The dispute arose from a private agreement where one party was to exchange a parcel of land for the construction of a house on another property owned by the initial landowners; after the house was built, occupied, and later became uninhabitable due to defects, the landowners sought rescission of the original contract after demanding reconstruction, which the builder agreed to only if the land sale was formalized. The appellate court refused to rescind the agreement, finding that the obligation to deliver a habitable house was executed since the structure was built, delivered, and occupied, while simultaneously holding the builder liable under contract law for the serious, undiscussed construction defects by awarding the landowners a sum for demolition and reconstruction plus damages, a decision the high court upheld, reasoning that condemning the builder for defects was compatible with finding the primary obligation (delivery of a constructed house) fulfilled, and that substituting a monetary obligation for reconstruction was permissible because the landowners opposed reconstruction and the builder had offered to pay a sum determined by the court.

Regeste Legislator

Généré par l'IA

ARTICLE 1792 DU CODE CIVIL, REJETTE LE POURVOI; Land Exchange and Construction Defects: Contract Rescission Versus Damages for Habitable Dwelling: The appellate court refused to rescind the agreement, finding that the obligation to deliver a habitable house was executed since the structure was built, delivered, and occupied, while simultaneously holding the builder liable under contract law for the serious, undiscussed construction defects by awarding the landowners a sum for demolition and reconstruction plus damages, a decision the high court upheld, reasoning that condemning the builder for defects was compatible with finding the primary obligation (delivery of a constructed house) fulfilled, and that substituting a monetary obligation for reconstruction was permissible because the landowners opposed reconstruction and the builder had offered to pay a sum determined by the court.

Mots-clés

Généré par l'IA
droit foncier contrat de construction vice de construction droit des obligations vente de gré à gré bien-fonds occupé

Dispositions légales citées

Généré par l'IA
Généré par l'IA

Questions juridiques clés extraites par Legislator

Généré par l'IA
article 1792 du code civil

Cited by the Court of Appeal as the basis for holding the contractor (Martinez) liable for construction defects.

REJETTE LE POURVOI

The final operative order which dismisses the appeal (pourvoi).

Vous souhaitez savoir comment cet arrêt s'applique à votre dossier ?

Analysez cette décision avec la législation fédérale, le droit cantonal, la doctrine et la jurisprudence subséquente dans Legislator AI.

Ouvrir dans Legislator →

Texte complet

SUR LE PREMIER MOYEN : ATTENDU QU'IL RESULTE DES ENONCIATIONS DE L'ARRET ATTAQUE QUE, PAR ACTE SOUS SEINGS PRIVES, EN DATE DU 17 NOVEMBRE 1956, LES EPOUX X... SE SONT ENGAGES A CEDER UN TERRAIN DE 6000 METRES CARRES A MARTINEZ, EN CONTRE PARTIE DE QUOI CE DERNIER S'ENGAGEAIT A CONSTRUIRE UNE MAISON DE TROIS PIECES SUR UN AUTRE TERRAIN APPARTENANT AUX EPOUX X... ;

QUE CEUX-CI ONT PRIS POSSESSION DE CET IMMEUBLE EN 1958 ET QUE, CERTAINES MALFACONS ETANT APPARUES EN 1960, MARTINEZ A PROCEDE A DES REPARATIONS ;

QUE, TOUTEFOIS, LES DESORDRES S'ETANT AGGRAVES, LA MAISON EST DEVENUE INHABITABLE ET LES EPOUX X... ONT, LE 6 JANVIER 1964, MIS EN DEMEURE MARTINEZ DE LA RECONSTRUIRE ;

QUE CELUI-CI A ACCEPTE MAIS A DEMANDE QUE SOIT ETABLI, A SON PROFIT, L'ACTE AUTHENTIQUE DE VENTE DU TERRAIN QUI LUI AVAIT ETE PROMIS ;

QU'A LA SUITE DES DIFFICULTES ALORS SURVENUES, MARTINEZ A ASSIGNE POUR OBTENIR LA REGULARISATION DE LA VENTE ET LES EPOUX X... ONT RECONVENTIONNELLEMENT DEMANDE LA RESILIATION DE LA CONVENTION DE 1956 ;

ATTENDU QU'IL EST FAIT GRIEF AUDIT ARRET D'AVOIR REFUSE DE PRONONCER CETTE RESILIATION, AU MOTIF QUE MARTINEZ AVAIT EXECUTE SON OBLIGATION ET D'AVOIR ALLOUE AUX EPOUX X... UNE SOMME DE 55000 FRANCS POUR PRIX DE DEMOLITION ET DE RECONSTRUCTION DE LA MAISON ET UNE SOMME DE 1000 FRANCS A TITRE DE DOMMAGES-INTERETS, ALORS, SELON LE POURVOI, QUE, D'UNE PART, LA COUR D'APPEL, QUI A CONSTATE QUE LA MAISON ETAIT INHABITABLE ET DEVAIT ETRE DEMOLIE, N'A PAS TIRE LES CONSEQUENCES QUI S'IMPOSAIENT DE SES CONSTATATIONS, QUE MARTINEZ, EN LIVRANT UNE MAISON ATTEINTE DE TELS VICES, A MANQUE A SES OBLIGATIONS CONTRACTUELLES DE DEBITEUR, CE QUI DEVAIT ENTRAINER LA RESOLUTION DU CONTRAT, QUE, D'AUTRE PART, L'ARRET NE POUVAIT, SANS SE CONTREDIRE, ENONCER QUE LE CONTRAT AVAIT ETE EXECUTE, TOUT EN CONSTATANT QUE LA MAISON DEVAIT ETRE DEMOLIE ET EN CONDAMNANT MARTINEZ A VERSER 55000 FRANCS POUR PRIX DE LA MAISON ET 1000 FRANCS DE DOMMAGES-INTERETS, UNE TELLE CONDAMNATION SUPPOSANT NECESSAIREMENT UNE FAUTE DU DEBITEUR ET QU'ENFIN, LA COUR D'APPEL NE POUVAIT INFIRMER LE JUGEMENT SANS S'EXPLIQUER SUR L'ATTITUDE FAUTIVE ET LA MAUVAISE VOLONTE DE MARTINEZ RETENUES PAR LES PREMIERS JUGES COMME CAUSE DE LA RESOLUTION ;

MAIS ATTENDU, D'ABORD, QUE LA COUR D'APPEL, QUI ETAIT EN DROIT DE DONNER DES FAITS QUI LUI ETAIENT SOUMIS, UNE INTERPRETATION DIFFERENTE DE CELLE DES PREMIERS JUGES ET QUI RAPPELLE QUE LES EPOUX X... ONT HABITE L'IMMEUBLE PENDANT PLUSIEURS ANNEES, DECLARE QUE LE PRIX CONVENU EN CONTRE-PARTIE DU TERRAIN CONSISTAIT DANS LA LIVRAISON D'UNE MAISON D'HABITATION QUI A ETE EFFECTIVEMENT CONSTRUITE, CONFORMEMENT AUX PLANS DRESSES PAR L'ARCHITECTE AUQUEL ONT EU RECOURS LES EPOUX X..., TERMINEE ET LIVREE A CES DERNIERS QUI EN ONT PRIS POSSESSION SANS AUCUNE RESTRICTION NI RESERVE, DE SORTE QUE LES ACCORDS ONT ETE PLEINEMENT ET DEFINITIVEMENT EXECUTES PAR LES PARTIES ;

QUE, D'AUTRE PART, EN PRONONCANT CONTRE MARTINEZ CONDAMNATION AU PAYEMENT DES SOMMES CI-DESSUS RAPPELEES, LA COUR D'APPEL NE S'EST PAS CONTREDITE DES LORS QU'ELLE ENONCAIT QUE LES VICES DE CONSTRUCTION, NON DISCUTES, ETAIENT DE NATURE A ENGAGER LA RESPONSABILITE DE L'ENTREPRENEUR PAR APPLICATION DE L'ARTICLE 1792 DU CODE CIVIL ;

QUE LE PREMIER MOYEN N'EST DONC PAS FONDE ;

SUR LE SECOND MOYEN : ATTENDU QU'IL EST ENCORE REPROCHE A LA COUR D'APPEL D'AVOIR DENATURE LES ELEMENTTS DU LITIGE, ALORS QUE, LIEE PAR LA CONVENTION QUI LUI ETAIT SOUMISE, ELLE NE OOUVAIT SUBSTITUER UNE OBLIGATION DE SOMME D'ARGENT A UNE OBLIGATION DE FAIRE ;

MAIS ATTENDU QUE MARTINEZ OFFRAIT, DANS SES CONCLUSIONS D'APPEL, DE PAYER LA SOMME QUI SERAIT ARBITREE PAR LA COUR, AUX EPOUX X... QUI S'OPPOSAIENT A LA RECONSTRUCTION DE L'IMMEUBLE ;

QUE CEUX-CI NE DISCUTAIENT EN RIEN CETTE PROPOSITION, SE BORNANT A SOLLICITER LA CONFIRMATION DU JUGEMENT ET QU'EN CONSEQUENCE LES JUGES DU SECOND DEGRE, QUI SE TROUVAIENT SAISIS DE LA QUESTION, N'ONT PAS DENATURE LES ELEMENTS DU LITIGE EN FIXANT A 55000 FRANCS LA SOMME QUE MARTINEZ DEVRAIT VERSER POUR OBTENIR DES EPOUX JULIANO Y... DE LA VENTE ;

QUE LE SECOND MOYEN DOIT EGALEMENT ETRE REJETE ;

PAR CES MOTIFS : REJETTE LE POURVOI FORME CONTRE L'ARRET RENDU LE 18 DECEMBRE 1968 PAR LA COUR D'APPEL D'AIX-EN-PROVENCE ;