High Court quashes planning permission for quarry as non-compliant with EU environmental law principles.

Case Number IEHC 338
Court / Authority
Jurisdiction Ireland (IE)
Decision Date
Outcome Dismissed

Legislator summary

AI generated

The High Court granted certiorari to quash the Planning Board's decision to grant planning permission for a quarry, finding it potentially non-compliant with EU environmental law. The applicants argued that the Board failed to properly assess environmental impacts and apply correct legal principles regarding past versus future development. The court noted the Board's decision was not in compliance with relevant EU directives and the 2011 Directive, though it deferred on the precise terms of the declaration pending further argument.

Legislator headnote

AI generated

s.34 of the Planning and Development Act 2000; s.177D of the Planning and Development Act 2000; Planning and Development Act 2000; EU law principles; Commission v Ireland; Comune di Corridonia; Habitats Directive; environmental impact assessment; quashing of planning permission; procedural fairness; substituted consent; unauthorised development; environmental protection; judicial review; High Court of Ireland

Keywords

AI generated
retroactive permit nature conservation permit planning permission variance standing against building permit revocation of a permit unpermitted structures

Cited Legislation

AI generated
s.34 of the Planning and Development Act 2000
permission under s.34 of the Planning and Development Act 2000, as amended, (hereinafter “the Act of 2000”) may be made, and
s.177D of the Planning and Development Act 2000
In this regard, s. 177D lays out 7 different factors the Board is to have regard to in determining whether or not “exceptional
Commission v Ireland
However, in Commission v Ireland, the court held that Ireland could not usefully rely on Wells as in the same judgment it was stated
Comune di Corridonia
The Comune di Corridonia case
2011 Directive
Ireland and Comune di Corridonia and/or the provisions of the 2011 Directive and Habitats Directive as transposed into Irish law.
Habitats Directive
requirements of the European Environmental Impact Assessment and the Habitats Directives.
Development Act 2000
permission under s.34 of the Planning and Development Act 2000, as amended, (hereinafter “the Act of 2000”) may be made, and

Cited Case Law

AI generated
AI generated

Need to analyze how this precedent applies to your matter?

Cross-reference this judgment against statutes, commentaries, and subsequent citing case law inside Legislator AI.

Open in Legislator →

Full text

[2018] IEHC 338

THE HIGH COURT

JUDICIAL REVIEW

[2016 No. 499 JR]

BETWEEN

ALICE HAYES, PATRICK HAYES AND PETER SWEETMAN

Applicants

-and-

AN BORD PLEANÁLA

Respondent

IRELAND AND THE ATTORNEY GENERAL

Respondent

-and-

MURRAY BROTHERS TARMACADAM LIMITED

Notice Party

-and-

CORK COUNTY COUNCIL

Notice Party

-and-

AN TAISCE

Notice Party

Judgment of Ms. Justice Ní Raifeartaigh delivered on the 17th day of May, 2018

Nature of the Case

1. This is a case which concerns the procedures under Irish planning legislation insofar as they apply to the relationship between

applications for planning permission in respect of quarries, on the one hand, and EU law, on the other, or perhaps more accurately,

Irish law as enhanced or supplemented by EU law concerning environmental matters. It concerns matters such as the relationship

between past and future development in the context of quarrying; the relationship between retention permission and “standard” or

ordinary permission; the relationship between regularising the past and obtaining permission for future development; and the

distinction between an “ordinary” environmental impact statement and a remedial environmental impact statement.

2. A very specific and net legal issue is presented to the Court for decision. This issue is whether an application for planning

permission under s.34 of the Planning and Development Act 2000, as amended, (hereinafter “the Act of 2000”) may be made, and

granted, in the particular configuration of circumstances presenting in the present case: these being (a) that the quarry fell into a

category which would have required environmental or habitat assessment; (b) that the quarry owner had previously failed to register

the quarry with the local planning authority in accordance with his obligation under s.261 of the Act of 2000, as a result of which, by

operation of law, it became an “unauthorised development” ; (c) that this resulted in service by the planning authority of an

enforcement order in accordance with the regime established by s.261A of the Act of 2000 as amended; (d) that the quarry complied

with the enforcement notice and ceased its quarrying operations for six months; (e) that subsequent to this cessation, the quarry

owner applied for planning permission in respect of future development by means of an application pursuant to s.34 of the Act of

2000, which application was accompanied by an environmental impact assessment; and (f) where no application for substituted

consent was (or apparently could have been) made by the quarry owner or operator under the statutory provisions governing these

matters. The question is whether, in these circumstances, such an application for planning permission amounted in effect to a grant

of prohibited “retention permission” contrary to s.34(12) of the Act of 2000 as amended and/or constituted a breach of the

requirements of the European Environmental Impact Assessment and the Habitats Directives.

3. The case came before the Court by way of judicial review for an order of certiorari of a decision made by the An Bord Pleanála

(hereinafter “the Board) on the 17th May 2016 upholding a decision of the second notice party, Cork County Council, (hereinafter “the

Council”) in respect of a grant of planning permission for a quarry owned and operated by the first notice party and further, a

declaration that this decision was ultra vires the first respondent’s powers. The applicants also seek a declaration that the second

and third respondents have failed to give effect to the decision of the CJEU in Case C-215/06 Commission of the European

Communities v Ireland [2008] ECR I-4911 and the substantive requirements of the EIA Directive insofar as the relevant transposing

legislation permits a developer who has engaged in unauthorised development to comply with an enforcement notice under s. 154 of

the Planning and Development Act 2000 and upon compliance submit an application for planning permission pursuant to s. 34 of the

Planning and Development Act 2000 rather than avail of the substitute consent procedure in Part. XA of and ss. 261-261A of the

same Act. A stay was also sought to prevent the first named notice party from carrying out any works at the quarry site and if

necessary, a preliminary reference to the Court of Justice of the European Union (CJEU) pursuant to Art. 267 of the Treaty on the

Functioning of the European Union.

Relevant Facts/Chronology

4. The most important features of the chronology set out below, for present purposes, are that the quarry failed to register with its

local planning authority under s.261 of the Act of 2000; that it was refused planning permission in 2011; that it was the subject of a

determination in 2012 by the Council that it was an “unauthorised development”; that it was served with an enforcement notice as a

result of which it ceased activities for 6 months, ending on the 17th October, 2014; and that it subsequently made a successful

application for planning permission to the Council, subsequently upheld by the Board in 2015.

5. The quarry in issue in these proceedings is situated at Ardcahan, Dunmanway, in County Cork. It was purchased at some time by

Murray Brothers Tarmacadam Ltd. (hereinafter “the Developer”) from Cork County Council (hereinafter “the Council”). When the

obligation pursuant to s.261 of the Act of 2000 to register the quarry came into force, in the 2004/5 period, the Developer did not

comply with its statutory obligation to register with the Council. This is a matter of considerable significance in the case.

6. On the 25th May, 2011, the Developer made an application to the Council for planning permission in respect of the quarry. On the

13th July, 2011 the Council refused to grant the permission sought on the grounds that it was an extension of an existing

unauthorised quarry and was not supported by an Environmental Impact Statement (EIS) or a Natura Impact Statement (NIS).

7. In accordance with its obligation pursuant to s.261A of the Act of 2000, as amended, (discussed below), the Council examined this

particular quarry. On the 23rd August, 2012 the Council made a formal determination. This concluded first, that development had been

carried out at the site since 1 February 1990 such as to require an Environmental Impact Assessment (EIA), and since 26 February

1997 such as to require an Appropriate Assessment (AA), and that neither form of assessment had been carried out. It also stated

that although a pre-1964 use had existed at the quarry, this had not been properly registered under s.261 before the deadline of April

2005. Accordingly, it determined that the quarry was an “unauthorised development” within the meaning of s.261(10) of the Act of

2000.

8. On the 25th November, 2013, and in accordance with the procedures mandated by s.261A, the Council issued an enforcement

notice to the Developer pursuant to s. 154 of the Act of 2000. The enforcement notice required, inter alia, the cessation of quarrying

at the site within a six-month period. It did not require the taking of any remedial steps with regard to the operation that had been

carried out there in the past.

9. Although there was some dispute as to precisely when the enforcement notice was complied with, it is clear that that this had

taken place by the 17th October, 2014 at the latest, because on this date, the Council wrote to the Developer stating that the

enforcement notice had been complied with and was now closed.

10. On the 24th October, 2014, one week after the Council had communicated that the enforcement notice had been complied with,

the Developer submitted a planning permission application to the Council pursuant to s. 34 of the Planning and Development Act 2000

i.e. an application for “standard” or “conventional” planning permission. This application was accompanied by an Environmental Impact

Statement (EIS). It was also accompanied by a legal opinion setting out the conclusion of the author that the application could be

considered a standard application for planning permission once the terms of the 2013 enforcement notice had been complied with. It

may be noted that the EIS submitted with this planning application described the proposed development as “at the site of a previous

quarry development and existing tarmacadam plant…”. This application was subsequently amended on three occasions in 2015 (on the

10th March, 14th May, and the 4th June).

11. On the 14th November, 2014, the third named notice party, An Taisce, made a submission to the Council, referring to the history

as described above and submitted that the subject of this 2014 application was entirely contiguous with the 2011 unauthorised site.

It submitted that this could not be considered a de novo application and was in reality an application for retention permission and that

the Council would be acting ultra vires if it were to grant planning permission.

12. On the 25th November, 2014, the applicants made a submission objecting to the application on grounds relating to the

unauthorised status of previous development, the scale of the quarry, and the requirements in respect of environmental impact

assessment.

13. On the 26th June, 2015 Cork County Council granted planning permission to the Developer subject to 27 conditions.

14. On the 22nd July, 2015, the first and second named applicants and An Taisce appealed the Council’s decision to the first named

respondent, An Bord Pleanála (hereinafter “the Board”). The Developer also appealed the decision in respect of one of the conditions

laid down by the planning authority, relating to the payment of monies towards the maintenance of nearby public road. The third

named applicant was an observer to the appeal and made a submission to the Board on the 13th August, 2015. The Developer issued

a response to the third-party appeals dated the 19th August, 2015.

15. The Board appointed an inspector who carried out a site inspection on the 28th September, 2015 and prepared a report dated the

13th October, 2015. He noted, inter alia, that the application was contiguous to, and included part of, the quarry against which the

enforcement notice had previously issued. The inspector recommended that the planning permission be granted subject to 18

conditions.

16. On the 20th November, 2015 the submissions in relation to the appeal and the inspector’s report were considered by the Board.

The Board decided to defer the decision to a further meeting. On the 11th May, 2016 this meeting took place. The Board decided to

grant permission generally in accordance with the inspector’s recommendations, subject to some amendments. A record of the board’s

decision states that it had regard to the EIS, the NIS, the character and nature of the application site, the location, scale and form

of the proposed development, the planning history of the site, the inspector’s report, the pattern of development in the vicinity, the

proposed means of controlling and mitigating emissions from the development, and the policies of the planning authority in respect of

extractive industry, landscape character and heritage. It concluded that the proposed development, subject to compliance with

several conditions, would not seriously injure the amenities of the area or of property in the vicinity, would not be prejudicial to public

health or would not pose an unacceptable risk of environmental pollution and so would be in accord with the proper planning and

sustainable development of the area. It laid down 17 conditions to be complied with by the Developer and reduced the figure of the

sum payable for the maintenance of the nearby public road.

17. Following this decision, the Board granted planning permission to the Developer on the 17th May 2016, subject to 17 conditions

for development. This is the decision impugned in these proceedings. The decision included the following statement:

“In making its decision, the Board had regard, inter alia, to the following:

…

(g) the planning history of the site, including that the existing quarry has been deemed, by virtue of section 261(1) of the

Planning and Development Act, 2000, as amended to comprise unauthorised development by reason of the failure to

register under section 261 of the Act of 2000 as amended, that an enforcement notice has been served by the planning

authority and that the planning authority is satisfied that the enforcement notice has been complied with.

(h) the fact that the application is not prohibited under section 34(12) of the Planning and Development Act, 2000, as

amended.

18. The Developer did not at any stage make any application for substitute consent under the procedures introduced by the Act of

2010, for reasons which are discussed below.

The Legal Context

19. The courts have frequently observed in the past that quarries present unique challenges for planning law. This arises from certain

distinctive features of quarries, including that the operation of many quarries pre-dated planning control in Ireland; the long period of

time during which quarrying operations may be carried out, the intensity of which may ebb and flow at different times within the

overall period; and the range of effects and impacts on the environment that arise from the process of extraction; as well as the

unique nature of quarrying itself. There is a significant difference, both in practical and in conceptual terms, for example, between a

planning application to build a house, and a planning application in respect of a quarry which has existed for more than 50 years. The

law in this area is complex and involves, inter alia, the interaction between Irish law and a number of European Directives and CJEU

decisions.

20. In examining the legal context to events in this case, it may be helpful to distinguish between the legal framework prior to the

CJEU decision in Commission v. Ireland Case C-215/06 [2008] E.C.R I-04911 and the legal position after that decision.

The relevant EU Directives and the law prior to the decision in Commission v. Ireland

21. Two important EU Directives in the environmental area had imposed obligations on Ireland to ensure that the decision-making

process in the planning area included meaningful consideration of environmental issues, as well as affording an important role to public

participation in the process.

22. Council Directive 85/337/EEC (also known as the “EIA Directive”) was introduced to deal with the effects of public and private

projects which were likely to have significant effects on the environment and came into effect on the 3rd July, 1988. Article 2

required that Member States adopt all measures necessary to ensure that, before development consent is given, projects likely to

have significant effects on the environment by virtue, inter alia, of their nature, size or location are made subject to an assessment

with regard to their effects. Member States may, in exceptional cases, exempt a specific project in whole or in part from the

provisions laid down in the Directive. The Directive was subsequently amended on three occasions and is no longer in force. A codified

version of the Directive and its amendments now exists in the form of Directive 2011/92/EU. Article 3 of the EIA Directive provided

that a valid EIA shall identify, describe and assess the direct and indirect effects of a project on the following factors: (i) human

beings, fauna and flora; (ii) soil, water, air, climate and the landscape; (iii) the inter-action between these factors and; (iv) material

assets and the cultural heritage. Article 4 provided that the projects subject to the directive are to be found in Annex II. Annex II

was amended by Council Directive 97/11/EC to include quarries, open-cast mining and peat extraction,

23. Article 5 provided that Member States adopt the necessary measures to ensure that the developer supplies information laid out in

Annex III (now Annex IV of Directive 2011/92/EU) in as much as the Member States consider that the information is relevant to a

given stage of the consent procedure and to the specific characteristics of a particular project or type of project and of the

environmental features likely to be affected and that the Member States consider that a developer may be required to compile this

information having regard inter alia to current knowledge and methods of assessment. The type of information mandated under Annex

III includes, for example, a description of the aspects of the environment likely to be significantly affected by the proposed project,

including, in particular, population, fauna, flora, soil, water, air, climatic factors, material assets, including the architectural and

archaeological heritage, landscape and the interrelationship between the above factors.

24. Article 6 required that public authorities concerned with the environment and members of the public shall be given the opportunity

to express their opinion on a request for development consent.

25. The second relevant directive, Council Directive 92/43/EEC (also known as the “Habitats Directive”), was adopted to promote the

maintenance of biodiversity, taking account of economic, social, cultural and regional requirements and came into force on the 10th

June, 1994. It lays down the general rule that an appropriate assessment must be made of any plan or programme likely to have a

significant effect on the conservation objectives of a site which has been designated or is designated in future. Article 6(3) mandates

that any plan or project not directly connected with, or necessary to the management of, the site but likely to have a significant

effect thereon, either individually or in combination with other plans or projects, shall be subject to appropriate assessment of its

implications for the site in view of the site's conservation objectives. Annexes I – V of the Directive list the various criteria to be

applied when determining if a given site is a designated site.

26. Another important distinction of the legal landscape was s. 261 of the Act of 2000. The Act of 2000 introduced an obligation to

register quarries and commenced on the 28th April, 2004. Section 261 required the owner or operator of a quarry (not being one in

respect of which planning permission was granted within the previous 5 years), within one year of the coming into operation of the

section, (i.e. by the 27th April, 2005) to register with their planning authority. It set out the specific type of information to be

provided to the authority. The planning authority was then required to publish a notice of the registration and the required contents

of the notice were prescribed. Where certain proposed courses of action were in contemplation, the authority was required to serve

notice on the quarry owner or operator. Not later than 2 years from the registration of a quarry, the authority could impose conditions

on a quarry which had commenced operation before the 1st October, 1964; or restate, modify or add conditions in respect of a quarry

in respect of which planning permission was granted. Section 261(7) dealt with the continued operation of a quarry greater in size

than 5 hectares or that was situated in particular sites and that commenced operation before 1 October 1964; where such a quarry

“would be likely to have significant effects on the environment” . In such a case, the authority was required to request an application

for planning permission accompanied by an environmental impact statement. Importantly, s. 261(10) also clearly established that a

failure to register renders a quarry an unauthorised development.

27. Under the provisions of s.261, there was no duty on the planning authority to seek out quarries; it was for the owner or operator

to make the information available to the authority. This is of particular relevance in the present case, as the Developer did not

register the quarry in issue in these proceedings.

28. A practice apparently developed whereby quarry owners applied for, and were routinely granted, retention permission under

s.34(1) of the Act of 2000 in respect of unauthorised development, even where the unauthorised development should have been

assessed under the EIA or Habitats Directives. This practice was examined and condemned by the CJEU in the case of Commission v.

Ireland and led to a number of significant legislative amendments.

The decision in Commission v. Ireland

29. In Commission of the European Communities v Ireland (Case C-215/06) [2008] E.C.R I-04911 the Commission brought proceedings

against Ireland on the basis that, inter alia, Ireland had failed to transpose the EIA Directive adequately and that in allowing for

retention permission to be granted after the development had been executed, in whole or in part, without consent undermined the

preventive objectives of the Directive.

30. At para. 49, the court referred to the “fundamental objective” of Directive 85/337/EEC; namely that before development consent

is given, projects likely to have significant effects on the environment should be made subject to a requirement for development

consent and assessment with regard to their effects. At para. 54, it accepted that Irish legislation requires environmental impact

assessments and planning permission to be carried out and obtained as a general rule prior to the execution of works. However, it said

(at para. 55) that Irish legislation established retention permission and “equates its effects to those of the ordinary planning

permission which precedes the carrying out of the works and development”, even though the project has been executed and no

environmental assessment was, in fact, carried out. “In addition,”, the court said at para. 56, “the grant of such a retention

permission, use of which Ireland recognises to be common in planning matters lacking any exceptional circumstances, has the result,

under Irish law, that the obligations imposed by Directive 85/337 as amended are considered to have in fact been satisfied”. It said

(para. 57) that while Community law cannot preclude the national rules from allowing, in certain cases, the regularisation of

operations which are unlawful in light of Community law, “such a possibility should be subject to the conditions that it does not offer

the persons concerned the opportunity to circumvent the Community rules or to dispense with applying them, and that it should

remain the exception”. It said that the system of regularisation in force “may have the effect of encouraging developers to forgo

ascertaining whether intended projects satisfy the criteria of Article 2(1) of the Directive 85/337 as amended, and, consequently, not

to undertake the action required for identification of the effects of those projects on the environment and for their prior assessment”

(para. 58). It pointed out that the first recital of the preamble to the Directive referred to the necessity for the planning authority to

take into account “at the earliest possible stage” the effects on the environment, “the objective being to prevent the creation of

pollution or nuisances at source rather than subsequently trying to counteract their effects”.

31. Ireland had attempted to rely on a previous decision of the CJEU in Case C-201/02 R(Wells) v Secretary of State for Transport,

Local Government and the Regions [2004] E.C.R I-748. In Wells, a mining operation had been granted consent without an EIA having

been carried out. Mrs. Wells made a request to revoke the approval in order to remedy the failure to carry out an EIA. The Court held,

inter alia, that as regards to remedying a failure to carry out an EIA: -

“it is for the national court to determine whether it is possible under domestic law for a consent already granted to be

revoked or suspended in order to subject the project in question to an assessment of its environmental effects, in

accordance with the requirements of Directive 85/337, or alternatively, if the individual so agrees, whether it is possible

for the latter to claim compensation for the harm suffered…. the competent authorities are obliged to take, within the

sphere of their competence, all general or particular measures for remedying the failure to carry out an assessment of

the environmental effects of a project as provided for in Article 2(1) of Directive 85/337.” (emphasis added)

However, in Commission v Ireland, the court held that Ireland could not usefully rely on Wells as in the same judgment it was stated

that:-

“Member States are required to nullify the unlawful consequences of a breach of Community law. The competent

authorities are therefore obliged to take the measures necessary to remedy failure to carry out an environmental impact

assessment, for example the revocation or suspension of a consent already granted in order to carry out such an

assessment, subject to the limits resulting from the procedural autonomy of the Member States.” (emphasis added).

32. What is clear from the decision in Commission v. Ireland is that what was not in compliance with the EIA Directive was a regime

in which a developer could routinely bypass the requirements of the Directive by applying for and obtaining, ex post facto, a grant of

retention permission after a project had been executed, having failed to submit appropriate environmental assessments before the

project had commenced.

33. However, the decision left a number of questions unanswered. For example, precisely what type of “exceptional” circumstances

would justify permission being granted after the event? And could development into the future be authorised even where there had

been a failure to submit/carry out environmental assessment in the past, and if so, in what circumstances?

The law after the decision in Commission v. Ireland

34. Certain legislative amendments to the Act of 2000 were introduced in order to address the issues identified in the CJEU decision.

In broad terms, these were three-fold: a prohibition in respect of retention permission in certain circumstances (s.34(12)); a new

procedure for a new species of permission described as “substitute consent” (Part XA); and an obligation on the planning authorities

to examine and make decision on quarries within their area (s.261A).

35. The first of these amendments, s. 34(12) of the Act of 2000, as inserted by s. 23 of the Planning and Development (Amendment)

Act 2010, provides that a planning authority “shall refuse to consider an application to retain unauthorised development of land”

where the application is one which would have required an Environmental Impact Assessment, or a determination regarding the

necessity of an EIA, or an Appropriate Assessment, had planning permission been sought before the development was commenced.

36. Secondly, the amending Act introduced a new Part XA into the Act of 2000, containing procedures in respect of “substitute

consent”. Substitute consent is essentially a form of retention permission which may only be granted in limited circumstances in order

to comply with the Commission v. Ireland strictures as to “exceptional circumstances”. S. 177O of the Act of 2000 provides that: -

“(1) A grant of substitute consent shall have effect as if it were a permission granted under section 34 of the Act and

where a development is being carried out in compliance with a substitute consent or any condition to which the consent

is subject it shall be deemed to be authorised development.

(2) Where a development has not been or is not being carried out in compliance with a grant of substitute consent or any

condition to which the substitute consent is subject it shall, notwithstanding any other provision in this Act, be

unauthorised development.”

37. The provisions concerning substitute consent are extremely, and I would venture to comment, unduly, complex. There are a

number of “gateways” to obtaining substitute consent. A planning authority may issue a notice requiring the quarry developer/owner

to apply for substitute consent if the planning authority is of the belief that existing planning permission is defective, invalid or

otherwise in breach of law. Otherwise the first step in seeking substitute consent is for the developer to make an application for leave

to apply for substitute consent. Section 177C of the Planning Development (Amendment) Act 2010 envisages two situations where a

developer’s application for leave to apply for substitute consent arises. The first situation arises where the developer/owner is

applying for leave to apply for substitute consent because he believes that the permission granted was in breach of law, invalid or

otherwise defective in a material respect. In this situation the developer/owner is relieved from having to show exceptional

circumstances. The second situation arises where the developer/owner believes that “exceptional circumstances” exist such that it

may be appropriate to permit the regularisation of the development by permitting an application for substitute consent.

38. In this regard, s. 177D lays out 7 different factors the Board is to have regard to in determining whether or not “exceptional

circumstances” exist. These factors are:

• whether regularising the development would circumvent the purpose and aims of the EIA or Habitats Directives;

• whether the applicant had or could reasonably have had a belief that the development was not unauthorised;

• whether the ability to carry out an assessment of the environmental impacts of the development, or an

appropriate assessment, and to provide for public participation in such an assessment has been substantially

impaired;

• the actual or likely significant effects on the environment or adverse effects on the integrity of a European site

resulting from the carrying out or continuation of the development;

• the extent to which significant effects on the environment or adverse effects on the integrity of a European site

can be remediated;

• Whether the applicant had complied with previous planning permission granted or had previously carried out an

unauthorised development; and

• any other matters the Board considers relevant.

39. If leave is granted, then the process of the substantive application for substitute consent begins under s. 177E. This section

provides that the application must be accompanied by a remedial environmental impact statement (EIs) or a remedial Natura impact

statement (NIS). This is of significance in the present proceedings. Ss. 177F and 177G contain what is to be included in a remedial

EIS and NIS respectively. These includes details of any appropriate remedial measures taken or proposed to be taken to remedy any

significant adverse effects on the environment (if EIS) or any appropriate remedial or mitigation measures undertaken or proposed to

be undertaken to mitigate or remedy any significant effects on the environment or European Site (if NIS).

40. Section 177K provides that the Board may decide to grant the substitute consent, subject to, or without, conditions, or to refuse

it. It lays out the 12 criteria to be regarded by the Board in determining whether or not to grant substitute consent. These include,

inter alia:

• The provisions of the development plan and any local area plan for the area;

• The provision of any special amenity area order relating to the area;

• The remedial environmental impact statement, or remedial Natura impact statement, or both of those statements

as the case may be, submitted with the application;

• the significant effects on the environment or on a European site which have occurred, are occurring or could be

reasonably expected to occur because the development was being carried out.

41. Section 177K (3) provides that the conditions which may be attached to the grant of a substitute consent may include conditions

relating to remediation of all or part of the site on which the development the subject of the grant of substitute consent is situated.

This is also of significance in the present proceedings.

42. Section 177L deals with the refusal of leave to apply for substitute consent/refusal to grant substitute consent. It provides for a

process of issuing a draft direction to the applicant, an opportunity to make submissions, and the finalisation of the direction. The

direction can do one of two things. The first is to require the applicant to cease activity or operations at the site of the development

“where the Board forms the opinion that the continuation of all or parts of the activity or operations is likely to cause significant

adverse effects on the environment or adverse effects on the integrity of a European site”. The second is to require, alternatively,

the applicant to take such remedial measures as are considered necessary to restore the site to a safe and environmentally

sustainable condition and to avoid, in a European site, the deterioration of natural habitats and the habitats of species or the

disturbance of the species for which the site has been designated, insofar as such disturbance could be significant in relation to the

objectives of the Habitats Directive. Insofar as the direction requires the taking of remedial measures, such remedial action may be

required in relation to development that was carried out at any time but no more than 7 years prior to the date when the section

came into operation.

43. What is of particular significance about the substitute consent procedure, for present purposes, is that consideration of possible

harm done to the environment in the past (or continuing harm as a result of past activity) and remediation of the land are central

considerations. The developer must submit a remedial impact assessment and the Board is empowered to impose conditions for

remediation.

44. A third, important amendment to the Act of 2000, in order to render Irish law compliant with the Commission v Ireland decision,

was the insertion of further provisions concerning quarries, including another gateway for substitute consent, via a new provision,

s.261A. It was commenced on the 15th November, 2011 and provided that between that date and the 23rd August, 2012, each

planning authority had to examine every quarry in its area and determine whether (i) a development, which was not authorised by

Part IV of the Local Government (Planning and Development) Act 1963, was carried out after the 1st February, 1990 which would

have required an environmental impact assessment or a determination as to whether an EIA was required, but that such assessment

or determination was not carried out or made; or whether (ii) a development, which was not authorised by Part IV of the Local

Government (Planning and Development) Act 1963, was carried out after the 26th February, 1997, which would have required an

appropriate assessment, having regard to the Habitats Directive, but was not carried out. If development had been carried out after

these prescribed dates which should have been assessed having regard to the relevant European directives, but was not, either a

developer would be required to apply for substitute consent or they would receive an enforcement notice. The only quarries which

were allowed to apply for substitute consent were those which had a pre-1964 use or had a permission under Part III of the Act of

2000 or Part IV of the 1963 Act, and that had registered under s.261 of the Act of 2000. This gateway allows a quarry to bypass the

s.177D leave procedure and therefore exceptional circumstances will not have to be shown in relation to the development. Because

the quarry in the present proceedings had not registered under s. 261, it could not avail of this pathway into the substituted consent

procedure.

45. It was submitted by counsel that an important feature of the substitute consent procedure, for present purposes, is that a

developer in the position of the Developer in the present proceedings is, in effect, precluded from availing of the s.177D “gateway”

because of the listing of the following as a factor which the Board is to take into account in deciding whether exceptional

circumstances exist (s.177D(2)(b)): “whether the applicant had or could reasonably have had a belief that the development was not

unauthorised”. Given the Developer’s failure to register the quarry before April 2005 and given the Council’s subsequent determination

of the quarry’s unauthorised status, he could manifestly not have satisfied this condition. Whether this necessarily means that he

would automatically have had his application for leave refused by the Board is perhaps less clear, but in any event the Developer in

the present case did not seek leave pursuant to s.177D. Further, because the quarry had not been registered, the Council was not

empowered to serve a notice inviting an application for substitute consent under the s.261A gateways.

46. This legal landscape after the 2010 Act amendments has been considered in a number of judgments. In McGrath Limestone Works

Ltd v., A Bord Pleanála [2014] IEHC 382, the planning authority had, pursuant to s.261A, required that an application for substitute

consent be made in respect of a quarry which had previously been registered pursuant to s.261. The quarry firm had sought to argue,

inter alia, that the planning authority, by dispensing with the requirement for an environmental impact statement and imposing

conditions for regulating noise, blasting and operating times etc. at the time of registering the quarry under s. 261, had created a

legitimate expectation that the firm would not have to comply with any further legal obligations, which arose subsequently under s.

261A. There was also a claim that s.261A was unconstitutional. The application was refused by Charleton J. who comprehensively

examined the provisions of s.261 and s.261A. He described the decision in Commission v. Ireland as an “unrestrained condemnation of

a legal order which not having detected projects deleterious to the environment, because they were not reported by developers,

could subsequently authorise these without the need for any assessment as to their effects on either protected habitats or on the

environment”. He commented that s.261A rather than being “an imposition on quarries” instead “enabled every quarry to be what is,

in effect, a special case: a complete exception to the strictures of what European law requires. In that context, requiring a quarry

owner to which that section applies to seek substitute consent and in doing so fulfil the European law obligations which is part of the

Irish legal order is entirely reasonable”. Of course, the present case raises questions about the position of a quarry which cannot (or

did not) apply for substituted consent.

47. In An Taisce v McTigue Quarries [2016] IEHC 620, Barrett J. described the concept of substitute consent in the following terms: -

“Among the changes made were the establishment of a substitute consent process whereby the legal position of quarry

developments that had been done without an environmental impact assessment (EIA), screening for an EIA, or

appropriate assessment (AA) could apply for ‘substitute consent’. The key provision in this regard was a new s.261A of

the Planning and Development Act 2000, as inserted by the Act of 2010. Notably, for reasons that will be identified later

below, a substitute consent regularised what was done previous to consent but save as regards the taking of those

remedial measures, it did not allow for continuing or future development of a quarry and continuing or future development

required separate planning permission to be obtained following the issuance of the substitute consent.”

He continued that: -

“The substitute consent process was established…to allow the retrospective regularisation of a quarrying development

which had been carried out in the absence of an EIA, screening for an EIA, or AA, as applicable.”

48. Barrett J. went on to examine the Commission v Ireland decision where the court emphasised that any regularisation procedure

must not allow applicants to circumvent Community rules or dispense with applying those rules and that such a procedure must be an

exception. Having examined this legal background, he said, at para. 10: -

“Put plainly, a substitute consent regularises what was done previous to the consent and allows the undertakings of

certain remedial measures after the consent, but does not otherwise allow continuing or future development of a quarry:

such continuing or future development requires separate planning permission.”

49. It is clear, therefore, that Barrett J. considered that a substitute consent was backward-looking rather than forward-looking; it

regularises what was done previous to the substitute consent but does not authorise future development. Therefore, in relation to

any future development an applicant cannot rely on substitute consent but must instead go through the procedures laid down for a

normal grant of planning permission.

50. Since 2015, as a result of further amendments in that year, a person can now apply simultaneously for (a) substitute consent in

respect of a quarry under s.261A and (b) permission for further development of a quarry. This arises as a result of s.37 L of the Act of

2000 inserted by reg. 4 of EU (Environmental Impact Assessment and Habitats) Regulations 2015 (S.I. No. 301 of 2015). This provision

was not a part of the legal regime under consideration in the present case as it was not in force at the relevant time, but it does

tend to emphasise that there is an important distinction between an application for substitute consent and application for permission

to further develop a quarry.

The Comune di Corridonia case

51. Subsequent to the decision of the Board in the present case, an important decision was handed down by the CJEU, namely the

Commune di Corridonia case. Commune di Corrridonia v Provincia di Macerate (Joined Cases C-196/16 and C-197/16) [2016] involved

a reference for a preliminary ruling from Italy, “to clarify whether an environmental impact assessment pursuant to Directive 2011/92

can be carried out after the project concerned has already been realised” (emphasis added). The factual matrix in which this arose

was in the context of the construction of two plants for the generation of electricity on the basis of biogas obtained from the

anaerobic digestion of biomass. The competent Italian planning authority had given its consent for the plants in 2012. The authority

responsible for the project’s environmental impact did not require an assessment of the environmental impact to be submitted; this

decision was taken in accordance with a provision of regional law. This provision of regional law was subsequently annulled by Italy’s

constitutional court. Accordingly, the failure to obtain an environmental assessment before the project’s implementation was the

consequence of a legal error by a State authority. By this stage, the plants had already been constructed and commenced

operations. Proceedings were brought subsequent to the constitutional court’s decision, which resulted in the annulment of the

original planning permissions. The question then arose as to the appropriate approach in circumstances where the appropriate

assessments had not been, and could no longer be, obtained at the earliest possible time and in advance of the development.

52. Advocate General Kokott in her opinion dated the 30th March 2017 referred to the suggestion that the plants should be

dismantled and removed as a “legal consequence [that] is-at least in theory – possible” but said that it was “unlikely to come into

consideration”. She said that although the error of procedure could no longer fully rectified i.e. there could not now be an

environmental assessment at the earliest possible opportunity, the consequences of the error could still be mitigated. She referred to

“pragmatic solutions” being called for which did not result in an incentive to circumvent the rules of the Directive. She went on to

discuss what could be done and concluded that, in answer to the legal question raised, the court should rule that in such a situation,

the competent authorities should carry out the assessment at a later stage and draw the appropriate consequences from this

outcome; but that this cannot result in the project being treated as if its consent had been given in full compliance with the

Directive. Overall, I think it is fair to say that her Opinion as a whole is not premised on any view that a failure to carry out an

environmental impact assessment in advance of a development would always and necessarily be fatal to the continued operations of

the development in question.

53. The decision of the court was delivered on the 26th July, 2017. It pointed out that the purpose of taking into account

environmental effects at the earliest possible stage in the planning and decision-making processes was to try to prevent the creation

of pollution or nuisances at source rather than trying to counteract their effects at a later stage. It noted that neither Directive

85/337 nor Directive 2011/92 contained any explicit provisions relating to the consequences of a breach of that obligation to carry

out a prior assessment. While Member States were required to “nullify the unlawful consequences of the breach of EU law”, and

competent national authorities were under an obligation to take all necessary measures within the sphere of their competence to

remedy the failure, “for example” by revoking a consent already granted in order to carry out an assessment, the Court had held that

EU law “ does not preclude national rules which, in certain cases, permit the regularisation of operations or measures which are

unlawful in light of EU law, provided the regularisation did not offer the persons concerned the opportunity to circumvent the rules of

EU law or dispense with their application”. It referred to the regime in Commission v Ireland at this point, and then referred to Stadt

Wiener Neustadt v Niederosterreichische Landesregierung Case C-348/15 [2016] in respect of the concept of “deemed consent”, as

examples of what was not permissible. It then went to say, in what I consider to be an important passage at para. 41: -

“Furthermore, an assessment carried out after a plant has been constructed and has entered into operation cannot be

confined to its future impact on the environment, but must also take into account its environmental impact from the time

of its completion.”

54. While it was for the referring court to assess whether the legislation at issue satisfied the requirements above, the facts of the

present case appeared to indicate that the activities of the biogas plants had not attempted to circumvent rules of EU law. The

failure to procure environmental impact assessment had been due to the application of domestic law as it was before it was ruled

incompatible with EU law by the constitutional court.

55. The formal answer to the question posed was as follows: -

“In the light of all of the foregoing considerations, the answer to the question posed is that, in the event of failure to

carry out an environmental impact assessment required under Directive 85/337, EU law, on the one hand, requires Member

States to nullify the unlawful consequences of that failure and, on the other hand, does not preclude regularisation

through the conducting of an impact assessment, after the plant concerned has been constructed and has entered into

operation, on condition that:

-national rules allowing for that regularisation do not provide the parties concerned with an opportunity to circumvent the

rules of EU law or to dispense with applying them, and

-an assessment carried out for regularisation purposes is not conducted solely in respect of the plant’s future

environmental impact but must also take into account its environmental impact from the time of its completion.” (para 43)

56. Thus, it appears that there is a two-pronged test to be applied when considering a measure or provision which seeks to regularise

a past failure to conduct an environmental impact assessment: (1) whether it provides the developer with an opportunity to

circumvent EU law; and (2) whether the assessment to be now carried out takes into account not only the development’s future

impact but also its past impact.

The decision in Murphy v. An Bord Pleanala [2009] IEHC 38

57. An issue debated between the parties was whether the application for permission in the present case involved an element of

retention and/or whether permission may be given where the site in question contains, or is connected in some way to, an

unauthorised development. There appears to be little Irish authority on the point, but one authority identified by the parties in this

regard was the decision in Murphy v. An Bord Pleanala [2009] IEHC 38. The development in question consisted of a first-floor

extension over an existing premise which involved an extension for which permission had not been sought. The applicant (a neighbour-

objector) contended that the original development was (in part) illegal and that the proposed development incorporated that

development by being built on top of it. The allegation that the original development was illegal was the subject of Circuit Court

proceedings between the parties. In reply, the developer claimed it was not unauthorised because it amounted to an exempted

development, on the basis that its area was below the threshold in respect of which planning permission would be required. By the

time of the planning inspector’s report into the premises, the Circuit Court proceedings had been withdrawn. The inspector

recommended a refusal of planning permission. He did not express a view as to the dispute concerning the earlier works. An Bord

Pleanala decided to grant planning permission. It too made no determination as to whether the earlier works amounted to

unauthorised development. The applicant brought judicial review proceedings, seeking certiorari of that decision, which was refused.

The High Court, Feeney J., noted that there was no express statutory prohibition on the grant of planning permission which has within

its area unauthorised development. Feeney J. rejected the submission that the grant of planning permission in respect of the first floor

would thereby implicitly approve the status of the existing storeroom underneath:

“In this case the planning permission did no more than assure the applicant that as regards the planning legislation, the

particular development sought would be lawful. That development was in respect of a first-floor extension and did not

extend to the ground floor. If an earlier development by the developer was unauthorised and/or unlawful, the planning

permission granted did not, either by law or by implication, authorise or permit such earlier development”.

And later-

“The applicant’s argument in relation to an irrational decision is predicated upon a claim that the proposed development is

to be carried out on top of an illegal structure. That has not been established. Even if it were the case that it had been

proved that the development permitted by the planning permission was to be carried out on top of an illegal structure,

that, of itself, does not disentitle An Bord Pleanala from granting permission…In light of the above, the Court is satisfied

that An Bord Pleanala is not prohibited from granting planning permission in circumstances where the development in

respect of which planning permission is sought incorporates an extant development which it is alleged amounts to an

unauthorised use and/or development. Nor is it the case that an application for permission, in circumstances such have

been established in this case, must include an application for retention of the alleged unauthorised development.

Therefore, it cannot be said that An Bord Pleanala was obliged to determine whether or not the disputed works were an

authorised development or exempted development”.

58. Interestingly, Feeney J. referred to a planning decision in respect of a quarry relied on by the applicant, where the Board had

refused the grant of planning permission for an extension of an unauthorised development in relation to quarrying activities. He said

“Cases such as that are fundamentally different from the facts of this case. What was under consideration in the quarrying case was

the extension of quarrying activities into a new field or area from the original quarry area. The decision was that the proposed

development of itself, would be an unauthorised development”.

59. I will summarise below the submission of the parties as to the implications of this decision, if any, for the present proceedings.

The submissions of the parties

60. As the submissions on behalf of the applicants and those of the State parties were aligned insofar as they both considered that

the Board had made a legal error in granting the planning permission sought by the Developer, I will deal with those in the first

instance, and then turn to the submissions on behalf of the Board, even though this was not the order in which the submissions were

presented at the hearing. My summary is a paraphrase of, I hope, the essential points on behalf of each of the parties rather than a

comprehensive repetition of their written and oral submissions.

The submissions of the applicants

61. It was submitted on behalf of the applicants that the legislative scheme did not permit of a situation whereby, in circumstances

such as that pertaining in the present case, the planning authority could grant “standard” planning permission pursuant to s.34 to the

quarry in question, because this, it was submitted, would in effect amount to retention permission and would therefore breach the

prohibition in s.34(12) of the Act of 2000 and circumvent the substitute consent procedure in s.261A of the Act. Reliance was placed

upon Shillelagh Quarries v. An Bord Pleanala [2012] IEHC 257 for the proposition that in determining whether or not an application is

for retention permission or not, it is the substance of the application that should be examined, not the words used. In that case,

Hedigan J. said:

“whether or not the word ‘retention’ is used, the substance is the same here as in the case of retention permission.

Development, which would otherwise be required to undergo the EIA process, cannot be given ex post facto development

consent under EU law”.

It was argued that what was, in effect, being authorised was the extension of an existing and unauthorised quarry, rather than a

proposal for a new quarry. Emphasis was laid upon the map submitted with the planning application, which showed a substantial

overlap between the location of the “old” quarrying operations and the proposed “new” quarrying operations within the overall site.

62. Further, it was argued that s.1A of the Act of 2000 requires the court to interpret the legislative provisions in a manner compliant

with, inter alia, the requirements of the EIA Directive and the Habitats Directive, and that the procedure used in the present case

circumvented the requirements of European law as set out in Commission v. Ireland and the statutory procedures specifically

designed to ensure that those EU law requirements were complied with. It was submitted that the Developer is compliance with the

enforcement notice of the Council merely led to the cessation of quarrying for six months but did not lead to the carrying out of any

remedial EIS or NIS. Thus, the grant of planning permission in all of the circumstances was not in compliance with the requirements as

set out in Commission v. Ireland or the fundamental objective of the two Directives in question.

63. Counsel on behalf of the applicants submitted that an important point of distinction between the present case and the Murphy

case was that in the present case, there had been a determination that there had been an unauthorised development, whereas in

Murphy, this issue had never been determined.

The submissions of Ireland and the Attorney General

64. It was submitted on behalf of Ireland and the Attorney General (hereinafter referred to as “the State respondents”) that it was

ultimately a question of degree as to whether or not, in any particular case, a planning application amounted to an application for

retention permission, and that this was a matter for the local planning authority, followed by An Bord Pleanála, and these decisions

were only amenable to being overturned by the Court on the usual judicial review principles. It was submitted that in this case, the

Board had made an error of law. It submitted that at the level of general principle, where permission is sought for the carrying out of

further quarrying activity at quarry face or edge which would not otherwise exist “but for” the previous unauthorised development,

such a planning application might reasonably be said to involve “an element of retention”. Pointing out that the statutory definition

under s.2 of the Act of 2000 defines “structure” to include an excavation, or other thing constructed or made on, in or under land, it

was submitted that a literal interpretation would suggest that there is an element of retention where a planning application seeks to

retain an existing quarry pit. It was submitted that “retention” meant retention in the ordinary meaning of “keeping” something, rather

than the meaning contended for by An Bord Pleanála, namely that it amounted to a “legal cleansing” of its planning status. It was also

suggested that, on a purposive interpretation, if there is no requirement to apply to retain the existing “hole in the ground”, then the

risk of having to restore the land is removed and in a real sense the landowner is benefitting from being allowed to retain the

unauthorised development and to develop it further.

65. A number of European authorities were opened to me by counsel on behalf of the State respondents on the subject of when

operations or developments can be considered distinct from previous operations or developments, for the purpose of arguing that

continuing to quarry on an existing quarry site amounted to further development of the same quarry in reality. In Stadt Papenburg v

Bundesrepublik Deutschland Case C-226/08 [2010] E.C.R I-00131, the question arose as to whether the repeated, ongoing dredging of

a river could be considered a single “project” under Article 6(3) of the Habitats Directive or a series of projects all of which would

require development consent. The court stated at para. 47: -

“Finally, if, having regard in particular to the regularity or nature of the maintenance works at issue in the main

proceedings or the conditions under which they are carried out, they can be regarded as constituting a single operation,

in particular where they are designed to maintain the navigable channel at a certain depth by means of regular dredging

necessary for that purpose, those maintenance works can be considered to be one and the same project for the

purposes of Article 6(3) of the Habitats Directive.”(emphasis added)

66. In Brussels Hoofdstedelijk v Vlaams Gewest Case C-275/09 [2011] E.C.R I-01753, a dispute arose in relation to the renewal of an

existing consent for the operation of Bruxelles-National Airport. The Court stated that the objective of legislation cannot be

circumvented by the splitting of projects and a failure to take into account their cumulative effect and in doing so, escape the

obligation to carry out an assessment when, taking the projects together, they are likely to have significant effects on the

environment within the meaning of the EIA Directive.

67. Stadt Wiener Neustadt v Niederosterreichische Landesregierung Case C-348/15 [2016] concerned a waste processing plant in

Austria for which consent was originally given to process 9,900 tonnes of waste per annum in 1986 and 1993 (i.e. before Austria

joined the European Union). In 2002 the regional government permitted an increase in the plant’s maximum processing capacity to

34,000 tonnes. This was to be affected through the construction of an extension of the plant. The consent for the extension was

granted without an EIA. The domestic legislation provided that consent for a project which required an EIA but for which one had not

been completed was capable of being annulled within 3 years. If a project’s consent was no longer at risk of annulment the domestic

legislation provided that the consent was at this point deemed to have been granted lawfully. The CJEU held that while time limits in

relation to bringing proceedings against a grant of consent were not in principle precluded, a provision which deemed such consent as

lawfully authorised by virtue of it being incapable of challenge before the courts was incompatible with the EIA Directive. As noted

earlier, this decision was referred to in Comune di Corrridonia v Provincia di Macerate (Joined Cases C-196/16 and C-197/16) [2016]

ECLI:EU:C2017:589.

68. Counsel on behalf of the State respondents placed considerable reliance on the decision in Comune di Corrridonia v Provincia di

Macerate (Joined Cases C-196/16 and C-197/16) [2016] ECLI:EU:C2017:589, and in particular the passages of the Court’s judgment

which stated that where an assessment has been carried out after a plant has been constructed and has entered into operation,

such assessment cannot be confined to its future impact on the environment but must also take into account its environmental

impact from the time of its completion i.e. in the past.

69. With regard to the decision in Murphy v. An Bord Pleanála, it was submitted that, in the first instance, this did not involve a

quarry and that the decision did not arise in the context of the complex EU/Irish web of law concerning quarry planning and

environmental assessments; and secondly, that there was no discussion of the concept of retention useful for present purposes.

The submissions of the Board

70. Counsel for the Board submitted that there is nothing in the Act of 2000 as amended which explicitly prohibits an application for

planning permission of the kind made here. It was submitted that there was no express statutory prohibition on an application for

planning permission for future works where the history had been such as that in the present case, and that this was of considerable

relevance in circumstances where the planning code does, in other areas, contain explicit statutory prohibitions.

71. It was submitted that the present application did not amount to an application for retention permission because it concerned

quarrying operations in the future and did not seek in any way to legally regularise what had happened in the past. It was submitted

that the application did not in fact involve “retention”. A quarry was essentially “a hole in the ground” and new quarrying is by its

nature “parasitic” on the old quarry. This did not mean that quarrying into the future necessarily involved “retention”; the

consequences of the prior unauthorised development remain and its legal status has not been cleansed. The Oireachtas had set out a

complex scheme which had been followed in the present case; given the circumstances of this quarry, an enforcement notice had

been served and there had been a cessation of the activity for six months in compliance with the notice. However, this does not

prevent an application for planning permission in respect of developments which are to take place into the future. As was stated in

the written submissions: “What it means it that the quarryman has to accept the consequences that there is an historic issue over

the status of works carried out on the lands. That historic issue does not mandate the result of any prospective application, although

it clearly is a relevant consideration for the Planning Authority in determining the prospective application for permission”. The

unauthorised status of the past development is a consideration to be taken into account in the planning application for future

development but does not constitute a bar to future development.

72. It was submitted that the contrary interpretation of the legislation would be to effectively “sterilise” the quarry into the future,

leaving a quarry face, which is in fact still capable of being physically exploited, legally incapable of being exploited. This would be to

wrongly treat an “unregularized past” as inevitably leading to a sterilised “future”. Further, it would lead to the absurd practical

consequence that a neighbouring quarry could be commenced so long as it did not rely upon established cutting lines.

73. It was submitted that the construction contended for by the applicants and the State respondents would also be a

disproportionate consequence from the failure of the Developer to have registered in accordance with s.261 Act of 2000. On this

approach, nothing could ever, it was argued, be done at this quarry, not matter how environmentally acceptable it would be, simply

because of a past failure to have engaged in an administrative act, namely putting details on a register. It was pointed out that a

relevant environmental impact assessment had been sent to the Board with the present application for planning permission and that

the Board had decided that the proposed quarrying would not have unacceptable environmental effects.

74. The Board relied on the case of Desmond Murphy v. An Bord Pleanála [2009] IEHC 38 for the proposition that planning permission

may be applied for (and granted) even if the site of the proposed development contains a previous unauthorised development.

75. The Board sought to distinguish Shillelagh Quarries v. An Bord Pleanála [2012] IEHC 257 case on the basis that, in the present

case, there had been an enforcement notice which had been complied with.

76. As regards European law, it was submitted that the core problem identified in Commission v. Ireland was a situation whereby

retention permission could be granted routinely in non-exceptional circumstances, thus regularising the past unauthorised

development and treating it in legal terms as if it had received planning permission prior to the carrying out of the development. The

case did not deal with the question of future development but was instead focussed on the issue of regularising the past. In contrast,

the case of Comune di Corridonia did deal with the issue of future developments and did envisage that permission could be granted to

projects in respect of which there had been a failure to carry out environmental impact assessment pre-development, provided later

environmental impact assessment was carried out. It was submitted that none of the authorities cited by the State respondents

showed that European law took a rigid perspective to the effect that the Directives could never be satisfied by carrying out

assessments after the development had commenced.

Discussion and Decision

77. I will start with an examination of Murphy v. An Bord Pleanala [2009] IEHC 38, the facts of which were set out earlier. In this

case, the High Court (Feeney J). accepted the proposition that the planning permission for a proposed first-storey development did

not implicitly authorise an existing extension, the planning status of which was in dispute, and that the permission granted did not in

any way incorporate any element of retention in respect of the first extension. His decision could therefore be said to support the

broader proposition that a planning permission application under s.34 is limited to defining the status and conditions of future

development and does not speak at all to the legal status of past development. I appreciate that there is a distinction between that

case and the present one insofar as whether the first extension in the Murphy case was unauthorised or not was a matter in dispute,

rather than a matter unequivocally established (as was the unauthorised nature of the quarry in the present case). However, this

does not seem to me to be an important point of distinction because the decision of Feeney J. was based upon the principle that the

status of the first extension did not affect the validity of permission given; no doubt if the establishment of the status of the first

extension would had made any difference to the outcome, Feeney J. would have held that the issue required a determination by the

Board. His decision was, however, that the status did not need to be determined precisely because it was not relevant to the

permission for the future development which was actually granted and in issue in the proceedings.

78. More problematic, however, is the fact that Feeney J. specifically stated that quarry cases were “fundamentally different” from

the case before him. Unfortunately, his brief reference to a quarry planning decision cited to him does not make it clear whether the

quarry permission in that case was refused because of features of the proposed development (i.e. an objection to the future

development itself), or simply because the proposed quarrying was the extension of quarrying activities from the original quarry area

(i.e. that the future development amounted to retention). Further, the decision pre-dates the decision in Commission v. Ireland and

the 2010 legislation enacted in response to it. Accordingly, it seems to me that the precedential value of the Murphy decision is

rather limited when considering the situation in the present case.

79. Turning therefore to the CJEU decisions, which are of central importance in these proceedings, there is no doubt that the specific

problem in issue in Commission v. Ireland was the widespread practice of granting retention permission and treating the situation as

legally identical to a situation where a developer had obtained planning permission before the development and as a result of a

process in which appropriate environmental impact assessments had been submitted by him and considered by the decision-maker.

However, it seems to me that EU law is not primarily concerned with the label given to the type of permission granted but is more

fundamentally concerned with ensuring that the process of assessing environmental impact and incorporating this into planning

decisions is observed as fully as possible. What was of concern to the CJEU, on my understanding of Commission v. Ireland, was that

by retrospectively validating development via the mechanism of granting retention permission, the requirement to submit an

environmental impact assessment was thereby routinely being bypassed. This concern with process, and the role of environmental

impact assessments with the process, emerges further in Comune di Corridonia. The case of Comune di Corridonia dealt with what is,

for present purposes, the even more pertinent factual situation of an actual development which had failed to submit an environmental

impact assessment in the past (in that case, because the competent national authority did not deem it necessary) and was now

seeking to have development authorised into the future. Thus, it squarely addressed the question of whether and when a future

development may be permitted even when there has been a failure to conduct environmental impact at the earliest possible time,

which of course is the most desirable scenario from an environmental point of view. As noted above, the court set out a two-pronged

test for when such development may be permitted: at para. 38, the court said “such a possible regularisation would have to be

subject to the condition that it does not offer the persons concerned the opportunity to circumvent the rules of EU law or to

dispense with their application, and that it should remain the exception” (emphasis added) and, at para. 41, “an assessment carried

out after a plant has been constructed and has entered into operation cannot be confined to its future impact on the environment,

but must also take into account its environmental impact from the time of its completion” (emphasis added). Obviously, the choice

of the word “completion” in its formulation above was influenced by the facts of that case which involved the construction of a

biogas plant. However, what I understand the words to mean is that the “baseline” from which the environmental effects must be

assessed is the date when the environmental impact assessment should originally have been carried out and taken into account by

the decision-maker.

80. How do the principles identified in those authorities interact with the regime currently set out in the Irish legislation? The

substitute consent procedure in Part XA of the Act of 2000 was introduced into Irish law in order to comply with the requirements of

EU law. As has been discussed above, at the core of the procedure is the requirement that the developer submit a “remedial”

environmental impact assessment, which is then factored into the decision-making process by the decision-maker, and as a result of

which, inter alia, remediation works may be ordered. But what of a quarry owner who wishes to obtain permission for future

development? In this regard, it seems to me helpful to compare and contrast the position of two categories of developer.

81. Let us take first the position of a registered quarry owner who applies for both substitute consent and planning permission in

respect of future development. Prior to 2015, as I understand it, these applications would have to be consecutive, but now they can

be carried out simultaneously because of the insertion of the new s.37L. Whether the applications are sequential or simultaneous the

important point is that, by the end of the entire process, the decision-maker will have reached its decision on the basis of a full range

of information -retrospective and prospective-before deciding what to do. It might be said that the developer’s applications, and the

Board’s decisions, are Janus-faced in this regard; that is to say, both forward- and backward-looking as regards the environmental

impact on the site. The purpose of the process is to ensure that any past adverse effects on the environment are ameliorated or

mitigated as much as this can now be done, as well as to prevent future adverse effects from the future works as far as possible.

82. By way of contrast, let us take the position of a developer such as a Developer in the in the present case, who has not gone

through the substitute consent process and instead has been determined to have been engaged in unauthorised development in the

past, has ceased quarrying operations for 6 months in compliance with an enforcement notice, and has then made an “ordinary” or

“standard” s.34 planning application in respect of proposed future development. It is true that the quarry was closed for 6 months,

and it also true that the unauthorised status of the past development has not been legally cleansed. However, a key practical

distinction is that this Developer has not at any stage of the process submitted a remedial impact statement, and the impact of the

past works on the environment and/or the issue of remediation works has not been directly addressed by the Board in respect of his

quarry.

83. Thus, the important practical distinction between the two categories of developer i.e. the developer described at paragraph 81

above, and the Developer in the present case, is that while both have to submit forward-looking environmental impact reports in

respect of their future development, the Developer in the present case was not required to submit a remedial impact statement and

the Board did not factor the impact of past development on the environment into its decision-making process. It does not seem to me

that this situation could be in compliance with EU law as interpreted by the CJEU, particularly having regard to the second prong of

the two-pronged test set out in the Comune di Corridonia case. Accordingly, I am of the view that the decision of the Board in the

present case must be quashed.

84. I should perhaps clarify my view on the question of whether the grant of permission in this case can be characterised as

“retention permission”. Insofar as retention is seen as simply “cleansing” the past from a legal point of view, the answer is no,

because the past unauthorised development of this quarry remains unauthorised. However, a slightly different, and in my view more

pertinent question, is whether what was done in this case was in breach of the principles set out by the CJEU, to which the answer

is, in my view, yes. There was considerable argument between the parties as to whether the decision in Commission v. Ireland was

primarily about the legal “cleansing” of the past or not. It seems to me that the answer is neither a simple “yes” or “no”. Rather, my

understanding of Commission v. Ireland is that it was concerned about the legal cleansing of the past because this was being done

without environmental impact assessments being carried out and the results of such assessments being factored into the decision-

making of the planning authority. My understanding of this decision in this regard is re-enforced by how matters were dealt with in the

Comune di Corridonia case, where the emphasis on (what Irish law would call) remedial environmental impact assessments came to

the fore. Accordingly, I am not convinced that framing the issue for decision into the binary question of whether or not the permission

given amounted to retention permission or not necessarily advances the analysis or answers the right question. Fundamentally, the

Directives are about process; ensuring that an appropriate process in respect of assessing environmental impact is followed. The label

given to the permission granted must surely be subordinate to that core purpose.

85. It was argued on behalf of the Board that if the views of the applicants and State respondents were correct, this quarry would be

rendered sterile into the future, because it could not move beyond its unauthorised past and obtain permission for the future. It was

submitted that this would be a disproportionate effect flowing from the failure of a developer, in the past, to have taken the simple

administrative step of furnishing details for a register, particularly in circumstances where (as was found by the Board in 2015) there

would not be significant environmental impacts from this quarry into the future. I would characterize the failure to register as going

somewhat further than a mere failure to take an administrative step, despite what was stated in this regard by Charleton J. in the

McGrath Limestone case in a different context, because this failure to register entailed the further practical and real consequence

that the quarry escaped the scrutiny of the planning authority in 2004/5 and therefore also escaped a determination at that time as

to whether an environmental impact assessment was required. However, I agree with the Board’s interpretation of EU law, as

elucidated in the decisions referred to, insofar as it suggests that EU law does not always and necessarily require that developments

which have failed to submit environmental impact assessments in the past must be permanently sterilised into the future (i.e. a

particular outcome); rather, it seems to me that EU law requires that information about past adverse environmental effects (if any)

be made available to the decision-maker and a decision made by the decision-maker about the future in light of all relevant

information (i.e. a particular process).

86. It is not clear to me whether the exclusion of a quarry such as the one in the present case from the substitute consent regime

was a deliberate strategy on the part of the Oireachtas or whether it is something of a loophole arising in a highly complex set of

provisions (Part XA and s.261A). But insofar as there is such an exclusion and it is considered to be disproportionate, the problem

could presumably be remedied in the future by some appropriate legislative amendment. I do not, however, consider that the

suggested disproportionality of the effect of the statutory regime enables me to disregard the preconditions to regularisation

described in the Comune di Corridonia case. If the sterility effect is because of a procedural blockage in the Irish statutory regime

which attempts to transpose EU law, an amendment could remove the procedural blockage and allow a quarry developer, in an

appropriate case, to obtain the appropriate environmental impacts assessments (including remedial assessment) and successfully

acquire permission for future development.

87. I add one caveat to the above. It is not entirely clear to me that the Developer was in fact excluded from, and could not have

submitted an application pursuant to s.177(D) for substituted consent, as distinct from the invitation to apply for the substitute

consent “gateway” under s.261A from which regime he was clearly excluded. It appeared to be the assumption of the parties in the

case that the Developer could not make any such application, by reason of s.177D(2)(b), which refers to the developer’s belief as to

the whether or not the development was unauthorised. However, this factor is only one of a number of factors to be considered by

the Board under a s.177D application for permission. Another factor is, for example, the actual or likely significant effects on the

environment resulting from the carrying out or continuation of the development. Is it a foregone conclusion that the application must

necessarily be refused simply because the Developer engaged in authorised development in the past? I am not entirely convinced that

a developer in the position of the Developer in the present case is definitively precluded from making an application under s.177D.

Whether he would succeed in obtaining leave to make an application for substitute consent, and then ultimately obtain substitute

consent, is a different matter. What was assumed in these proceedings was that he could not even make the application, or at least,

that such application would inevitably be futile. This question was not necessary for determination in the present proceedings as the

Developer had not in fact sought to obtain leave under this provision and I therefore do not express any concluded view in relation to

the matter. Arguments can be made on both sides, having regard to not merely the language of s.177D itself but also how this

section interacts with the overall scheme in the legislation and the enforcement procedure in respect of unauthorised quarries.

88. By reason of the foregoing conclusions, I will grant certiorari of the Board’s decision of 17 May, 2016. I will hear argument as to

the precise terms of any Declaration to be granted. My provisional view in that regard is that I should grant a Declaration that the

acceptance, consideration and granting of planning permission to the Developer pursuant to s.34 of the Act of 2000 as amended in

the particular circumstances of the present case was not in compliance with the principles of EU law as identified in Commission v

Ireland and Comune di Corridonia and/or the provisions of the 2011 Directive and Habitats Directive as transposed into Irish law.

However, I will hear such argument on this as the parties may wish to offer when they have had an opportunity to consider the

judgment.

89. Finally, I should say, for completeness, that an issue was raised as to whether adequate notice of the decision of the 17th May,

2016 was given by the Board. Having regard to the affidavit evidence in this regard, together with the submissions filed, I am not

satisfied that there is sufficient evidence to substantiate this contention and I refuse this ground of relief.