Legislator Case Law & Legislation
IEHC 782 ECLI:IE:HC:2017:782 AI generated

Court rejects plaintiff's protocol for site inspection, allowing defendants to proceed with a revised, less intrusive sampling plan.

Case Number IEHC 782
Court / Authority
Jurisdiction Ireland (IE)
Decision Date
Outcome Partially Allowed

Legislator summary

AI generated

The court refused the plaintiffs' request to inspect the site using their expert's protocol, instead granting the defendants' proposed revised protocol. The plaintiffs argued their protocol was necessary and that the defendants' alternative was overly intrusive, but the court found this reasoning incorrect as it would force defendants to rely on evidence they could not obtain. The court determined the defendants' revised plan, involving fewer drill holes and EPA approval, constituted the least intrusive method satisfying their evidentiary needs while protecting the plaintiffs' site.

Legislator headnote

AI generated

s. 6.0 of the report of Golder; The court must balance the right to present a case against the need to interfere with others' rights to the least possible extent, allowing a revised inspection protocol if it is less intrusive than the original request.

Keywords

AI generated
site inspection protocol least intrusive principle environmental damage risk evidentiary necessity sampling methodology party autonomy in litigation EPA approval requirement

Cited Case Law

AI generated
AI generated

Need to analyze how this precedent applies to your matter?

Cross-reference this judgment against statutes, commentaries, and subsequent citing case law inside Legislator AI.

Open in Legislator →

Full text

[2017] IEHC 782

THE HIGH COURT

COMMERCIAL

[2017 3203 P]

BETWEEN

MURPHY ENVIRONMENTAL HOLLYWOOD LTD, INTEGRATED MATERIALS SOLUTIONS PARTNERSHIP ACTING THROUGH ITS

GENERAL PARTNER INTEGRATED MATERIALS GP LIMITED

PLAINTIFFS

AND

SPENCER PLACE DEVELOPMENT COMPANY LIMITED, P.J. HEGARTY AND SONS UNLIMITED COMPANY, BARNMORE DEMOLITION

& CIVIL ENGINERING LIMITED

DEFENDANTS

JUDGMENT of Ms. Justice Costello delivered on the 21st day of December, 2017

1. On the 15th May, 2017 McGovern J. made an order for the inspection of the first named plaintiff’s property at Hollywood Great,

Nags Head, The Naul, County Dublin (the site) by the defendants’ experts on or before the 26th May, 2017. He also ordered that the

relevant experts were to meet to agree a protocol for inspection and the taking of samples for testing. He granted the parties liberty

to apply in the event that there was a difficulty in agreeing a protocol. The parties could not agree a protocol and the plaintiffs

brought a motion dated 19th July, 2017 directing that inspection of the site be conducted in accordance with s.6.0 of the report

prepared by the plaintiffs’ expert, Golder Associates, (Golder) dated 4th July, 2017. The defendants say that this protocol in effect

amounts to an impermissible limitation of the original order of McGovern J. and they seek to inspect the site in accordance with a

revised protocol prepared by Marron Environmental on behalf of all three defendants dated the 2nd August, 2017.

Background

2. The plaintiffs operate an inert landfill at the site which is licensed by the Environmental Protection Agency (EPA) to receive inert

waste. The plaintiffs contend that inter alia the first named defendant either directly or through the second or third named

defendants transferred non-inert waste soil including hazardous waste soil from its site at Spencer Dock, Dublin 1 to the site (the

impugned waste). The plaintiffs plead that the defendants produced documents which misdescribed the waste as non-hazardous soil

which was suitable for disposal at an inert landfill. On this basis the plaintiffs accepted approximately 6000 tons of waste from the

defendants in or about February 2017.

3. In March 2017 it became apparent that the impugned waste was not inert waste and in accordance with instructions from the EPA

the impugned waste was quarantined and is currently isolated in the location in which it was deposited within the site in an area

known as Cell 4.

4. The plaintiffs retained Golder to advise in relation to the remediation of the site. The plaintiffs and the EPA agreed a remediation

plan following an extensive site investigation, sampling and analysis exercise which was approved by the EPA.

5. On the 6th April, 2017 the plaintiffs commenced these proceedings and the proceedings were entered into the commercial list on

the 24th April, 2017. Prior to that, on the 18th and 19th of April, 2017, an inspection of the material at Cell 4 was undertaken by the

plaintiffs at which experts instructed on behalf of the defendants attended. The defendants were provided with split samples of the

material for the purposes of their own testing.

Order for Inspection

6. The order of McGovern J. of 15 May 2017 was made pursuant to O.50 r.4 of the Rules of the Superior Courts. In James Elliot

Construction Ltd v. Lagan & Ors [2015] IEHC 631 I summarised the principles applicable to an application under O.50 r.4 as follows:

“(1) The Court may order that a party may take samples of the property of another party to proceedings which may be

necessary or expedient for the purpose of obtaining full information or evidence;

(2) The power must be viewed in the context of a party’s constitutional right of access to the courts;

(3) The Court must ensure that the litigant will have facilities to present his case to the Court. This includes all the

advices and information which the litigant wishes to present to the courts, either in support of his own case, or to

undermine that of his deponent;

(4) The right to an order for inspection or the taking of samples is not dependent upon the strength of the case of the

party seeking the order;

(5) Inspection, or the ordering of the taking of samples, should be facilitated if it can be achieved while at the same

time protecting the interests of the opposing party. The interests of an opposing party that a court takes into account

are those relating to that party’s rights as the owner or occupier of property;

(6) The proposed inspection or taking of samples must be shown to be necessary or expedient by reference to the

issues in the case;

(7) The inspection or sampling ordered should be limited to that which the party seeking the order has shown to be

necessary or expedient to his own case or his defence of his opponent’s case.”

7. It is clear that the right of a party to inspect and take samples of or from the property of another party to proceedings and, by

extension, the scope of such inspection or sampling, is not dependent upon the Court being satisfied as to the strength of the case

of the party seeking the inspection. It is rather to secure that party’s constitutional right of access to the courts or, as was said by

Ms Justice Murphy in Ballymore Residential Ltd & Anor v. Roadstone Ltd & Ors [2017] IEHC 539, to ensure equality of arms between

the litigants.

8. Mr Justice Murphy in Bula Ltd. v. Tara Mines Ltd (No. 1) [1987] I.R. 85 held that it is impracticable and undesirable to attempt to

evaluate the strength or weaknesses of the cases of either the plaintiff or the defendants on the hearing of such a motion. In the

case of Wymes v. Crowley [1987] IEHC 68 the geologists for the plaintiffs and the defendants disagreed as to whether the proposed

inspection would cause damage to the ore body which was sought to be inspected. The Court indicated that it could not resolve the

conflict but that inspection should be facilitated if it could be achieved whilst at the same time protecting the interests of the

defendants.

9. In James Elliot Construction Ltd at para. 21 I held that unless it could be shown that the information sought to be obtained from

the sample that the party wished to take from its opponents property could have no bearing on the case as pleaded, I was of the

opinion that it was not for the court to decide on a motion pursuant to O.50 r.4 to shut the party out from obtaining the information

it sought. Similarly, in Charleton v. Kenny [2007] IEHC 308, Clarke J. (as he then was) controlled the process of obtaining the

information sought by the plaintiff but he did not limit the information obtained once the plaintiff met the threshold for the granting of

the order.

The Scope of the Order

10. Mr. Justice McGovern ordered: -

“that an inspection of the first named plaintiff’s property at Hollywood Great, Nags Head, The Naul, County Dublin by the

defendant’s experts to take place on or before Friday the 16th day of May, 2017 and that the reports following the

inspection be completed and exchanged within one week thereafter (on or before Friday the 2nd day of June, 2017),

And…that the relevant experts do meet by Thursday of this week (the 18th day of May, 2017) to agree a protocol for

the inspection and taking of samples for testing and if there is any difficulty in agreeing a protocol then the court doth

grant the parties liberty to apply.”

11. It is thus clear that the scope of the order is for inspection of the entire site and it is not confined to the area where the

impugned material is or was deposited and the sole matter for agreement between the parties was the protocol for the inspection and

the taking of samples for testing from the site.

12. The plaintiffs say that the protocol should be confined to the inspection and testing of material from in or around Cell 4. This took

place in August 2017, so in effect there should be no further inspection of the site. On the other hand the defendants argue that the

protocol is to control the process whereby inspection and testing is to take place and it is not to limit the scope of the order. They

urge strongly that the order is not confined to that portion of the site known as Cell 4 and the protocol should not limit them in a

manner which is inconsistent with the terms of the order of the 15th May, 2017.

13. The inspection sought by the defendants was not confined to inspecting solely the impugned material. They sought inspection

and testing of (i) the impugned material, (ii) the area and material adjacent to the impugned material and (iii) samples from the site

not directly impacted by the impugned material. Initially the emphasis in the submissions to court was on inspecting the impugned

material, as the parties wished to ascertain whether the impugned material was from Spencer Dock or whether it had been

contaminated by other waste soil on the site. However, the application was never confined or limited solely to the impugned material

or the material in its immediate environs. The notice of motion of 10th May, 2017 sought an order for the inspection and testing of

the site and the waste material the subject matter of the proceedings. The order made was for inspection of the entire site and was

not confined to the impugned material.

Attempts to Agree a Protocol

14. The defendants’ proposed protocol of the 2nd May, 2017 was for the independent testing of the facility and presented a process

“for the assessment of the site” (emphasis added). The document stated:

“The requirement for additional testing at the site is presented in the context of an overall risk assessment and remedial

option assessment for the site.” (emphasis added)

The protocol specification was not confined to the remediation of the site. It referred to a staged approach to the assessment and

investigations and included an assessment to determine if leachate from the impugned material posed a potential impact to

groundwater. In order to carry out the assessment certain information was key, including baseline groundwater and surface water

monitoring for the site, a review of exceedances in EPA licence and the seepage quality for other waste at the site based on soil

quality results.

15. On the 17th May, 2017 the experts instructed by all of the parties met to try to agree a protocol for inspection and testing at the

site in accordance with the order of the 15th May, 2017. The plan proposed by the defendants included sampling materials outside of

the area where the impugned waste was stockpiled. Mr. Conor Tonra on behalf of Golder informed the attendees of the meeting that

all plans for intrusive works on the site would have to be agreed with the EPA. The defendants’ experts were to put forward a

documented plan for approval by the EPA to include sampling and other testing locations, sampling methodology, analytical suite,

sample depth depths, reasons for sampling and characterisation and health and safety considerations. The parties agreed that a non-

intrusive site inspection could be carried out prior to intrusive investigations to allow the defendants to prepare a more robust plan.

16. There was a disagreement in the absence of the perfected court order as to the scope of the order. The minutes of the meeting

recorded that the extent to which intrusive investigations were permitted or appropriate outside the impugned materials was unclear.

17. On the 22nd June, 2017 RPS (the expert instructed by the second named defendant) prepared a protocol for inspection and

testing at the site on behalf of the defendants. They proposed sampling the impugned material and non-impugned material at the site.

Background sampling of the non-impugned material was to determine waste quality prior to the placement of the impugned material.

They proposed a Photoionization Detector (PID) spike survey at 60 points around the site including parts of the site which were

capped. It was also proposed that fifteen site investigation points (trial pits) outside of the impugned material would be excavated.

18. The plaintiffs objected strongly to the protocol by email dated 1st June, 2017 and on the 2nd August, 2017, after the return date

for the plaintiffs’ motion, Marron Environmental on behalf of the defendants proposed a revised protocol for inspection and testing at

the site. The scope of the proposed works remained the same. The defendants still sought soil samples outside the impugned material

and water and leachate sampling. However, alternative, less intrusive procedures were proposed.

19. There would be no PID spike survey at the site in order to accommodate the concerns raised by Golder that the process may be

detrimental to the integrity of the clay cap in situ in closed areas of the site. They said that it was necessary to obtain soil and

leachate samples from across the entire site to confirm that other areas of the site are not contributing to ground water, surface

water or leachate contamination. It was therefore proposed to collect fifteen samples from areas up gradient of and removed from the

stock pile of impugned waste and Cell 4 and to have a total of 22 soil sampling locations outside the stock pile of impugned waste.

The proposal stated that the exact number and location of the proposed samples would be confirmed after the site inspection and

topographic survey.

20. In relation to water and leachate sampling, it was proposed to collect surface water, groundwater and leachate samples at the

site. They expected to collect four surface water samples from local drainage network, including one sample upstream and up to three

samples downstream from the site. Depending on the location of existing boreholes, Marron Environmental recommended that two or

three groundwater samples be collected to include one sample up gradient of the impugned waste and one or two samples down

gradient (if available). It was proposed to sample four existing leachate monitoring points shown on maps provided by the plaintiffs.

The Plaintiffs’ Objections to the Defendants’ Proposed Protocol.

21. The initial objections were to the proposed PID spike survey at 60 points on the site at locations that were a significant distance

from Cell 4 and physically isolated from the impugned material. It was said that this was unnecessarily intrusive and that no

appropriate methodology for restoration of the site had been proposed. As the defendants no longer intend to seek a PID spike survey

this objection falls away.

22. The plaintiff said that the defendants’ proposals would interfere with areas of the site which had been capped and this would

potentially cause further environmental damage and had an increased potential to generate leachates.

23. Mr. Cian O’Hora on behalf of the first named plaintiff expressed concern that trial pits would cause a number of soft spots due to

different settlement of material over time which could lead to water logging. He said his main concern was the integrity of the cap

which is threatened if the defendants carried out the PID spike survey or excavated trial pits.

24. Mr. O’Hora also emphasised that the facility was regulated by the EPA and the proposed works would give rise to regulatory issues

with the EPA.

25. The primary objection was on the basis that the proposed inspection was unnecessary and there was no scientific basis for the

proposed testing. The impugned material is entirely within the confines of Cell 4. The existing test results from the site and the

Spencer Dock site show that the impugned material was not inert but had high levels of contamination and was hazardous which

could not be explained by co-mingling of the impugned waste with third party material present on the site. Furthermore, the impugned

waste was quarantined and covered in early March 2017 to prevent cross contamination between the impugned waste and other soils

at the site.

26. The wastes outside Cell 4 are inert landfill. The facility has operated since 2003 within the confines of its EPA licence. The site

has never been found by the EPA to have operated outside the bounds of its remit and in the circumstances it was wholly

unnecessary to implement a protocol which had the potential to cause further damage to the site by undertaking unnecessary

interventions and testing in order to establish something which can be established from readily available existing data. There was no

need to take samples outside Cell 4 as these are historical wastes that have been capped and sealed, in some areas more than ten

years ago. The groundwater and leachates from these areas have been monitored since 2003 in accordance with the requirements of

the EPA. There was no need to establish a baseline status of areas of the site other than Cell 4 where the impugned waste is situate

by means of the inspection and sampling proposed by the defendants. A large bank of leachate and ground water monitoring data

dating back to 2003 exists and will be made available to the defendants.

27. The plaintiffs say that the waste in the rest of the site is completely isolated and separated from Cell 4 by constructed clay

barrier systems and therefore any baseline data required by the defendants need only be obtained from Cell 4 and not from samples

from the rest of the site. They criticised as incredible the suggestion that problems with the material in Cell 4 could be attributed to

cross contamination of the impugned waste from other wastes on the site. This is because of the nature of the contamination

revealed by the testing of material at Spencer Dock and the impugned waste, the levels of contamination and the fact that there are

no pathways permitting cross contamination of the impugned waste where it is isolated in Cell 4.

28. The plaintiffs argue that they did not agree to inspection and testing of the site in the manner now sought in the protocols

proposed by the defendants. They proceeded on a misapprehension, induced by the defendants, that the inspection sought was

confined to the material in Cell 4. Accordingly there was no argument before the High Court in relation to the scope of the order. They

say that what the defendants seek is excessively onerous and unduly burdensome to the plaintiffs. They will have to apply to the EPA

to approve the proposed works and this will inevitably lead to delay in the litigation. The works are invasive and will cause damage

and it may not be possible to reinstate the site in a satisfactory manner. They emphasise the fact that the plaintiffs are the

licensees-not the defendants-and that they are required to satisfy the EPA in relation to hazards on the site.

29. The fundamental objection is that the scope of the inspection and testing is not necessary based upon the justifications put

forward by the defendants. They point to the fact that the defendants have not said why 15 years of data collecting and recording

groundwater and leachate from the site is not sufficient to establish the baseline for the site. They say that this data is in fact better

than the data that could be obtained by the sampling proposed by the defendants. They also complain that the inspection is directed

towards a peripheral aspect of the case: post remediation the site will be monitored to ensure that there is no further environmental

contamination. In the event that further damage to the environment ensues, the defendants may be held liable for this further

damage and further remediation. They complain that inspection was sought before the defendants delivered their defences and

therefore before the issues in the case have been joined.

Discussion

30. It has been clear from the beginning that it would be necessary to obtain the consent of the EPA to the proposed works which

the defendants would carry out as part of the inspection and sampling of the site. It is recorded in the minutes of the meeting of the

17th May, 2017 which I have referred to above. Nothing has changed in the meantime save that the parties are now seven months

removed from that date. Therefore this ground of objection to the particular protocol proposed by the defendants is disingenuous and

without merit. There was no reason why the protocol proposed by the defendants could not have been submitted to the EPA to

ascertain whether as a matter of principle they had any objection to what was proposed. If the EPA indicated any objections, it could

have been possible to consider how to satisfy these objections while still affording the defendants the opportunity to inspect the site

in accordance with the court order.

31. Likewise, the argument that the inspection is premature is unpersuasive. The plaintiffs never raised the point when the issue of

inspection was raised before Mr Justice McGovern and I see no reason why it should now become a relevant criterion in assessing

which of two protocols for inspection should be authorised by the court.

32. The defendants have revised their proposed protocol with a view to accommodating concerns raised by the plaintiffs regarding

the integrity of the cap on the closed areas of the site. They are no longer proposing to proceed with 60 PID spike holes.

Furthermore, they now propose sampling by means of drill holes approximately 150 mm in diameter instead of trial pits. They also

propose back filling the drill holes with bentonite from the base up to the ground surface. Bentonite is an inert and impermeable

substance that expands after emplacement and, according to Mr. Marron, will provide a thorough impermeable seal at each of the

sample areas. The affidavits sworn in response by the plaintiffs do not engage with the revised protocol or consider the effectiveness

of back filling the drill holes with bentonite.

33. The court cannot attempt to reconcile the disputes on affidavits between the experts as to whether it is possible to reinstate the

site following the proposed inspection and sampling in a manner which will not lead to or give rise to a risk of further environmental

damage resulting from the inspection and reinstatement. Murphy J. was faced with precisely this difficulty in Wymes v. Crowley but

nonetheless he permitted a limited form of inspection to proceed.

34. In this regard it is useful to note that whichever protocol is adopted it will be scrutinised by the EPA as the EPA must approve the

works involved. If the EPA has concerns that environmental damage may be caused by the proposed inspection and testing it would

be open to the EPA to seek whatever appropriate variations or assurances are required or possibly to refuse some or all of the

proposed works if this is necessary. In effect it will act as a neutral arbiter with regard to the concerns the plaintiffs raise regarding

potential damage to the environment.

35. Furthermore, as Murphy J. pointed out in Ballymore Residential Ltd, a litigant has within reason, and subject to the rules of

evidence, the right to present his case as he considers appropriate so that even if the Court considers that the case might be

presented in a different manner, that of itself would not act as a bar to an order for inspection. It is not for the Court or for the

plaintiffs in this case to direct the information which the defendants may gather and the evidence which they may lead at the trial of

the action. It is to be borne in mind that in Bula v. Tara the Court was of the opinion that the plaintiff’s allegations were

extraordinarily improbable but the strength or weakness of the case a party wished to advance was not the relevant consideration for

a court determining whether or not to grant an order for inspection.

36. It follows that the plaintiffs’ arguments based on the alleged improbability of the defendants’ contentions or the fact that

alternative and possibly more useful evidence may be available to them (the data relating to groundwater and leachate monitoring

dating back to 2003) does not afford a reason to restrict inspection of the site in the manner advocated by the plaintiffs. Likewise

arguments about the necessity for the inspection of the site are largely not on point.

37. The question asked by Murphy J. in Ballymore Residential Ltd was: what was the least intrusive inspection which would satisfy

the plaintiff’s need and entitlement to obtain evidence necessary to permit it to pursue its claim, while interfering to the least possible

extent with the rights of others? The plaintiffs emphasised the necessity to obtain the evidence referred to in this question and urged

that no further inspection was required in this case because in effect there was alternative, better evidence available to the

defendants. However, this argument ignores the observation earlier in her judgment that a litigant has the right to present his case as

he considers appropriate even if the court considered that the case might be presented in a different manner, a fortiori, an opponent

seeking to resist an order for inspection. The effect of the plaintiffs’ arguments that the inspection is not necessary is that the

defendants would be obliged to rely upon alternative evidence rather than the evidence they wish to obtain by inspecting the site

and taking appropriate samples. In my opinion this submission is incorrect as a matter of principle and does not provide a reason to

refuse the defendants’ inspection upon the terms of the protocol they have proposed.

38. The only relevant issue raised by the plaintiffs in opposition to the defendants’ protocol for inspection is the potential for

environmental damage resulting from the proposed inspection and sampling. I am satisfied that the inspection to be carried out on the

site in accordance with the proposed protocol of the 2nd August, 2017 is in accordance with the principles I set out in the case of

James Elliot Construction Ltd. The revised protocol takes account of the concerns raised by the plaintiffs’ experts. They have

abandoned the proposed PID spike survey entirely and making trial pits. Instead they are seeking 22 drill holes of a maximum diameter

of 150 mm from a site which holds circa 2 million tons of waste soil and occupies an area of approximately 57 acres. In my opinion this

sampling amounts to the least intrusive inspection and sampling of the plaintiffs’ site which will satisfy the defendants’ requirements.

The back filling is to be with bentonite rather than soil which should secure an impermeable reinstatement. In addition to this, it is

important to note that all of the works must receive the prior approval of the EPA. I am therefore satisfied that while facilitating the

defendants’ entitlements, the plaintiffs’ interests as the owner of the site and the operator of the facility are interfered with to the

least possible extent.

Decision

39. I refuse to direct that inspection of the site be conducted in accordance s.6.0 of the report of Golder dated 4th July, 2017.

Instead I direct that it shall be in accordance with the proposal of Marron Environmental dated 2nd August, 2017 subject to any

variations, restrictions or amendments which the EPA may in its independent discretion impose if it authorises the carrying out of the

works. If there is any difficulty arising from the terms of the order or from the involvement of the EPA in approving the proposed

works, the parties shall have liberty to apply to the court.

40. In light of my judgment, it was not necessary to consider whether or not to vary the order of McGovern J. of the 15th May, 2017

and therefore I make no order in that regard.