Antenna Permit Appeal: Standing, Data Requirements, and Location Dependency Assessment
Legislator-Zusammenfassung
KI-generiertThe court addressed an appeal concerning a building permit for a mobile radio antenna installation, specifically addressing the legitimacy of an interest group's complaint, the required content of location data sheets for adaptive antennas, and the assessment of location dependency. The court dismissed the appeal regarding the standing of the interest group, but ruled that the location data sheets must concretely state the correction factor and maximum transmission power, and that simplified antenna diagrams are insufficient, holding that electronic antenna diagrams are subject to record-keeping and inspection rights. Furthermore, the court found that coverage maps based on publicly known deficiencies do not sufficiently support a determination of location dependency, leading to the approval of parts of the complaint, rejection of others, and remittal for further assessment.
Legislator-Regeste
AmtlichBaubewilligung für Mobilfunk-Antennenanlage | [Erforderliche Baugesuchsunterlagen für adaptive Mobilfunkantennen] Keine Beschwerdelegitimation für egoistische Verbandsbeschwerde (E. 2). Korrekturfaktor sowie maximale Sendeleistung müssen im Standortdatenblatt konkret ausgewiesen werden (E. 5). Umhüllende Antennendiagramme sind im Standortdatenblatt nicht genügend detailliert abgedruckt; Anforderungen; Aktenführungspflicht und Akteneinsichtsrecht gelten auch für elektronische Antennendiagramme (E. 6). Gestützt auf offenkundig mangelhafte Mobilfunkabdeckungskarten lässt sich die Standortgebundenheit (Art. 24 lit. a RPG) nicht beurteilen; Anforderungen (E. 7). Gutheissung und Rückweisung. Im Übrigen Abweisung.
Schlagwörter
KI-generiertZitierte Gesetzesbestimmungen
KI-generiertVerwandte Entscheide
KI-generiertZentrale Rechtsfragen, extrahiert von Legislator
KI-generiertThe court addressed the requirement of site specificity concerning the mobile radio installation.
The court based its decision regarding the rejection of the appeal in part on this provision concerning building regulations.
This provision was used in relation to the substantive assessment of the appeal regarding the permit conditions.
The court implicitly ruled on the conditions for issuing the permit under this article when discussing the required documentation.
This provision was cited regarding the examination of the location requirements.
This provision was cited regarding the examination of the location requirements.
This provision was used to reject the egoistic association appeal for lack of standing (Beschwerdelegitimation).
This procedural rule was applied in the decision regarding the costs.
This provision governs the allocation of costs, which was addressed in the final orders.
Volltext
Verwaltungsgericht des Kantons Zürich: VB.2024.00753
--- · --- · --- · --- · --- · [Standard Suche](/findinfo/xhtmltemplates/standard.htm) · [Erweiterte Suche](/findinfo/xhtmltemplates/advanced.htm) · [Hilfe](/findinfo/help/index.htm)
[Druckansicht](/cgi-bin/nph-omniscgi.exe?OmnisPlatform=WINDOWS&WebServerUrl=&WebServerScript=/cgi-bin/nph-omniscgi.exe&OmnisLibrary=JURISWEB&OmnisClass=rtFindinfoWebHtmlService&OmnisServer=JURISWEB,127.0.0.1:7000&Parametername=WWW&Schema=ZH_VG_WEB&Source=&Aufruf=getDocument&cSprache=GER&nF30_KEY=224981&W10_KEY=13317003&nTrefferzeile=1&Template=standard/results/printviewdocument.fiw)
--- · --- · --- · Geschäftsnummer: · VB.2024.00753 · Entscheidart und -datum: · Endentscheid vom 22.05.2025 · Spruchkörper: · 3. Abteilung/3. Kammer · Weiterzug: · Eine Beschwerde in öffentlich-rechtlichen Angelegenheiten ist am Bundesgericht noch hängig. · Rechtsgebiet: · Raumplanungs-, Bau- und Umweltrecht · Betreff: · Baubewilligung für Mobilfunk-Antennenanlage · [Erforderliche Baugesuchsunterlagen für adaptive Mobilfunkantennen] Keine Beschwerdelegitimation für egoistische Verbandsbeschwerde (E. 2). Korrekturfaktor sowie maximale Sendeleistung müssen im Standortdatenblatt konkret ausgewiesen werden (E. 5).
Umhüllende Antennendiagramme sind im Standortdatenblatt nicht genügend detailliert abgedruckt; Anforderungen; Aktenführungspflicht und Akteneinsichtsrecht gelten auch für elektronische Antennendiagramme (E. 6). Gestützt auf offenkundig mangelhafte Mobilfunkabdeckungskarten lässt sich die Standortgebundenheit (Art. 24 lit. a RPG) nicht beurteilen; Anforderungen (E. 7). Gutheissung und Rückweisung. Im Übrigen Abweisung. · --- · Stichworte: · ABDECKUNGSKARTEN ADAPTIVE ANTENNE AKTENEINSICHTSRECHT AKTENFÜHRUNGSPFLICHT ANTENNENDIAGRAMME AUSNAHMEBEWILLIGUNGEN BAUEN AUSSERHALB DER BAUZONEN BAUGESUCHSUNTERLAGEN BESCHWERDELEGITIMATION EGOISTISCHE VERBANDSBESCHWERDE ELEKTRONISCHE AKTEN FREQUENZ KORREKTURFAKTOR MOBILFUNK MOBILFUNKANLAGE MOBILFUNKANTENNE RECHTLICHES GEHÖR RÜCKWEISUNG RÜCKWEISUNGSENTSCHEID SENDELEISTUNG STANDORTDATENBLATT STANDORTGEBUNDENHEIT · Rechtsnormen:
· Art. 93 Abs. I lit. a BGG Art. 93 Abs. I lit. b BGG Art. 29 Abs. II BV Art. 74 Abs. I BV Art. 74 Abs. II BV Art. 3 Abs. III NISV Art. 4 Abs. I NISV Art. 11 Abs. I NISV Art. 11 Abs. II NISV Art. 11 Abs. II lit. a NISV Art. 13 Abs. I NISV § 310 Abs. I PBG § 313 Abs. I PBG § 314 Abs. IV PBG § 338a PBG Art. 24 lit. a RPG Art. 1 Abs. I USG Art. 7 Abs. I USG Art. 11 USG Art. 11 Abs. III USG Art. 12 Abs. I lit. a USG Art. 12 Abs. II USG Art. 13 Abs. I USG Art. 13 Abs. II USG § 7 VRG § 7 Abs. I VRG § 8 VRG § 8 Abs. I VRG § 9 Abs. I VRG § 13 Abs. II VRG § 17 Abs. II VRG § 21 Abs. I VRG § 26a Abs. II VRG § 52 Abs. II VRG § 57 VRG § 65a Abs. II VRG Art. 60 ZGB · Publikationen:
· - keine - · Gewichtung: (1 von hoher / 5 von geringer Bedeutung) · Gewichtung: 1