Appeal Against Public Procurement Award: Window Contract Technical Compliance and Right to be Heard
Legislator-Zusammenfassung
KI-generiertA party appealed the award of a contract for wooden/metal windows in a public procurement procedure, primarily arguing a violation of the right to be heard due to insufficient initial justification for the award and non-compliance with technical requirements by the successful bidder. The court determined that any initial lack of justification was cured by subsequent clarification, and regarding the technical specifications for weather protection and composite systems, the awarding authority did not exceed its discretionary power in evaluating the competing offer, thus rendering a judicial expert opinion unnecessary; furthermore, non-adherence to all technical requirements does not automatically mandate exclusion from the procedure, leading to the rejection of the appeal.
Legislator-Regeste
AmtlichSubmission | Submissionsverfahren; Beschwerde gegen Zuschlag für Fenster aus Holz/Metall. Eine Verletzung des rechtlichen Gehörs, die aus dem ursprünglichen Fehlen einer ausreichenden Begründung des Zuschlags erwachsen ist, gilt als geheilt und ist für den Verfahrensausgang nicht von Bedeutung (E. 4.4). Musskriterien, technische Anforderungen und Eignungskriterien sind keine identischen Begriffe. Im Zentrum des vorliegenden Beschwerdeverfahrens steht die Rüge der Einhaltung der technischen Anforderungen an die Fenster aus Holz/Metall (E. 5.5, 5.7). Die Vergabestelle hat namentlich bezüglich Witterungsschutz und Verbundsystem bei der Beurteilung des Angebots der Mitbeteiligten ihren Ermessensspielraum nicht überschritten. Der Beizug eines gerichtlichen Gutachtens erübrigt sich (E. 6.3, 7.5 ff., 8 ff.). Dies gilt umso mehr, da nicht zwingend ein Verfahrensausschluss erfolgen muss, wenn einzelne technische Anforderungen nicht erfüllt werden (E. 14.3). Abweisung.
Schlagwörter
KI-generiertZitierte Gesetzesbestimmungen
KI-generiertVerwandte Entscheide
KI-generiertZentrale Rechtsfragen, extrahiert von Legislator
KI-generiertThis provision is cited in the context of the substantive review concerning the assessment of technical requirements by the awarding authority.
This provision is cited in the context of the substantive review concerning the assessment of technical requirements by the awarding authority.
This provision is cited, likely related to the assessment criteria or award decision.
This provision is cited, likely related to the assessment criteria or award decision.
This provision is cited, likely related to the grounds for exclusion or evaluation.
This provision is cited, likely related to the transparency or procedure of the award process.
This provision is cited, likely related to the procedural aspects of the award process.
This provision is cited, likely concerning the basic requirements or procedures.
This provision is cited, likely concerning the basic requirements or procedures.
This article, typically governing court costs, is assumed to be cited in the dispositive as the appeal was dismissed (implied by the final statement 'Abweisung').
Volltext
Verwaltungsgericht des Kantons Zürich: VB.2024.00769
--- · --- · --- · --- · --- · [Standard Suche](/findinfo/xhtmltemplates/standard.htm) · [Erweiterte Suche](/findinfo/xhtmltemplates/advanced.htm) · [Hilfe](/findinfo/help/index.htm)
[Druckansicht](/cgi-bin/nph-omniscgi.exe?OmnisPlatform=WINDOWS&WebServerUrl=&WebServerScript=/cgi-bin/nph-omniscgi.exe&OmnisLibrary=JURISWEB&OmnisClass=rtFindinfoWebHtmlService&OmnisServer=JURISWEB,127.0.0.1:7000&Parametername=WWW&Schema=ZH_VG_WEB&Source=&Aufruf=getDocument&cSprache=GER&nF30_KEY=225115&W10_KEY=13317002&nTrefferzeile=1&Template=standard/results/printviewdocument.fiw)
--- · --- · --- · Geschäftsnummer: · VB.2024.00769 · Entscheidart und -datum: · Endentscheid vom 30.06.2025 · Spruchkörper: · 1. Abteilung/1. Kammer · Weiterzug: · Dieser Entscheid ist rechtskräftig. · Rechtsgebiet: · Submissionsrecht · Betreff: · Submission · Submissionsverfahren; Beschwerde gegen Zuschlag für Fenster aus Holz/Metall. Eine Verletzung des rechtlichen Gehörs, die aus dem ursprünglichen Fehlen einer ausreichenden Begründung des Zuschlags erwachsen ist, gilt als geheilt und ist für den Verfahrensausgang nicht von Bedeutung (E. 4.4).
Musskriterien, technische Anforderungen und Eignungskriterien sind keine identischen Begriffe. Im Zentrum des vorliegenden Beschwerdeverfahrens steht die Rüge der Einhaltung der technischen Anforderungen an die Fenster aus Holz/Metall (E. 5.5, 5.7). Die Vergabestelle hat namentlich bezüglich Witterungsschutz und Verbundsystem bei der Beurteilung des Angebots der Mitbeteiligten ihren Ermessensspielraum nicht überschritten. Der Beizug eines gerichtlichen Gutachtens erübrigt sich (E. 6.3, 7.5 ff., 8 ff.). Dies gilt umso mehr, da nicht zwingend ein Verfahrensausschluss erfolgen muss, wenn einzelne technische Anforderungen nicht erfüllt werden (E. 14.3).
Abweisung. · --- · Stichworte: · AUSSCHLUSS AUS DEM VERFAHREN EIGNUNGSKRITERIEN ERMESSENSSPIELRAUM GUTACHTEN MUSSKRITERIEN RECHTLICHES GEHÖR TECHNISCHE ANFORDERUNGEN · Rechtsnormen: · Art. 16 Abs. I lit. a IVöB Art. 16 Abs. II IVöB Art. 27 IVöB Art. 29 IVöB Art. 44 Abs. I lit. a IVöB Art. 51 Abs. II IVöB Art. 51 Abs. III lit. c IVöB Art. 56 Abs. III IVöB Art. 56 Abs. IV IVöB · Publikationen: · - keine - · Gewichtung: (1 von hoher / 5 von geringer Bedeutung) · Gewichtung: 3