Legislator Jurisprudence & Législation
A/485/97 • CJ GE A/485/97 Généré par l'IA

Unauthorized Construction Removal Order Confirmed

Numéro de cause A/485/97
Autorité / Tribunal
Juridiction Suisse · Canton de Genève (CH-GE)
Date de la décision
Issue du litige Rejeté (Dismissed)

Synthèse Legislator

Généré par l'IA

The court confirmed an order for the removal of a palisade and a chicken coop, reasoning that these structures, built without the required authorization, constituted unauthorized constructions falling under the relevant building regulations concerning walls and similar structures.

Regeste Legislator

Généré par l'IA

Unauthorized Construction Removal Order Confirmed: The court confirmed an order for the removal of a palisade and a chicken coop, reasoning that these structures, built without the required authorization, constituted unauthorized constructions falling under the relevant building regulations concerning walls and similar structures.

Mots-clés

Généré par l'IA
construction illicite éloignement réglementation de la construction ordre de démolition détournement d'objets sous main de justice expulsion d'un logement
Généré par l'IA

Vous souhaitez savoir comment cet arrêt s'applique à votre dossier ?

Analysez cette décision avec la législation fédérale, le droit cantonal, la doctrine et la jurisprudence subséquente dans Legislator AI.

Ouvrir dans Legislator →

Texte complet

A/485/97

### [[pjdoc 11073]](/apps/decis/fr/ata/show/1880660) du 05.08.1997

Descripteurs : CONSTRUCTION ET INSTALLATION; MUR; POULAILLER

Normes : LCI.129

Résumé : Confirmation d'un ordre d'évacuation d'une palissade et d'un poulailler.

Pas de document HTML