Schedule to the Housing Act, 1966 are hereby incorporated in
this order and the provisions of those Acts shall apply accordingly.
4. This order may be cited as: -
N67 /N85 Inner Relief Road Ennistymon (Blake's Corner) Compulsory Purchase Order
2020”
8. The CPO was submitted to the board for approval.
9. In June, 2021, an oral hearing took place. The applicants argued that the members’ decision
wasn’t a development consent and that the decision didn’t comply with the EIA or habitats directives.
10. On 24th May, 2022, the board’s inspector reported, recommending approval of the CPO.
Paragraph 3.1 of the inspector’s report summarises the position:
“Schedule I of the CPO Schedule lists 110 x individual plots that will be permanently and
temporarily affected during construction works. Schedule II Part I lists the 5 x Public Rights
of Way proposed to be extinguished. Schedule II Part II lists the 1 Private Rights of Way
proposed to be extinguished. Deposit maps illustrate lands to be permanently and
temporarily acquired, the Public and Private Rights of Way to be extinguished and the Private
Fishing Rights to be Temporarily Extinguished.”
11. On 31st August, 2022, the board adopted a direction approving the CPO and a further
direction under s. 219 of the 2000 Act that the applicants should not get their costs of the CPO
objections.
12. On 20th September, 2022, the board made an order approving the CPO, and that decision
is now challenged together with the refusal of costs.
Procedural history
13. On 14th November, 2022 the matter was first mentioned in the List and adjourned for an
amended statement of grounds. Renewed liberty to amend the statement of grounds was given on
21st November, 2022.
14. As papers were not in order, it was adjourned again until 19th December, 2022.
15. There were further issues with the amendments because no MS Word version had been
uploaded to ShareFile.
16. In January, 2023, the List Registrar wrote to the applicants’ solicitor in this regard but there
was no immediate reply. The net result was that there were two unperfected orders on the system
(of 14th and 21st November, 2022). This is because the normally applicable procedure is that an
order allowing an amendment is not perfected until the MS Word version of the amendment is
submitted.
17. It emerged that an amended statement had been filed on 18th January, 2023 but was not
on ShareFile. It was eventually emailed to the court on the evening of 30th January, 2023. On foot
of that and of answers to the court’s checklist indicating that the matter was appropriate for
automatic admission to the list, leave was granted.
18. On 20th February, 2023 it emerged that the matter was not in fact one that should qualify
for automatic admission and so a motion to admit would have been required.
19. On that basis, on 27th February, 2023 I set aside the leave order by consent, but allowed
the orders for amendment of pleadings to stand, without objection from the opposing parties. I
adjourned the matter for a motion to admit the case to the List.
20. On 13th March, 2023 on foot of such a motion I admitted the case to the List without
objection.
21. The council then applied for an order that leave be on notice. It submitted that the road
was important to the community and to the local authority, and that it would be contended that
there were no substantial grounds for the proceedings. The action related to a function transferred
by Part XIV of the 2000 Act and so comes within s. 50(2)(b) of that Act. The other respondents did
not apply for such an order.
22. I decided that the council was entitled to make the application even though the other
respondents were not seeking leave on notice. I stated that while one could be sceptical about leave
on notice as a generality, on balance it was appropriate here given all of the circumstances including
the history of the matter. However I stated that the position regarding costs protection would have
to be clarified first. The matter was adjourned for that purpose for a week, and then again by
consent on 20th March, 2023.
23. Normally, there would simply be a hearing on costs protection but that didn’t happen here,
because an issue broke out regarding the costs of the costs protection issue. On 27th March, 2023,
the board and the State accepted that there would be no order as to the costs of the costs protection
application. The council did not so agree.
24. On 17th April 2023, the various options were discussed, specifically that there be a summary
hearing on costs protection for the costs protection motion; that the issue about costs of the costs
would be rolled into a single hearing, possibly together with the leave hearing, or that the applicants
would withdraw the proceedings without incurring further costs. The applicants stated a preference
for dealing with costs protection for the costs protection on a summary basis.
25. That issue was then heard, as respects the council, across two short and relatively summary
hearings on 24th and 25th April, 2023.
26. In the No. 1 judgment, I rejected the claim for costs protection regarding the council, subject
in effect to reviewing that following the decision on costs protection against the other parties.
27. By notice of motion filed on 7th June, 2023, the applicant then sought costs protection as
against the board and the State. That application was heard on 17th July, 2023, again in a summary
manner. The council did not participate in that hearing. As noted above, the board and the State
agreed that there would be no order as to costs in the event that the applicants were not successful
in the costs protection application.
Relief sought
28. In the amended statement of grounds, the applicants seek the following reliefs:
“1. An Order of Certiorari quashing the decision of the First Named Respondent to confirm a
Compulsory Purchase Order authorising the compulsory acquisition of the Applicants’ lands
entitled ‘N67/N85 Inner Relief Road Ennistymon (Blake’s Corner) Compulsory Purchase
Order 2020’ which confirmation of the CPO was purported to be made by decision dated
20th September 2022 and signed by Patricia Calleary, Board Member under An Bord Pleanála
reference ABP-307413-20 (the impugned decision).
2. Such Declaration(s) of the legal rights and/or legal position of the Applicant and/or
Respondents and/or persons similarly situated as the Court considers appropriate.
3. A Declaration, as against the Third and Fourth Named Respondents that insofar as the
procedures and test that was applied by the First Named Respondent complies with the
statutory provisions required to be complied with in a Compulsory Acquisition of land and
the confirmation of the impugned decision the said provisions are, in circumstances where
the Applicants’ property, family home and its business are the subject matter of a
Compulsory Acquisition, the said provisions and procedures are inconsistent with and
contrary to Articles 40.3, 41, 43 and 40.5 of the Constitution of Ireland.
4. A Declaration that the provisions of Section 76 of the Third Schedule of the Housing Act
1966 as extended by Section 10 of The Local Government (No.2) Act 1960 as substituted
by Section 86 of the Housing Act 1966 and as amended and extended by Section 6 and the
Second Schedule of the Roads Act 1993-2005 and Section 213 of the Planning and
Development Act 2000-2019 and all other Acts thereby enabling which statutory scheme
formed the basis of, making of and confirmation of a Compulsory Purchase Order underlying
Compulsory Purchase Order 2020 N67/N85 Inner Relief Road Ennistymon (Blake’s Corner)
N5, and the tests therein have not been satisfied, and that such decision is contrary to and
inconsistent with Articles 43, 40.3, 40.5 and 41 including all unspecified rights and including
the [right] to earn a livelihood, right to bodily integrity and endangerment to health, both
physical and psychological and to a clean environment in the particular circumstances of this
case.
5. A Declaration that the Applicants are entitled to costs protection in respect of the reliefs
set out at Paragraph D on the grounds set out at Paragraph E pursuant to Section 50B of
the Planning and Development Act 2000, the Environmental (Miscellaneous Provisions) Act
2011 and the Aarhus Convention.
6. A Declaration that the policy in relation to a claim for costs as relied on by the First Named
Respondent in the consideration and determination of the Applicants’ claim for costs is
inconsistent with and contrary to with Articles 40.3, 43 and 40.5 of the 1937 Constitution
and Council Directive 2011/92 EU (as amended).
7. An Order of Certiorari quashing the decision of the First Named Respondent not to award
the Applicants’ costs pursuant to a policy described as ‘An Bord Pleanala Policy in relation to
Costs 2016’ and requiring that the matter be remitted to the First Named Respondent so as
to determine whether the Applicants are entitled to and the quantum of costs in respect of
their participation in the Application of the Compulsory Acquisition the subject matter of
application ABP307413/20.
8. A stay on the implementation of the said decision subject to application 307413/20, or
the taking of any steps in respect of the compulsory purchase of the Applicants’ lands
pending the determination of the proceedings.
9. Interim and/or interlocutory reliefs.
10. Further and other relief.
11. The costs of the application.”
Grounds of challenge
29. The amended statement of grounds sets out the following core grounds:
“1. The First Respondent impugned decision is invalid, failed to apply the appropriate
legal test and/or procedure in respect of its consideration and determination of application
307413/20 of the Compulsory Acquisition of the Applicants’ lands.
2. The First Respondent impugned decision is invalid, failed to and/ or would not apply
properly or at all the test of proportionality as primary consideration as to confirm the
Scheme for the Compulsory Acquisition of the Applicants’ lands.
3. The First Named Respondent impugned decision is invalid, failed to facilitate,
consider, or engage with the Applicants’ submissions with regard to the Compulsory
Acquisition application in respect of their property in an appropriate manner or the
circumstances arising from the said Compulsory Acquisition in application 307413/20.
4. The First Named Respondent erred in law in excluding a consideration of and/or the
adequacy of a procedure for providing compensation which was required to be addressed in
the particular circumstances of this case, which is contrary to the Applicants Constitutional
rights.
5. The First Named Respondent erred in law in the manner in which it considered and
determined the Applicants’ application for costs, relied on a document that fettered its
discretion and adopted a fixed rule as the determination as to how any costs application
would be determined, no matter what the particular circumstances, which is unreasonable,
inappropriate, and contrary to plain reason and common sense.
6. The Scheme underlining the Compulsory Acquisition is ultra vires to the Second
Named Respondent in that the nature and purpose of the Scheme grounding the Compulsory
Purchase Order is not provided for and/or is inconsistent in the Clare County Development
and as such the impugned decision is ultra vires, invalid and void.
7. The First Named Respondent erred in law in having regard to the Road Safety
Strategy 2013-2020 and the South West Regional Planning Guidelines in application
307413/20, which failed to properly apply Council Directive 92/43EEC and 2001/42EC into
the decision making process.
8. Insofar as Statutory provisions and procedure grounding the consideration of a
compulsory purchase order excludes any consideration of the procedure for and adequacy
of compensation in a procedure where the Applicants’ family home and its business is to be
compulsorily acquired and where the effect of such acquisition will be to render the
Applicants homeless and incapable of providing accommodation for themselves and for their
children, such provisions are contrary to Article 40.3, Article 43, and Article 40.5 of the
Constitution.
European Law:
1. The First Named Respondent erred in law in relying on Section 179 of the Planning
and Development Act 2000 and Part 8 of the Planning and Development Regulations 2001
in excluding the Applicants from raising submissions in respect of Directive 92/43EEC,
predetermined the issue and where part of the scheme was located adjoining and/or within
a European site.
2. Section 78 of the Housing Act 1966 (as amended) is inconsistent with and/or fails
to transpose Council Directive 92/43EEC and/or with Section 50, 50A, 50B of the Planning
and Development Act 2000.
3. Section 50(1) of the 1993 Roads Act is inconsistent with the Statutory Scheme
underlying the making of a Compulsory Purchase Order insofar as it excludes, and did in fact
exclude the making of and the consideration of a scheme which is a specified and/or sub
threshold development for matters relevant to Council Directive 2011/92EU.
4. The Third and Fourth Named Respondents failed to transpose their requirements of
Council Directives 92/43EC and/or 2011/92EU into the Statutory Scheme underlying the
making of a Compulsory Purchase Order and as applied in application number ABP/307413-
20 whereby Council Directive 92/43 EEC and/or 2011/92EU were excluded in the
determination made of application 307413/20.
5. The Statutory Scheme underlying the making of and determination of a Compulsory
Purchase Order and/or in application 307413-20 which excluded any consideration of
environmental issues either under Council Directive 92/43EEC, 2001/42EU or 2011/92EU is
inconsistent with and contrary to and/or fails to transpose the provisions of the aforesaid
Directives.”
The application for costs protection in respect of the CPO challenge
30. The first complaint made (which is the applicants’ best point) is that the power to
compulsorily acquire land is not just about title and there are numerous ancillary aspects such as
the right to confirm an order in part only and the extinguishment or allegedly the creation of rights
of way. Those points need to be unpacked slightly:
(i) The confirmation of a CPO in part isn’t really relevant because that doesn’t constitute
development in some sense that does not apply to confirmation in whole.
(ii) Extinguishment of rights of way is provided for under s. 10(4)(d) of the Local
Government (No. 2) Act 1960 as most recently relevantly amended by the 2000 Act.
That needs separate consideration and I return to that below.
(iii) Creation of rights of way was referred to in oral submissions (although despite being
the applicants’ best point, there seems to be no reference to rights of way at all in
the written submissions), but unless I missed it, no specific statutory provision was
identified as a basis for the alleged power to create rights of way under a CPO. In
the absence of identifying such a provision I think that point is going nowhere, and
we can limit our later discussion to extinguishment of such rights.
31. The second point is that this is a self-contained power that was formerly vested in the
Minister. But whether it’s self-contained or not is not the point.
32. The third point is that the board is obliged to consider whether it is appropriate or not to
confirm the order, which the applicants say is a critical step in whether what they call “the scheme”
should proceed (here in submissions using “scheme” in a sense to mean the development). This,
they say, illustrates that it is not within the power of the developer to proceed with the “scheme”,
but that the “scheme” depends on the acquisition being approved. Again, that doesn’t make the
CPO a development consent any more than any other necessary step such as a contract for sale.
33. Fourthly, the applicants rely on the CPO being capable of being heard at the same time as
the consent which indicates that environmental considerations are a factor. That doesn’t establish
that the CPO process is a manifestation of national or European environmental law.
34. Fifthly, the intra-urban nature of the scheme and the proximity to a European site doesn’t
change the legal nature of the CPO process.
35. The sixth and final point was that European environmental law arises as part of the
development and thus as a factor to be considered in the CPO process, for example as part of
assessment of suitability. That again is essentially a misconceived argument that an applicant by
making environmental submissions at the CPO stage can convert a CPO into a development consent.
36. The principle that one project may require multiple consents (Harte Peat Limited v. The
Environmental Protection Agency, Ireland and The Attorney General [2022] IEHC 148, [2022] 3 JIC
1606 (Unreported, High Court, Phelan J., 16th March, 2022); Martin v An Bord Pleanála, Ireland and
The Attorney General [2007] IESC 23, [2008] 1 I.R. 336, [2007] 2 I.L.R.M. 401, [2007] 5 JIC 1001;
Case C-50/09 European Commission v. Ireland (Court of Justice of the European Union, 3rd March,
2011, ECLI:EU:C:2011:109)) doesn’t have the effect that a procedure such as CPO that is not a
development consent should be treated as if it was.
37. So the only one of the applicants’ points that needs further consideration is in effect that the
power at CPO stage to extinguish rights of way involves a need to comply with the habitats directive
in particular and thus makes the CPO legislation into legislation giving effect to that directive, thus
triggering statutory costs protection under s. 50B of the 2000 Act.
The rights of way issue
38. This particular CPO proposes to extinguish various rights of way, and any CPO in principle
could do so. Does that involve a “project” such that the EIA or habitats directives apply?
39. As regards EIA, clearly not. The EIA directive involves an interpretation of “project” that
involves it being physical in nature: Case C-275/09 Brussels Hoofdstedelijk Gewest and Others v.
Vlaams Gewest (Court of Justice of the European Union, 17th March, 2011, ECLI:EU:C:2011:154)
para. 24:
“It follows that the renewal of an existing permit to operate an airport cannot, in the absence
of any works or interventions involving alterations to the physical aspect of the site, be
classified as a ‘project’ within the meaning of the second indent of Article 1(2) of Directive
85/337.”
40. This was put in general terms in Case C-121/11 Pro-Braine ASBL and Others v. Commune
de Braine-le-Château (Court of Justice of the European Union, 19th April, 2012,
ECLI:EU:C:2012:225) para. 31:
“As has been established by the Court, the term ‘project’ refers to works or interventions
involving alterations to the physical aspect of the site (Case C‑275/09 Brussels Hoofdstedelijk
Gewest and Others [2011] ECR I‑1753, paragraphs 20, 24 and 38).”
41. The point was repeated in Case C-411/17 Inter-Environnement Wallonnie ASBL and Bond
Beter Leefmilieu Vlaanderen ASBL v. Conseil des ministres (Court of Justice of the European Union,
29th July, 2019, ECLI:EU:C:2019:622):
“61 The term ‘project’ in Article 1(2)(a) of the EIA Directive refers, in the first indent, to
the execution of construction works or of other installations or schemes and in the second
indent, to other interventions in the natural surroundings and landscape including those
involving the extraction of mineral resources.
62 It follows from the case-law of the Court that the definition of the term ‘project’,
specifically in the context of the wording of the first indent of Article 1(2)(a) of the EIA
Directive, refers to work or interventions involving alterations to the physical aspect of the
site (see, to that effect, judgment of 19 April 2012, Pro-Braine and Others, C‑121/11,
EU:C:2012:225, paragraph 31 and the case-law cited).”
42. That decision also highlighted that the definition of “project” under the habitats directive
was wider than that under the EIA directive. Under a section headed “[t]he definition of a ‘project’,
for the purposes of the Habitats Directive”, the court said:
“122 As the Habitats Directive does not define the term ‘project’, for the purposes of Article
6(3), account should be taken of the definition of ‘project’ in Article 1(2)(a) of the EIA
Directive (see, to that effect, judgments of 7 September 2004, Waddenvereniging and
Vogelbeschermingsvereniging, C‑127/02, EU:C:2004:482, paragraphs 23, 24 and 26; of 14
January 2010, Stadt Papenburg, C‑226/08, EU:C:2010:10, paragraph 38; of 17 July 2014,
Commission v Greece C‑600/12, not published, EU:C:2014:2086, paragraph 75; and of 7
November 2018, Coöperatie Mobilisation for the Environment and Others, C‑293/17 and
C‑294/17, EU:C:2018:882, paragraph 60).
123 The Court has previously held that if an activity is covered by the EIA Directive, it
must, a fortiori, be covered by the Habitats Directive (judgment of 7 November 2018,
Coöperatie Mobilisation for the Environment and Others, C‑293/17 and C‑294/17,
EU:C:2018:882, paragraph 65).
124 It follows that if an activity is regarded as a ‘project’ within the meaning of the EIA
Directive, it may constitute a ‘project’ within the meaning of the Habitats Directive (judgment
of 7 November 2018, Coöperatie Mobilisation for the Environment and Others, C‑293/17 and
C‑294/17, EU:C:2018:882, paragraph 66).
125 Given the answer to Question 6(a) to (c), it must be held that measures such as those
at issue in the main proceedings, together with the work inextricably linked thereto,
constitute a project, for the purposes of the Habitats Directive.
126 Further, it is not disputed that the project at issue in the main proceedings is neither
linked to nor necessary for the management of a protected site.
127 Last, the fact that a recurrent activity has been authorised under national law before
the entry into force of the Habitats Directive does not constitute, in itself, an obstacle to
such an activity being regarded, at the time of each subsequent intervention, as a distinct
project for the purposes of that directive, at the risk of permanently excluding that activity
from any prior assessment of its implications for that site (see, to that effect, judgments of
14 January 2010, Stadt Papenburg, C‑226/08, EU:C:2010:10, paragraph 41, and of 7
November 2018, Coöperatie Mobilisation for the Environment and Others, C‑293/17 and
C‑294/17, EU:C:2018:882, paragraph 77).
128 To that end, it must be determined whether, having regard in particular to the
regularity or nature of some activities or the conditions under which they are carried out,
they must be regarded as constituting a single operation, and can be considered to be one
and the same project for the purposes of Article 6(3) of the Habitats Directive (see, to that
effect, judgments of 14 January 2010, Stadt Papenburg, C‑226/08, EU:C:2010:10,
paragraph 47, and of 7 November 2018, Coöperatie Mobilisation for the Environment and
Others, C‑293/17 and C‑294/17, EU:C:2018:882, paragraph 78).
129 That would not be the case where there is no continuity in the activity, inter alia when
the location and conditions in which it is carried out are not the same (judgment of 7
November 2018, Coöperatie Mobilisation for the Environment and Others, C‑293/17 and
C‑294/17, EU:C:2018:882, paragraph 83).
130 In the present case, while industrial electricity production by the Doel 1 and Doel 2
power stations was authorised before the entry into force of the Habitats Directive for an
unlimited period, the Law of 31 January 2003 limited that period of activity to 40 years, up
until 15 February 2015 for the Doel 1 power station and 1 December 2015 for the Doel 2
power station. As noted by the referring court, that legislative choice was modified by the
measures at issue in the main proceedings, with the result, in particular, that one of those
two power stations had to be restarted.
131 It is also undisputed that upon implementation of those measures, industrial
production at those two power stations will not be carried out under operational conditions
identical to those initially authorised, if only due to scientific developments and new safety
standards, the latter of which justify, as stated in paragraphs 64 to 66 of the present
judgment, proceeding with major upgrading work. Furthermore, the order for reference
indicates that a production consent was granted to the operator of those power stations after
the Habitats Directive had entered into force, following an increase in their capacity.
132 It follows that the measures at issue in the main proceedings, together with the work
inextricably linked thereto, constitute a distinct project, subject to the rules of assessment
provided for in Article 6(3) of the Habitats Directive.
133 The fact that the national authority that is competent to approve the plan or project
in question is the legislature has no bearing in this matter. In contrast to the provisions of
the EIA Directive, no derogation is possible from the assessment under Article 6(3) of the
Habitats Directive on the grounds that the competent authority to grant consent to the
project in question is the legislature (see, to that effect, judgment of 16 February 2012,
Solvay and Others, C‑182/10, EU:C:2012:82, paragraph 69).”
43. Case C-254/19 Friends of the Irish Environment Ltd v. An Bord Pleanála (Court of Justice of
the European Union, 9th September, 2020, ECLI:EU:C:2020:680) repeats this point:
“28 In the first place, in order to assess whether a decision extending the period set in the
original consent for the construction of a natural liquefied gas regasification terminal, in
respect of which works have not commenced, relates to a ‘project’ within the meaning of
Article 6(3) of the Habitats Directive, it is important to observe that it follows from the case-
law that the concept of ‘project’ within the meaning of Article 1(2)(a) of the EIA Directive
can be taken into account in that regard (see, to that effect, judgment of 29 July 2019,
Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen, C-411/17,
EU:C:2019:622, paragraph 122 and the case-law cited).
29 Furthermore, since the definition of the concept of ‘project’ under the EIA Directive is
more restrictive than that under the Habitats Directive, the Court has held that, if an activity
is covered by the EIA Directive, it must, a fortiori, be covered by the Habitats Directive
(judgments of 7 November 2018, Coöperatie Mobilisation for the Environment and Others,
C-293/17 and C-294/17, EU:C:2018:882, paragraph 65, and of 29 July 2019, Inter-
Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen, C-411/17, EU:C:2019:622,
paragraph 123).
30 It follows that if an activity is regarded as a ‘project’, within the meaning of the EIA
Directive, it may constitute a ‘project’ within the meaning of the Habitats Directive (judgment
of 29 July 2019, Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen, C-
411/17, EU:C:2019:622, paragraph 124 and the case-law cited).
31 The term ‘project’ in Article 1(2)(a) of the EIA Directive refers, in the first indent thereof,
to the execution of construction works or of other installations or schemes and, in the second
indent thereof, to other interventions in the natural surroundings and landscape including
those involving the extraction of mineral resources.
32 In addition, it follows from the Court’s case-law that the definition of the term ‘project’,
specifically in the context of the wording of the first indent of Article 1(2)(a) of the EIA
Directive, refers to work or interventions involving alterations to the physical aspect of the
site (judgment of 29 July 2019, Inter-Environnement Wallonie and Bond Beter Leefmilieu
Vlaanderen, C-411/17, EU:C:2019:622, paragraph 62 and the case-law cited).
33 In the present case, the decision to extend a period originally set for the construction of
a liquefied natural gas regasification terminal, for which works have not commenced, meets
such criteria and must therefore be regarded as relating to a ‘project’ within the meaning of
the EIA Directive.
34 Such a decision must therefore also be regarded as relating to a ‘project’ within the
meaning of Article 6(3) of the Habitats Directive.
35 However, as Advocate General Kokott observed in point 32 of her Opinion, if, having
regard in particular to the regularity or nature of those activities or the conditions under
which they are carried out, certain activities must be regarded as constituting a single
operation, they can be considered to be one and the same project for the purposes of Article
6(3) of the Habitats Directive, exempted from a new assessment procedure under that
provision (see, to that effect, judgments of 14 January 2010, Stadt Papenburg, C-226/08,
EU:C:2010:10, paragraphs 47 and 48, and of 7 November 2018, Coöperatie Mobilisation for
the Environment and Others, C-293/17 and C-294/17, EU:C:2018:882, paragraphs 78 and
80).”
44. So we then come to the question of whether the extinguishment of rights of way at the CPO
stage as envisaged by the CPO legislation could constitute a project for habitats purposes. I think
that is arguable, based on what the applicants have put forward, which creates a procedural
complication here which has the effect that I shouldn’t go on from there to determine the actual
merits of that point in the absence of the council.
45. The procedural complication arises because in the No. 1 judgment I didn’t think that the
applicants had an arguable point against the council, save insofar as they managed to establish such
a point against the board or State. They have done that now to the level of arguability, which means
that there should be a costs-protected hearing on whether they are correct substantively on that (as
opposed to having merely established that the point is arguable so as to warrant costs protection
for the argument as to whether the point is actually correct), involving all opposing parties. Logically,
costs protection including against the council must apply to that hearing because the applicants have
managed to surmount the threshold of having an arguable ground for this point, as discussed more
fully in the No. 1 judgment.
46. If in due course the applicants did manage to establish that such extinguishment could be a
“project”, then it wouldn’t seem to matter that they haven’t made any point in the pleadings on the
issue of the extinguishment of rights of way, because they could rely on Heather Hill Management
Company CLG v. An Bord Pleanála [2022] IESC 43, [2022] 2 I.L.R.M. 313, [2022] 11 JIC 1004 in
reply to that. In other words, if that is a project, then the CPO legislation is legislation to implement
the habitats directive (contrary to the view I took in the No. 1 judgment, but in fairness that was
subject to further argument involving the other opposing parties), and therefore a challenge under
that legislation is covered by s. 50B of the 2000 Act on the Heather Hill doctrine irrespective of the
grounds pleaded.
The application for costs protection in relation to the challenge to the refusal of costs
47. As noted above, the board also decided under s. 219 of the 2000 Act that the applicants
should not get their costs of the CPO objections.
48. But if the CPO process is not domestic law related to the environment, or law giving effect
to EU environmental law, such that costs protection applies to that process, then an ancillary
application regarding costs of that process is not going to attract costs protection either. So this
point falls, subject to the rights of way issue.
The application for costs protection in relation to the challenge to measures of general
application
49. While not particularly addressed in submissions, I also need to consider whether costs
protection applies to the constitutional challenge and the challenge to the board’s policy document.
50. That challenge is pleaded in a rather roundabout way. Normally if one wants to challenge a
decision under a statute, step 1 is to plead that the decision is ultra vires and invalid. Step 2 is to
plead that if (which is denied) the decision does comply with the statute, then the statute is invalid
or incompatible with ECHR provisions.
51. Here, reliefs 1, 4 and 7 challenge the board’s decisions on a conventional administrative law
basis. Reliefs 3 and 6 (which precede, rather than follow, the corresponding administrative law
grounds 5 and 7 respectively) challenge measures of general application, being the legislation and
the board’s policy respectively. As the reliefs are phrased, the board policy is impugned by reference
to the Constitution and the EIA directive whereas the challenge to the legislation refers only to the
former (as does domestic core ground 8). However, European core grounds 2, 3 and 5 allege
breaches of EU law by the legislation. This is not reflected in the relief sought. European core
ground 4 alleges non-transposition but there is no corresponding relief claimed as required by
Practice Direction HC119. There is no core ground supporting the relief regarding the invalidity of
the board policy, either by reference to EU law or at all, although possibly domestic core ground 5
could be construed generously as suggesting that the policy document is invalid because it fetters
the board’s discretion. The core grounds also seek to collaterally challenge the Road Safety Strategy
(domestic core ground 7) and what they call the “scheme” underlying the CPO (domestic core ground
6). However, no corresponding reliefs in that regard are claimed. The “scheme” claim needs further
investigation. The pleadings also use the word “scheme” confoundingly in a separate sense to refer
to the legislation (“statutory scheme”), and in written and oral submissions the applicants used
“scheme” to mean the development overall. Surely synonyms could have been found.
52. The applicants don’t trouble themselves to define what they mean by “scheme”, by reference
to a date or a document or anything else, but on closer examination what they mean by that word
seems to vary by context to mean either the underlying development, or the CPO considered overall,
as opposed to insofar as it affects the applicants. Sub-ground 3 provides that:
“3. The First Named Respondent applied inappropriate and incorrect tests in respect of
the manner in which they considered whether it was inappropriate or not to confirm the
scheme ...”
53. This is to use the term “scheme” as equivalent to the CPO. Elsewhere, reference is made to
the scheme not being able to proceed unless the CPO is confirmed, which uses it as a term meaning
the development. If the challenge to the “scheme” means a challenge to the CPO, it adds nothing
to the certiorari already explicitly sought. If it means a challenge to the underlying development
consent, then it doesn’t get out of the starting blocks. That was done and dusted years ago.
54. But despite the depletion of one’s Wille zum Leben caused by the effort of deciphering the
confounding pleadings here, almost none of it actually matters.
55. That’s because, subject to the rights of way point:
(i) the impugned CPO legislation is not legislation giving effect to the directives referred
to in s. 50B(1)(a) of the 2000 Act and nor does it constitute domestic environmental
law;
(ii) the board’s CPO costs policy is not made under legislation giving effect to the
directives referred to in s. 50B(1)(a) of the 2000 Act and nor does it constitute
domestic environmental law;
(iii) the Road Safety Strategy is not (or at least hasn’t been shown to have been) made
under legislation giving effect to the directives referred to in s. 50B(1)(a) of the 2000
Act and nor does it constitute domestic environmental law; and
(iv) the CPO “scheme” referred to in domestic core grounds 2 and 6 and EU core grounds
1 and 3 either doesn’t exist independently of the CPO in the sense in which that
word appears in the pleadings, or means the development consent which obviously
can’t be challenged at this stage.
56. The fact that the foregoing are challenged by reference to EU environmental law doesn’t
change the legal basis of their adoption.
57. Thus there is no basis for costs protection for these challenges either, subject to the rights
of way issue.
Order
58. For the foregoing reasons, it will be ordered that:
(i) the relief sought in the notice of motion as against the board and the State be
refused other than in relation to the issue arising from rights of way extinguishment;
(ii) the matter be listed for mention on 9th October, 2023, with a view to fixing a date
for a costs protection hearing against all opposing parties on that issue, which will
be costs-protected as against all opposing parties including the council; and
(iii) absent any submission to the contrary within 7 days, the foregoing order be
perfected forthwith on the basis of the applicants’ costs being reserved.