Construction of a new power plant on the opposite bank constitutes a new facility requiring a water right permit under the Water Act.
Legislator summary
AI generatedThe Supreme Administrative Court ruled that constructing a new power plant on the opposite bank of a river, doubling the flow volume, constitutes a new facility under the Water Act. The court determined that such a significant alteration to the watercourse and infrastructure falls within the scope of the Water Act's provisions for new facilities. Consequently, a water right permit is mandatory for this type of construction, allowing authorities to impose conditions such as minimum flow requirements.
Legislator headnote
AI generatedWater Act 3rd Chapter 1st Section 2nd Paragraph; Water Act 3rd Chapter 2nd Section 1st Paragraph: Construction of a new power plant on the opposite bank of a river, significantly altering the flow volume, constitutes a new facility requiring a water right permit.
Keywords
AI generatedCited Legislation
AI generatedRelated Decisions
AI generatedFull text
Voimalaitoksen uusiminen siten, että uusi voimalaitos rakennettiin kosken toiselle rannalle vanhaan kuivuneeseen myllyuomaan noin 20 metriä pääuomasta pohjoiseen, sekä niin että alakanavaa ruopattiin ja rakennusvirtaama kaksinkertaistui 4 kuutiometristä 8 kuutiometriin, oli VL 3 luvun 1 §:n 2 momentissa tarkoitettua uuden voimalaitoksen rakentamista, johon on vesilain 3 luvun 2 §:n 1 momentin mukaan haettava vesioikeuden lupa. Lupaan voitiin tarvittaessa ottaa määräykset muun muassa vähimmäisjuoksutusvelvollisuudesta.